Production schedule

Reno Integration Center
Schedule as of
Wed Jun 3 06:00
Published
Sep 29, 12:59
Page refresh
Every 5 minutes
Integrity checks
9 of 9 passed

298 open orders are scheduled to finish by Jul 31. 41 will finish late and 51 more finish inside one shift of their due date.

86.2%
On-time orders
257 of 298 open orders
−5.5 pts since the last run
85.4%
Weighted on-time
Orders weighted by customer tier
−3.8 pts since the last run
41
Late orders
31 order-days late in total
+16 since the last run
SMT81%
Constraint
Surface mount, where late orders wait longest
Busiest resource SMT-04 at 96%
77%
Utilization
All resources, next 14 days
−0.6 pts since the last run
6.3%
Changeover share
Of busy time spent on changeovers
39
Orders in progress
30 open orders still waiting on material
57%
Schedule stability
Next 7 days' operations held within 4 h of the last run
46 of 198 changed resource

Needs attention

The most urgent exceptions, worst first. Each links to the order or resource.

Scenario: Saturday overtime on SMT and PK

Adds 144 open hours over the next two weeks and cuts late orders from 41 to 25 and weighted lateness by 43%. To adopt it, set allow_overtime to Y and list SMT, PK in overtime_work_centers.

  1. 36 late orders queue at SMT surface mount
    9 are customer orders. Worst is WO-10332 (Silver), 4.8 d late.
    26 of them could finish sooner by splitting the job across lines with idle gaps; see each order.
  2. WO-10255 is 2.7 d late waiting for material
    SoC module from Kestrel Silicon arrives Sun Jun 7 06:00.
    Expedite the SoC module to arrive by Thu Jun 4 13:25. Everything else fits before the due date.
  3. 2 late orders queue at TB burn-in and test
    All are stock replenishment. Worst is WO-10281 (Stock), 18 h late.
    See each order for the fix; the scenario above shows what overtime buys.
  4. 1 late order queues at PK pack-out
    All are stock replenishment. Worst is WO-10152 (Stock), 0.9 h late.
    See each order for the fix; the scenario above shows what overtime buys.
  5. SMT-05 is down until Thu Jun 4 12:00
    Placement head failure, awaiting spare
    Work is already scheduled around it.
  6. SMT operators leave free resources idle for 49 hours in the next week
    Tightest: night shift on Thu Jun 4, 7.0 h with a free resource and nobody to run it
    Cross-train or add headcount on that shift.
  7. Test technicians leave free resources idle for 81 hours in the next week
    Tightest: day shift on Sat Jun 6, 8.5 h with a free resource and nobody to run it
    Cross-train or add headcount on that shift.

All 77 exceptions

On-time by customer tier

Share of open orders projected to finish by their due date. The black tick is the service target.

Platinum
83%5 of 6, target 98%
Gold
75%6 of 8, target 95%
Silver
78%7 of 9, target 92%
Internal
100%3 of 3, target 90%
Standard
50%4 of 8, target 90%
Stock
88%232 of 264, target 90%

Work center load by week

Booked hours as a share of open hours, after shifts, holidays and planned downtime. This week counts from the as-of time. Amber is above 90%, red is over capacity.

Work centerThis weekWeek of Jun 8Week of Jun 15Week of Jun 22Week of Jun 29Week of Jul 6Resources
SMT Surface mount83%80%81%79%86%83%7
SUB Sub-assembly72%85%78%88%76%92%3
FA Final assembly61%91%80%88%93%94%6
TB Burn-in and test85%86%87%85%79%84%4
CFG Imaging and configuration19%10%16%37%47%53%2
PK Pack-out70%75%84%80%88%88%2

Orders due and finishing each week

Grey is what falls due that week; teal finishes on time and red finishes late.

Jun 1
Jun 8
Jun 15
Jun 22
Jun 29
Jul 6
Jul 13
Jul 20
DueFinishes on timeFinishes late

How close to the due date orders finish

Open orders by projected finish against their due date.

43
163
51
30
10
1
3+ days early
8 h to 3 days early
Within 8 h
Up to 1 day late
1 to 3 days late
3+ days late

Schedule board

Every operation on every resource. Hatching at the start of a bar is changeover; grey is closed time and red hatching is planned downtime. Hover a bar for detail and click it to open the order.

Tracing WO-10329400 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Mon Jun 1 15:00, finishes Tue Jun 2 06:55CompleteOrder detailsClear

Tracing WO-10259490 × 22" Touch Monitor, grayDue Wed Jun 3 17:00, finishes Wed Jun 3 11:20At riskOrder detailsClear

Tracing WO-10136470 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jun 8 17:00, finishes Mon Jun 8 15:00At riskOrder detailsClear

Tracing WO-10197245 × Chromebook 11", 4GB / 64GBDue Tue Jun 2 17:00, finishes Mon Jun 1 14:10CompleteOrder detailsClear

Tracing WO-10203475 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jun 10 17:00, finishes Wed Jun 10 15:00At riskOrder detailsClear

Tracing WO-10317150 × All-in-One 24", 16GB / 512GB, grayDue Tue Jun 2 15:00, finishes Tue Jun 2 14:20CompleteOrder detailsClear

Tracing WO-10005120 × Thin Client, 4GB / 32GB, grayDue Tue Jun 2 17:00, finishes Mon Jun 1 09:15CompleteOrder detailsClear

Tracing WO-1009295 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jun 2 17:00, finishes Mon Jun 1 06:15CompleteOrder detailsClear

Tracing WO-10121355 × 27" QHD Monitor, 165HzDue Wed Jun 3 17:00, finishes Tue Jun 2 08:35CompleteOrder detailsClear

Tracing WO-10155445 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 4 17:00, finishes Wed Jun 3 10:45On timeOrder detailsClear

Tracing WO-10239320 × 1TB NVMe SSD, grayDue Tue Jun 2 17:00, finishes Mon Jun 1 10:50CompleteOrder detailsClear

Tracing WO-10034170 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jun 3 17:00, finishes Mon Jun 1 17:20CompleteOrder detailsClear

Tracing WO-1032360 × Mini PC, 8-core, 16GB / 512GBDue Wed Jun 3 15:00, finishes Mon Jun 1 13:10CompleteOrder detailsClear

Tracing WO-10044370 × 24" FHD Monitor, IPSDue Fri Jun 5 17:00, finishes Wed Jun 3 22:35On timeOrder detailsClear

Tracing WO-1007720 × Thin Client, 4GB / 32GB, grayDue Wed Jun 3 17:00, finishes Mon Jun 1 13:55CompleteOrder detailsClear

Tracing WO-10087200 × 12" Pro Tablet, 256GBDue Fri Jun 5 17:00, finishes Wed Jun 3 16:05On timeOrder detailsClear

Tracing WO-10131160 × 8" Rugged Tablet, 64GB, grayDue Fri Jun 5 17:00, finishes Wed Jun 3 19:25On timeOrder detailsClear

Tracing WO-10188340 × KVM Switch, 2-port 4K, grayDue Fri Jun 5 17:00, finishes Thu Jun 4 06:30On timeOrder detailsClear

Tracing WO-10220160 × 8-Port Gigabit SwitchDue Wed Jun 3 17:00, finishes Tue Jun 2 13:00CompleteOrder detailsClear

Tracing WO-10230110 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jun 5 17:00, finishes Thu Jun 4 08:40On timeOrder detailsClear

Tracing WO-10283130 × USB-C Travel Hub, 7-in-1Due Thu Jun 4 17:00, finishes Wed Jun 3 12:25On timeOrder detailsClear

Tracing WO-10058100 × 128GB USB Flash Drive, 10-packDue Thu Jun 4 17:00, finishes Mon Jun 1 16:10CompleteOrder detailsClear

Tracing WO-1017870 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jun 3 17:00, finishes Mon Jun 1 15:10CompleteOrder detailsClear

Tracing WO-10302330 × Mechanical Keyboard, TKLDue Wed Jun 3 17:00, finishes Tue Jun 2 16:55CompleteOrder detailsClear

Tracing WO-10015150 × 4-Bay NAS Enclosure, grayDue Thu Jun 4 17:00, finishes Tue Jun 2 09:10CompleteOrder detailsClear

Tracing WO-10102310 × 1080p Webcam with micDue Thu Jun 4 17:00, finishes Tue Jun 2 19:55CompleteOrder detailsClear

Tracing WO-10156390 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 17:20On timeOrder detailsClear

Tracing WO-10255350 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jun 12 17:00, finishes Mon Jun 15 09:35LateOrder detailsClear

Tracing WO-1031580 × 22" Touch MonitorDue Fri Jun 5 15:00, finishes Wed Jun 3 13:40On timeOrder detailsClear

Tracing WO-10049190 × 27" 4K Monitor, USB-C, refreshDue Mon Jun 8 17:00, finishes Thu Jun 4 13:55On timeOrder detailsClear

Tracing WO-10073415 × 4-Bay NAS EnclosureDue Tue Jun 9 17:00, finishes Fri Jun 5 20:10On timeOrder detailsClear

Tracing WO-10083155 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 08:25On timeOrder detailsClear

Tracing WO-10208485 × 4-Bay NAS Enclosure, refreshDue Mon Jun 8 17:00, finishes Thu Jun 4 20:00On timeOrder detailsClear

Tracing WO-10245415 × Thunderbolt Dock, 4 portsDue Wed Jun 10 17:00, finishes Mon Jun 8 21:50On timeOrder detailsClear

Tracing WO-1031080 × Mini PC, 8-core, 16GB / 512GB, refreshDue Tue Jun 9 15:00, finishes Fri Jun 5 07:25On timeOrder detailsClear

Tracing WO-10001390 × Ergonomic Mouse, wireless, grayDue Mon Jun 8 17:00, finishes Thu Jun 4 09:00On timeOrder detailsClear

Tracing WO-10030245 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jun 9 17:00, finishes Fri Jun 5 16:50On timeOrder detailsClear

Tracing WO-10040540 × KVM Switch, 2-port 4KDue Thu Jun 11 17:00, finishes Tue Jun 9 10:40On timeOrder detailsClear

Tracing WO-10117100 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jun 9 17:00, finishes Fri Jun 5 21:20On timeOrder detailsClear

Tracing WO-1017485 × 8" Rugged Tablet, 64GBDue Tue Jun 9 17:00, finishes Mon Jun 8 08:10On timeOrder detailsClear

Tracing WO-10193120 × 10" Tablet, 64GBDue Mon Jun 8 17:00, finishes Thu Jun 4 15:50On timeOrder detailsClear

Tracing WO-10216230 × USB-C Travel Hub, 7-in-1, grayDue Tue Jun 9 17:00, finishes Mon Jun 8 11:25On timeOrder detailsClear

Tracing WO-1023530 × Tower Workstation, 32GB / 1TBDue Mon Jun 8 17:00, finishes Thu Jun 4 21:05On timeOrder detailsClear

Tracing WO-1026930 × Thin Client, 4GB / 32GBDue Mon Jun 8 17:00, finishes Thu Jun 4 22:10On timeOrder detailsClear

Tracing WO-1032640 × 14" Laptop, 8-core, 16GB / 512GBDue Tue Jun 9 15:00, finishes Thu Jun 4 16:45On timeOrder detailsClear

Tracing WO-10330150 × 27" QHD Monitor, 165Hz, refreshDue Tue Jun 9 15:00, finishes Fri Jun 5 13:00On timeOrder detailsClear

Tracing WO-1002185 × Mini PC, 8-core, 16GB / 512GBDue Fri Jun 12 17:00, finishes Tue Jun 9 22:00On timeOrder detailsClear

Tracing WO-10069365 × Mesh Wi-Fi Kit, 3-packDue Mon Jun 15 17:00, finishes Thu Jun 11 13:20On timeOrder detailsClear

Tracing WO-10141430 × 4K Conference CameraDue Tue Jun 9 17:00, finishes Mon Jun 8 06:35On timeOrder detailsClear

Tracing WO-1022695 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 16:10On timeOrder detailsClear

Tracing WO-10279500 × Ergonomic Mouse, wirelessDue Wed Jun 10 17:00, finishes Mon Jun 8 22:15On timeOrder detailsClear

Tracing WO-10289355 × 27" 4K Monitor, USB-CDue Fri Jun 12 17:00, finishes Wed Jun 10 20:40On timeOrder detailsClear

Tracing WO-1001145 × All-in-One 24", 16GB / 512GBDue Wed Jun 10 17:00, finishes Mon Jun 8 14:40On timeOrder detailsClear

Tracing WO-10054130 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jun 10 17:00, finishes Mon Jun 8 15:55On timeOrder detailsClear

Tracing WO-10150380 × 2TB Portable SSDDue Wed Jun 10 17:00, finishes Mon Jun 8 17:50On timeOrder detailsClear

Tracing WO-10260540 × 22" Touch Monitor, grayDue Wed Jun 17 17:00, finishes Wed Jun 17 08:55On timeOrder detailsClear

Tracing WO-10298140 × USB-C Dock, 100W, dual displayDue Tue Jun 9 17:00, finishes Mon Jun 8 12:55On timeOrder detailsClear

Tracing WO-1034130 × 15" Laptop, 12-core, 32GB / 1TBDue Fri Jun 12 12:00, finishes Tue Jun 9 18:10On timeOrder detailsClear

Tracing WO-10113140 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jun 15 17:00, finishes Thu Jun 11 17:45On timeOrder detailsClear

Tracing WO-10127155 × 24-Port PoE Switch, managed, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 13:30On timeOrder detailsClear

Tracing WO-10198240 × Chromebook 11", 4GB / 64GBDue Tue Jun 16 17:00, finishes Mon Jun 15 14:20On timeOrder detailsClear

Tracing WO-10265125 × 24-Port PoE Switch, managedDue Thu Jun 11 17:00, finishes Tue Jun 9 18:25On timeOrder detailsClear

Tracing WO-10006155 × Thin Client, 4GB / 32GB, grayDue Tue Jun 16 17:00, finishes Mon Jun 15 10:35On timeOrder detailsClear

Tracing WO-10064230 × 1TB NVMe SSD, refreshDue Fri Jun 12 17:00, finishes Tue Jun 9 20:50On timeOrder detailsClear

Tracing WO-1009820 × Wi-Fi 6E RouterDue Wed Jun 10 17:00, finishes Mon Jun 8 16:30On timeOrder detailsClear

Tracing WO-10108100 × Wi-Fi 6 Access Point, ceilingDue Fri Jun 12 17:00, finishes Wed Jun 10 08:10On timeOrder detailsClear

Tracing WO-10122340 × 27" QHD Monitor, 165HzDue Wed Jun 17 17:00, finishes Tue Jun 16 11:00On timeOrder detailsClear

Tracing WO-10137505 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jun 22 17:00, finishes Mon Jun 22 15:45At riskOrder detailsClear

Tracing WO-1018425 × 8" Rugged Tablet, 64GB, grayDue Thu Jun 11 17:00, finishes Wed Jun 10 06:40On timeOrder detailsClear

Tracing WO-10204475 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jun 24 17:00, finishes Wed Jun 24 16:45At riskOrder detailsClear

Tracing WO-10294265 × 34" Ultrawide Monitor, curvedDue Mon Jun 15 17:00, finishes Fri Jun 12 19:45On timeOrder detailsClear

Tracing WO-10339120 × Thin Client, 4GB / 32GB, grayDue Wed Jun 17 15:00, finishes Mon Jun 15 19:10On timeOrder detailsClear

Tracing WO-1016580 × 34" Ultrawide Monitor, curved, grayDue Fri Jun 12 17:00, finishes Wed Jun 10 11:15On timeOrder detailsClear

Tracing WO-10209435 × 4-Bay NAS Enclosure, refreshDue Mon Jun 15 17:00, finishes Fri Jun 12 12:25On timeOrder detailsClear

Tracing WO-10026450 × 1TB NVMe SSDDue Mon Jun 15 17:00, finishes Thu Jun 11 06:45On timeOrder detailsClear

Tracing WO-10240300 × 1TB NVMe SSD, grayDue Tue Jun 16 17:00, finishes Mon Jun 15 16:25On timeOrder detailsClear

Tracing WO-10035195 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jun 17 17:00, finishes Mon Jun 15 20:35On timeOrder detailsClear

Tracing WO-10142400 × 4K Conference CameraDue Tue Jun 16 17:00, finishes Mon Jun 15 13:45On timeOrder detailsClear

Tracing WO-10157380 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 18 17:00, finishes Wed Jun 17 07:45On timeOrder detailsClear

Tracing WO-1017090 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jun 15 17:00, finishes Fri Jun 12 08:35On timeOrder detailsClear

Tracing WO-10256345 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jun 26 17:00, finishes Fri Jun 26 12:45At riskOrder detailsClear

Tracing WO-10324400 × 22" Touch Monitor, grayDue Fri Jun 26 15:00, finishes Fri Jun 26 06:45On timeOrder detailsClear

Tracing WO-10088190 × 12" Pro Tablet, 256GBDue Fri Jun 19 17:00, finishes Wed Jun 17 13:50On timeOrder detailsClear

Tracing WO-1009390 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jun 16 17:00, finishes Fri Jun 12 22:30On timeOrder detailsClear

Tracing WO-1027450 × Wi-Fi 6E Router, grayDue Tue Jun 16 17:00, finishes Mon Jun 15 15:25On timeOrder detailsClear

Tracing WO-10045280 × 24" FHD Monitor, IPSDue Fri Jun 19 17:00, finishes Wed Jun 17 16:40On timeOrder detailsClear

Tracing WO-10103350 × 1080p Webcam with micDue Thu Jun 18 17:00, finishes Tue Jun 16 16:05On timeOrder detailsClear

Tracing WO-10132140 × 8" Rugged Tablet, 64GB, grayDue Fri Jun 19 17:00, finishes Wed Jun 17 16:20On timeOrder detailsClear

Tracing WO-10189340 × KVM Switch, 2-port 4K, grayDue Fri Jun 19 17:00, finishes Wed Jun 17 20:55On timeOrder detailsClear

Tracing WO-10221160 × 8-Port Gigabit SwitchDue Wed Jun 17 17:00, finishes Tue Jun 16 08:35On timeOrder detailsClear

Tracing WO-10231110 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jun 19 17:00, finishes Wed Jun 17 19:20On timeOrder detailsClear

Tracing WO-10311400 × 27" 4K Monitor, USB-C, refreshDue Thu Jun 25 15:00, finishes Wed Jun 24 08:25On timeOrder detailsClear

Tracing WO-1034230 × Chromebook 11", 4GB / 64GB, refreshDue Fri Jun 19 12:00, finishes Wed Jun 17 09:50On timeOrder detailsClear

Tracing WO-10059110 × 128GB USB Flash Drive, 10-packDue Thu Jun 18 17:00, finishes Tue Jun 16 13:15On timeOrder detailsClear

Tracing WO-1007820 × Thin Client, 4GB / 32GB, grayDue Wed Jun 17 17:00, finishes Mon Jun 15 21:25On timeOrder detailsClear

Tracing WO-1017975 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jun 17 17:00, finishes Mon Jun 15 22:45On timeOrder detailsClear

Tracing WO-10303260 × Mechanical Keyboard, TKLDue Wed Jun 17 17:00, finishes Tue Jun 16 11:10On timeOrder detailsClear

Tracing WO-10308300 × All-in-One 24", 16GB / 512GB, grayDue Tue Jun 30 15:00, finishes Tue Jun 30 18:00LateOrder detailsClear

Tracing WO-10016120 × 4-Bay NAS Enclosure, grayDue Thu Jun 18 17:00, finishes Tue Jun 16 12:15On timeOrder detailsClear

Tracing WO-10284100 × USB-C Travel Hub, 7-in-1Due Thu Jun 18 17:00, finishes Wed Jun 17 10:45On timeOrder detailsClear

Tracing WO-10041630 × KVM Switch, 2-port 4KDue Thu Jun 25 17:00, finishes Mon Jun 22 22:30On timeOrder detailsClear

Tracing WO-10158365 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 25 17:00, finishes Tue Jun 23 15:50On timeOrder detailsClear

Tracing WO-10246410 × Thunderbolt Dock, 4 portsDue Wed Jun 24 17:00, finishes Mon Jun 22 13:10On timeOrder detailsClear

Tracing WO-10250125 × 4K Conference Camera, grayDue Thu Jun 18 17:00, finishes Wed Jun 17 09:00On timeOrder detailsClear

Tracing WO-10318400 × 34" Ultrawide Monitor, curved, grayDue Thu Jul 2 15:00, finishes Thu Jul 2 17:50LateOrder detailsClear

Tracing WO-10319120 × All-in-One 24", 16GB / 512GB, grayDue Mon Jun 22 15:00, finishes Thu Jun 18 07:25On timeOrder detailsClear

Tracing WO-10050215 × 27" 4K Monitor, USB-C, refreshDue Mon Jun 22 17:00, finishes Thu Jun 18 11:05On timeOrder detailsClear

Tracing WO-10194125 × 10" Tablet, 64GBDue Mon Jun 22 17:00, finishes Thu Jun 18 09:25On timeOrder detailsClear

Tracing WO-10210485 × 4-Bay NAS Enclosure, refreshDue Mon Jun 22 17:00, finishes Fri Jun 19 09:40On timeOrder detailsClear

Tracing WO-1027040 × Thin Client, 4GB / 32GBDue Mon Jun 22 17:00, finishes Thu Jun 18 12:30On timeOrder detailsClear

Tracing WO-10002370 × Ergonomic Mouse, wireless, grayDue Mon Jun 22 17:00, finishes Wed Jun 17 22:35On timeOrder detailsClear

Tracing WO-10031200 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jun 23 17:00, finishes Thu Jun 18 15:40On timeOrder detailsClear

Tracing WO-10084165 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jun 25 17:00, finishes Mon Jun 22 21:35On timeOrder detailsClear

Tracing WO-1011890 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jun 23 17:00, finishes Fri Jun 19 07:05On timeOrder detailsClear

Tracing WO-10143410 × 4K Conference CameraDue Tue Jun 23 17:00, finishes Thu Jun 18 19:25On timeOrder detailsClear

Tracing WO-10199305 × Chromebook 11", 4GB / 64GBDue Tue Jun 30 17:00, finishes Mon Jun 29 14:50On timeOrder detailsClear

Tracing WO-10217180 × USB-C Travel Hub, 7-in-1, grayDue Tue Jun 23 17:00, finishes Fri Jun 19 09:20On timeOrder detailsClear

Tracing WO-10280590 × Ergonomic Mouse, wirelessDue Wed Jun 24 17:00, finishes Mon Jun 22 17:45On timeOrder detailsClear

Tracing WO-10307150 × 27" QHD Monitor, 165HzDue Wed Jun 24 15:00, finishes Fri Jun 19 20:55On timeOrder detailsClear

Tracing WO-1001240 × All-in-One 24", 16GB / 512GBDue Wed Jun 24 17:00, finishes Fri Jun 19 14:25On timeOrder detailsClear

Tracing WO-10074430 × 4-Bay NAS EnclosureDue Tue Jun 23 17:00, finishes Thu Jun 18 14:05On timeOrder detailsClear

Tracing WO-10175110 × 8" Rugged Tablet, 64GBDue Tue Jun 23 17:00, finishes Mon Jun 22 07:55On timeOrder detailsClear

Tracing WO-1023635 × Tower Workstation, 32GB / 1TBDue Mon Jun 22 17:00, finishes Thu Jun 18 11:05On timeOrder detailsClear

Tracing WO-10290385 × 27" 4K Monitor, USB-CDue Fri Jun 26 17:00, finishes Thu Jun 25 11:50On timeOrder detailsClear

Tracing WO-10055140 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jun 24 17:00, finishes Fri Jun 19 13:15On timeOrder detailsClear

Tracing WO-10070320 × Mesh Wi-Fi Kit, 3-packDue Mon Jun 29 17:00, finishes Fri Jun 26 15:25On timeOrder detailsClear

Tracing WO-10151330 × 2TB Portable SSDDue Wed Jun 24 17:00, finishes Fri Jun 19 21:30On timeOrder detailsClear

Tracing WO-1022795 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jun 25 17:00, finishes Tue Jun 23 08:10On timeOrder detailsClear

Tracing WO-10266125 × 24-Port PoE Switch, managedDue Thu Jun 25 17:00, finishes Tue Jun 23 10:55On timeOrder detailsClear

Tracing WO-10332400 × Thin Client, 4GB / 32GB, grayDue Fri Jul 10 15:00, finishes Wed Jul 15 09:30LateOrder detailsClear

Tracing WO-1034330 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Fri Jun 26 12:00, finishes Tue Jun 23 11:45On timeOrder detailsClear

Tracing WO-10065300 × 1TB NVMe SSD, refreshDue Fri Jun 26 17:00, finishes Tue Jun 23 18:30On timeOrder detailsClear

Tracing WO-10128160 × 24-Port PoE Switch, managed, refreshDue Thu Jun 25 17:00, finishes Tue Jun 23 07:30On timeOrder detailsClear

Tracing WO-10299110 × USB-C Dock, 100W, dual displayDue Tue Jun 23 17:00, finishes Thu Jun 18 17:00On timeOrder detailsClear

Tracing WO-1002275 × Mini PC, 8-core, 16GB / 512GBDue Fri Jun 26 17:00, finishes Tue Jun 23 15:45On timeOrder detailsClear

Tracing WO-10036195 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jul 1 17:00, finishes Mon Jun 29 18:25On timeOrder detailsClear

Tracing WO-1009920 × Wi-Fi 6E RouterDue Wed Jun 24 17:00, finishes Wed Jun 24 06:35On timeOrder detailsClear

Tracing WO-1018520 × 8" Rugged Tablet, 64GB, grayDue Thu Jun 25 17:00, finishes Wed Jun 24 09:00On timeOrder detailsClear

Tracing WO-10261465 × 22" Touch Monitor, grayDue Wed Jul 1 17:00, finishes Wed Jul 1 06:55On timeOrder detailsClear

Tracing WO-10325250 × Mini PC, 8-core, 16GB / 512GBDue Mon Jul 6 15:00, finishes Wed Jul 8 07:45LateOrder detailsClear

Tracing WO-10027410 × 1TB NVMe SSDDue Mon Jun 29 17:00, finishes Fri Jun 26 09:35On timeOrder detailsClear

Tracing WO-10114125 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jun 29 17:00, finishes Fri Jun 26 16:40On timeOrder detailsClear

Tracing WO-10138450 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jul 6 17:00, finishes Mon Jul 6 16:20At riskOrder detailsClear

Tracing WO-10159415 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 2 17:00, finishes Thu Jul 2 09:30At riskOrder detailsClear

Tracing WO-1016680 × 34" Ultrawide Monitor, curved, grayDue Fri Jun 26 17:00, finishes Tue Jun 23 23:00On timeOrder detailsClear

Tracing WO-10295235 × 34" Ultrawide Monitor, curvedDue Mon Jun 29 17:00, finishes Mon Jun 29 07:05On timeOrder detailsClear

Tracing WO-1010990 × Wi-Fi 6 Access Point, ceilingDue Fri Jun 26 17:00, finishes Tue Jun 23 20:25On timeOrder detailsClear

Tracing WO-10123350 × 27" QHD Monitor, 165HzDue Wed Jul 1 17:00, finishes Tue Jun 30 11:00On timeOrder detailsClear

Tracing WO-10190360 × KVM Switch, 2-port 4K, grayDue Thu Jul 2 17:00, finishes Thu Jul 2 14:20At riskOrder detailsClear

Tracing WO-10205415 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jul 8 17:00, finishes Fri Jul 10 11:00LateOrder detailsClear

Tracing WO-10211420 × 4-Bay NAS Enclosure, refreshDue Mon Jun 29 17:00, finishes Fri Jun 26 20:25On timeOrder detailsClear

Tracing WO-10257340 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jul 10 17:00, finishes Mon Jul 13 13:25LateOrder detailsClear

Tracing WO-10314400 × 22" Touch MonitorDue Mon Jul 6 15:00, finishes Tue Jul 7 08:05LateOrder detailsClear

Tracing WO-10007120 × Thin Client, 4GB / 32GB, grayDue Tue Jun 30 17:00, finishes Mon Jun 29 08:10On timeOrder detailsClear

Tracing WO-10046290 × 24" FHD Monitor, IPSDue Thu Jul 2 17:00, finishes Wed Jul 1 08:05On timeOrder detailsClear

Tracing WO-10089190 × 12" Pro Tablet, 256GBDue Thu Jul 2 17:00, finishes Wed Jul 1 11:40On timeOrder detailsClear

Tracing WO-1017170 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jun 29 17:00, finishes Fri Jun 26 17:30On timeOrder detailsClear

Tracing WO-10241280 × 1TB NVMe SSD, grayDue Tue Jun 30 17:00, finishes Mon Jun 29 14:55On timeOrder detailsClear

Tracing WO-1033540 × Tower Workstation, 32GB / 1TBDue Mon Jun 29 15:00, finishes Wed Jun 24 11:00On timeOrder detailsClear

Tracing WO-1009485 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jun 30 17:00, finishes Mon Jun 29 09:00On timeOrder detailsClear

Tracing WO-10222150 × 8-Port Gigabit SwitchDue Wed Jul 1 17:00, finishes Mon Jun 29 20:15On timeOrder detailsClear

Tracing WO-1027560 × Wi-Fi 6E Router, grayDue Tue Jun 30 17:00, finishes Mon Jun 29 16:10On timeOrder detailsClear

Tracing WO-10133145 × 8" Rugged Tablet, 64GB, grayDue Thu Jul 2 17:00, finishes Wed Jul 1 17:05On timeOrder detailsClear

Tracing WO-10144480 × 4K Conference CameraDue Tue Jun 30 17:00, finishes Mon Jun 29 12:25On timeOrder detailsClear

Tracing WO-10232100 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Thu Jul 2 17:00, finishes Thu Jul 2 16:20At riskOrder detailsClear

Tracing WO-10304320 × Mechanical Keyboard, TKLDue Wed Jul 1 17:00, finishes Mon Jun 29 22:45On timeOrder detailsClear

Tracing WO-1033740 × 24" FHD Monitor, IPSDue Tue Jun 30 15:00, finishes Fri Jun 26 21:35On timeOrder detailsClear

Tracing WO-10060110 × 128GB USB Flash Drive, 10-packDue Thu Jul 2 17:00, finishes Tue Jun 30 09:10On timeOrder detailsClear

Tracing WO-1007920 × Thin Client, 4GB / 32GB, grayDue Wed Jul 1 17:00, finishes Mon Jun 29 17:00On timeOrder detailsClear

Tracing WO-10285120 × USB-C Travel Hub, 7-in-1Due Thu Jul 2 17:00, finishes Thu Jul 2 17:55LateOrder detailsClear

Tracing WO-10338150 × All-in-One 24", 16GB / 512GB, grayDue Wed Jul 8 15:00, finishes Wed Jul 8 13:45At riskOrder detailsClear

Tracing WO-10017135 × 4-Bay NAS Enclosure, grayDue Thu Jul 2 17:00, finishes Tue Jun 30 08:10On timeOrder detailsClear

Tracing WO-10104340 × 1080p Webcam with micDue Thu Jul 2 17:00, finishes Wed Jul 1 14:25On timeOrder detailsClear

Tracing WO-1018065 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jul 1 17:00, finishes Tue Jun 30 07:00On timeOrder detailsClear

Tracing WO-10212460 × 4-Bay NAS Enclosure, refreshDue Mon Jul 6 17:00, finishes Mon Jul 6 11:20At riskOrder detailsClear

Tracing WO-10032245 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jul 7 17:00, finishes Tue Jul 7 06:05On timeOrder detailsClear

Tracing WO-10051220 × 27" 4K Monitor, USB-C, refreshDue Mon Jul 6 17:00, finishes Mon Jul 6 07:35On timeOrder detailsClear

Tracing WO-10075530 × 4-Bay NAS EnclosureDue Tue Jul 7 17:00, finishes Tue Jul 7 09:35At riskOrder detailsClear

Tracing WO-10160380 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 9 17:00, finishes Fri Jul 10 19:30LateOrder detailsClear

Tracing WO-10251105 × 4K Conference Camera, grayDue Thu Jul 2 17:00, finishes Thu Jul 2 19:30LateOrder detailsClear

Tracing WO-10333150 × 10" Tablet, 64GBDue Wed Jul 8 15:00, finishes Thu Jul 9 18:30LateOrder detailsClear

Tracing WO-10003480 × Ergonomic Mouse, wireless, grayDue Mon Jul 6 17:00, finishes Thu Jul 2 22:30On timeOrder detailsClear

Tracing WO-10139470 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jul 20 17:00, finishes Mon Jul 20 17:35LateOrder detailsClear

Tracing WO-10195115 × 10" Tablet, 64GBDue Mon Jul 6 17:00, finishes Mon Jul 6 07:20On timeOrder detailsClear

Tracing WO-10262525 × 22" Touch Monitor, grayDue Wed Jul 15 17:00, finishes Thu Jul 16 21:00LateOrder detailsClear

Tracing WO-1031380 × 22" Touch Monitor, grayDue Tue Jul 7 15:00, finishes Mon Jul 6 19:15On timeOrder detailsClear

Tracing WO-10331300 × 22" Touch MonitorDue Wed Jul 8 15:00, finishes Thu Jul 9 16:15LateOrder detailsClear

Tracing WO-10042550 × KVM Switch, 2-port 4KDue Thu Jul 9 17:00, finishes Thu Jul 9 16:05At riskOrder detailsClear

Tracing WO-1017695 × 8" Rugged Tablet, 64GBDue Tue Jul 7 17:00, finishes Tue Jul 7 09:50At riskOrder detailsClear

Tracing WO-10247415 × Thunderbolt Dock, 4 portsDue Wed Jul 8 17:00, finishes Thu Jul 9 06:15LateOrder detailsClear

Tracing WO-10291365 × 27" 4K Monitor, USB-CDue Fri Jul 10 17:00, finishes Wed Jul 8 11:35On timeOrder detailsClear

Tracing WO-1002390 × Mini PC, 8-core, 16GB / 512GBDue Fri Jul 10 17:00, finishes Fri Jul 10 20:00LateOrder detailsClear

Tracing WO-1011990 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jul 7 17:00, finishes Mon Jul 6 15:55On timeOrder detailsClear

Tracing WO-10145490 × 4K Conference CameraDue Tue Jul 7 17:00, finishes Tue Jul 7 13:55At riskOrder detailsClear

Tracing WO-10206495 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jul 22 17:00, finishes Fri Jul 24 08:35LateOrder detailsClear

Tracing WO-10218210 × USB-C Travel Hub, 7-in-1, grayDue Tue Jul 7 17:00, finishes Tue Jul 7 12:55At riskOrder detailsClear

Tracing WO-1023730 × Tower Workstation, 32GB / 1TBDue Mon Jul 6 17:00, finishes Mon Jul 6 12:25At riskOrder detailsClear

Tracing WO-1027135 × Thin Client, 4GB / 32GBDue Mon Jul 6 17:00, finishes Mon Jul 6 13:40At riskOrder detailsClear

Tracing WO-10309120 × 27" 4K Monitor, USB-C, refreshDue Wed Jul 8 15:00, finishes Tue Jul 7 17:30On timeOrder detailsClear

Tracing WO-10312120 × 27" 4K Monitor, USB-C, refreshDue Thu Jul 9 15:00, finishes Fri Jul 10 10:55LateOrder detailsClear

Tracing WO-10085150 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jul 9 17:00, finishes Thu Jul 9 22:05LateOrder detailsClear

Tracing WO-10152350 × 2TB Portable SSDDue Wed Jul 8 17:00, finishes Wed Jul 8 17:55LateOrder detailsClear

Tracing WO-10267115 × 24-Port PoE Switch, managedDue Thu Jul 9 17:00, finishes Thu Jul 9 18:25LateOrder detailsClear

Tracing WO-10281490 × Ergonomic Mouse, wirelessDue Wed Jul 8 17:00, finishes Thu Jul 9 10:35LateOrder detailsClear

Tracing WO-10300130 × USB-C Dock, 100W, dual displayDue Tue Jul 7 17:00, finishes Tue Jul 7 14:20At riskOrder detailsClear

Tracing WO-1001345 × All-in-One 24", 16GB / 512GBDue Wed Jul 8 17:00, finishes Wed Jul 8 15:20At riskOrder detailsClear

Tracing WO-10056130 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jul 8 17:00, finishes Tue Jul 7 15:35On timeOrder detailsClear

Tracing WO-1010020 × Wi-Fi 6E RouterDue Wed Jul 8 17:00, finishes Tue Jul 7 14:30On timeOrder detailsClear

Tracing WO-10129160 × 24-Port PoE Switch, managed, refreshDue Thu Jul 9 17:00, finishes Fri Jul 10 13:55LateOrder detailsClear

Tracing WO-1022890 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jul 9 17:00, finishes Fri Jul 10 16:30LateOrder detailsClear

Tracing WO-10028530 × 1TB NVMe SSDDue Mon Jul 13 17:00, finishes Mon Jul 13 08:40On timeOrder detailsClear

Tracing WO-10037170 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jul 15 17:00, finishes Wed Jul 15 08:10On timeOrder detailsClear

Tracing WO-10066270 × 1TB NVMe SSD, refreshDue Fri Jul 10 17:00, finishes Fri Jul 10 22:00LateOrder detailsClear

Tracing WO-10110100 × Wi-Fi 6 Access Point, ceilingDue Fri Jul 10 17:00, finishes Fri Jul 10 07:10On timeOrder detailsClear

Tracing WO-1016780 × 34" Ultrawide Monitor, curved, grayDue Fri Jul 10 17:00, finishes Wed Jul 8 18:25On timeOrder detailsClear

Tracing WO-1018620 × 8" Rugged Tablet, 64GB, grayDue Thu Jul 9 17:00, finishes Thu Jul 9 22:40LateOrder detailsClear

Tracing WO-10296265 × 34" Ultrawide Monitor, curvedDue Mon Jul 13 17:00, finishes Tue Jul 14 09:05LateOrder detailsClear

Tracing WO-10071320 × Mesh Wi-Fi Kit, 3-packDue Mon Jul 13 17:00, finishes Mon Jul 13 14:30At riskOrder detailsClear

Tracing WO-10115135 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jul 13 17:00, finishes Mon Jul 13 19:15LateOrder detailsClear

Tracing WO-10200235 × Chromebook 11", 4GB / 64GBDue Tue Jul 14 17:00, finishes Tue Jul 14 21:25LateOrder detailsClear

Tracing WO-10213460 × 4-Bay NAS Enclosure, refreshDue Mon Jul 13 17:00, finishes Mon Jul 13 19:45LateOrder detailsClear

Tracing WO-1009585 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jul 14 17:00, finishes Tue Jul 14 08:30On timeOrder detailsClear

Tracing WO-10124315 × 27" QHD Monitor, 165HzDue Wed Jul 15 17:00, finishes Wed Jul 15 16:25At riskOrder detailsClear

Tracing WO-10161425 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 16 17:00, finishes Thu Jul 16 15:35At riskOrder detailsClear

Tracing WO-10340300 × 27" QHD Monitor, 165Hz, refreshDue Fri Jul 17 15:00, finishes Fri Jul 17 14:50At riskOrder detailsClear

Tracing WO-10008120 × Thin Client, 4GB / 32GB, grayDue Tue Jul 14 17:00, finishes Tue Jul 14 06:35On timeOrder detailsClear

Tracing WO-10047280 × 24" FHD Monitor, IPSDue Fri Jul 17 17:00, finishes Fri Jul 17 10:45At riskOrder detailsClear

Tracing WO-10090190 × 12" Pro Tablet, 256GBDue Fri Jul 17 17:00, finishes Fri Jul 17 13:50At riskOrder detailsClear

Tracing WO-1017280 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jul 13 17:00, finishes Mon Jul 13 15:45At riskOrder detailsClear

Tracing WO-10191350 × KVM Switch, 2-port 4K, grayDue Fri Jul 17 17:00, finishes Fri Jul 17 19:30LateOrder detailsClear

Tracing WO-10223150 × 8-Port Gigabit SwitchDue Wed Jul 15 17:00, finishes Wed Jul 15 12:45At riskOrder detailsClear

Tracing WO-10242270 × 1TB NVMe SSD, grayDue Tue Jul 14 17:00, finishes Tue Jul 14 12:00At riskOrder detailsClear

Tracing WO-1027650 × Wi-Fi 6E Router, grayDue Tue Jul 14 17:00, finishes Tue Jul 14 13:05At riskOrder detailsClear

Tracing WO-10146380 × 4K Conference CameraDue Tue Jul 14 17:00, finishes Tue Jul 14 12:00At riskOrder detailsClear

Tracing WO-1023390 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jul 17 17:00, finishes Fri Jul 17 21:20LateOrder detailsClear

Tracing WO-10018140 × 4-Bay NAS Enclosure, grayDue Thu Jul 16 17:00, finishes Wed Jul 15 14:00On timeOrder detailsClear

Tracing WO-1008020 × Thin Client, 4GB / 32GB, grayDue Wed Jul 15 17:00, finishes Tue Jul 14 13:55On timeOrder detailsClear

Tracing WO-10134135 × 8" Rugged Tablet, 64GB, grayDue Fri Jul 17 17:00, finishes Fri Jul 17 21:25LateOrder detailsClear

Tracing WO-1018170 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jul 15 17:00, finishes Tue Jul 14 13:15On timeOrder detailsClear

Tracing WO-10258305 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jul 24 17:00, finishes Mon Jul 27 12:40LateOrder detailsClear

Tracing WO-10286120 × USB-C Travel Hub, 7-in-1Due Thu Jul 16 17:00, finishes Wed Jul 15 20:55On timeOrder detailsClear

Tracing WO-10305260 × Mechanical Keyboard, TKLDue Wed Jul 15 17:00, finishes Tue Jul 14 15:20On timeOrder detailsClear

Tracing WO-10316400 × 34" Ultrawide Monitor, curvedDue Fri Jul 24 15:00, finishes Wed Jul 22 09:30On timeOrder detailsClear

Tracing WO-10043600 × KVM Switch, 2-port 4KDue Thu Jul 23 17:00, finishes Wed Jul 22 13:20On timeOrder detailsClear

Tracing WO-10052215 × 27" 4K Monitor, USB-C, refreshDue Mon Jul 20 17:00, finishes Mon Jul 20 09:25At riskOrder detailsClear

Tracing WO-10061100 × 128GB USB Flash Drive, 10-packDue Thu Jul 16 17:00, finishes Wed Jul 15 14:55On timeOrder detailsClear

Tracing WO-10105350 × 1080p Webcam with micDue Thu Jul 16 17:00, finishes Wed Jul 15 17:45On timeOrder detailsClear

Tracing WO-10162395 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 23 17:00, finishes Thu Jul 23 13:00At riskOrder detailsClear

Tracing WO-10248485 × Thunderbolt Dock, 4 portsDue Wed Jul 22 17:00, finishes Tue Jul 21 21:20On timeOrder detailsClear

Tracing WO-10252115 × 4K Conference Camera, grayDue Thu Jul 16 17:00, finishes Wed Jul 15 19:20On timeOrder detailsClear

Tracing WO-1012090 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jul 21 17:00, finishes Tue Jul 21 06:40On timeOrder detailsClear

Tracing WO-10004490 × Ergonomic Mouse, wireless, grayDue Mon Jul 20 17:00, finishes Mon Jul 20 08:30On timeOrder detailsClear

Tracing WO-10033245 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jul 21 17:00, finishes Mon Jul 20 21:25On timeOrder detailsClear

Tracing WO-10076445 × 4-Bay NAS EnclosureDue Tue Jul 21 17:00, finishes Mon Jul 20 21:05On timeOrder detailsClear

Tracing WO-10214395 × 4-Bay NAS Enclosure, refreshDue Mon Jul 20 17:00, finishes Mon Jul 20 12:55At riskOrder detailsClear

Tracing WO-10292350 × 27" 4K Monitor, USB-CDue Fri Jul 24 17:00, finishes Fri Jul 24 14:00At riskOrder detailsClear

Tracing WO-10196105 × 10" Tablet, 64GBDue Mon Jul 20 17:00, finishes Fri Jul 17 17:55On timeOrder detailsClear

Tracing WO-10219180 × USB-C Travel Hub, 7-in-1, grayDue Tue Jul 21 17:00, finishes Tue Jul 21 09:50At riskOrder detailsClear

Tracing WO-1032280 × 12" Pro Tablet, 256GBDue Mon Jul 20 15:00, finishes Fri Jul 17 15:05On timeOrder detailsClear

Tracing WO-1002480 × Mini PC, 8-core, 16GB / 512GBDue Fri Jul 24 17:00, finishes Thu Jul 23 15:35On timeOrder detailsClear

Tracing WO-10147450 × 4K Conference CameraDue Tue Jul 21 17:00, finishes Tue Jul 21 07:35On timeOrder detailsClear

Tracing WO-10153370 × 2TB Portable SSDDue Wed Jul 22 17:00, finishes Tue Jul 21 15:15On timeOrder detailsClear

Tracing WO-1017790 × 8" Rugged Tablet, 64GBDue Tue Jul 21 17:00, finishes Tue Jul 21 08:20On timeOrder detailsClear

Tracing WO-1023830 × Tower Workstation, 32GB / 1TBDue Mon Jul 20 17:00, finishes Mon Jul 20 14:00At riskOrder detailsClear

Tracing WO-10263595 × 22" Touch Monitor, grayDue Wed Jul 29 17:00, finishes Wed Jul 29 20:55LateOrder detailsClear

Tracing WO-1027240 × Thin Client, 4GB / 32GBDue Mon Jul 20 17:00, finishes Mon Jul 20 15:25At riskOrder detailsClear

Tracing WO-10301150 × USB-C Dock, 100W, dual displayDue Tue Jul 21 17:00, finishes Tue Jul 21 10:00At riskOrder detailsClear

Tracing WO-10321150 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jul 27 15:00, finishes Mon Jul 27 21:10LateOrder detailsClear

Tracing WO-1032780 × 15" Laptop, 12-core, 32GB / 1TBDue Tue Jul 21 15:00, finishes Mon Jul 20 17:05On timeOrder detailsClear

Tracing WO-1001435 × All-in-One 24", 16GB / 512GBDue Wed Jul 22 17:00, finishes Tue Jul 21 11:45On timeOrder detailsClear

Tracing WO-10057150 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jul 22 17:00, finishes Tue Jul 21 11:55On timeOrder detailsClear

Tracing WO-10072325 × Mesh Wi-Fi Kit, 3-packDue Mon Jul 27 17:00, finishes Mon Jul 27 18:05LateOrder detailsClear

Tracing WO-10086145 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jul 23 17:00, finishes Wed Jul 22 13:00On timeOrder detailsClear

Tracing WO-10130185 × 24-Port PoE Switch, managed, refreshDue Thu Jul 23 17:00, finishes Wed Jul 22 16:40On timeOrder detailsClear

Tracing WO-1022990 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jul 23 17:00, finishes Thu Jul 23 08:35On timeOrder detailsClear

Tracing WO-10268130 × 24-Port PoE Switch, managedDue Thu Jul 23 17:00, finishes Wed Jul 22 19:55On timeOrder detailsClear

Tracing WO-10282500 × Ergonomic Mouse, wirelessDue Wed Jul 22 17:00, finishes Tue Jul 21 15:40On timeOrder detailsClear

Tracing WO-1033640 × 15" Laptop, 12-core, 32GB / 1TBDue Thu Jul 23 15:00, finishes Wed Jul 22 06:50On timeOrder detailsClear

Tracing WO-1010120 × Wi-Fi 6E RouterDue Wed Jul 22 17:00, finishes Tue Jul 21 12:30On timeOrder detailsClear

Tracing WO-10116140 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jul 27 17:00, finishes Mon Jul 27 23:00LateOrder detailsClear

Tracing WO-10163450 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 30 17:00, finishes Thu Jul 30 16:05At riskOrder detailsClear

Tracing WO-10297255 × 34" Ultrawide Monitor, curvedDue Mon Jul 27 17:00, finishes Mon Jul 27 09:30At riskOrder detailsClear

Tracing WO-1033440 × Mini PC, 8-core, 16GB / 512GB, grayDue Thu Jul 23 15:00, finishes Tue Jul 21 22:50On timeOrder detailsClear

Tracing WO-10201285 × Chromebook 11", 4GB / 64GBDue Tue Jul 28 17:00, finishes Tue Jul 28 20:55LateOrder detailsClear

Tracing WO-10029440 × 1TB NVMe SSDDue Mon Jul 27 17:00, finishes Mon Jul 27 13:00At riskOrder detailsClear

Tracing WO-10038195 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jul 29 17:00, finishes Tue Jul 28 19:50On timeOrder detailsClear

Tracing WO-10067260 × 1TB NVMe SSD, refreshDue Fri Jul 24 17:00, finishes Thu Jul 23 18:00On timeOrder detailsClear

Tracing WO-10111100 × Wi-Fi 6 Access Point, ceilingDue Fri Jul 24 17:00, finishes Wed Jul 22 14:30On timeOrder detailsClear

Tracing WO-10125265 × 27" QHD Monitor, 165HzDue Wed Jul 29 17:00, finishes Wed Jul 29 12:00At riskOrder detailsClear

Tracing WO-1016865 × 34" Ultrawide Monitor, curved, grayDue Fri Jul 24 17:00, finishes Thu Jul 23 21:25On timeOrder detailsClear

Tracing WO-1017385 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jul 27 17:00, finishes Mon Jul 27 15:30At riskOrder detailsClear

Tracing WO-1018720 × 8" Rugged Tablet, 64GB, grayDue Thu Jul 23 17:00, finishes Thu Jul 23 19:15LateOrder detailsClear

Tracing WO-10215460 × 4-Bay NAS Enclosure, refreshDue Mon Jul 27 17:00, finishes Fri Jul 24 19:55On timeOrder detailsClear

Tracing WO-10096100 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jul 28 17:00, finishes Tue Jul 28 09:55At riskOrder detailsClear

Tracing WO-1032060 × 34" Ultrawide Monitor, curved, grayDue Mon Jul 27 15:00, finishes Fri Jul 24 15:55On timeOrder detailsClear

Tracing WO-10009135 × Thin Client, 4GB / 32GB, grayDue Tue Jul 28 17:00, finishes Tue Jul 28 07:40On timeOrder detailsClear

Tracing WO-10135160 × 8" Rugged Tablet, 64GB, grayDue Fri Jul 31 17:00, finishes Fri Jul 31 06:55On timeOrder detailsClear

Tracing WO-10243290 × 1TB NVMe SSD, grayDue Tue Jul 28 17:00, finishes Tue Jul 28 12:15At riskOrder detailsClear

Tracing WO-10148405 × 4K Conference CameraDue Tue Jul 28 17:00, finishes Tue Jul 28 09:10At riskOrder detailsClear

Tracing WO-10048330 × 24" FHD Monitor, IPSDue Fri Jul 31 17:00, finishes Thu Jul 30 13:20On timeOrder detailsClear

Tracing WO-10106350 × 1080p Webcam with micDue Thu Jul 30 17:00, finishes Wed Jul 29 22:15On timeOrder detailsClear

Tracing WO-1018265 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jul 29 17:00, finishes Tue Jul 28 14:35On timeOrder detailsClear

Tracing WO-10224130 × 8-Port Gigabit SwitchDue Wed Jul 29 17:00, finishes Wed Jul 29 14:25At riskOrder detailsClear

Tracing WO-1027760 × Wi-Fi 6E Router, grayDue Tue Jul 28 17:00, finishes Tue Jul 28 13:30At riskOrder detailsClear

Tracing WO-10306280 × Mechanical Keyboard, TKLDue Wed Jul 29 17:00, finishes Wed Jul 29 16:40At riskOrder detailsClear

Tracing WO-1008120 × Thin Client, 4GB / 32GB, grayDue Wed Jul 29 17:00, finishes Mon Jul 27 16:15On timeOrder detailsClear

Tracing WO-10091160 × 12" Pro Tablet, 256GBDue Fri Jul 31 17:00, finishes Thu Jul 30 15:55On timeOrder detailsClear

Tracing WO-10192290 × KVM Switch, 2-port 4K, grayDue Fri Jul 31 17:00, finishes Thu Jul 30 19:55On timeOrder detailsClear

Tracing WO-10019140 × 4-Bay NAS Enclosure, grayDue Thu Jul 30 17:00, finishes Wed Jul 29 17:55On timeOrder detailsClear

Tracing WO-10062110 × 128GB USB Flash Drive, 10-packDue Thu Jul 30 17:00, finishes Wed Jul 29 19:25On timeOrder detailsClear

Tracing WO-10234100 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jul 31 17:00, finishes Thu Jul 30 18:05On timeOrder detailsClear

Tracing WO-10253115 × 4K Conference Camera, grayDue Thu Jul 30 17:00, finishes Tue Jul 28 21:00On timeOrder detailsClear

Tracing WO-10287110 × USB-C Travel Hub, 7-in-1Due Thu Jul 30 17:00, finishes Wed Jul 29 22:25On timeOrder detailsClear

Tracing WO-10344240 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Fri Jun 12 15:00, finishes Thu Jun 11 10:40On timeOrder detailsClear

Show
Color by
Work centers
Resource Load
Mon 1
Tue 2
Wed 3
Thu 4
Fri 5
Sat 6
Sun 7
Mon 8
Tue 9
Wed 10
Thu 11
Fri 12
Sat 13
Sun 14
Mon 15
Tue 16
Wed 17
Thu 18
Fri 19
Sat 20
Sun 21
Mon 22
Tue 23
Wed 24
Thu 25
Fri 26
Sat 27
Sun 28
Mon 29
Tue 30
Wed 1
Thu 2
Fri 3
Sat 4
Sun 5
Mon 6
Tue 7
Wed 8
Thu 9
Fri 10
Sat 11
Sun 12
SMT Surface mount81%
WO-10141WO-10141 op 10, place and reflow circuit boards
4K Conference Camera
State
Finished
Quantity
430
Start
Mon Jun 1 05:00
End
Mon Jun 1 20:20
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 34 h to spare
WO-10174WO-10174 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB
State
Finished
Quantity
85
Start
Mon Jun 1 20:20
End
Tue Jun 2 09:50
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 33 h to spare
WO-10279WO-10279 op 10, place and reflow circuit boards
Ergonomic Mouse, wireless
State
Finished
Quantity
500
Start
Tue Jun 2 09:50
End
Wed Jun 3 05:05
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10083WO-10083 op 10, place and reflow circuit boards
Chromebook 11", 4GB / 64GB, refresh
State
Running now
Quantity
149 left of 155
Start
Wed Jun 3 05:05
End
Thu Jun 4 01:50
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.4 d to spare
WO-10265WO-10265 op 10, place and reflow circuit boards
24-Port PoE Switch, managed
State
Held in the frozen window
Quantity
125
Start
Thu Jun 4 03:25
End
Thu Jun 4 17:25
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 47 h to spare
WO-10069WO-10069 op 10, place and reflow circuit boards
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
365
Start
Fri Jun 5 06:00
End
Mon Jun 8 19:50
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.2 d to spare
WO-10339WO-10339 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Mon Jun 8 19:50
End
Tue Jun 9 08:40
Changeover
90 min
For
ACCOUNT 3915, Standard
Order due
Wed Jun 17 15:00
Order
On time, 44 h to spare
WO-10303WO-10303 op 10, place and reflow circuit boards
Mechanical Keyboard, TKL
State
Planned
Quantity
260
Start
Tue Jun 9 08:40
End
Tue Jun 9 19:20
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10260WO-10260 op 10, place and reflow circuit boards
22" Touch Monitor, gray
State
Planned
Quantity
540
Start
Wed Jun 10 00:15
End
Thu Jun 11 18:15
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 8.1 h to spare
WO-10002WO-10002 op 10, place and reflow circuit boards
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
370
Start
Fri Jun 12 06:00
End
Fri Jun 12 21:45
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.8 d to spare
WO-10012WO-10012 op 10, place and reflow circuit boards
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
40
Start
Mon Jun 15 01:55
End
Mon Jun 15 08:30
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.1 d to spare
WO-10016WO-10016 op 10, place and reflow circuit boards
4-Bay NAS Enclosure, gray
State
Planned
Quantity
120
Start
Mon Jun 15 10:30
End
Mon Jun 15 16:50
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10210WO-10210 op 10, place and reflow circuit boards
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
485
Start
Wed Jun 17 10:30
End
Thu Jun 18 07:50
Changeover
10 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 3.3 d to spare
WO-10185WO-10185 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Thu Jun 18 07:50
End
Thu Jun 18 12:15
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 32 h to spare
WO-10022WO-10022 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
75
Start
Thu Jun 18 12:15
End
Thu Jun 18 23:25
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 3.1 d to spare
WO-10256WO-10256 op 10, place and reflow circuit boards
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
345
Start
Fri Jun 19 03:05
End
Tue Jun 23 04:30
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
At risk, 4.2 h to spare
WO-10275WO-10275 op 10, place and reflow circuit boards
Wi-Fi 6E Router, gray
State
Planned
Quantity
60
Start
Tue Jun 23 06:00
End
Tue Jun 23 14:00
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 25 h to spare
WO-10099WO-10099 op 10, place and reflow circuit boards
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Tue Jun 23 15:20
End
Tue Jun 23 17:25
Changeover
10 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 10 h to spare
WO-10222WO-10222 op 10, place and reflow circuit boards
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Wed Jun 24 14:00
End
Thu Jun 25 06:25
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 45 h to spare
WO-10180WO-10180 op 10, place and reflow circuit boards
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
65
Start
Mon Jun 29 06:00
End
Mon Jun 29 12:45
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 34 h to spare
WO-10032WO-10032 op 10, place and reflow circuit boards
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
245
Start
Mon Jun 29 12:45
End
Tue Jun 30 12:05
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 11 h to spare
WO-10218WO-10218 op 10, place and reflow circuit boards
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
210
Start
Tue Jun 30 12:05
End
Wed Jul 1 11:25
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 4.1 h to spare
WO-10281WO-10281 op 10, place and reflow circuit boards
Ergonomic Mouse, wireless
State
Planned
Quantity
490
Start
Wed Jul 1 11:25
End
Thu Jul 2 05:50
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 18 h late
WO-10152WO-10152 op 10, place and reflow circuit boards
2TB Portable SSD
State
Planned
Quantity
350
Start
Thu Jul 2 06:00
End
Thu Jul 2 22:25
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 0.9 h late
WO-10160WO-10160 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Sun Jul 5 23:25
End
Mon Jul 6 23:35
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 26 h late
WO-10110WO-10110 op 10, place and reflow circuit boards
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
100
Start
Mon Jul 6 23:35
End
Tue Jul 7 08:40
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 9.8 h to spare
WO-10172WO-10172 op 10, place and reflow circuit boards
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
80
Start
Tue Jul 7 08:40
End
Tue Jul 7 18:30
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 1.2 h to spare
WO-10008WO-10008 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Wed Jul 8 02:20
End
Wed Jul 8 14:55
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 10 h to spare
WO-10095WO-10095 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Wed Jul 8 14:55
End
Thu Jul 9 04:20
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 8.5 h to spare
WO-10105WO-10105 op 10, place and reflow circuit boards
1080p Webcam with mic
State
Planned
Quantity
350
Start
Thu Jul 9 06:00
End
Thu Jul 9 20:10
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 23 h to spare
WO-10252WO-10252 op 10, place and reflow circuit boards
4K Conference Camera, gray
State
Planned
Quantity
115
Start
Thu Jul 9 20:10
End
Fri Jul 10 01:05
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 22 h to spare
WO-10242WO-10242 op 10, place and reflow circuit boards
1TB NVMe SSD, gray
State
Planned
Quantity
270
Start
Fri Jul 10 06:00
End
Fri Jul 10 21:15
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 5.0 h to spare
WO-10305WO-10305 op 10, place and reflow circuit boards
Mechanical Keyboard, TKL
State
Planned
Quantity
260
Start
Sun Jul 12 23:00
End
Mon Jul 13 08:55
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 26 h to spare
WO-10136WO-10136 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB
State
Finished
Quantity
470
Start
Thu May 28 18:05
End
Tue Jun 2 01:15
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
At risk, 2.0 h to spare
WO-10098WO-10098 op 10, place and reflow circuit boards
Wi-Fi 6E Router
State
Finished
Quantity
20
Start
Tue Jun 2 06:00
End
Tue Jun 2 09:25
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10203WO-10203 op 10, place and reflow circuit boards
14" Rugged Laptop, 16GB / 256GB
State
Running now
Quantity
371 left of 475
Start
Tue Jun 2 09:25
End
Fri Jun 5 10:00
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
At risk, 2.0 h to spare
WO-10255WO-10255 op 10, place and reflow circuit boards
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
350
Start
Sun Jun 7 23:00
End
Wed Jun 10 00:15
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
Late, 2.7 d late
WO-10059WO-10059 op 10, place and reflow circuit boards
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Wed Jun 10 02:20
End
Wed Jun 10 09:00
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10284WO-10284 op 10, place and reflow circuit boards
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
100
Start
Wed Jun 10 09:00
End
Wed Jun 10 21:10
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 30 h to spare
WO-10132WO-10132 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
140
Start
Wed Jun 10 21:10
End
Thu Jun 11 16:35
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10050WO-10050 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
215
Start
Thu Jun 11 16:35
End
Fri Jun 12 07:20
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10118WO-10118 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Fri Jun 12 07:20
End
Fri Jun 12 22:55
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.4 d to spare
WO-10236WO-10236 op 10, place and reflow circuit boards
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
35
Start
Sun Jun 14 23:00
End
Mon Jun 15 04:10
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10270WO-10270 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB
State
Planned
Quantity
40
Start
Mon Jun 15 10:30
End
Mon Jun 15 15:45
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10204WO-10204 op 10, place and reflow circuit boards
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Mon Jun 15 16:50
End
Thu Jun 18 13:45
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
At risk, 0.2 h to spare
WO-10065WO-10065 op 10, place and reflow circuit boards
1TB NVMe SSD, refresh
State
Planned
Quantity
300
Start
Thu Jun 18 13:45
End
Fri Jun 19 06:35
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10070WO-10070 op 10, place and reflow circuit boards
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Fri Jun 19 06:35
End
Mon Jun 22 16:20
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.1 d to spare
WO-10144WO-10144 op 10, place and reflow circuit boards
4K Conference Camera
State
Planned
Quantity
480
Start
Mon Jun 22 20:30
End
Tue Jun 23 14:25
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 29 h to spare
WO-10304WO-10304 op 10, place and reflow circuit boards
Mechanical Keyboard, TKL
State
Planned
Quantity
320
Start
Tue Jun 23 17:25
End
Wed Jun 24 04:55
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 42 h to spare
WO-10318WO-10318 op 10, place and reflow circuit boards
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
400
Start
Wed Jun 24 04:55
End
Thu Jun 25 14:50
Changeover
90 min
For
ACCOUNT 3915, Standard
Order due
Thu Jul 2 15:00
Order
Late, 2.8 h late
WO-10232WO-10232 op 10, place and reflow circuit boards
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
100
Start
Thu Jun 25 14:50
End
Fri Jun 26 04:25
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 0.7 h to spare
WO-10133WO-10133 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
145
Start
Fri Jun 26 10:30
End
Mon Jun 29 06:30
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 24 h to spare
WO-10212WO-10212 op 10, place and reflow circuit boards
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Mon Jun 29 06:30
End
Tue Jun 30 04:40
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 5.7 h to spare
WO-10338WO-10338 op 10, place and reflow circuit boards
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
150
Start
Tue Jun 30 06:00
End
Tue Jun 30 23:35
Changeover
90 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
At risk, 1.2 h to spare
WO-10331WO-10331 op 10, place and reflow circuit boards
22" Touch Monitor
State
Planned
Quantity
300
Start
Tue Jun 30 23:35
End
Wed Jul 1 19:20
Changeover
90 min
For
ACCOUNT 6021, Standard
Order due
Wed Jul 8 15:00
Order
Late, 25 h late
WO-10129WO-10129 op 10, place and reflow circuit boards
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Thu Jul 2 05:50
End
Sun Jul 5 23:25
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 21 h late
WO-10332WO-10332 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
400
Start
Mon Jul 6 06:00
End
Tue Jul 7 22:35
Changeover
90 min
For
ACCOUNT 5190, Silver
Order due
Fri Jul 10 15:00
Order
Late, 4.8 d late
WO-10296WO-10296 op 10, place and reflow circuit boards
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Wed Jul 8 00:40
End
Wed Jul 8 21:05
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 16 h late
WO-10037WO-10037 op 10, place and reflow circuit boards
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
170
Start
Wed Jul 8 21:05
End
Thu Jul 9 19:40
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 8.8 h to spare
WO-10286WO-10286 op 10, place and reflow circuit boards
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
120
Start
Thu Jul 9 19:40
End
Fri Jul 10 08:45
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 20 h to spare
WO-10030WO-10030 op 10, place and reflow circuit boards
Mesh Wi-Fi Kit, 3-pack, refresh
State
Finished
Quantity
245
Start
Fri May 29 19:55
End
Mon Jun 1 14:50
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 4.0 d to spare
WO-10011WO-10011 op 10, place and reflow circuit boards
All-in-One 24", 16GB / 512GB
State
Finished
Quantity
45
Start
Mon Jun 1 20:00
End
Tue Jun 2 03:10
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.1 d to spare
WO-10150WO-10150 op 10, place and reflow circuit boards
2TB Portable SSD
State
Finished
Quantity
380
Start
Tue Jun 2 03:10
End
Tue Jun 2 20:15
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 47 h to spare
WO-10184WO-10184 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB, gray
State
Finished
Quantity
25
Start
Tue Jun 2 20:15
End
Wed Jun 3 00:45
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 34 h to spare
WO-10127WO-10127 op 10, place and reflow circuit boards
24-Port PoE Switch, managed, refresh
State
Running now
Quantity
123 left of 155
Start
Wed Jun 3 02:20
End
Wed Jun 3 19:25
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.1 d to spare
WO-10226WO-10226 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB, refresh
State
Held in the frozen window
Quantity
95
Start
Wed Jun 3 23:10
End
Thu Jun 4 09:55
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.0 d to spare
WO-10289WO-10289 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C
State
Planned
Quantity
355
Start
Thu Jun 4 15:15
End
Fri Jun 5 13:45
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 44 h to spare
WO-10294WO-10294 op 10, place and reflow circuit boards
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Fri Jun 5 13:45
End
Mon Jun 8 08:55
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 2.9 d to spare
WO-10093WO-10093 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Mon Jun 8 08:55
End
Mon Jun 8 23:15
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 3.8 d to spare
WO-10035WO-10035 op 10, place and reflow circuit boards
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Mon Jun 8 23:15
End
Wed Jun 10 08:15
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10045WO-10045 op 10, place and reflow circuit boards
24" FHD Monitor, IPS
State
Planned
Quantity
280
Start
Wed Jun 10 08:15
End
Thu Jun 11 03:30
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10231WO-10231 op 10, place and reflow circuit boards
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
110
Start
Thu Jun 11 05:30
End
Thu Jun 11 20:45
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 46 h to spare
WO-10194WO-10194 op 10, place and reflow circuit boards
10" Tablet, 64GB
State
Planned
Quantity
125
Start
Thu Jun 11 20:45
End
Fri Jun 12 11:25
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.3 d to spare
WO-10074WO-10074 op 10, place and reflow circuit boards
4-Bay NAS Enclosure
State
Planned
Quantity
430
Start
Sun Jun 14 23:00
End
Mon Jun 15 17:05
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10175WO-10175 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB
State
Planned
Quantity
110
Start
Mon Jun 15 17:05
End
Tue Jun 16 07:55
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 33 h to spare
WO-10280WO-10280 op 10, place and reflow circuit boards
Ergonomic Mouse, wireless
State
Planned
Quantity
590
Start
Tue Jun 16 07:55
End
Wed Jun 17 06:05
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 47 h to spare
WO-10084WO-10084 op 10, place and reflow circuit boards
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
165
Start
Wed Jun 17 06:05
End
Thu Jun 18 05:45
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10158WO-10158 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
365
Start
Thu Jun 18 05:45
End
Fri Jun 19 04:50
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.0 d to spare
WO-10335WO-10335 op 10, place and reflow circuit boards
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
40
Start
Fri Jun 19 06:00
End
Fri Jun 19 11:55
Changeover
90 min
For
ACCOUNT 2800, Silver
Order due
Mon Jun 29 15:00
Order
On time, 5.2 d to spare
WO-10211WO-10211 op 10, place and reflow circuit boards
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
420
Start
Mon Jun 22 00:00
End
Mon Jun 22 20:30
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 2.9 d to spare
WO-10094WO-10094 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Mon Jun 22 20:30
End
Tue Jun 23 09:25
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 32 h to spare
WO-10036WO-10036 op 10, place and reflow circuit boards
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Tue Jun 23 09:25
End
Wed Jun 24 10:40
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 47 h to spare
WO-10046WO-10046 op 10, place and reflow circuit boards
24" FHD Monitor, IPS
State
Planned
Quantity
290
Start
Wed Jun 24 10:40
End
Thu Jun 25 06:00
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 33 h to spare
WO-10159WO-10159 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
415
Start
Thu Jun 25 06:00
End
Fri Jun 26 07:05
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 7.5 h to spare
WO-10003WO-10003 op 10, place and reflow circuit boards
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
480
Start
Fri Jun 26 07:05
End
Mon Jun 29 03:00
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 3.8 d to spare
WO-10195WO-10195 op 10, place and reflow circuit boards
10" Tablet, 64GB
State
Planned
Quantity
115
Start
Mon Jun 29 03:00
End
Mon Jun 29 16:40
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.7 h to spare
WO-10119WO-10119 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Mon Jun 29 16:40
End
Tue Jun 30 08:00
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 25 h to spare
WO-10176WO-10176 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB
State
Planned
Quantity
95
Start
Tue Jun 30 08:00
End
Tue Jun 30 21:25
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.2 h to spare
WO-10333WO-10333 op 10, place and reflow circuit boards
10" Tablet, 64GB
State
Planned
Quantity
150
Start
Wed Jul 1 03:55
End
Wed Jul 1 20:50
Changeover
45 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
Late, 28 h late
WO-10205WO-10205 op 10, place and reflow circuit boards
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
415
Start
Wed Jul 1 20:50
End
Tue Jul 7 07:45
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 42 h late
WO-10257WO-10257 op 10, place and reflow circuit boards
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
340
Start
Tue Jul 7 07:45
End
Thu Jul 9 07:45
Changeover
45 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 2.9 d late
WO-10223WO-10223 op 10, place and reflow circuit boards
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Thu Jul 9 07:45
End
Fri Jul 10 01:10
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
At risk, 4.2 h to spare
WO-10340WO-10340 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
300
Start
Fri Jul 10 01:10
End
Fri Jul 10 20:35
Changeover
90 min
For
ACCOUNT 7463, Gold
Order due
Fri Jul 17 15:00
Order
At risk, 0.2 h to spare
WO-10134WO-10134 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
135
Start
Fri Jul 10 20:35
End
Mon Jul 13 15:20
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 17 17:00
Order
Late, 4.4 h late
WO-10326WO-10326 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB
State
Finished
Quantity
40
Start
Fri May 29 19:45
End
Mon Jun 1 02:05
For
ACCOUNT 8321, Platinum
Order due
Tue Jun 9 15:00
Order
On time, 4.9 d to spare
WO-10117WO-10117 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, gray
State
Finished
Quantity
100
Start
Mon Jun 1 02:05
End
Mon Jun 1 18:15
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.8 d to spare
WO-10040WO-10040 op 10, place and reflow circuit boards
KVM Switch, 2-port 4K
State
Running now
Quantity
276 left of 540
Start
Tue Jun 2 05:30
End
Thu Jun 4 07:00
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.3 d to spare
WO-10344WO-10344 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
240
Start
Thu Jun 4 07:00
End
Fri Jun 5 17:30
Changeover
90 min
For
ACCOUNT 4340, Platinum
Order due
Fri Jun 12 15:00
Order
On time, 28 h to spare
WO-10006WO-10006 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
155
Start
Mon Jun 8 03:25
End
Mon Jun 8 20:10
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 30 h to spare
WO-10198WO-10198 op 10, place and reflow circuit boards
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
240
Start
Mon Jun 8 20:10
End
Wed Jun 10 02:20
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10103WO-10103 op 10, place and reflow circuit boards
1080p Webcam with mic
State
Planned
Quantity
350
Start
Wed Jun 10 02:25
End
Wed Jun 10 16:20
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.0 d to spare
WO-10088WO-10088 op 10, place and reflow circuit boards
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Wed Jun 10 16:20
End
Thu Jun 11 15:50
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.1 d to spare
WO-10137WO-10137 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
505
Start
Thu Jun 11 15:50
End
Tue Jun 16 08:50
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
At risk, 1.2 h to spare
WO-10041WO-10041 op 10, place and reflow circuit boards
KVM Switch, 2-port 4K
State
Planned
Quantity
630
Start
Tue Jun 16 08:50
End
Thu Jun 18 20:00
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10027WO-10027 op 10, place and reflow circuit boards
1TB NVMe SSD
State
Planned
Quantity
410
Start
Fri Jun 19 06:00
End
Mon Jun 22 00:00
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.3 d to spare
WO-10337WO-10337 op 10, place and reflow circuit boards
24" FHD Monitor, IPS
State
Planned
Quantity
40
Start
Mon Jun 22 06:00
End
Mon Jun 22 09:55
Changeover
90 min
For
ACCOUNT 2800, Silver
Order due
Tue Jun 30 15:00
Order
On time, 3.7 d to spare
WO-10171WO-10171 op 10, place and reflow circuit boards
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
70
Start
Mon Jun 22 14:00
End
Mon Jun 22 22:55
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10199WO-10199 op 10, place and reflow circuit boards
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
305
Start
Tue Jun 23 04:30
End
Wed Jun 24 19:05
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10089WO-10089 op 10, place and reflow circuit boards
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Wed Jun 24 19:05
End
Thu Jun 25 18:05
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 29 h to spare
WO-10314WO-10314 op 10, place and reflow circuit boards
22" Touch Monitor
State
Planned
Quantity
400
Start
Thu Jun 25 18:05
End
Fri Jun 26 19:45
Changeover
90 min
For
ACCOUNT 3327, Gold
Order due
Mon Jul 6 15:00
Order
Late, 17 h late
WO-10138WO-10138 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
450
Start
Fri Jun 26 19:45
End
Wed Jul 1 05:55
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 0.7 h to spare
WO-10291WO-10291 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C
State
Planned
Quantity
365
Start
Wed Jul 1 05:55
End
Thu Jul 2 05:15
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 2.2 d to spare
WO-10085WO-10085 op 10, place and reflow circuit boards
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
150
Start
Thu Jul 2 05:15
End
Mon Jul 6 01:45
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.1 h late
WO-10186WO-10186 op 10, place and reflow circuit boards
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Mon Jul 6 01:45
End
Mon Jul 6 05:55
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.7 h late
WO-10267WO-10267 op 10, place and reflow circuit boards
24-Port PoE Switch, managed
State
Planned
Quantity
115
Start
Mon Jul 6 05:55
End
Mon Jul 6 19:30
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 1.4 h late
WO-10066WO-10066 op 10, place and reflow circuit boards
1TB NVMe SSD, refresh
State
Planned
Quantity
270
Start
Mon Jul 6 19:30
End
Tue Jul 7 11:05
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 5.0 h late
WO-10213WO-10213 op 10, place and reflow circuit boards
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Tue Jul 7 19:00
End
Wed Jul 8 15:55
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.8 h late
WO-10200WO-10200 op 10, place and reflow circuit boards
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
235
Start
Wed Jul 8 15:55
End
Thu Jul 9 22:00
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
Late, 4.4 h late
WO-10047WO-10047 op 10, place and reflow circuit boards
24" FHD Monitor, IPS
State
Planned
Quantity
280
Start
Fri Jul 10 01:05
End
Fri Jul 10 20:05
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 17 17:00
Order
At risk, 6.2 h to spare
WO-10090WO-10090 op 10, place and reflow circuit boards
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Fri Jul 10 20:05
End
Mon Jul 13 19:35
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 17 17:00
Order
At risk, 3.2 h to spare
WO-10330WO-10330 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Finished
Quantity
150
Start
Fri May 29 18:15
End
Mon Jun 1 05:00
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.1 d to spare
WO-10216WO-10216 op 10, place and reflow circuit boards
USB-C Travel Hub, 7-in-1, gray
State
Finished
Quantity
230
Start
Mon Jun 1 06:00
End
Tue Jun 2 13:35
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 30 h to spare
WO-10108WO-10108 op 10, place and reflow circuit boards
Wi-Fi 6 Access Point, ceiling
State
Finished
Quantity
100
Start
Tue Jun 2 13:35
End
Tue Jun 2 22:55
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.4 d to spare
WO-10156WO-10156 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Held in the frozen window
Quantity
390
Start
Thu Jun 4 12:00
End
Fri Jun 5 12:25
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 48 h to spare
WO-10209WO-10209 op 10, place and reflow circuit boards
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
435
Start
Fri Jun 5 12:25
End
Mon Jun 8 09:00
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.2 d to spare
WO-10240WO-10240 op 10, place and reflow circuit boards
1TB NVMe SSD, gray
State
Planned
Quantity
300
Start
Mon Jun 8 09:00
End
Tue Jun 9 00:55
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 25 h to spare
WO-10078WO-10078 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Tue Jun 9 00:55
End
Tue Jun 9 04:40
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10179WO-10179 op 10, place and reflow circuit boards
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
75
Start
Tue Jun 9 06:00
End
Tue Jun 9 14:20
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 42 h to spare
WO-10157WO-10157 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Wed Jun 10 05:20
End
Thu Jun 11 05:30
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 33 h to spare
WO-10319WO-10319 op 10, place and reflow circuit boards
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
120
Start
Thu Jun 11 06:00
End
Thu Jun 11 20:35
Changeover
90 min
For
ACCOUNT 9148, Standard
Order due
Mon Jun 22 15:00
Order
On time, 4.3 d to spare
WO-10031WO-10031 op 10, place and reflow circuit boards
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
200
Start
Fri Jun 12 06:00
End
Mon Jun 15 01:55
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10299WO-10299 op 10, place and reflow circuit boards
USB-C Dock, 100W, dual display
State
Planned
Quantity
110
Start
Mon Jun 15 06:00
End
Mon Jun 15 17:05
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.0 d to spare
WO-10151WO-10151 op 10, place and reflow circuit boards
2TB Portable SSD
State
Planned
Quantity
330
Start
Mon Jun 15 17:05
End
Tue Jun 16 08:30
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 4.8 d to spare
WO-10311WO-10311 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
400
Start
Tue Jun 16 08:30
End
Wed Jun 17 11:25
Changeover
90 min
For
ACCOUNT 7463, Gold
Order due
Thu Jun 25 15:00
Order
On time, 31 h to spare
WO-10128WO-10128 op 10, place and reflow circuit boards
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Thu Jun 18 00:55
End
Thu Jun 18 19:45
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10109WO-10109 op 10, place and reflow circuit boards
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
90
Start
Thu Jun 18 19:45
End
Fri Jun 19 03:05
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10290WO-10290 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C
State
Planned
Quantity
385
Start
Fri Jun 19 04:50
End
Mon Jun 22 05:15
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 29 h to spare
WO-10308WO-10308 op 10, place and reflow circuit boards
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
300
Start
Mon Jun 22 05:15
End
Tue Jun 23 14:35
Changeover
90 min
For
ACCOUNT 5190, Silver
Order due
Tue Jun 30 15:00
Order
Late, 3.0 h late
WO-10261WO-10261 op 10, place and reflow circuit boards
22" Touch Monitor, gray
State
Planned
Quantity
465
Start
Tue Jun 23 14:35
End
Thu Jun 25 03:15
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 10 h to spare
WO-10251WO-10251 op 10, place and reflow circuit boards
4K Conference Camera, gray
State
Planned
Quantity
105
Start
Thu Jun 25 06:00
End
Thu Jun 25 11:50
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 2.5 h late
WO-10285WO-10285 op 10, place and reflow circuit boards
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
120
Start
Thu Jun 25 11:50
End
Fri Jun 26 01:25
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 0.9 h late
WO-10325WO-10325 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
250
Start
Fri Jun 26 01:25
End
Mon Jun 29 11:10
Changeover
90 min
For
ACCOUNT 7702, Gold
Order due
Mon Jul 6 15:00
Order
Late, 41 h late
WO-10271WO-10271 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB
State
Planned
Quantity
35
Start
Mon Jun 29 11:10
End
Mon Jun 29 15:50
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 3.3 h to spare
WO-10013WO-10013 op 10, place and reflow circuit boards
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
45
Start
Mon Jun 29 15:50
End
Mon Jun 29 22:30
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
At risk, 1.7 h to spare
WO-10145WO-10145 op 10, place and reflow circuit boards
4K Conference Camera
State
Planned
Quantity
490
Start
Tue Jun 30 04:40
End
Tue Jun 30 23:05
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 3.1 h to spare
WO-10056WO-10056 op 10, place and reflow circuit boards
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
130
Start
Wed Jul 1 06:00
End
Wed Jul 1 13:45
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 25 h to spare
WO-10042WO-10042 op 10, place and reflow circuit boards
KVM Switch, 2-port 4K
State
Planned
Quantity
550
Start
Wed Jul 1 19:20
End
Mon Jul 6 21:35
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
At risk, 0.9 h to spare
WO-10028WO-10028 op 10, place and reflow circuit boards
1TB NVMe SSD
State
Planned
Quantity
530
Start
Tue Jul 7 03:50
End
Wed Jul 8 02:20
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
On time, 8.3 h to spare
WO-10146WO-10146 op 10, place and reflow circuit boards
4K Conference Camera
State
Planned
Quantity
380
Start
Wed Jul 8 06:00
End
Wed Jul 8 20:55
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 5.0 h to spare
WO-10262WO-10262 op 10, place and reflow circuit boards
22" Touch Monitor, gray
State
Planned
Quantity
525
Start
Thu Jul 9 06:00
End
Fri Jul 10 22:55
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
Late, 28 h late
WO-10004WO-10004 op 10, place and reflow circuit boards
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
490
Start
Fri Jul 10 22:55
End
Mon Jul 13 19:10
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 20 17:00
Order
On time, 8.5 h to spare
WO-10073WO-10073 op 10, place and reflow circuit boards
4-Bay NAS Enclosure
State
Finished
Quantity
415
Start
Fri May 29 20:10
End
Mon Jun 1 08:30
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.9 d to spare
WO-10054WO-10054 op 10, place and reflow circuit boards
128GB USB Flash Drive, 10-pack, refresh
State
Finished
Quantity
130
Start
Mon Jun 1 20:45
End
Tue Jun 2 03:30
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10245WO-10245 op 10, place and reflow circuit boards
Thunderbolt Dock, 4 ports
State
Running now
Quantity
191 left of 415
Start
Tue Jun 2 03:30
End
Thu Jun 4 01:55
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10064WO-10064 op 10, place and reflow circuit boards
1TB NVMe SSD, refresh
State
Planned
Quantity
230
Start
Thu Jun 4 01:55
End
Thu Jun 4 15:35
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10026WO-10026 op 10, place and reflow circuit boards
1TB NVMe SSD
State
Planned
Quantity
450
Start
Thu Jun 4 15:35
End
Fri Jun 5 09:15
Changeover
10 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.4 d to spare
WO-10113WO-10113 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
140
Start
Fri Jun 5 09:15
End
Mon Jun 8 03:25
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.0 d to spare
WO-10142WO-10142 op 10, place and reflow circuit boards
4K Conference Camera
State
Planned
Quantity
400
Start
Mon Jun 8 06:00
End
Mon Jun 8 21:30
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10122WO-10122 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz
State
Planned
Quantity
340
Start
Tue Jun 9 04:40
End
Wed Jun 10 05:20
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10250WO-10250 op 10, place and reflow circuit boards
4K Conference Camera, gray
State
Planned
Quantity
125
Start
Wed Jun 10 06:00
End
Wed Jun 10 12:30
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 32 h to spare
WO-10189WO-10189 op 10, place and reflow circuit boards
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
340
Start
Thu Jun 11 03:30
End
Fri Jun 12 16:45
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 44 h to spare
WO-10217WO-10217 op 10, place and reflow circuit boards
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
180
Start
Mon Jun 15 00:10
End
Mon Jun 15 19:50
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.3 d to spare
WO-10246WO-10246 op 10, place and reflow circuit boards
Thunderbolt Dock, 4 ports
State
Planned
Quantity
410
Start
Tue Jun 16 05:25
End
Thu Jun 18 00:55
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 2.2 d to spare
WO-10324WO-10324 op 10, place and reflow circuit boards
22" Touch Monitor, gray
State
Planned
Quantity
400
Start
Thu Jun 18 06:00
End
Fri Jun 19 13:30
Changeover
90 min
For
ACCOUNT 6021, Standard
Order due
Fri Jun 26 15:00
Order
On time, 8.2 h to spare
WO-10295WO-10295 op 10, place and reflow circuit boards
34" Ultrawide Monitor, curved
State
Planned
Quantity
235
Start
Mon Jun 22 03:05
End
Mon Jun 22 20:30
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 9.9 h to spare
WO-10241WO-10241 op 10, place and reflow circuit boards
1TB NVMe SSD, gray
State
Planned
Quantity
280
Start
Tue Jun 23 06:00
End
Tue Jun 23 21:40
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10017WO-10017 op 10, place and reflow circuit boards
4-Bay NAS Enclosure, gray
State
Planned
Quantity
135
Start
Wed Jun 24 06:00
End
Wed Jun 24 12:45
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.4 d to spare
WO-10060WO-10060 op 10, place and reflow circuit boards
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Wed Jun 24 12:45
End
Wed Jun 24 18:25
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.3 d to spare
WO-10190WO-10190 op 10, place and reflow circuit boards
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
360
Start
Thu Jun 25 06:00
End
Fri Jun 26 21:45
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 2.7 h to spare
WO-10051WO-10051 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
220
Start
Sun Jun 28 23:00
End
Mon Jun 29 14:15
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.4 h to spare
WO-10309WO-10309 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Tue Jun 30 23:05
End
Wed Jul 1 06:35
Changeover
10 min
For
ACCOUNT 7702, Gold
Order due
Wed Jul 8 15:00
Order
On time, 22 h to spare
WO-10247WO-10247 op 10, place and reflow circuit boards
Thunderbolt Dock, 4 ports
State
Planned
Quantity
415
Start
Wed Jul 1 06:35
End
Mon Jul 6 02:20
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 13 h late
WO-10276WO-10276 op 10, place and reflow circuit boards
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Mon Jul 6 06:00
End
Mon Jul 6 13:00
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 3.9 h to spare
WO-10023WO-10023 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
90
Start
Mon Jul 6 14:35
End
Tue Jul 7 03:50
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 3.0 h late
WO-10071WO-10071 op 10, place and reflow circuit boards
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Tue Jul 7 06:00
End
Wed Jul 8 15:45
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 2.5 h to spare
WO-10124WO-10124 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz
State
Planned
Quantity
315
Start
Wed Jul 8 15:45
End
Thu Jul 9 14:50
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
At risk, 0.6 h to spare
WO-10080WO-10080 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Fri Jul 10 14:00
End
Fri Jul 10 17:30
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 27 h to spare
WO-10191WO-10191 op 10, place and reflow circuit boards
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
350
Start
Fri Jul 10 17:30
End
Tue Jul 14 08:15
Changeover
90 min
For
Warehouse stock
Order due
Fri Jul 17 17:00
Order
Late, 2.5 h late
WO-10298WO-10298 op 10, place and reflow circuit boards
USB-C Dock, 100W, dual display
State
Finished
Quantity
140
Start
Mon Jun 1 06:00
End
Mon Jun 1 22:05
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 28 h to spare
WO-10341WO-10341 op 10, place and reflow circuit boards
15" Laptop, 12-core, 32GB / 1TB
State
Finished
Quantity
30
Start
Tue Jun 2 06:00
End
Tue Jun 2 12:10
For
ENGINEERING, Internal
Order due
Fri Jun 12 12:00
Order
On time, 2.7 d to spare
WO-10021WO-10021 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
85
Start
Wed Jun 3 06:00
End
Wed Jun 3 20:45
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10165WO-10165 op 10, place and reflow circuit boards
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Thu Jun 4 06:00
End
Thu Jun 4 15:15
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.2 d to spare
WO-10170WO-10170 op 10, place and reflow circuit boards
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
90
Start
Fri Jun 5 06:00
End
Fri Jun 5 18:25
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.4 d to spare
WO-10274WO-10274 op 10, place and reflow circuit boards
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Mon Jun 8 06:00
End
Mon Jun 8 13:55
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 26 h to spare
WO-10221WO-10221 op 10, place and reflow circuit boards
8-Port Gigabit Switch
State
Planned
Quantity
160
Start
Tue Jun 9 06:00
End
Wed Jun 10 02:25
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 32 h to spare
WO-10342WO-10342 op 10, place and reflow circuit boards
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
30
Start
Wed Jun 10 06:00
End
Wed Jun 10 12:30
Changeover
90 min
For
ENGINEERING, Internal
Order due
Fri Jun 19 12:00
Order
On time, 2.1 d to spare
WO-10143WO-10143 op 10, place and reflow circuit boards
4K Conference Camera
State
Planned
Quantity
410
Start
Fri Jun 12 06:00
End
Mon Jun 15 00:10
Changeover
90 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.9 d to spare
WO-10055WO-10055 op 10, place and reflow circuit boards
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
140
Start
Mon Jun 15 04:10
End
Mon Jun 15 13:25
Changeover
90 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.2 d to spare
WO-10307WO-10307 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz
State
Planned
Quantity
150
Start
Mon Jun 15 15:45
End
Tue Jun 16 05:25
Changeover
90 min
For
ACCOUNT 7702, Gold
Order due
Wed Jun 24 15:00
Order
On time, 4.8 d to spare
WO-10227WO-10227 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Tue Jun 16 06:00
End
Tue Jun 16 19:05
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10266WO-10266 op 10, place and reflow circuit boards
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Wed Jun 17 06:00
End
Wed Jun 17 22:40
Changeover
90 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.3 d to spare
WO-10343WO-10343 op 10, place and reflow circuit boards
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
30
Start
Thu Jun 18 06:00
End
Thu Jun 18 12:40
Changeover
90 min
For
ENGINEERING, Internal
Order due
Fri Jun 26 12:00
Order
On time, 3.0 d to spare
WO-10166WO-10166 op 10, place and reflow circuit boards
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Thu Jun 18 23:25
End
Fri Jun 19 08:10
Changeover
90 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.8 d to spare
WO-10114WO-10114 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
125
Start
Fri Jun 19 08:10
End
Mon Jun 22 03:05
Changeover
90 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10079WO-10079 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Mon Jun 22 06:00
End
Mon Jun 22 09:05
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 2.0 d to spare
WO-10007WO-10007 op 10, place and reflow circuit boards
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Mon Jun 22 16:55
End
Tue Jun 23 06:50
Changeover
10 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 33 h to spare
WO-10123WO-10123 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz
State
Planned
Quantity
350
Start
Tue Jun 23 06:50
End
Wed Jun 24 12:35
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 30 h to spare
WO-10104WO-10104 op 10, place and reflow circuit boards
1080p Webcam with mic
State
Planned
Quantity
340
Start
Thu Jun 25 03:15
End
Thu Jun 25 18:30
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 27 h to spare
WO-10313WO-10313 op 10, place and reflow circuit boards
22" Touch Monitor, gray
State
Planned
Quantity
80
Start
Fri Jun 26 04:25
End
Fri Jun 26 13:10
Changeover
90 min
For
ACCOUNT 3327, Gold
Order due
Tue Jul 7 15:00
Order
On time, 20 h to spare
WO-10237WO-10237 op 10, place and reflow circuit boards
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
30
Start
Mon Jun 29 06:00
End
Mon Jun 29 11:25
Changeover
90 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 4.6 h to spare
WO-10075WO-10075 op 10, place and reflow circuit boards
4-Bay NAS Enclosure
State
Planned
Quantity
530
Start
Mon Jun 29 11:25
End
Tue Jun 30 13:05
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.4 h to spare
WO-10300WO-10300 op 10, place and reflow circuit boards
USB-C Dock, 100W, dual display
State
Planned
Quantity
130
Start
Tue Jun 30 13:05
End
Wed Jul 1 03:55
Changeover
90 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 2.7 h to spare
WO-10100WO-10100 op 10, place and reflow circuit boards
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Wed Jul 1 06:00
End
Wed Jul 1 09:45
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 26 h to spare
WO-10312WO-10312 op 10, place and reflow circuit boards
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Wed Jul 1 09:45
End
Wed Jul 1 20:35
Changeover
90 min
For
ACCOUNT 9148, Standard
Order due
Thu Jul 9 15:00
Order
Late, 20 h late
WO-10167WO-10167 op 10, place and reflow circuit boards
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Thu Jul 2 06:00
End
Thu Jul 2 14:30
Changeover
45 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 47 h to spare
WO-10228WO-10228 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Mon Jul 6 02:20
End
Mon Jul 6 14:35
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 24 h late
WO-10115WO-10115 op 10, place and reflow circuit boards
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
135
Start
Tue Jul 7 06:00
End
Wed Jul 8 00:40
Changeover
10 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.2 h late
WO-10061WO-10061 op 10, place and reflow circuit boards
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
100
Start
Wed Jul 8 06:00
End
Wed Jul 8 13:20
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 26 h to spare
WO-10181WO-10181 op 10, place and reflow circuit boards
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
70
Start
Thu Jul 9 04:20
End
Thu Jul 9 13:20
Changeover
90 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 28 h to spare
WO-10161WO-10161 op 10, place and reflow circuit boards
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
425
Start
Thu Jul 9 14:50
End
Fri Jul 10 22:00
Changeover
90 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
At risk, 1.4 h to spare
SUB Sub-assembly79%
WO-10326WO-10326 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB
State
Finished
Quantity
40
Start
Mon Jun 1 06:00
End
Mon Jun 1 08:20
For
ACCOUNT 8321, Platinum
Order due
Tue Jun 9 15:00
Order
On time, 4.9 d to spare
WO-10136WO-10136 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB
State
Finished
Quantity
470
Start
Mon Jun 1 13:30
End
Tue Jun 2 14:35
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
At risk, 2.0 h to spare
WO-10341WO-10341 op 20, build modules and harnesses
15" Laptop, 12-core, 32GB / 1TB
State
Finished
Quantity
30
Start
Tue Jun 2 15:10
End
Tue Jun 2 16:55
For
ENGINEERING, Internal
Order due
Fri Jun 12 12:00
Order
On time, 2.7 d to spare
WO-10150WO-10150 op 20, build modules and harnesses
2TB Portable SSD
State
Finished
Quantity
380
Start
Tue Jun 2 19:00
End
Tue Jun 2 22:10
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 47 h to spare
WO-10279WO-10279 op 20, build modules and harnesses
Ergonomic Mouse, wireless
State
Running now
Quantity
146 left of 500
Start
Tue Jun 2 22:10
End
Wed Jun 3 07:00
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10203WO-10203 op 20, build modules and harnesses
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Thu Jun 4 08:15
End
Fri Jun 5 13:05
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
At risk, 2.0 h to spare
WO-10064WO-10064 op 20, build modules and harnesses
1TB NVMe SSD, refresh
State
Planned
Quantity
230
Start
Fri Jun 5 13:05
End
Fri Jun 5 15:40
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10289WO-10289 op 20, build modules and harnesses
27" 4K Monitor, USB-C
State
Planned
Quantity
355
Start
Fri Jun 5 15:40
End
Mon Jun 8 08:10
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 44 h to spare
WO-10209WO-10209 op 20, build modules and harnesses
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
435
Start
Mon Jun 8 08:10
End
Mon Jun 8 12:20
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.2 d to spare
WO-10294WO-10294 op 20, build modules and harnesses
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Mon Jun 8 12:20
End
Mon Jun 8 20:55
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 2.9 d to spare
WO-10093WO-10093 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Mon Jun 8 20:55
End
Tue Jun 9 08:25
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 3.8 d to spare
WO-10274WO-10274 op 20, build modules and harnesses
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Tue Jun 9 08:25
End
Tue Jun 9 10:55
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 26 h to spare
WO-10303WO-10303 op 20, build modules and harnesses
Mechanical Keyboard, TKL
State
Planned
Quantity
260
Start
Tue Jun 9 17:40
End
Tue Jun 9 20:40
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10198WO-10198 op 20, build modules and harnesses
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
240
Start
Tue Jun 9 22:00
End
Wed Jun 10 14:45
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10221WO-10221 op 20, build modules and harnesses
8-Port Gigabit Switch
State
Planned
Quantity
160
Start
Wed Jun 10 14:45
End
Wed Jun 10 19:45
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 32 h to spare
WO-10103WO-10103 op 20, build modules and harnesses
1080p Webcam with mic
State
Planned
Quantity
350
Start
Wed Jun 10 19:45
End
Wed Jun 10 23:00
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.0 d to spare
WO-10284WO-10284 op 20, build modules and harnesses
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
100
Start
Thu Jun 11 06:00
End
Thu Jun 11 08:20
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 30 h to spare
WO-10342WO-10342 op 20, build modules and harnesses
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
30
Start
Thu Jun 11 08:20
End
Thu Jun 11 10:50
Changeover
50 min
For
ENGINEERING, Internal
Order due
Fri Jun 19 12:00
Order
On time, 2.1 d to spare
WO-10045WO-10045 op 20, build modules and harnesses
24" FHD Monitor, IPS
State
Planned
Quantity
280
Start
Thu Jun 11 10:50
End
Thu Jun 11 18:25
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10231WO-10231 op 20, build modules and harnesses
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
110
Start
Thu Jun 11 18:25
End
Fri Jun 12 06:40
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 46 h to spare
WO-10189WO-10189 op 20, build modules and harnesses
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
340
Start
Fri Jun 12 12:00
End
Fri Jun 12 18:05
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 44 h to spare
WO-10002WO-10002 op 20, build modules and harnesses
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
370
Start
Fri Jun 12 19:05
End
Fri Jun 12 22:40
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.8 d to spare
WO-10236WO-10236 op 20, build modules and harnesses
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
35
Start
Mon Jun 15 06:00
End
Mon Jun 15 08:25
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10118WO-10118 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Mon Jun 15 08:25
End
Mon Jun 15 13:45
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.4 d to spare
WO-10055WO-10055 op 20, build modules and harnesses
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
140
Start
Mon Jun 15 13:45
End
Mon Jun 15 15:35
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.2 d to spare
WO-10016WO-10016 op 20, build modules and harnesses
4-Bay NAS Enclosure, gray
State
Planned
Quantity
120
Start
Mon Jun 15 16:15
End
Mon Jun 15 17:40
Changeover
40 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10074WO-10074 op 20, build modules and harnesses
4-Bay NAS Enclosure
State
Planned
Quantity
430
Start
Mon Jun 15 17:40
End
Mon Jun 15 21:05
Changeover
25 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10175WO-10175 op 20, build modules and harnesses
8" Rugged Tablet, 64GB
State
Planned
Quantity
110
Start
Tue Jun 16 06:00
End
Tue Jun 16 11:15
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 33 h to spare
WO-10151WO-10151 op 20, build modules and harnesses
2TB Portable SSD
State
Planned
Quantity
330
Start
Tue Jun 16 11:15
End
Tue Jun 16 14:10
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 4.8 d to spare
WO-10280WO-10280 op 20, build modules and harnesses
Ergonomic Mouse, wireless
State
Planned
Quantity
590
Start
Wed Jun 17 06:00
End
Wed Jun 17 11:20
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 47 h to spare
WO-10210WO-10210 op 20, build modules and harnesses
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
485
Start
Wed Jun 17 22:35
End
Thu Jun 18 09:35
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 3.3 d to spare
WO-10041WO-10041 op 20, build modules and harnesses
KVM Switch, 2-port 4K
State
Planned
Quantity
630
Start
Thu Jun 18 11:30
End
Thu Jun 18 21:10
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10185WO-10185 op 20, build modules and harnesses
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Thu Jun 18 21:10
End
Thu Jun 18 22:45
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 32 h to spare
WO-10266WO-10266 op 20, build modules and harnesses
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Thu Jun 18 22:45
End
Fri Jun 19 09:25
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.3 d to spare
WO-10022WO-10022 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
75
Start
Fri Jun 19 09:25
End
Fri Jun 19 15:00
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 3.1 d to spare
WO-10109WO-10109 op 20, build modules and harnesses
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
90
Start
Fri Jun 19 15:00
End
Fri Jun 19 17:25
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10290WO-10290 op 20, build modules and harnesses
27" 4K Monitor, USB-C
State
Planned
Quantity
385
Start
Fri Jun 19 17:25
End
Mon Jun 22 11:05
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 29 h to spare
WO-10070WO-10070 op 20, build modules and harnesses
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Mon Jun 22 11:05
End
Mon Jun 22 19:25
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.1 d to spare
WO-10211WO-10211 op 20, build modules and harnesses
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
420
Start
Mon Jun 22 19:25
End
Mon Jun 22 23:00
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 2.9 d to spare
WO-10295WO-10295 op 20, build modules and harnesses
34" Ultrawide Monitor, curved
State
Planned
Quantity
235
Start
Tue Jun 23 06:00
End
Tue Jun 23 13:45
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 9.9 h to spare
WO-10144WO-10144 op 20, build modules and harnesses
4K Conference Camera
State
Planned
Quantity
480
Start
Tue Jun 23 13:45
End
Tue Jun 23 17:50
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 29 h to spare
WO-10099WO-10099 op 20, build modules and harnesses
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Tue Jun 23 17:55
End
Tue Jun 23 19:45
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 10 h to spare
WO-10094WO-10094 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Tue Jun 23 19:45
End
Wed Jun 24 07:00
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 32 h to spare
WO-10036WO-10036 op 20, build modules and harnesses
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Wed Jun 24 07:00
End
Wed Jun 24 15:10
Changeover
40 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 47 h to spare
WO-10304WO-10304 op 20, build modules and harnesses
Mechanical Keyboard, TKL
State
Planned
Quantity
320
Start
Wed Jun 24 15:10
End
Wed Jun 24 18:05
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 42 h to spare
WO-10017WO-10017 op 20, build modules and harnesses
4-Bay NAS Enclosure, gray
State
Planned
Quantity
135
Start
Wed Jun 24 18:05
End
Wed Jun 24 20:15
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.4 d to spare
WO-10222WO-10222 op 20, build modules and harnesses
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Wed Jun 24 20:50
End
Thu Jun 25 08:05
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 45 h to spare
WO-10046WO-10046 op 20, build modules and harnesses
24" FHD Monitor, IPS
State
Planned
Quantity
290
Start
Thu Jun 25 08:05
End
Thu Jun 25 16:25
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 33 h to spare
WO-10060WO-10060 op 20, build modules and harnesses
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Thu Jun 25 16:25
End
Thu Jun 25 18:05
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.3 d to spare
WO-10089WO-10089 op 20, build modules and harnesses
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Thu Jun 25 18:05
End
Fri Jun 26 08:50
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 29 h to spare
WO-10251WO-10251 op 20, build modules and harnesses
4K Conference Camera, gray
State
Planned
Quantity
105
Start
Fri Jun 26 08:50
End
Fri Jun 26 11:00
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 2.5 h late
WO-10133WO-10133 op 20, build modules and harnesses
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
145
Start
Fri Jun 26 19:35
End
Mon Jun 29 08:55
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 24 h to spare
WO-10180WO-10180 op 20, build modules and harnesses
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
65
Start
Mon Jun 29 12:05
End
Mon Jun 29 14:15
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 34 h to spare
WO-10051WO-10051 op 20, build modules and harnesses
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
220
Start
Mon Jun 29 14:15
End
Mon Jun 29 20:55
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.4 h to spare
WO-10212WO-10212 op 20, build modules and harnesses
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Mon Jun 29 20:55
End
Tue Jun 30 07:45
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 5.7 h to spare
WO-10075WO-10075 op 20, build modules and harnesses
4-Bay NAS Enclosure
State
Planned
Quantity
530
Start
Tue Jun 30 10:30
End
Tue Jun 30 13:55
Changeover
25 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.4 h to spare
WO-10119WO-10119 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Tue Jun 30 13:55
End
Tue Jun 30 19:15
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 25 h to spare
WO-10145WO-10145 op 20, build modules and harnesses
4K Conference Camera
State
Planned
Quantity
490
Start
Tue Jun 30 19:15
End
Wed Jul 1 06:25
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 3.1 h to spare
WO-10176WO-10176 op 20, build modules and harnesses
8" Rugged Tablet, 64GB
State
Planned
Quantity
95
Start
Wed Jul 1 06:25
End
Wed Jul 1 11:05
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.2 h to spare
WO-10300WO-10300 op 20, build modules and harnesses
USB-C Dock, 100W, dual display
State
Planned
Quantity
130
Start
Wed Jul 1 11:05
End
Wed Jul 1 13:35
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 2.7 h to spare
WO-10331WO-10331 op 20, build modules and harnesses
22" Touch Monitor
State
Planned
Quantity
300
Start
Wed Jul 1 13:35
End
Wed Jul 1 21:55
Changeover
50 min
For
ACCOUNT 6021, Standard
Order due
Wed Jul 8 15:00
Order
Late, 25 h late
WO-10312WO-10312 op 20, build modules and harnesses
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Wed Jul 1 21:55
End
Thu Jul 2 08:30
Changeover
40 min
For
ACCOUNT 9148, Standard
Order due
Thu Jul 9 15:00
Order
Late, 20 h late
WO-10247WO-10247 op 20, build modules and harnesses
Thunderbolt Dock, 4 ports
State
Planned
Quantity
415
Start
Mon Jul 6 06:00
End
Mon Jul 6 13:40
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 13 h late
WO-10129WO-10129 op 20, build modules and harnesses
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Mon Jul 6 13:40
End
Mon Jul 6 18:15
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 21 h late
WO-10160WO-10160 op 20, build modules and harnesses
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Mon Jul 6 18:15
End
Tue Jul 7 11:50
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 26 h late
WO-10267WO-10267 op 20, build modules and harnesses
24-Port PoE Switch, managed
State
Planned
Quantity
115
Start
Tue Jul 7 11:50
End
Tue Jul 7 15:15
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 1.4 h late
WO-10066WO-10066 op 20, build modules and harnesses
1TB NVMe SSD, refresh
State
Planned
Quantity
270
Start
Tue Jul 7 15:15
End
Tue Jul 7 18:10
Changeover
50 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 5.0 h late
WO-10115WO-10115 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
135
Start
Tue Jul 7 18:10
End
Wed Jul 8 09:20
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.2 h late
WO-10276WO-10276 op 20, build modules and harnesses
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Wed Jul 8 09:20
End
Wed Jul 8 11:50
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 3.9 h to spare
WO-10257WO-10257 op 20, build modules and harnesses
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
340
Start
Wed Jul 8 12:20
End
Thu Jul 9 10:50
Changeover
50 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 2.9 d late
WO-10095WO-10095 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Thu Jul 9 10:50
End
Thu Jul 9 14:55
Changeover
40 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 8.5 h to spare
WO-10200WO-10200 op 20, build modules and harnesses
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
235
Start
Thu Jul 9 14:55
End
Fri Jul 10 07:20
Changeover
40 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
Late, 4.4 h late
WO-10252WO-10252 op 20, build modules and harnesses
4K Conference Camera, gray
State
Planned
Quantity
115
Start
Fri Jul 10 07:20
End
Fri Jul 10 09:05
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 22 h to spare
WO-10242WO-10242 op 20, build modules and harnesses
1TB NVMe SSD, gray
State
Planned
Quantity
270
Start
Fri Jul 10 19:20
End
Fri Jul 10 22:10
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 5.0 h to spare
WO-10001WO-10001 op 20, build modules and harnesses
Ergonomic Mouse, wireless, gray
State
Finished
Quantity
390
Start
Fri May 29 19:50
End
Mon Jun 1 06:45
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.3 d to spare
WO-10330WO-10330 op 20, build modules and harnesses
27" QHD Monitor, 165Hz, refresh
State
Finished
Quantity
150
Start
Mon Jun 1 08:55
End
Mon Jun 1 13:45
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.1 d to spare
WO-10117WO-10117 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, gray
State
Finished
Quantity
100
Start
Mon Jun 1 15:25
End
Mon Jun 1 21:15
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.8 d to spare
WO-10298WO-10298 op 20, build modules and harnesses
USB-C Dock, 100W, dual display
State
Finished
Quantity
140
Start
Tue Jun 2 11:05
End
Tue Jun 2 13:45
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 28 h to spare
WO-10054WO-10054 op 20, build modules and harnesses
128GB USB Flash Drive, 10-pack, refresh
State
Finished
Quantity
130
Start
Tue Jun 2 13:45
End
Tue Jun 2 15:30
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10098WO-10098 op 20, build modules and harnesses
Wi-Fi 6E Router
State
Finished
Quantity
20
Start
Tue Jun 2 15:30
End
Tue Jun 2 16:50
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10174WO-10174 op 20, build modules and harnesses
8" Rugged Tablet, 64GB
State
Finished
Quantity
85
Start
Tue Jun 2 16:50
End
Tue Jun 2 21:10
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 33 h to spare
WO-10184WO-10184 op 20, build modules and harnesses
8" Rugged Tablet, 64GB, gray
State
Held in the frozen window
Quantity
25
Start
Wed Jun 3 06:00
End
Wed Jun 3 07:20
Changeover
25 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 34 h to spare
WO-10245WO-10245 op 20, build modules and harnesses
Thunderbolt Dock, 4 ports
State
Held in the frozen window
Quantity
415
Start
Wed Jun 3 16:10
End
Thu Jun 4 06:50
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10083WO-10083 op 20, build modules and harnesses
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
155
Start
Thu Jun 4 06:50
End
Thu Jun 4 14:10
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.4 d to spare
WO-10226WO-10226 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Thu Jun 4 14:10
End
Thu Jun 4 19:40
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.0 d to spare
WO-10021WO-10021 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
85
Start
Thu Jun 4 19:40
End
Fri Jun 5 07:50
Changeover
25 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10344WO-10344 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
240
Start
Fri Jun 5 09:35
End
Fri Jun 5 21:05
Changeover
50 min
For
ACCOUNT 4340, Platinum
Order due
Fri Jun 12 15:00
Order
On time, 28 h to spare
WO-10113WO-10113 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
140
Start
Fri Jun 5 21:05
End
Mon Jun 8 12:30
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.0 d to spare
WO-10006WO-10006 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
155
Start
Mon Jun 8 15:05
End
Mon Jun 8 22:50
Changeover
40 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 30 h to spare
WO-10142WO-10142 op 20, build modules and harnesses
4K Conference Camera
State
Planned
Quantity
400
Start
Mon Jun 8 22:50
End
Tue Jun 9 09:20
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10078WO-10078 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Tue Jun 9 09:20
End
Tue Jun 9 11:35
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10179WO-10179 op 20, build modules and harnesses
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
75
Start
Tue Jun 9 13:30
End
Tue Jun 9 15:50
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 42 h to spare
WO-10255WO-10255 op 20, build modules and harnesses
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
350
Start
Tue Jun 9 16:10
End
Wed Jun 10 15:05
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
Late, 2.7 d late
WO-10059WO-10059 op 20, build modules and harnesses
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Wed Jun 10 15:05
End
Wed Jun 10 16:45
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10250WO-10250 op 20, build modules and harnesses
4K Conference Camera, gray
State
Planned
Quantity
125
Start
Wed Jun 10 16:45
End
Wed Jun 10 18:30
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 32 h to spare
WO-10260WO-10260 op 20, build modules and harnesses
22" Touch Monitor, gray
State
Planned
Quantity
540
Start
Wed Jun 10 19:55
End
Thu Jun 11 20:30
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 8.1 h to spare
WO-10132WO-10132 op 20, build modules and harnesses
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
140
Start
Thu Jun 11 20:30
End
Fri Jun 12 09:35
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10194WO-10194 op 20, build modules and harnesses
10" Tablet, 64GB
State
Planned
Quantity
125
Start
Fri Jun 12 09:35
End
Fri Jun 12 14:40
Changeover
40 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.3 d to spare
WO-10137WO-10137 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
505
Start
Mon Jun 15 08:15
End
Tue Jun 16 12:10
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
At risk, 1.2 h to spare
WO-10227WO-10227 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Tue Jun 16 16:15
End
Tue Jun 16 21:45
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10204WO-10204 op 20, build modules and harnesses
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Wed Jun 17 12:00
End
Thu Jun 18 16:20
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
At risk, 0.2 h to spare
WO-10128WO-10128 op 20, build modules and harnesses
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Thu Jun 18 16:20
End
Thu Jun 18 21:25
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10343WO-10343 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
30
Start
Thu Jun 18 21:25
End
Fri Jun 19 06:30
Changeover
50 min
For
ENGINEERING, Internal
Order due
Fri Jun 26 12:00
Order
On time, 3.0 d to spare
WO-10324WO-10324 op 20, build modules and harnesses
22" Touch Monitor, gray
State
Planned
Quantity
400
Start
Fri Jun 19 06:30
End
Fri Jun 19 20:00
Changeover
50 min
For
ACCOUNT 6021, Standard
Order due
Fri Jun 26 15:00
Order
On time, 8.2 h to spare
WO-10335WO-10335 op 20, build modules and harnesses
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
40
Start
Fri Jun 19 20:00
End
Fri Jun 19 22:40
Changeover
50 min
For
ACCOUNT 2800, Silver
Order due
Mon Jun 29 15:00
Order
On time, 5.2 d to spare
WO-10027WO-10027 op 20, build modules and harnesses
1TB NVMe SSD
State
Planned
Quantity
410
Start
Fri Jun 19 22:40
End
Mon Jun 22 08:55
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.3 d to spare
WO-10337WO-10337 op 20, build modules and harnesses
24" FHD Monitor, IPS
State
Planned
Quantity
40
Start
Mon Jun 22 10:30
End
Mon Jun 22 12:20
Changeover
50 min
For
ACCOUNT 2800, Silver
Order due
Tue Jun 30 15:00
Order
On time, 3.7 d to spare
WO-10256WO-10256 op 20, build modules and harnesses
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
345
Start
Mon Jun 22 16:20
End
Tue Jun 23 15:05
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
At risk, 4.2 h to spare
WO-10007WO-10007 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Tue Jun 23 15:05
End
Tue Jun 23 21:30
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 33 h to spare
WO-10241WO-10241 op 20, build modules and harnesses
1TB NVMe SSD, gray
State
Planned
Quantity
280
Start
Tue Jun 23 21:30
End
Wed Jun 24 07:25
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10199WO-10199 op 20, build modules and harnesses
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
305
Start
Wed Jun 24 09:20
End
Wed Jun 24 21:50
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10318WO-10318 op 20, build modules and harnesses
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
400
Start
Wed Jun 24 21:50
End
Thu Jun 25 19:10
Changeover
50 min
For
ACCOUNT 3915, Standard
Order due
Thu Jul 2 15:00
Order
Late, 2.8 h late
WO-10104WO-10104 op 20, build modules and harnesses
1080p Webcam with mic
State
Planned
Quantity
340
Start
Thu Jun 25 19:10
End
Thu Jun 25 22:20
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 27 h to spare
WO-10232WO-10232 op 20, build modules and harnesses
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
100
Start
Fri Jun 26 06:00
End
Fri Jun 26 10:55
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 0.7 h to spare
WO-10285WO-10285 op 20, build modules and harnesses
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
120
Start
Fri Jun 26 10:55
End
Fri Jun 26 13:35
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 0.9 h late
WO-10313WO-10313 op 20, build modules and harnesses
22" Touch Monitor, gray
State
Planned
Quantity
80
Start
Fri Jun 26 13:35
End
Fri Jun 26 16:45
Changeover
50 min
For
ACCOUNT 3327, Gold
Order due
Tue Jul 7 15:00
Order
On time, 20 h to spare
WO-10190WO-10190 op 20, build modules and harnesses
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
360
Start
Mon Jun 29 06:00
End
Mon Jun 29 12:55
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 2.7 h to spare
WO-10003WO-10003 op 20, build modules and harnesses
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
480
Start
Mon Jun 29 12:55
End
Mon Jun 29 17:15
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 3.8 d to spare
WO-10195WO-10195 op 20, build modules and harnesses
10" Tablet, 64GB
State
Planned
Quantity
115
Start
Mon Jun 29 17:15
End
Mon Jun 29 22:10
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.7 h to spare
WO-10271WO-10271 op 20, build modules and harnesses
Thin Client, 4GB / 32GB
State
Planned
Quantity
35
Start
Mon Jun 29 22:10
End
Tue Jun 30 07:50
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 3.3 h to spare
WO-10032WO-10032 op 20, build modules and harnesses
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
245
Start
Tue Jun 30 07:50
End
Tue Jun 30 14:05
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 11 h to spare
WO-10013WO-10013 op 20, build modules and harnesses
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
45
Start
Tue Jun 30 14:05
End
Tue Jun 30 17:25
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
At risk, 1.7 h to spare
WO-10338WO-10338 op 20, build modules and harnesses
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
150
Start
Wed Jul 1 06:25
End
Wed Jul 1 14:15
Changeover
25 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
At risk, 1.2 h to spare
WO-10309WO-10309 op 20, build modules and harnesses
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Wed Jul 1 14:15
End
Wed Jul 1 18:00
Changeover
50 min
For
ACCOUNT 7702, Gold
Order due
Wed Jul 8 15:00
Order
On time, 22 h to spare
WO-10291WO-10291 op 20, build modules and harnesses
27" 4K Monitor, USB-C
State
Planned
Quantity
365
Start
Wed Jul 1 18:00
End
Thu Jul 2 10:50
Changeover
25 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 2.2 d to spare
WO-10167WO-10167 op 20, build modules and harnesses
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Thu Jul 2 13:25
End
Thu Jul 2 16:35
Changeover
40 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 47 h to spare
WO-10152WO-10152 op 20, build modules and harnesses
2TB Portable SSD
State
Planned
Quantity
350
Start
Mon Jul 6 06:00
End
Mon Jul 6 09:00
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 0.9 h late
WO-10205WO-10205 op 20, build modules and harnesses
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
415
Start
Mon Jul 6 09:00
End
Tue Jul 7 11:25
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 42 h late
WO-10332WO-10332 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
400
Start
Tue Jul 7 11:25
End
Wed Jul 8 13:10
Changeover
50 min
For
ACCOUNT 5190, Silver
Order due
Fri Jul 10 15:00
Order
Late, 4.8 d late
WO-10172WO-10172 op 20, build modules and harnesses
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
80
Start
Wed Jul 8 13:10
End
Wed Jul 8 17:30
Changeover
40 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 1.2 h to spare
WO-10296WO-10296 op 20, build modules and harnesses
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Wed Jul 8 17:30
End
Thu Jul 9 09:05
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 16 h late
WO-10146WO-10146 op 20, build modules and harnesses
4K Conference Camera
State
Planned
Quantity
380
Start
Thu Jul 9 09:05
End
Thu Jul 9 13:00
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 5.0 h to spare
WO-10061WO-10061 op 20, build modules and harnesses
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
100
Start
Thu Jul 9 13:00
End
Thu Jul 9 14:35
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 26 h to spare
WO-10037WO-10037 op 20, build modules and harnesses
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
170
Start
Thu Jul 9 14:35
End
Thu Jul 9 22:00
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 8.8 h to spare
WO-10105WO-10105 op 20, build modules and harnesses
1080p Webcam with mic
State
Planned
Quantity
350
Start
Thu Jul 9 22:00
End
Fri Jul 10 08:15
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 23 h to spare
WO-10286WO-10286 op 20, build modules and harnesses
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
120
Start
Fri Jul 10 08:15
End
Fri Jul 10 11:25
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 20 h to spare
WO-10080WO-10080 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Fri Jul 10 18:00
End
Fri Jul 10 20:15
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 27 h to spare
WO-10161WO-10161 op 20, build modules and harnesses
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
425
Start
Fri Jul 10 20:15
End
Mon Jul 13 14:20
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
At risk, 1.4 h to spare
WO-10310WO-10310 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB, refresh
State
Finished
Quantity
80
Start
Fri May 29 21:30
End
Mon Jun 1 06:35
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.3 d to spare
WO-10073WO-10073 op 20, build modules and harnesses
4-Bay NAS Enclosure
State
Finished
Quantity
415
Start
Mon Jun 1 09:35
End
Mon Jun 1 13:15
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.9 d to spare
WO-10030WO-10030 op 20, build modules and harnesses
Mesh Wi-Fi Kit, 3-pack, refresh
State
Finished
Quantity
245
Start
Mon Jun 1 15:15
End
Mon Jun 1 21:30
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 4.0 d to spare
WO-10141WO-10141 op 20, build modules and harnesses
4K Conference Camera
State
Finished
Quantity
430
Start
Mon Jun 1 21:30
End
Tue Jun 2 07:10
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 34 h to spare
WO-10011WO-10011 op 20, build modules and harnesses
All-in-One 24", 16GB / 512GB
State
Finished
Quantity
45
Start
Tue Jun 2 13:05
End
Tue Jun 2 16:25
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.1 d to spare
WO-10216WO-10216 op 20, build modules and harnesses
USB-C Travel Hub, 7-in-1, gray
State
Finished
Quantity
230
Start
Tue Jun 2 16:25
End
Tue Jun 2 21:15
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 30 h to spare
WO-10108WO-10108 op 20, build modules and harnesses
Wi-Fi 6 Access Point, ceiling
State
Running now
Quantity
9 left of 100
Start
Tue Jun 2 21:20
End
Wed Jun 3 06:10
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.4 d to spare
WO-10127WO-10127 op 20, build modules and harnesses
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
155
Start
Wed Jun 3 16:50
End
Wed Jun 3 21:35
Changeover
40 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.1 d to spare
WO-10040WO-10040 op 20, build modules and harnesses
KVM Switch, 2-port 4K
State
Planned
Quantity
540
Start
Thu Jun 4 06:00
End
Thu Jun 4 14:30
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.3 d to spare
WO-10265WO-10265 op 20, build modules and harnesses
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Thu Jun 4 15:55
End
Thu Jun 4 20:05
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 47 h to spare
WO-10156WO-10156 op 20, build modules and harnesses
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
390
Start
Thu Jun 4 20:45
End
Fri Jun 5 14:05
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 48 h to spare
WO-10165WO-10165 op 20, build modules and harnesses
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Fri Jun 5 14:05
End
Fri Jun 5 17:15
Changeover
40 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.2 d to spare
WO-10026WO-10026 op 20, build modules and harnesses
1TB NVMe SSD
State
Planned
Quantity
450
Start
Fri Jun 5 17:15
End
Fri Jun 5 21:15
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.4 d to spare
WO-10170WO-10170 op 20, build modules and harnesses
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
90
Start
Fri Jun 5 21:15
End
Mon Jun 8 09:10
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.4 d to spare
WO-10069WO-10069 op 20, build modules and harnesses
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
365
Start
Mon Jun 8 12:10
End
Mon Jun 8 21:30
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.2 d to spare
WO-10240WO-10240 op 20, build modules and harnesses
1TB NVMe SSD, gray
State
Planned
Quantity
300
Start
Mon Jun 8 21:30
End
Tue Jun 9 07:30
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 25 h to spare
WO-10339WO-10339 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Tue Jun 9 07:30
End
Tue Jun 9 13:55
Changeover
50 min
For
ACCOUNT 3915, Standard
Order due
Wed Jun 17 15:00
Order
On time, 44 h to spare
WO-10035WO-10035 op 20, build modules and harnesses
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Tue Jun 9 19:45
End
Wed Jun 10 11:05
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10122WO-10122 op 20, build modules and harnesses
27" QHD Monitor, 165Hz
State
Planned
Quantity
340
Start
Wed Jun 10 11:05
End
Wed Jun 10 21:20
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10157WO-10157 op 20, build modules and harnesses
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Wed Jun 10 21:20
End
Thu Jun 11 14:00
Changeover
25 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 33 h to spare
WO-10088WO-10088 op 20, build modules and harnesses
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Thu Jun 11 14:00
End
Thu Jun 11 21:45
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.1 d to spare
WO-10319WO-10319 op 20, build modules and harnesses
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
120
Start
Thu Jun 11 21:45
End
Fri Jun 12 11:40
Changeover
50 min
For
ACCOUNT 9148, Standard
Order due
Mon Jun 22 15:00
Order
On time, 4.3 d to spare
WO-10050WO-10050 op 20, build modules and harnesses
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
215
Start
Fri Jun 12 11:40
End
Fri Jun 12 17:45
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10031WO-10031 op 20, build modules and harnesses
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
200
Start
Fri Jun 12 19:10
End
Mon Jun 15 07:00
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10143WO-10143 op 20, build modules and harnesses
4K Conference Camera
State
Planned
Quantity
410
Start
Mon Jun 15 07:00
End
Mon Jun 15 11:05
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.9 d to spare
WO-10012WO-10012 op 20, build modules and harnesses
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
40
Start
Mon Jun 15 11:05
End
Mon Jun 15 14:10
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.1 d to spare
WO-10270WO-10270 op 20, build modules and harnesses
Thin Client, 4GB / 32GB
State
Planned
Quantity
40
Start
Mon Jun 15 16:25
End
Mon Jun 15 19:40
Changeover
40 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10217WO-10217 op 20, build modules and harnesses
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
180
Start
Mon Jun 15 19:40
End
Tue Jun 16 06:15
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.3 d to spare
WO-10299WO-10299 op 20, build modules and harnesses
USB-C Dock, 100W, dual display
State
Planned
Quantity
110
Start
Tue Jun 16 06:15
End
Tue Jun 16 08:20
Changeover
40 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.0 d to spare
WO-10307WO-10307 op 20, build modules and harnesses
27" QHD Monitor, 165Hz
State
Planned
Quantity
150
Start
Tue Jun 16 08:20
End
Tue Jun 16 13:40
Changeover
50 min
For
ACCOUNT 7702, Gold
Order due
Wed Jun 24 15:00
Order
On time, 4.8 d to spare
WO-10311WO-10311 op 20, build modules and harnesses
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
400
Start
Tue Jun 16 19:20
End
Wed Jun 17 13:10
Changeover
40 min
For
ACCOUNT 7463, Gold
Order due
Thu Jun 25 15:00
Order
On time, 31 h to spare
WO-10246WO-10246 op 20, build modules and harnesses
Thunderbolt Dock, 4 ports
State
Planned
Quantity
410
Start
Thu Jun 18 06:00
End
Thu Jun 18 13:35
Changeover
50 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 2.2 d to spare
WO-10084WO-10084 op 20, build modules and harnesses
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
165
Start
Thu Jun 18 13:35
End
Thu Jun 18 21:20
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10158WO-10158 op 20, build modules and harnesses
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
365
Start
Thu Jun 18 21:20
End
Fri Jun 19 14:05
Changeover
50 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.0 d to spare
WO-10065WO-10065 op 20, build modules and harnesses
1TB NVMe SSD, refresh
State
Planned
Quantity
300
Start
Fri Jun 19 14:05
End
Fri Jun 19 17:15
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10166WO-10166 op 20, build modules and harnesses
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Fri Jun 19 17:15
End
Fri Jun 19 21:05
Changeover
50 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.8 d to spare
WO-10114WO-10114 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
125
Start
Fri Jun 19 21:05
End
Mon Jun 22 11:45
Changeover
50 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10079WO-10079 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Mon Jun 22 11:45
End
Mon Jun 22 13:20
Changeover
40 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 2.0 d to spare
WO-10171WO-10171 op 20, build modules and harnesses
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
70
Start
Mon Jun 22 21:30
End
Tue Jun 23 08:20
Changeover
40 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10308WO-10308 op 20, build modules and harnesses
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
300
Start
Tue Jun 23 08:20
End
Wed Jun 24 06:50
Changeover
40 min
For
ACCOUNT 5190, Silver
Order due
Tue Jun 30 15:00
Order
Late, 3.0 h late
WO-10275WO-10275 op 20, build modules and harnesses
Wi-Fi 6E Router, gray
State
Planned
Quantity
60
Start
Wed Jun 24 06:50
End
Wed Jun 24 09:05
Changeover
50 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 25 h to spare
WO-10123WO-10123 op 20, build modules and harnesses
27" QHD Monitor, 165Hz
State
Planned
Quantity
350
Start
Wed Jun 24 09:05
End
Wed Jun 24 20:10
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 30 h to spare
WO-10261WO-10261 op 20, build modules and harnesses
22" Touch Monitor, gray
State
Planned
Quantity
465
Start
Wed Jun 24 20:10
End
Thu Jun 25 17:50
Changeover
40 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 10 h to spare
WO-10159WO-10159 op 20, build modules and harnesses
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
415
Start
Thu Jun 25 17:50
End
Fri Jun 26 12:05
Changeover
40 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 7.5 h to spare
WO-10314WO-10314 op 20, build modules and harnesses
22" Touch Monitor
State
Planned
Quantity
400
Start
Fri Jun 26 12:05
End
Fri Jun 26 22:30
Changeover
40 min
For
ACCOUNT 3327, Gold
Order due
Mon Jul 6 15:00
Order
Late, 17 h late
WO-10325WO-10325 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
250
Start
Fri Jun 26 22:30
End
Mon Jun 29 21:20
Changeover
50 min
For
ACCOUNT 7702, Gold
Order due
Mon Jul 6 15:00
Order
Late, 41 h late
WO-10237WO-10237 op 20, build modules and harnesses
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
30
Start
Mon Jun 29 21:20
End
Tue Jun 30 06:20
Changeover
40 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 4.6 h to spare
WO-10138WO-10138 op 20, build modules and harnesses
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
450
Start
Tue Jun 30 06:55
End
Wed Jul 1 08:15
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 0.7 h to spare
WO-10218WO-10218 op 20, build modules and harnesses
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
210
Start
Wed Jul 1 08:15
End
Wed Jul 1 12:45
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 4.1 h to spare
WO-10056WO-10056 op 20, build modules and harnesses
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
130
Start
Wed Jul 1 12:55
End
Wed Jul 1 14:40
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 25 h to spare
WO-10100WO-10100 op 20, build modules and harnesses
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Wed Jul 1 14:40
End
Wed Jul 1 16:00
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 26 h to spare
WO-10333WO-10333 op 20, build modules and harnesses
10" Tablet, 64GB
State
Planned
Quantity
150
Start
Wed Jul 1 17:25
End
Thu Jul 2 06:25
Changeover
50 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
Late, 28 h late
WO-10281WO-10281 op 20, build modules and harnesses
Ergonomic Mouse, wireless
State
Planned
Quantity
490
Start
Thu Jul 2 06:25
End
Thu Jul 2 11:05
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 18 h late
WO-10085WO-10085 op 20, build modules and harnesses
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
150
Start
Mon Jul 6 06:00
End
Mon Jul 6 13:10
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.1 h late
WO-10042WO-10042 op 20, build modules and harnesses
KVM Switch, 2-port 4K
State
Planned
Quantity
550
Start
Mon Jul 6 14:10
End
Mon Jul 6 22:45
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
At risk, 0.9 h to spare
WO-10186WO-10186 op 20, build modules and harnesses
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Mon Jul 6 22:45
End
Tue Jul 7 07:20
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.7 h late
WO-10228WO-10228 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Tue Jul 7 07:20
End
Tue Jul 7 12:35
Changeover
50 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 24 h late
WO-10023WO-10023 op 20, build modules and harnesses
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
90
Start
Tue Jul 7 12:35
End
Tue Jul 7 18:05
Changeover
25 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 3.0 h late
WO-10110WO-10110 op 20, build modules and harnesses
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
100
Start
Tue Jul 7 18:05
End
Tue Jul 7 21:10
Changeover
50 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 9.8 h to spare
WO-10028WO-10028 op 20, build modules and harnesses
1TB NVMe SSD
State
Planned
Quantity
530
Start
Tue Jul 7 21:10
End
Wed Jul 8 08:05
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
On time, 8.3 h to spare
WO-10071WO-10071 op 20, build modules and harnesses
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Wed Jul 8 09:05
End
Wed Jul 8 17:25
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 2.5 h to spare
WO-10213WO-10213 op 20, build modules and harnesses
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Wed Jul 8 17:25
End
Wed Jul 8 21:45
Changeover
50 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.8 h late
WO-10008WO-10008 op 20, build modules and harnesses
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Wed Jul 8 21:45
End
Thu Jul 9 11:10
Changeover
50 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 10 h to spare
WO-10124WO-10124 op 20, build modules and harnesses
27" QHD Monitor, 165Hz
State
Planned
Quantity
315
Start
Thu Jul 9 11:10
End
Thu Jul 9 20:50
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
At risk, 0.6 h to spare
WO-10181WO-10181 op 20, build modules and harnesses
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
70
Start
Thu Jul 9 20:50
End
Fri Jul 10 06:05
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 28 h to spare
WO-10223WO-10223 op 20, build modules and harnesses
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Fri Jul 10 06:05
End
Fri Jul 10 10:40
Changeover
40 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
At risk, 4.2 h to spare
WO-10262WO-10262 op 20, build modules and harnesses
22" Touch Monitor, gray
State
Planned
Quantity
525
Start
Fri Jul 10 10:40
End
Mon Jul 13 10:45
Changeover
50 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
Late, 28 h late
FA Final assembly81%
WO-10001WO-10001 op 30, final assembly
Ergonomic Mouse, wireless, gray
State
Finished
Quantity
390
Start
Fri May 29 21:20
End
Mon Jun 1 07:45
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.3 d to spare
WO-10208WO-10208 op 30, final assembly
4-Bay NAS Enclosure, refresh
State
Finished
Quantity
485
Start
Mon Jun 1 12:25
End
Mon Jun 1 21:10
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.9 d to spare
WO-10030WO-10030 op 30, final assembly
Mesh Wi-Fi Kit, 3-pack, refresh
State
Finished
Quantity
245
Start
Mon Jun 1 21:10
End
Tue Jun 2 12:20
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 4.0 d to spare
WO-10298WO-10298 op 30, final assembly
USB-C Dock, 100W, dual display
State
Finished
Quantity
140
Start
Tue Jun 2 15:15
End
Tue Jun 2 19:45
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 28 h to spare
WO-10341WO-10341 op 30, final assembly
15" Laptop, 12-core, 32GB / 1TB
State
Finished
Quantity
30
Start
Tue Jun 2 19:45
End
Tue Jun 2 22:55
For
ENGINEERING, Internal
Order due
Fri Jun 12 12:00
Order
On time, 2.7 d to spare
WO-10279WO-10279 op 30, final assembly
Ergonomic Mouse, wireless
State
Held in the frozen window
Quantity
500
Start
Wed Jun 3 06:40
End
Wed Jun 3 16:00
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10040WO-10040 op 30, final assembly
KVM Switch, 2-port 4K
State
Planned
Quantity
540
Start
Thu Jun 4 07:45
End
Thu Jun 4 22:20
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.3 d to spare
WO-10209WO-10209 op 30, final assembly
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
435
Start
Mon Jun 8 09:35
End
Mon Jun 8 17:35
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.2 d to spare
WO-10142WO-10142 op 30, final assembly
4K Conference Camera
State
Planned
Quantity
400
Start
Tue Jun 9 07:15
End
Tue Jun 9 14:55
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10274WO-10274 op 30, final assembly
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Tue Jun 9 14:55
End
Tue Jun 9 18:00
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 26 h to spare
WO-10255WO-10255 op 30, final assembly
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
350
Start
Tue Jun 9 19:50
End
Thu Jun 11 19:35
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
Late, 2.7 d late
WO-10132WO-10132 op 30, final assembly
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
140
Start
Fri Jun 12 06:30
End
Fri Jun 12 19:35
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10002WO-10002 op 30, final assembly
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
370
Start
Fri Jun 12 20:35
End
Mon Jun 15 11:20
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.8 d to spare
WO-10016WO-10016 op 30, final assembly
4-Bay NAS Enclosure, gray
State
Planned
Quantity
120
Start
Mon Jun 15 17:30
End
Mon Jun 15 20:35
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10074WO-10074 op 30, final assembly
4-Bay NAS Enclosure
State
Planned
Quantity
430
Start
Mon Jun 15 20:35
End
Tue Jun 16 09:30
Changeover
5 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10210WO-10210 op 30, final assembly
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
485
Start
Thu Jun 18 07:00
End
Thu Jun 18 15:05
Changeover
5 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 3.3 d to spare
WO-10128WO-10128 op 30, final assembly
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Thu Jun 18 19:00
End
Fri Jun 19 10:40
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10343WO-10343 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
30
Start
Fri Jun 19 10:40
End
Fri Jun 19 14:05
Changeover
45 min
For
ENGINEERING, Internal
Order due
Fri Jun 26 12:00
Order
On time, 3.0 d to spare
WO-10109WO-10109 op 30, final assembly
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
90
Start
Fri Jun 19 17:00
End
Fri Jun 19 21:20
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10027WO-10027 op 30, final assembly
1TB NVMe SSD
State
Planned
Quantity
410
Start
Mon Jun 22 07:05
End
Mon Jun 22 14:00
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.3 d to spare
WO-10211WO-10211 op 30, final assembly
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
420
Start
Mon Jun 22 20:50
End
Tue Jun 23 11:15
Changeover
25 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 2.9 d to spare
WO-10099WO-10099 op 30, final assembly
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Tue Jun 23 20:00
End
Tue Jun 23 21:40
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 10 h to spare
WO-10144WO-10144 op 30, final assembly
4K Conference Camera
State
Planned
Quantity
480
Start
Tue Jun 23 21:40
End
Wed Jun 24 13:35
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 29 h to spare
WO-10199WO-10199 op 30, final assembly
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
305
Start
Wed Jun 24 13:35
End
Thu Jun 25 22:20
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10104WO-10104 op 30, final assembly
1080p Webcam with mic
State
Planned
Quantity
340
Start
Thu Jun 25 22:20
End
Fri Jun 26 12:10
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 27 h to spare
WO-10251WO-10251 op 30, final assembly
4K Conference Camera, gray
State
Planned
Quantity
105
Start
Fri Jun 26 12:10
End
Fri Jun 26 14:30
Changeover
25 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 2.5 h late
WO-10285WO-10285 op 30, final assembly
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
120
Start
Fri Jun 26 14:30
End
Fri Jun 26 18:30
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 0.9 h late
WO-10180WO-10180 op 30, final assembly
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
65
Start
Mon Jun 29 14:15
End
Mon Jun 29 17:35
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 34 h to spare
WO-10003WO-10003 op 30, final assembly
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
480
Start
Mon Jun 29 17:35
End
Tue Jun 30 10:45
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 3.8 d to spare
WO-10032WO-10032 op 30, final assembly
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
245
Start
Tue Jun 30 10:45
End
Tue Jun 30 21:50
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 11 h to spare
WO-10119WO-10119 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Tue Jun 30 21:50
End
Wed Jul 1 14:55
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 25 h to spare
WO-10176WO-10176 op 30, final assembly
8" Rugged Tablet, 64GB
State
Planned
Quantity
95
Start
Wed Jul 1 14:55
End
Thu Jul 2 06:20
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.2 h to spare
WO-10300WO-10300 op 30, final assembly
USB-C Dock, 100W, dual display
State
Planned
Quantity
130
Start
Thu Jul 2 06:20
End
Thu Jul 2 10:35
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 2.7 h to spare
WO-10056WO-10056 op 30, final assembly
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
130
Start
Thu Jul 2 10:35
End
Thu Jul 2 13:30
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 25 h to spare
WO-10100WO-10100 op 30, final assembly
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Thu Jul 2 13:30
End
Thu Jul 2 15:10
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 26 h to spare
WO-10281WO-10281 op 30, final assembly
Ergonomic Mouse, wireless
State
Planned
Quantity
490
Start
Thu Jul 2 15:10
End
Mon Jul 6 07:20
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 18 h late
WO-10152WO-10152 op 30, final assembly
2TB Portable SSD
State
Planned
Quantity
350
Start
Mon Jul 6 07:25
End
Mon Jul 6 13:50
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 0.9 h late
WO-10042WO-10042 op 30, final assembly
KVM Switch, 2-port 4K
State
Planned
Quantity
550
Start
Mon Jul 6 15:55
End
Tue Jul 7 13:45
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
At risk, 0.9 h to spare
WO-10267WO-10267 op 30, final assembly
24-Port PoE Switch, managed
State
Planned
Quantity
115
Start
Tue Jul 7 14:05
End
Tue Jul 7 20:25
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 1.4 h late
WO-10110WO-10110 op 30, final assembly
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
100
Start
Tue Jul 7 20:35
End
Wed Jul 8 07:25
Changeover
25 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 9.8 h to spare
WO-10276WO-10276 op 30, final assembly
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Wed Jul 8 12:05
End
Wed Jul 8 14:50
Changeover
25 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 3.9 h to spare
WO-10257WO-10257 op 30, final assembly
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
340
Start
Wed Jul 8 15:30
End
Fri Jul 10 14:20
Changeover
45 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 2.9 d late
WO-10181WO-10181 op 30, final assembly
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
70
Start
Fri Jul 10 14:20
End
Fri Jul 10 17:50
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 28 h to spare
WO-10061WO-10061 op 30, final assembly
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
100
Start
Fri Jul 10 17:50
End
Fri Jul 10 20:45
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 26 h to spare
WO-10242WO-10242 op 30, final assembly
1TB NVMe SSD, gray
State
Planned
Quantity
270
Start
Fri Jul 10 21:10
End
Mon Jul 13 09:15
Changeover
25 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 5.0 h to spare
WO-10188WO-10188 op 30, final assembly
KVM Switch, 2-port 4K, gray
State
Finished
Quantity
340
Start
Fri May 29 15:10
End
Mon Jun 1 06:25
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 34 h to spare
WO-10193WO-10193 op 30, final assembly
10" Tablet, 64GB
State
Finished
Quantity
120
Start
Mon Jun 1 08:55
End
Mon Jun 1 18:15
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.0 d to spare
WO-10073WO-10073 op 30, final assembly
4-Bay NAS Enclosure
State
Finished
Quantity
415
Start
Mon Jun 1 22:45
End
Tue Jun 2 09:15
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.9 d to spare
WO-10141WO-10141 op 30, final assembly
4K Conference Camera
State
Finished
Quantity
430
Start
Tue Jun 2 12:40
End
Tue Jun 2 20:50
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 34 h to spare
WO-10098WO-10098 op 30, final assembly
Wi-Fi 6E Router
State
Finished
Quantity
20
Start
Tue Jun 2 20:50
End
Tue Jun 2 22:30
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10216WO-10216 op 30, final assembly
USB-C Travel Hub, 7-in-1, gray
State
Running now
Quantity
111 left of 230
Start
Tue Jun 2 22:30
End
Wed Jun 3 09:00
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 30 h to spare
WO-10245WO-10245 op 30, final assembly
Thunderbolt Dock, 4 ports
State
Held in the frozen window
Quantity
415
Start
Wed Jun 3 18:05
End
Thu Jun 4 13:50
Changeover
25 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10265WO-10265 op 30, final assembly
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Thu Jun 4 18:10
End
Fri Jun 5 08:00
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 47 h to spare
WO-10064WO-10064 op 30, final assembly
1TB NVMe SSD, refresh
State
Planned
Quantity
230
Start
Fri Jun 5 14:35
End
Fri Jun 5 20:05
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10026WO-10026 op 30, final assembly
1TB NVMe SSD
State
Planned
Quantity
450
Start
Fri Jun 5 20:05
End
Mon Jun 8 09:25
Changeover
5 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.4 d to spare
WO-10069WO-10069 op 30, final assembly
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
365
Start
Mon Jun 8 14:25
End
Tue Jun 9 15:10
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.2 d to spare
WO-10240WO-10240 op 30, final assembly
1TB NVMe SSD, gray
State
Planned
Quantity
300
Start
Tue Jun 9 15:10
End
Tue Jun 9 21:40
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 25 h to spare
WO-10035WO-10035 op 30, final assembly
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Tue Jun 9 22:40
End
Wed Jun 10 22:45
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10303WO-10303 op 30, final assembly
Mechanical Keyboard, TKL
State
Planned
Quantity
260
Start
Wed Jun 10 22:45
End
Thu Jun 11 11:00
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10059WO-10059 op 30, final assembly
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Thu Jun 11 11:00
End
Thu Jun 11 13:35
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10342WO-10342 op 30, final assembly
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
30
Start
Thu Jun 11 13:35
End
Thu Jun 11 16:55
Changeover
45 min
For
ENGINEERING, Internal
Order due
Fri Jun 19 12:00
Order
On time, 2.1 d to spare
WO-10088WO-10088 op 30, final assembly
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Thu Jun 11 16:55
End
Fri Jun 12 15:25
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.1 d to spare
WO-10231WO-10231 op 30, final assembly
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
110
Start
Fri Jun 12 15:25
End
Mon Jun 15 08:15
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 46 h to spare
WO-10194WO-10194 op 30, final assembly
10" Tablet, 64GB
State
Planned
Quantity
125
Start
Mon Jun 15 08:15
End
Mon Jun 15 17:55
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.3 d to spare
WO-10031WO-10031 op 30, final assembly
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
200
Start
Mon Jun 15 17:55
End
Tue Jun 16 14:40
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10217WO-10217 op 30, final assembly
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
180
Start
Tue Jun 16 14:40
End
Tue Jun 16 20:50
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.3 d to spare
WO-10055WO-10055 op 30, final assembly
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
140
Start
Tue Jun 16 20:50
End
Wed Jun 17 06:55
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.2 d to spare
WO-10246WO-10246 op 30, final assembly
Thunderbolt Dock, 4 ports
State
Planned
Quantity
410
Start
Thu Jun 18 07:55
End
Thu Jun 18 20:50
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 2.2 d to spare
WO-10185WO-10185 op 30, final assembly
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Fri Jun 19 06:00
End
Fri Jun 19 08:20
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 32 h to spare
WO-10266WO-10266 op 30, final assembly
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Fri Jun 19 08:20
End
Fri Jun 19 15:10
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.3 d to spare
WO-10256WO-10256 op 30, final assembly
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
345
Start
Mon Jun 22 20:00
End
Wed Jun 24 19:20
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
At risk, 4.2 h to spare
WO-10275WO-10275 op 30, final assembly
Wi-Fi 6E Router, gray
State
Planned
Quantity
60
Start
Wed Jun 24 19:20
End
Wed Jun 24 22:55
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 25 h to spare
WO-10222WO-10222 op 30, final assembly
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Thu Jun 25 06:00
End
Thu Jun 25 13:45
Changeover
25 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 45 h to spare
WO-10304WO-10304 op 30, final assembly
Mechanical Keyboard, TKL
State
Planned
Quantity
320
Start
Thu Jun 25 13:45
End
Thu Jun 25 19:55
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 42 h to spare
WO-10017WO-10017 op 30, final assembly
4-Bay NAS Enclosure, gray
State
Planned
Quantity
135
Start
Thu Jun 25 19:55
End
Thu Jun 25 22:40
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.4 d to spare
WO-10060WO-10060 op 30, final assembly
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Thu Jun 25 22:40
End
Fri Jun 26 07:55
Changeover
25 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.3 d to spare
WO-10232WO-10232 op 30, final assembly
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
100
Start
Fri Jun 26 08:55
End
Fri Jun 26 18:00
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 0.7 h to spare
WO-10190WO-10190 op 30, final assembly
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
360
Start
Mon Jun 29 07:55
End
Mon Jun 29 19:40
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 2.7 h to spare
WO-10138WO-10138 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
450
Start
Tue Jun 30 09:50
End
Thu Jul 2 15:25
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 0.7 h to spare
WO-10247WO-10247 op 30, final assembly
Thunderbolt Dock, 4 ports
State
Planned
Quantity
415
Start
Mon Jul 6 07:55
End
Mon Jul 6 21:00
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 13 h late
WO-10129WO-10129 op 30, final assembly
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Mon Jul 6 21:00
End
Tue Jul 7 12:40
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 21 h late
WO-10186WO-10186 op 30, final assembly
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Tue Jul 7 12:40
End
Tue Jul 7 15:00
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.7 h late
WO-10066WO-10066 op 30, final assembly
1TB NVMe SSD, refresh
State
Planned
Quantity
270
Start
Tue Jul 7 16:45
End
Tue Jul 7 22:55
Changeover
45 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 5.0 h late
WO-10028WO-10028 op 30, final assembly
1TB NVMe SSD
State
Planned
Quantity
530
Start
Tue Jul 7 22:55
End
Wed Jul 8 13:50
Changeover
5 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
On time, 8.3 h to spare
WO-10071WO-10071 op 30, final assembly
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Wed Jul 8 13:50
End
Thu Jul 9 12:35
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 2.5 h to spare
WO-10146WO-10146 op 30, final assembly
4K Conference Camera
State
Planned
Quantity
380
Start
Thu Jul 9 12:35
End
Thu Jul 9 19:55
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
At risk, 5.0 h to spare
WO-10200WO-10200 op 30, final assembly
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
235
Start
Thu Jul 9 19:55
End
Fri Jul 10 22:45
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
Late, 4.4 h late
WO-10105WO-10105 op 30, final assembly
1080p Webcam with mic
State
Planned
Quantity
350
Start
Fri Jul 10 22:45
End
Mon Jul 13 12:45
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 23 h to spare
WO-10230WO-10230 op 30, final assembly
15" Laptop, 12-core, 32GB / 1TB, gray
State
Finished
Quantity
110
Start
Fri May 29 19:10
End
Mon Jun 1 08:05
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 32 h to spare
WO-10326WO-10326 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB
State
Finished
Quantity
40
Start
Mon Jun 1 08:35
End
Mon Jun 1 12:45
For
ACCOUNT 8321, Platinum
Order due
Tue Jun 9 15:00
Order
On time, 4.9 d to spare
WO-10136WO-10136 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB
State
Running now
Quantity
191 left of 470
Start
Mon Jun 1 16:25
End
Wed Jun 3 22:25
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
At risk, 2.0 h to spare
WO-10203WO-10203 op 30, final assembly
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Thu Jun 4 11:55
End
Tue Jun 9 06:40
Changeover
25 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
At risk, 2.0 h to spare
WO-10093WO-10093 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Tue Jun 9 07:05
End
Tue Jun 9 16:00
Changeover
25 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 3.8 d to spare
WO-10198WO-10198 op 30, final assembly
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
240
Start
Wed Jun 10 07:55
End
Thu Jun 11 11:20
Changeover
25 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10250WO-10250 op 30, final assembly
4K Conference Camera, gray
State
Planned
Quantity
125
Start
Thu Jun 11 11:20
End
Thu Jun 11 14:20
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 32 h to spare
WO-10284WO-10284 op 30, final assembly
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
100
Start
Thu Jun 11 14:20
End
Thu Jun 11 17:45
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 30 h to spare
WO-10189WO-10189 op 30, final assembly
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
340
Start
Fri Jun 12 13:55
End
Mon Jun 15 07:20
Changeover
25 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 44 h to spare
WO-10137WO-10137 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
505
Start
Mon Jun 15 11:45
End
Wed Jun 17 21:45
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
At risk, 1.2 h to spare
WO-10041WO-10041 op 30, final assembly
KVM Switch, 2-port 4K
State
Planned
Quantity
630
Start
Thu Jun 18 13:15
End
Fri Jun 19 13:00
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10065WO-10065 op 30, final assembly
1TB NVMe SSD, refresh
State
Planned
Quantity
300
Start
Fri Jun 19 15:35
End
Fri Jun 19 22:20
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10070WO-10070 op 30, final assembly
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Mon Jun 22 13:20
End
Tue Jun 23 12:05
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.1 d to spare
WO-10094WO-10094 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Tue Jun 23 22:55
End
Wed Jun 24 14:40
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 32 h to spare
WO-10241WO-10241 op 30, final assembly
1TB NVMe SSD, gray
State
Planned
Quantity
280
Start
Wed Jun 24 14:40
End
Wed Jun 24 20:45
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10036WO-10036 op 30, final assembly
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Wed Jun 24 20:45
End
Thu Jun 25 20:50
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 47 h to spare
WO-10089WO-10089 op 30, final assembly
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Thu Jun 25 21:25
End
Fri Jun 26 19:55
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 29 h to spare
WO-10133WO-10133 op 30, final assembly
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
145
Start
Fri Jun 26 22:35
End
Mon Jun 29 18:15
Changeover
25 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 24 h to spare
WO-10195WO-10195 op 30, final assembly
10" Tablet, 64GB
State
Planned
Quantity
115
Start
Mon Jun 29 20:25
End
Tue Jun 30 12:05
Changeover
25 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.7 h to spare
WO-10212WO-10212 op 30, final assembly
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Tue Jun 30 12:05
End
Tue Jun 30 20:30
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 5.7 h to spare
WO-10075WO-10075 op 30, final assembly
4-Bay NAS Enclosure
State
Planned
Quantity
530
Start
Tue Jun 30 20:30
End
Wed Jul 1 11:15
Changeover
5 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.4 h to spare
WO-10145WO-10145 op 30, final assembly
4K Conference Camera
State
Planned
Quantity
490
Start
Wed Jul 1 11:15
End
Wed Jul 1 20:20
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 3.1 h to spare
WO-10218WO-10218 op 30, final assembly
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
210
Start
Wed Jul 1 20:20
End
Thu Jul 2 09:45
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 4.1 h to spare
WO-10333WO-10333 op 30, final assembly
10" Tablet, 64GB
State
Planned
Quantity
150
Start
Thu Jul 2 09:45
End
Thu Jul 2 21:35
Changeover
45 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
Late, 28 h late
WO-10205WO-10205 op 30, final assembly
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
415
Start
Mon Jul 6 12:40
End
Wed Jul 8 19:20
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 42 h late
WO-10213WO-10213 op 30, final assembly
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Wed Jul 8 19:20
End
Thu Jul 9 10:45
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.8 h late
WO-10095WO-10095 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Thu Jul 9 13:50
End
Thu Jul 9 22:35
Changeover
45 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 8.5 h to spare
WO-10037WO-10037 op 30, final assembly
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
170
Start
Thu Jul 9 22:35
End
Fri Jul 10 20:20
Changeover
25 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 8.8 h to spare
WO-10252WO-10252 op 30, final assembly
4K Conference Camera, gray
State
Planned
Quantity
115
Start
Fri Jul 10 20:20
End
Mon Jul 13 06:10
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 16 17:00
Order
On time, 22 h to spare
WO-10155WO-10155 op 30, final assembly
27" QHD Monitor, 165Hz, refresh
State
Finished
Quantity
445
Start
Thu May 28 14:00
End
Mon Jun 1 07:30
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
On time, 30 h to spare
WO-10049WO-10049 op 30, final assembly
27" 4K Monitor, USB-C, refresh
State
Finished
Quantity
190
Start
Mon Jun 1 09:50
End
Tue Jun 2 06:20
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.1 d to spare
WO-10117WO-10117 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, gray
State
Finished
Quantity
100
Start
Tue Jun 2 06:40
End
Tue Jun 2 17:40
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.8 d to spare
WO-10054WO-10054 op 30, final assembly
128GB USB Flash Drive, 10-pack, refresh
State
Finished
Quantity
130
Start
Tue Jun 2 17:40
End
Tue Jun 2 21:05
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10150WO-10150 op 30, final assembly
2TB Portable SSD
State
Running now
Quantity
200 left of 380
Start
Tue Jun 2 21:05
End
Wed Jun 3 09:00
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 47 h to spare
WO-10184WO-10184 op 30, final assembly
8" Rugged Tablet, 64GB, gray
State
Held in the frozen window
Quantity
25
Start
Wed Jun 3 10:35
End
Wed Jun 3 13:20
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 34 h to spare
WO-10127WO-10127 op 30, final assembly
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
155
Start
Wed Jun 3 19:25
End
Thu Jun 4 10:50
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.1 d to spare
WO-10226WO-10226 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Thu Jun 4 17:30
End
Fri Jun 5 11:30
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.0 d to spare
WO-10021WO-10021 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
85
Start
Fri Jun 5 11:30
End
Fri Jun 5 22:45
Changeover
5 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10165WO-10165 op 30, final assembly
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Fri Jun 5 22:45
End
Mon Jun 8 13:45
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.2 d to spare
WO-10289WO-10289 op 30, final assembly
27" 4K Monitor, USB-C
State
Planned
Quantity
355
Start
Mon Jun 8 13:45
End
Tue Jun 9 20:40
Changeover
25 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 44 h to spare
WO-10339WO-10339 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Tue Jun 9 20:40
End
Wed Jun 10 16:15
Changeover
45 min
For
ACCOUNT 3915, Standard
Order due
Wed Jun 17 15:00
Order
On time, 44 h to spare
WO-10179WO-10179 op 30, final assembly
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
75
Start
Wed Jun 10 16:15
End
Wed Jun 10 20:25
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 42 h to spare
WO-10260WO-10260 op 30, final assembly
22" Touch Monitor, gray
State
Planned
Quantity
540
Start
Wed Jun 10 22:30
End
Mon Jun 15 17:05
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 8.1 h to spare
WO-10236WO-10236 op 30, final assembly
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
35
Start
Mon Jun 15 17:05
End
Mon Jun 15 21:50
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10118WO-10118 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Mon Jun 15 21:50
End
Tue Jun 16 14:55
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.4 d to spare
WO-10299WO-10299 op 30, final assembly
USB-C Dock, 100W, dual display
State
Planned
Quantity
110
Start
Tue Jun 16 14:55
End
Tue Jun 16 18:10
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.0 d to spare
WO-10012WO-10012 op 30, final assembly
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
40
Start
Tue Jun 16 18:10
End
Wed Jun 17 07:20
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.1 d to spare
WO-10280WO-10280 op 30, final assembly
Ergonomic Mouse, wireless
State
Planned
Quantity
590
Start
Wed Jun 17 07:30
End
Wed Jun 17 18:15
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 47 h to spare
WO-10227WO-10227 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Wed Jun 17 18:15
End
Thu Jun 18 12:15
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10084WO-10084 op 30, final assembly
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
165
Start
Thu Jun 18 16:40
End
Fri Jun 19 15:30
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10324WO-10324 op 30, final assembly
22" Touch Monitor, gray
State
Planned
Quantity
400
Start
Fri Jun 19 15:30
End
Tue Jun 23 15:40
Changeover
45 min
For
ACCOUNT 6021, Standard
Order due
Fri Jun 26 15:00
Order
On time, 8.2 h to spare
WO-10171WO-10171 op 30, final assembly
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
70
Start
Tue Jun 23 15:40
End
Wed Jun 24 07:00
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10308WO-10308 op 30, final assembly
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
300
Start
Wed Jun 24 07:00
End
Fri Jun 26 06:20
Changeover
25 min
For
ACCOUNT 5190, Silver
Order due
Tue Jun 30 15:00
Order
Late, 3.0 h late
WO-10318WO-10318 op 30, final assembly
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
400
Start
Fri Jun 26 06:20
End
Tue Jun 30 08:50
Changeover
45 min
For
ACCOUNT 3915, Standard
Order due
Thu Jul 2 15:00
Order
Late, 2.8 h late
WO-10314WO-10314 op 30, final assembly
22" Touch Monitor
State
Planned
Quantity
400
Start
Tue Jun 30 08:50
End
Wed Jul 1 19:05
Changeover
15 min
For
ACCOUNT 3327, Gold
Order due
Mon Jul 6 15:00
Order
Late, 17 h late
WO-10237WO-10237 op 30, final assembly
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
30
Start
Wed Jul 1 19:05
End
Wed Jul 1 22:50
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 4.6 h to spare
WO-10271WO-10271 op 30, final assembly
Thin Client, 4GB / 32GB
State
Planned
Quantity
35
Start
Wed Jul 1 22:50
End
Thu Jul 2 10:45
Changeover
25 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 3.3 h to spare
WO-10309WO-10309 op 30, final assembly
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Thu Jul 2 10:45
End
Thu Jul 2 19:50
Changeover
45 min
For
ACCOUNT 7702, Gold
Order due
Wed Jul 8 15:00
Order
On time, 22 h to spare
WO-10331WO-10331 op 30, final assembly
22" Touch Monitor
State
Planned
Quantity
300
Start
Thu Jul 2 19:50
End
Mon Jul 6 23:00
Changeover
25 min
For
ACCOUNT 6021, Standard
Order due
Wed Jul 8 15:00
Order
Late, 25 h late
WO-10160WO-10160 op 30, final assembly
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Tue Jul 7 06:00
End
Wed Jul 8 14:30
Changeover
25 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 26 h late
WO-10115WO-10115 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
135
Start
Wed Jul 8 14:30
End
Thu Jul 9 14:30
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.2 h late
WO-10296WO-10296 op 30, final assembly
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Thu Jul 9 14:30
End
Fri Jul 10 19:10
Changeover
45 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 16 h late
WO-10223WO-10223 op 30, final assembly
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Fri Jul 10 19:10
End
Mon Jul 13 09:45
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
At risk, 4.2 h to spare
WO-10259WO-10259 op 30, final assembly
22" Touch Monitor, gray
State
Finished
Quantity
490
Start
Wed May 27 22:20
End
Mon Jun 1 07:45
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
At risk, 5.7 h to spare
WO-10235WO-10235 op 30, final assembly
Tower Workstation, 32GB / 1TB
State
Finished
Quantity
30
Start
Mon Jun 1 13:00
End
Mon Jun 1 16:45
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.8 d to spare
WO-10269WO-10269 op 30, final assembly
Thin Client, 4GB / 32GB
State
Finished
Quantity
30
Start
Mon Jun 1 16:45
End
Mon Jun 1 21:05
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.8 d to spare
WO-10310WO-10310 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB, refresh
State
Finished
Quantity
80
Start
Mon Jun 1 21:05
End
Tue Jun 2 11:10
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.3 d to spare
WO-10174WO-10174 op 30, final assembly
8" Rugged Tablet, 64GB
State
Running now
Quantity
33 left of 85
Start
Tue Jun 2 20:15
End
Wed Jun 3 08:30
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 33 h to spare
WO-10083WO-10083 op 30, final assembly
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
155
Start
Thu Jun 4 09:55
End
Fri Jun 5 07:55
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.4 d to spare
WO-10344WO-10344 op 30, final assembly
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
240
Start
Fri Jun 5 13:15
End
Mon Jun 8 19:20
Changeover
25 min
For
ACCOUNT 4340, Platinum
Order due
Fri Jun 12 15:00
Order
On time, 28 h to spare
WO-10170WO-10170 op 30, final assembly
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
90
Start
Mon Jun 8 19:20
End
Tue Jun 9 12:40
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.4 d to spare
WO-10294WO-10294 op 30, final assembly
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Tue Jun 9 12:40
End
Wed Jun 10 16:50
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 2.9 d to spare
WO-10221WO-10221 op 30, final assembly
8-Port Gigabit Switch
State
Planned
Quantity
160
Start
Wed Jun 10 17:00
End
Thu Jun 11 08:35
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 32 h to spare
WO-10103WO-10103 op 30, final assembly
1080p Webcam with mic
State
Planned
Quantity
350
Start
Thu Jun 11 08:35
End
Thu Jun 11 15:35
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.0 d to spare
WO-10157WO-10157 op 30, final assembly
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Thu Jun 11 15:35
End
Mon Jun 15 07:25
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 33 h to spare
WO-10319WO-10319 op 30, final assembly
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
120
Start
Mon Jun 15 07:25
End
Mon Jun 15 21:35
Changeover
45 min
For
ACCOUNT 9148, Standard
Order due
Mon Jun 22 15:00
Order
On time, 4.3 d to spare
WO-10270WO-10270 op 30, final assembly
Thin Client, 4GB / 32GB
State
Planned
Quantity
40
Start
Mon Jun 15 21:35
End
Tue Jun 16 09:35
Changeover
25 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10143WO-10143 op 30, final assembly
4K Conference Camera
State
Planned
Quantity
410
Start
Tue Jun 16 09:35
End
Tue Jun 16 17:25
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.9 d to spare
WO-10307WO-10307 op 30, final assembly
27" QHD Monitor, 165Hz
State
Planned
Quantity
150
Start
Tue Jun 16 17:25
End
Wed Jun 17 12:50
Changeover
45 min
For
ACCOUNT 7702, Gold
Order due
Wed Jun 24 15:00
Order
On time, 4.8 d to spare
WO-10311WO-10311 op 30, final assembly
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
400
Start
Wed Jun 17 12:50
End
Fri Jun 19 06:45
Changeover
25 min
For
ACCOUNT 7463, Gold
Order due
Thu Jun 25 15:00
Order
On time, 31 h to spare
WO-10158WO-10158 op 30, final assembly
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
365
Start
Fri Jun 19 06:45
End
Mon Jun 22 14:20
Changeover
25 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.0 d to spare
WO-10166WO-10166 op 30, final assembly
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Mon Jun 22 14:20
End
Mon Jun 22 22:00
Changeover
25 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.8 d to spare
WO-10290WO-10290 op 30, final assembly
27" 4K Monitor, USB-C
State
Planned
Quantity
385
Start
Mon Jun 22 22:00
End
Wed Jun 24 13:50
Changeover
25 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 29 h to spare
WO-10337WO-10337 op 30, final assembly
24" FHD Monitor, IPS
State
Planned
Quantity
40
Start
Wed Jun 24 13:50
End
Wed Jun 24 16:55
Changeover
25 min
For
ACCOUNT 2800, Silver
Order due
Tue Jun 30 15:00
Order
On time, 3.7 d to spare
WO-10007WO-10007 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Wed Jun 24 16:55
End
Thu Jun 25 13:00
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 33 h to spare
WO-10261WO-10261 op 30, final assembly
22" Touch Monitor, gray
State
Planned
Quantity
465
Start
Thu Jun 25 13:00
End
Mon Jun 29 18:15
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 10 h to spare
WO-10159WO-10159 op 30, final assembly
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
415
Start
Mon Jun 29 18:15
End
Wed Jul 1 12:25
Changeover
25 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 7.5 h to spare
WO-10051WO-10051 op 30, final assembly
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
220
Start
Wed Jul 1 12:25
End
Thu Jul 2 11:10
Changeover
25 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.4 h to spare
WO-10313WO-10313 op 30, final assembly
22" Touch Monitor, gray
State
Planned
Quantity
80
Start
Thu Jul 2 11:10
End
Thu Jul 2 17:55
Changeover
25 min
For
ACCOUNT 3327, Gold
Order due
Tue Jul 7 15:00
Order
On time, 20 h to spare
WO-10013WO-10013 op 30, final assembly
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
45
Start
Thu Jul 2 17:55
End
Mon Jul 6 07:45
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
At risk, 1.7 h to spare
WO-10312WO-10312 op 30, final assembly
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Mon Jul 6 07:45
End
Mon Jul 6 16:50
Changeover
45 min
For
ACCOUNT 9148, Standard
Order due
Thu Jul 9 15:00
Order
Late, 20 h late
WO-10085WO-10085 op 30, final assembly
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
150
Start
Mon Jul 6 16:50
End
Tue Jul 7 14:20
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.1 h late
WO-10167WO-10167 op 30, final assembly
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Tue Jul 7 14:20
End
Tue Jul 7 22:20
Changeover
45 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 47 h to spare
WO-10332WO-10332 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
400
Start
Tue Jul 7 22:20
End
Fri Jul 10 12:25
Changeover
45 min
For
ACCOUNT 5190, Silver
Order due
Fri Jul 10 15:00
Order
Late, 4.8 d late
WO-10124WO-10124 op 30, final assembly
27" QHD Monitor, 165Hz
State
Planned
Quantity
315
Start
Fri Jul 10 12:25
End
Mon Jul 13 20:00
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
At risk, 0.6 h to spare
WO-10044WO-10044 op 30, final assembly
24" FHD Monitor, IPS
State
Finished
Quantity
370
Start
Fri May 29 15:35
End
Mon Jun 1 17:25
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 42 h to spare
WO-10330WO-10330 op 30, final assembly
27" QHD Monitor, 165Hz, refresh
State
Finished
Quantity
150
Start
Mon Jun 1 17:25
End
Tue Jun 2 10:50
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.1 d to spare
WO-10011WO-10011 op 30, final assembly
All-in-One 24", 16GB / 512GB
State
Running now
Quantity
6 left of 45
Start
Tue Jun 2 18:20
End
Wed Jun 3 06:45
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.1 d to spare
WO-10108WO-10108 op 30, final assembly
Wi-Fi 6 Access Point, ceiling
State
Held in the frozen window
Quantity
100
Start
Wed Jun 3 08:10
End
Wed Jun 3 12:50
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.4 d to spare
WO-10156WO-10156 op 30, final assembly
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
390
Start
Fri Jun 5 06:00
End
Mon Jun 8 15:25
Changeover
45 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 48 h to spare
WO-10113WO-10113 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
140
Start
Mon Jun 8 15:25
End
Tue Jun 9 16:00
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.0 d to spare
WO-10006WO-10006 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
155
Start
Tue Jun 9 16:00
End
Wed Jun 10 15:05
Changeover
25 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 30 h to spare
WO-10078WO-10078 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Wed Jun 10 15:05
End
Wed Jun 10 17:10
Changeover
5 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10122WO-10122 op 30, final assembly
27" QHD Monitor, 165Hz
State
Planned
Quantity
340
Start
Wed Jun 10 17:10
End
Fri Jun 12 09:30
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10045WO-10045 op 30, final assembly
24" FHD Monitor, IPS
State
Planned
Quantity
280
Start
Fri Jun 12 09:30
End
Mon Jun 15 12:35
Changeover
25 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10050WO-10050 op 30, final assembly
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
215
Start
Mon Jun 15 12:35
End
Tue Jun 16 11:00
Changeover
25 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10175WO-10175 op 30, final assembly
8" Rugged Tablet, 64GB
State
Planned
Quantity
110
Start
Tue Jun 16 11:00
End
Tue Jun 16 20:35
Changeover
45 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 33 h to spare
WO-10151WO-10151 op 30, final assembly
2TB Portable SSD
State
Planned
Quantity
330
Start
Tue Jun 16 20:35
End
Wed Jun 17 09:10
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 4.8 d to spare
WO-10204WO-10204 op 30, final assembly
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Wed Jun 17 15:10
End
Mon Jun 22 10:45
Changeover
45 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
At risk, 0.2 h to spare
WO-10022WO-10022 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
75
Start
Mon Jun 22 10:45
End
Mon Jun 22 21:25
Changeover
45 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 3.1 d to spare
WO-10335WO-10335 op 30, final assembly
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
40
Start
Mon Jun 22 21:25
End
Tue Jun 23 08:50
Changeover
25 min
For
ACCOUNT 2800, Silver
Order due
Mon Jun 29 15:00
Order
On time, 5.2 d to spare
WO-10114WO-10114 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
125
Start
Tue Jun 23 08:50
End
Wed Jun 24 07:25
Changeover
25 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10295WO-10295 op 30, final assembly
34" Ultrawide Monitor, curved
State
Planned
Quantity
235
Start
Wed Jun 24 07:25
End
Thu Jun 25 09:25
Changeover
45 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 9.9 h to spare
WO-10079WO-10079 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Thu Jun 25 09:25
End
Thu Jun 25 12:40
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 2.0 d to spare
WO-10123WO-10123 op 30, final assembly
27" QHD Monitor, 165Hz
State
Planned
Quantity
350
Start
Thu Jun 25 12:40
End
Fri Jun 26 22:45
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 30 h to spare
WO-10046WO-10046 op 30, final assembly
24" FHD Monitor, IPS
State
Planned
Quantity
290
Start
Fri Jun 26 22:45
End
Tue Jun 30 09:00
Changeover
25 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 33 h to spare
WO-10325WO-10325 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
250
Start
Tue Jun 30 09:00
End
Thu Jul 2 09:05
Changeover
45 min
For
ACCOUNT 7702, Gold
Order due
Mon Jul 6 15:00
Order
Late, 41 h late
WO-10338WO-10338 op 30, final assembly
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
150
Start
Thu Jul 2 09:05
End
Mon Jul 6 09:00
Changeover
25 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
At risk, 1.2 h to spare
WO-10291WO-10291 op 30, final assembly
27" 4K Monitor, USB-C
State
Planned
Quantity
365
Start
Mon Jul 6 09:00
End
Tue Jul 7 16:55
Changeover
45 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 2.2 d to spare
WO-10228WO-10228 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Tue Jul 7 16:55
End
Wed Jul 8 09:55
Changeover
45 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 24 h late
WO-10023WO-10023 op 30, final assembly
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
90
Start
Wed Jul 8 09:55
End
Wed Jul 8 22:20
Changeover
5 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 3.0 h late
WO-10172WO-10172 op 30, final assembly
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
80
Start
Wed Jul 8 22:20
End
Thu Jul 9 14:20
Changeover
25 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 1.2 h to spare
WO-10008WO-10008 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Thu Jul 9 14:20
End
Fri Jul 10 09:35
Changeover
25 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 10 h to spare
WO-10080WO-10080 op 30, final assembly
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Fri Jul 10 20:30
End
Fri Jul 10 22:35
Changeover
5 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
On time, 27 h to spare
WO-10262WO-10262 op 30, final assembly
22" Touch Monitor, gray
State
Planned
Quantity
525
Start
Fri Jul 10 22:35
End
Wed Jul 15 16:00
Changeover
45 min
For
Warehouse stock
Order due
Wed Jul 15 17:00
Order
Late, 28 h late
TB Burn-in and test86%
WO-10259WO-10259 op 40, burn-in and functional test
22" Touch Monitor, gray
State
Finished
Quantity
490
Start
Sun May 31 19:20
End
Tue Jun 2 04:20
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
At risk, 5.7 h to spare
WO-10087WO-10087 op 40, burn-in and functional test
12" Pro Tablet, 256GB
State
Finished
Quantity
200
Start
Tue Jun 2 04:20
End
Wed Jun 3 04:20
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 2.0 d to spare
WO-10188WO-10188 op 40, burn-in and functional test
KVM Switch, 2-port 4K, gray
State
Held in the frozen window
Quantity
340
Start
Wed Jun 3 06:00
End
Wed Jun 3 15:55
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 34 h to spare
WO-10208WO-10208 op 40, burn-in and functional test
4-Bay NAS Enclosure, refresh
State
Held in the frozen window
Quantity
485
Start
Wed Jun 3 15:55
End
Thu Jun 4 10:10
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.9 d to spare
WO-10073WO-10073 op 40, burn-in and functional test
4-Bay NAS Enclosure
State
Planned
Quantity
415
Start
Thu Jun 4 10:10
End
Thu Jun 4 23:40
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.9 d to spare
WO-10117WO-10117 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
100
Start
Thu Jun 4 23:40
End
Fri Jun 5 18:35
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.8 d to spare
WO-10098WO-10098 op 40, burn-in and functional test
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Fri Jun 5 18:35
End
Fri Jun 5 20:45
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10245WO-10245 op 40, burn-in and functional test
Thunderbolt Dock, 4 ports
State
Planned
Quantity
415
Start
Fri Jun 5 20:45
End
Sat Jun 6 08:30
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10083WO-10083 op 40, burn-in and functional test
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
155
Start
Sat Jun 6 08:30
End
Sun Jun 7 09:50
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.4 d to spare
WO-10226WO-10226 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Sun Jun 7 09:50
End
Mon Jun 8 03:55
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.0 d to spare
WO-10344WO-10344 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
240
Start
Mon Jun 8 06:00
End
Tue Jun 9 22:20
Changeover
35 min
For
ACCOUNT 4340, Platinum
Order due
Fri Jun 12 15:00
Order
On time, 28 h to spare
WO-10113WO-10113 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
140
Start
Wed Jun 10 06:00
End
Thu Jun 11 12:35
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.0 d to spare
WO-10294WO-10294 op 40, burn-in and functional test
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Thu Jun 11 12:35
End
Fri Jun 12 04:30
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 2.9 d to spare
WO-10093WO-10093 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Fri Jun 12 04:30
End
Fri Jun 12 20:00
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 3.8 d to spare
WO-10240WO-10240 op 40, burn-in and functional test
1TB NVMe SSD, gray
State
Planned
Quantity
300
Start
Fri Jun 12 20:00
End
Sat Jun 13 08:50
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 25 h to spare
WO-10078WO-10078 op 40, burn-in and functional test
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Sat Jun 13 17:15
End
Sat Jun 13 21:40
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10122WO-10122 op 40, burn-in and functional test
27" QHD Monitor, 165Hz
State
Planned
Quantity
340
Start
Sat Jun 13 21:40
End
Sun Jun 14 17:15
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10059WO-10059 op 40, burn-in and functional test
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Sun Jun 14 20:15
End
Mon Jun 15 01:10
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10284WO-10284 op 40, burn-in and functional test
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
100
Start
Mon Jun 15 02:45
End
Mon Jun 15 06:00
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 30 h to spare
WO-10342WO-10342 op 40, burn-in and functional test
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
30
Start
Mon Jun 15 06:00
End
Mon Jun 15 11:25
Changeover
35 min
For
ENGINEERING, Internal
Order due
Fri Jun 19 12:00
Order
On time, 2.1 d to spare
WO-10002WO-10002 op 40, burn-in and functional test
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
370
Start
Mon Jun 15 11:25
End
Mon Jun 15 15:50
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.8 d to spare
WO-10016WO-10016 op 40, burn-in and functional test
4-Bay NAS Enclosure, gray
State
Planned
Quantity
120
Start
Mon Jun 15 19:50
End
Tue Jun 16 00:40
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10189WO-10189 op 40, burn-in and functional test
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
340
Start
Tue Jun 16 00:40
End
Tue Jun 16 10:35
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 44 h to spare
WO-10319WO-10319 op 40, burn-in and functional test
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
120
Start
Tue Jun 16 10:35
End
Wed Jun 17 10:40
Changeover
35 min
For
ACCOUNT 9148, Standard
Order due
Mon Jun 22 15:00
Order
On time, 4.3 d to spare
WO-10270WO-10270 op 40, burn-in and functional test
Thin Client, 4GB / 32GB
State
Planned
Quantity
40
Start
Wed Jun 17 10:40
End
Wed Jun 17 19:35
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10299WO-10299 op 40, burn-in and functional test
USB-C Dock, 100W, dual display
State
Planned
Quantity
110
Start
Wed Jun 17 19:35
End
Wed Jun 17 22:40
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.0 d to spare
WO-10210WO-10210 op 40, burn-in and functional test
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
485
Start
Thu Jun 18 08:10
End
Fri Jun 19 02:25
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 3.3 d to spare
WO-10012WO-10012 op 40, burn-in and functional test
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
40
Start
Fri Jun 19 02:25
End
Fri Jun 19 12:20
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.1 d to spare
WO-10280WO-10280 op 40, burn-in and functional test
Ergonomic Mouse, wireless
State
Planned
Quantity
590
Start
Fri Jun 19 12:20
End
Fri Jun 19 18:35
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 47 h to spare
WO-10311WO-10311 op 40, burn-in and functional test
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
400
Start
Fri Jun 19 18:35
End
Sat Jun 20 15:40
Changeover
35 min
For
ACCOUNT 7463, Gold
Order due
Thu Jun 25 15:00
Order
On time, 31 h to spare
WO-10128WO-10128 op 40, burn-in and functional test
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Sat Jun 20 15:40
End
Sun Jun 21 05:20
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10158WO-10158 op 40, burn-in and functional test
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
365
Start
Sun Jun 21 22:40
End
Mon Jun 22 17:05
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.0 d to spare
WO-10324WO-10324 op 40, burn-in and functional test
22" Touch Monitor, gray
State
Planned
Quantity
400
Start
Mon Jun 22 18:05
End
Tue Jun 23 19:00
Changeover
15 min
For
ACCOUNT 6021, Standard
Order due
Fri Jun 26 15:00
Order
On time, 8.2 h to spare
WO-10099WO-10099 op 40, burn-in and functional test
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Tue Jun 23 21:55
End
Wed Jun 24 00:05
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 10 h to spare
WO-10027WO-10027 op 40, burn-in and functional test
1TB NVMe SSD
State
Planned
Quantity
410
Start
Wed Jun 24 02:30
End
Wed Jun 24 16:30
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.3 d to spare
WO-10114WO-10114 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
125
Start
Wed Jun 24 16:30
End
Thu Jun 25 19:55
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10295WO-10295 op 40, burn-in and functional test
34" Ultrawide Monitor, curved
State
Planned
Quantity
235
Start
Thu Jun 25 19:55
End
Fri Jun 26 10:05
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 9.9 h to spare
WO-10144WO-10144 op 40, burn-in and functional test
4K Conference Camera
State
Planned
Quantity
480
Start
Fri Jun 26 10:05
End
Fri Jun 26 15:15
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 29 h to spare
WO-10199WO-10199 op 40, burn-in and functional test
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
305
Start
Fri Jun 26 15:15
End
Sun Jun 28 11:50
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10222WO-10222 op 40, burn-in and functional test
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Sun Jun 28 11:50
End
Mon Jun 29 00:30
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 45 h to spare
WO-10017WO-10017 op 40, burn-in and functional test
4-Bay NAS Enclosure, gray
State
Planned
Quantity
135
Start
Mon Jun 29 04:00
End
Mon Jun 29 09:20
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.4 d to spare
WO-10060WO-10060 op 40, burn-in and functional test
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Mon Jun 29 09:20
End
Mon Jun 29 13:55
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.3 d to spare
WO-10180WO-10180 op 40, burn-in and functional test
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
65
Start
Mon Jun 29 17:15
End
Mon Jun 29 22:20
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 34 h to spare
WO-10190WO-10190 op 40, burn-in and functional test
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
360
Start
Tue Jun 30 06:00
End
Tue Jun 30 16:25
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 2.7 h to spare
WO-10159WO-10159 op 40, burn-in and functional test
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
415
Start
Tue Jun 30 18:20
End
Wed Jul 1 15:10
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 7.5 h to spare
WO-10051WO-10051 op 40, burn-in and functional test
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
220
Start
Thu Jul 2 02:30
End
Thu Jul 2 14:00
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.4 h to spare
WO-10212WO-10212 op 40, burn-in and functional test
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Thu Jul 2 14:00
End
Fri Jul 3 07:20
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 5.7 h to spare
WO-10271WO-10271 op 40, burn-in and functional test
Thin Client, 4GB / 32GB
State
Planned
Quantity
35
Start
Fri Jul 3 07:20
End
Fri Jul 3 15:30
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 3.3 h to spare
WO-10032WO-10032 op 40, burn-in and functional test
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
245
Start
Fri Jul 3 15:30
End
Sat Jul 4 09:25
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 11 h to spare
WO-10119WO-10119 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Sat Jul 4 09:25
End
Sun Jul 5 02:30
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 25 h to spare
WO-10056WO-10056 op 40, burn-in and functional test
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
130
Start
Sun Jul 5 02:30
End
Sun Jul 5 08:05
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 25 h to spare
WO-10281WO-10281 op 40, burn-in and functional test
Ergonomic Mouse, wireless
State
Planned
Quantity
490
Start
Mon Jul 6 02:50
End
Mon Jul 6 08:05
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 18 h late
WO-10331WO-10331 op 40, burn-in and functional test
22" Touch Monitor
State
Planned
Quantity
300
Start
Mon Jul 6 10:25
End
Tue Jul 7 01:45
Changeover
35 min
For
ACCOUNT 6021, Standard
Order due
Wed Jul 8 15:00
Order
Late, 25 h late
WO-10291WO-10291 op 40, burn-in and functional test
27" 4K Monitor, USB-C
State
Planned
Quantity
365
Start
Tue Jul 7 01:45
End
Tue Jul 7 19:50
Changeover
15 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 2.2 d to spare
WO-10129WO-10129 op 40, burn-in and functional test
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Tue Jul 7 19:50
End
Wed Jul 8 09:30
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 21 h late
WO-10167WO-10167 op 40, burn-in and functional test
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Wed Jul 8 09:30
End
Wed Jul 8 15:25
Changeover
35 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 47 h to spare
WO-10110WO-10110 op 40, burn-in and functional test
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
100
Start
Wed Jul 8 15:25
End
Wed Jul 8 22:00
Changeover
35 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 9.8 h to spare
WO-10267WO-10267 op 40, burn-in and functional test
24-Port PoE Switch, managed
State
Planned
Quantity
115
Start
Thu Jul 9 01:30
End
Thu Jul 9 10:45
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 1.4 h late
WO-10066WO-10066 op 40, burn-in and functional test
1TB NVMe SSD, refresh
State
Planned
Quantity
270
Start
Thu Jul 9 10:45
End
Thu Jul 9 22:55
Changeover
35 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 5.0 h late
WO-10028WO-10028 op 40, burn-in and functional test
1TB NVMe SSD
State
Planned
Quantity
530
Start
Fri Jul 10 04:10
End
Fri Jul 10 21:45
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
On time, 8.3 h to spare
WO-10115WO-10115 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
135
Start
Sat Jul 11 07:25
End
Sun Jul 12 12:55
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.2 h late
WO-10296WO-10296 op 40, burn-in and functional test
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Sun Jul 12 12:55
End
Mon Jul 13 04:50
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 16 h late
WO-10302WO-10302 op 40, burn-in and functional test
Mechanical Keyboard, TKL
State
Finished
Quantity
330
Start
Mon Jun 1 00:00
End
Mon Jun 1 03:35
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10058WO-10058 op 40, burn-in and functional test
128GB USB Flash Drive, 10-pack
State
Finished
Quantity
100
Start
Mon Jun 1 03:35
End
Mon Jun 1 07:55
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
Complete
WO-10155WO-10155 op 40, burn-in and functional test
27" QHD Monitor, 165Hz, refresh
State
Finished
Quantity
445
Start
Mon Jun 1 08:05
End
Tue Jun 2 06:30
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
On time, 30 h to spare
WO-10269WO-10269 op 40, burn-in and functional test
Thin Client, 4GB / 32GB
State
Finished
Quantity
30
Start
Tue Jun 2 06:30
End
Tue Jun 2 13:35
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.8 d to spare
WO-10235WO-10235 op 40, burn-in and functional test
Tower Workstation, 32GB / 1TB
State
Finished
Quantity
30
Start
Tue Jun 2 16:40
End
Tue Jun 2 22:35
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.8 d to spare
WO-10193WO-10193 op 40, burn-in and functional test
10" Tablet, 64GB
State
Running now
Quantity
109 left of 120
Start
Wed Jun 3 04:35
End
Wed Jun 3 18:00
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.0 d to spare
WO-10141WO-10141 op 40, burn-in and functional test
4K Conference Camera
State
Held in the frozen window
Quantity
430
Start
Wed Jun 3 18:20
End
Wed Jun 3 23:00
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 34 h to spare
WO-10330WO-10330 op 40, burn-in and functional test
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
150
Start
Thu Jun 4 06:00
End
Thu Jun 4 13:55
Changeover
35 min
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.1 d to spare
WO-10216WO-10216 op 40, burn-in and functional test
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
230
Start
Thu Jun 4 13:55
End
Thu Jun 4 20:40
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 30 h to spare
WO-10298WO-10298 op 40, burn-in and functional test
USB-C Dock, 100W, dual display
State
Planned
Quantity
140
Start
Fri Jun 5 06:00
End
Fri Jun 5 09:25
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 28 h to spare
WO-10011WO-10011 op 40, burn-in and functional test
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
45
Start
Fri Jun 5 09:25
End
Fri Jun 5 20:30
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.1 d to spare
WO-10279WO-10279 op 40, burn-in and functional test
Ergonomic Mouse, wireless
State
Planned
Quantity
500
Start
Sat Jun 6 02:55
End
Sat Jun 6 08:15
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10040WO-10040 op 40, burn-in and functional test
KVM Switch, 2-port 4K
State
Planned
Quantity
540
Start
Sat Jun 6 08:15
End
Sat Jun 6 21:25
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.3 d to spare
WO-10127WO-10127 op 40, burn-in and functional test
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
155
Start
Sat Jun 6 21:25
End
Sun Jun 7 10:40
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.1 d to spare
WO-10265WO-10265 op 40, burn-in and functional test
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Sun Jun 7 10:40
End
Sun Jun 7 20:40
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 47 h to spare
WO-10156WO-10156 op 40, burn-in and functional test
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
390
Start
Sun Jun 7 22:35
End
Mon Jun 8 18:10
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 48 h to spare
WO-10108WO-10108 op 40, burn-in and functional test
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
100
Start
Tue Jun 9 06:00
End
Tue Jun 9 12:35
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.4 d to spare
WO-10165WO-10165 op 40, burn-in and functional test
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Tue Jun 9 12:35
End
Tue Jun 9 18:30
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.2 d to spare
WO-10289WO-10289 op 40, burn-in and functional test
27" 4K Monitor, USB-C
State
Planned
Quantity
355
Start
Tue Jun 9 18:30
End
Wed Jun 10 12:05
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 44 h to spare
WO-10142WO-10142 op 40, burn-in and functional test
4K Conference Camera
State
Planned
Quantity
400
Start
Wed Jun 10 12:05
End
Wed Jun 10 16:30
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10274WO-10274 op 40, burn-in and functional test
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Wed Jun 10 16:30
End
Wed Jun 10 21:10
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 26 h to spare
WO-10170WO-10170 op 40, burn-in and functional test
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
90
Start
Thu Jun 11 06:00
End
Thu Jun 11 23:45
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.4 d to spare
WO-10198WO-10198 op 40, burn-in and functional test
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
240
Start
Fri Jun 12 06:00
End
Sat Jun 13 17:15
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10179WO-10179 op 40, burn-in and functional test
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
75
Start
Sun Jun 14 01:55
End
Sun Jun 14 07:40
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 42 h to spare
WO-10221WO-10221 op 40, burn-in and functional test
8-Port Gigabit Switch
State
Planned
Quantity
160
Start
Sun Jun 14 07:40
End
Sun Jun 14 20:50
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 32 h to spare
WO-10157WO-10157 op 40, burn-in and functional test
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Mon Jun 15 00:30
End
Mon Jun 15 19:40
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 33 h to spare
WO-10088WO-10088 op 40, burn-in and functional test
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Mon Jun 15 19:40
End
Tue Jun 16 18:45
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.1 d to spare
WO-10050WO-10050 op 40, burn-in and functional test
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
215
Start
Tue Jun 16 18:45
End
Wed Jun 17 06:20
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10236WO-10236 op 40, burn-in and functional test
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
35
Start
Wed Jun 17 06:20
End
Wed Jun 17 13:30
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10031WO-10031 op 40, burn-in and functional test
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
200
Start
Wed Jun 17 13:30
End
Thu Jun 18 04:15
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10118WO-10118 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Thu Jun 18 04:15
End
Thu Jun 18 21:20
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.4 d to spare
WO-10151WO-10151 op 40, burn-in and functional test
2TB Portable SSD
State
Planned
Quantity
330
Start
Fri Jun 19 06:00
End
Fri Jun 19 18:00
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 4.8 d to spare
WO-10227WO-10227 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Sun Jun 21 05:20
End
Sun Jun 21 23:25
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10266WO-10266 op 40, burn-in and functional test
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Sun Jun 21 23:25
End
Mon Jun 22 09:45
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.3 d to spare
WO-10109WO-10109 op 40, burn-in and functional test
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
90
Start
Mon Jun 22 09:45
End
Mon Jun 22 15:20
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10022WO-10022 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
75
Start
Mon Jun 22 18:05
End
Tue Jun 23 12:30
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 3.1 d to spare
WO-10335WO-10335 op 40, burn-in and functional test
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
40
Start
Tue Jun 23 12:30
End
Tue Jun 23 20:20
Changeover
15 min
For
ACCOUNT 2800, Silver
Order due
Mon Jun 29 15:00
Order
On time, 5.2 d to spare
WO-10290WO-10290 op 40, burn-in and functional test
27" 4K Monitor, USB-C
State
Planned
Quantity
385
Start
Wed Jun 24 00:05
End
Wed Jun 24 19:30
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 29 h to spare
WO-10337WO-10337 op 40, burn-in and functional test
24" FHD Monitor, IPS
State
Planned
Quantity
40
Start
Wed Jun 24 19:30
End
Wed Jun 24 21:50
Changeover
15 min
For
ACCOUNT 2800, Silver
Order due
Tue Jun 30 15:00
Order
On time, 3.7 d to spare
WO-10171WO-10171 op 40, burn-in and functional test
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
70
Start
Thu Jun 25 06:00
End
Thu Jun 25 19:55
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10308WO-10308 op 40, burn-in and functional test
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
300
Start
Thu Jun 25 19:55
End
Sun Jun 28 06:50
Changeover
15 min
For
ACCOUNT 5190, Silver
Order due
Tue Jun 30 15:00
Order
Late, 3.0 h late
WO-10079WO-10079 op 40, burn-in and functional test
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Sun Jun 28 06:50
End
Sun Jun 28 10:55
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 2.0 d to spare
WO-10123WO-10123 op 40, burn-in and functional test
27" QHD Monitor, 165Hz
State
Planned
Quantity
350
Start
Sun Jun 28 10:55
End
Mon Jun 29 07:05
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 30 h to spare
WO-10104WO-10104 op 40, burn-in and functional test
1080p Webcam with mic
State
Planned
Quantity
340
Start
Mon Jun 29 07:05
End
Mon Jun 29 11:00
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 27 h to spare
WO-10285WO-10285 op 40, burn-in and functional test
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
120
Start
Mon Jun 29 11:00
End
Mon Jun 29 14:45
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 0.9 h late
WO-10046WO-10046 op 40, burn-in and functional test
24" FHD Monitor, IPS
State
Planned
Quantity
290
Start
Mon Jun 29 20:25
End
Tue Jun 30 11:50
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 33 h to spare
WO-10003WO-10003 op 40, burn-in and functional test
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
480
Start
Tue Jun 30 11:50
End
Tue Jun 30 17:25
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 3.8 d to spare
WO-10232WO-10232 op 40, burn-in and functional test
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
100
Start
Tue Jun 30 23:55
End
Wed Jul 1 15:10
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 0.7 h to spare
WO-10138WO-10138 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
450
Start
Wed Jul 1 15:10
End
Sat Jul 4 11:35
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 0.7 h to spare
WO-10218WO-10218 op 40, burn-in and functional test
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
210
Start
Sat Jul 4 11:35
End
Sat Jul 4 17:45
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 4.1 h to spare
WO-10309WO-10309 op 40, burn-in and functional test
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Sat Jul 4 17:45
End
Sun Jul 5 00:30
Changeover
35 min
For
ACCOUNT 7702, Gold
Order due
Wed Jul 8 15:00
Order
On time, 22 h to spare
WO-10333WO-10333 op 40, burn-in and functional test
10" Tablet, 64GB
State
Planned
Quantity
150
Start
Sun Jul 5 00:30
End
Sun Jul 5 17:35
Changeover
35 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
Late, 28 h late
WO-10152WO-10152 op 40, burn-in and functional test
2TB Portable SSD
State
Planned
Quantity
350
Start
Mon Jul 6 09:10
End
Mon Jul 6 21:55
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 0.9 h late
WO-10312WO-10312 op 40, burn-in and functional test
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Tue Jul 7 06:00
End
Tue Jul 7 12:45
Changeover
35 min
For
ACCOUNT 9148, Standard
Order due
Thu Jul 9 15:00
Order
Late, 20 h late
WO-10085WO-10085 op 40, burn-in and functional test
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
150
Start
Tue Jul 7 12:45
End
Wed Jul 8 13:20
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.1 h late
WO-10228WO-10228 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Wed Jul 8 13:20
End
Thu Jul 9 06:30
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 24 h late
WO-10023WO-10023 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
90
Start
Thu Jul 9 06:30
End
Fri Jul 10 04:10
Changeover
15 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 3.0 h late
WO-10071WO-10071 op 40, burn-in and functional test
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Fri Jul 10 06:00
End
Sat Jul 11 07:25
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 2.5 h to spare
WO-10172WO-10172 op 40, burn-in and functional test
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
80
Start
Sun Jul 12 06:15
End
Sun Jul 12 22:05
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
At risk, 1.2 h to spare
WO-10008WO-10008 op 40, burn-in and functional test
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Sun Jul 12 22:05
End
Mon Jul 13 19:50
Changeover
15 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 10 h to spare
WO-10121WO-10121 op 40, burn-in and functional test
27" QHD Monitor, 165Hz
State
Finished
Quantity
355
Start
Sun May 31 04:00
End
Mon Jun 1 00:25
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10015WO-10015 op 40, burn-in and functional test
4-Bay NAS Enclosure, gray
State
Finished
Quantity
150
Start
Mon Jun 1 00:25
End
Mon Jun 1 06:55
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
Complete
WO-10283WO-10283 op 40, burn-in and functional test
USB-C Travel Hub, 7-in-1
State
Finished
Quantity
130
Start
Mon Jun 1 06:55
End
Mon Jun 1 10:55
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
On time, 29 h to spare
WO-10044WO-10044 op 40, burn-in and functional test
24" FHD Monitor, IPS
State
Finished
Quantity
370
Start
Mon Jun 1 14:50
End
Tue Jun 2 10:20
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 42 h to spare
WO-10230WO-10230 op 40, burn-in and functional test
15" Laptop, 12-core, 32GB / 1TB, gray
State
Finished
Quantity
110
Start
Tue Jun 2 10:20
End
Wed Jun 3 03:00
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 32 h to spare
WO-10136WO-10136 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB
State
Running now
Quantity
455 left of 470
Start
Wed Jun 3 03:00
End
Sat Jun 6 02:55
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
At risk, 2.0 h to spare
WO-10341WO-10341 op 40, burn-in and functional test
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
30
Start
Mon Jun 8 03:55
End
Mon Jun 8 08:35
Changeover
15 min
For
ENGINEERING, Internal
Order due
Fri Jun 12 12:00
Order
On time, 2.7 d to spare
WO-10021WO-10021 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
85
Start
Mon Jun 8 08:35
End
Tue Jun 9 05:25
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10064WO-10064 op 40, burn-in and functional test
1TB NVMe SSD, refresh
State
Planned
Quantity
230
Start
Tue Jun 9 05:25
End
Tue Jun 9 15:50
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10026WO-10026 op 40, burn-in and functional test
1TB NVMe SSD
State
Planned
Quantity
450
Start
Tue Jun 9 15:50
End
Wed Jun 10 06:45
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.4 d to spare
WO-10255WO-10255 op 40, burn-in and functional test
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
350
Start
Wed Jun 10 08:20
End
Fri Jun 12 19:05
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
Late, 2.7 d late
WO-10035WO-10035 op 40, burn-in and functional test
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Sat Jun 13 08:50
End
Sun Jun 14 13:50
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10260WO-10260 op 40, burn-in and functional test
22" Touch Monitor, gray
State
Planned
Quantity
540
Start
Sun Jun 14 13:50
End
Mon Jun 15 23:45
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 8.1 h to spare
WO-10231WO-10231 op 40, burn-in and functional test
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
110
Start
Tue Jun 16 06:00
End
Tue Jun 16 22:40
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 46 h to spare
WO-10194WO-10194 op 40, burn-in and functional test
10" Tablet, 64GB
State
Planned
Quantity
125
Start
Wed Jun 17 06:00
End
Wed Jun 17 20:20
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.3 d to spare
WO-10074WO-10074 op 40, burn-in and functional test
4-Bay NAS Enclosure
State
Planned
Quantity
430
Start
Wed Jun 17 20:20
End
Thu Jun 18 10:40
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10143WO-10143 op 40, burn-in and functional test
4K Conference Camera
State
Planned
Quantity
410
Start
Thu Jun 18 10:40
End
Thu Jun 18 15:10
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.9 d to spare
WO-10217WO-10217 op 40, burn-in and functional test
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
180
Start
Thu Jun 18 15:10
End
Thu Jun 18 20:35
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.3 d to spare
WO-10307WO-10307 op 40, burn-in and functional test
27" QHD Monitor, 165Hz
State
Planned
Quantity
150
Start
Thu Jun 18 20:35
End
Fri Jun 19 05:35
Changeover
35 min
For
ACCOUNT 7702, Gold
Order due
Wed Jun 24 15:00
Order
On time, 4.8 d to spare
WO-10055WO-10055 op 40, burn-in and functional test
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
140
Start
Fri Jun 19 05:35
End
Fri Jun 19 11:30
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.2 d to spare
WO-10246WO-10246 op 40, burn-in and functional test
Thunderbolt Dock, 4 ports
State
Planned
Quantity
410
Start
Fri Jun 19 11:30
End
Fri Jun 19 23:05
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 2.2 d to spare
WO-10041WO-10041 op 40, burn-in and functional test
KVM Switch, 2-port 4K
State
Planned
Quantity
630
Start
Fri Jun 19 23:05
End
Sat Jun 20 14:05
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10084WO-10084 op 40, burn-in and functional test
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
165
Start
Sat Jun 20 14:05
End
Sun Jun 21 17:05
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10343WO-10343 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
30
Start
Sun Jun 21 17:05
End
Sun Jun 21 22:20
Changeover
15 min
For
ENGINEERING, Internal
Order due
Fri Jun 26 12:00
Order
On time, 3.0 d to spare
WO-10065WO-10065 op 40, burn-in and functional test
1TB NVMe SSD, refresh
State
Planned
Quantity
300
Start
Mon Jun 22 06:00
End
Mon Jun 22 19:25
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10166WO-10166 op 40, burn-in and functional test
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Tue Jun 23 06:00
End
Tue Jun 23 11:55
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.8 d to spare
WO-10256WO-10256 op 40, burn-in and functional test
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
345
Start
Tue Jun 23 11:55
End
Thu Jun 25 21:50
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
At risk, 4.2 h to spare
WO-10007WO-10007 op 40, burn-in and functional test
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Thu Jun 25 23:20
End
Fri Jun 26 21:25
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 33 h to spare
WO-10275WO-10275 op 40, burn-in and functional test
Wi-Fi 6E Router, gray
State
Planned
Quantity
60
Start
Sat Jun 27 08:40
End
Sat Jun 27 14:10
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 25 h to spare
WO-10036WO-10036 op 40, burn-in and functional test
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Sat Jun 27 14:10
End
Sun Jun 28 19:30
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 47 h to spare
WO-10261WO-10261 op 40, burn-in and functional test
22" Touch Monitor, gray
State
Planned
Quantity
465
Start
Sun Jun 28 19:30
End
Tue Jun 30 00:50
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 10 h to spare
WO-10089WO-10089 op 40, burn-in and functional test
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Tue Jun 30 00:50
End
Tue Jun 30 23:55
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 29 h to spare
WO-10314WO-10314 op 40, burn-in and functional test
22" Touch Monitor
State
Planned
Quantity
400
Start
Wed Jul 1 06:00
End
Thu Jul 2 02:15
Changeover
35 min
For
ACCOUNT 3327, Gold
Order due
Mon Jul 6 15:00
Order
Late, 17 h late
WO-10195WO-10195 op 40, burn-in and functional test
10" Tablet, 64GB
State
Planned
Quantity
115
Start
Thu Jul 2 06:00
End
Thu Jul 2 19:15
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.7 h to spare
WO-10300WO-10300 op 40, burn-in and functional test
USB-C Dock, 100W, dual display
State
Planned
Quantity
130
Start
Thu Jul 2 19:15
End
Thu Jul 2 22:45
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 2.7 h to spare
WO-10237WO-10237 op 40, burn-in and functional test
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
30
Start
Fri Jul 3 06:00
End
Fri Jul 3 12:15
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 4.6 h to spare
WO-10313WO-10313 op 40, burn-in and functional test
22" Touch Monitor, gray
State
Planned
Quantity
80
Start
Fri Jul 3 12:15
End
Fri Jul 3 17:50
Changeover
35 min
For
ACCOUNT 3327, Gold
Order due
Tue Jul 7 15:00
Order
On time, 20 h to spare
WO-10075WO-10075 op 40, burn-in and functional test
4-Bay NAS Enclosure
State
Planned
Quantity
530
Start
Fri Jul 3 17:50
End
Sat Jul 4 11:20
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.4 h to spare
WO-10338WO-10338 op 40, burn-in and functional test
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
150
Start
Sun Jul 5 13:10
End
Mon Jul 6 19:05
Changeover
35 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
At risk, 1.2 h to spare
WO-10247WO-10247 op 40, burn-in and functional test
Thunderbolt Dock, 4 ports
State
Planned
Quantity
415
Start
Mon Jul 6 19:05
End
Tue Jul 7 06:50
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 13 h late
WO-10042WO-10042 op 40, burn-in and functional test
KVM Switch, 2-port 4K
State
Planned
Quantity
550
Start
Tue Jul 7 06:50
End
Tue Jul 7 19:55
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
At risk, 0.9 h to spare
WO-10160WO-10160 op 40, burn-in and functional test
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Wed Jul 8 06:00
End
Thu Jul 9 01:10
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 26 h late
WO-10332WO-10332 op 40, burn-in and functional test
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
400
Start
Thu Jul 9 06:00
End
Sun Jul 12 06:15
Changeover
35 min
For
ACCOUNT 5190, Silver
Order due
Fri Jul 10 15:00
Order
Late, 4.8 d late
WO-10213WO-10213 op 40, burn-in and functional test
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Sun Jul 12 06:15
End
Sun Jul 12 23:35
Changeover
35 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
Late, 2.8 h late
WO-10095WO-10095 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Sun Jul 12 23:35
End
Mon Jul 13 14:15
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 14 17:00
Order
On time, 8.5 h to spare
WO-10102WO-10102 op 40, burn-in and functional test
1080p Webcam with mic
State
Finished
Quantity
310
Start
Mon Jun 1 06:00
End
Mon Jun 1 09:35
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
Complete
WO-10315WO-10315 op 40, burn-in and functional test
22" Touch Monitor
State
Finished
Quantity
80
Start
Mon Jun 1 09:35
End
Mon Jun 1 14:10
For
ACCOUNT 1466, Gold
Order due
Fri Jun 5 15:00
Order
On time, 2.1 d to spare
WO-10001WO-10001 op 40, burn-in and functional test
Ergonomic Mouse, wireless, gray
State
Finished
Quantity
390
Start
Mon Jun 1 14:10
End
Mon Jun 1 18:50
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.3 d to spare
WO-10131WO-10131 op 40, burn-in and functional test
8" Rugged Tablet, 64GB, gray
State
Finished
Quantity
160
Start
Tue Jun 2 06:00
End
Wed Jun 3 03:50
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 46 h to spare
WO-10049WO-10049 op 40, burn-in and functional test
27" 4K Monitor, USB-C, refresh
State
Running now
Quantity
151 left of 190
Start
Wed Jun 3 03:50
End
Wed Jun 3 13:45
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.1 d to spare
WO-10310WO-10310 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB, refresh
State
Held in the frozen window
Quantity
80
Start
Wed Jun 3 14:10
End
Thu Jun 4 05:30
Changeover
35 min
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.3 d to spare
WO-10326WO-10326 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB
State
Held in the frozen window
Quantity
40
Start
Thu Jun 4 05:30
End
Thu Jun 4 12:10
Changeover
35 min
For
ACCOUNT 8321, Platinum
Order due
Tue Jun 9 15:00
Order
On time, 4.9 d to spare
WO-10030WO-10030 op 40, burn-in and functional test
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
245
Start
Thu Jun 4 12:10
End
Fri Jun 5 06:05
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 4.0 d to spare
WO-10174WO-10174 op 40, burn-in and functional test
8" Rugged Tablet, 64GB
State
Planned
Quantity
85
Start
Fri Jun 5 06:05
End
Fri Jun 5 17:15
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 33 h to spare
WO-10054WO-10054 op 40, burn-in and functional test
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
130
Start
Fri Jun 5 17:15
End
Fri Jun 5 22:50
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10150WO-10150 op 40, burn-in and functional test
2TB Portable SSD
State
Planned
Quantity
380
Start
Fri Jun 5 22:50
End
Sat Jun 6 12:15
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 47 h to spare
WO-10203WO-10203 op 40, burn-in and functional test
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Sat Jun 6 12:15
End
Tue Jun 9 21:20
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
At risk, 2.0 h to spare
WO-10184WO-10184 op 40, burn-in and functional test
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
25
Start
Tue Jun 9 21:20
End
Wed Jun 10 01:10
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 34 h to spare
WO-10069WO-10069 op 40, burn-in and functional test
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
365
Start
Wed Jun 10 01:10
End
Thu Jun 11 06:05
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.2 d to spare
WO-10209WO-10209 op 40, burn-in and functional test
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
435
Start
Thu Jun 11 06:05
End
Thu Jun 11 22:30
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.2 d to spare
WO-10006WO-10006 op 40, burn-in and functional test
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
155
Start
Thu Jun 11 23:45
End
Sat Jun 13 04:10
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 30 h to spare
WO-10339WO-10339 op 40, burn-in and functional test
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Sat Jun 13 04:10
End
Sun Jun 14 01:55
Changeover
15 min
For
ACCOUNT 3915, Standard
Order due
Wed Jun 17 15:00
Order
On time, 44 h to spare
WO-10303WO-10303 op 40, burn-in and functional test
Mechanical Keyboard, TKL
State
Planned
Quantity
260
Start
Sun Jun 14 17:15
End
Sun Jun 14 20:15
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10103WO-10103 op 40, burn-in and functional test
1080p Webcam with mic
State
Planned
Quantity
350
Start
Sun Jun 14 20:50
End
Mon Jun 15 00:30
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.0 d to spare
WO-10250WO-10250 op 40, burn-in and functional test
4K Conference Camera, gray
State
Planned
Quantity
125
Start
Mon Jun 15 01:10
End
Mon Jun 15 02:45
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 32 h to spare
WO-10045WO-10045 op 40, burn-in and functional test
24" FHD Monitor, IPS
State
Planned
Quantity
280
Start
Mon Jun 15 06:00
End
Mon Jun 15 20:55
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10132WO-10132 op 40, burn-in and functional test
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
140
Start
Mon Jun 15 23:45
End
Tue Jun 16 18:55
Changeover
35 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10137WO-10137 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
505
Start
Tue Jun 16 18:55
End
Sat Jun 20 00:00
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
At risk, 1.2 h to spare
WO-10175WO-10175 op 40, burn-in and functional test
8" Rugged Tablet, 64GB
State
Planned
Quantity
110
Start
Sat Jun 20 00:00
End
Sat Jun 20 14:15
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 33 h to spare
WO-10204WO-10204 op 40, burn-in and functional test
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Sat Jun 20 14:15
End
Tue Jun 23 23:20
Changeover
35 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
At risk, 0.2 h to spare
WO-10185WO-10185 op 40, burn-in and functional test
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Tue Jun 23 23:20
End
Wed Jun 24 02:30
Changeover
35 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 32 h to spare
WO-10070WO-10070 op 40, burn-in and functional test
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Wed Jun 24 06:00
End
Thu Jun 25 07:25
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.1 d to spare
WO-10211WO-10211 op 40, burn-in and functional test
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
420
Start
Thu Jun 25 07:25
End
Thu Jun 25 23:20
Changeover
35 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 2.9 d to spare
WO-10094WO-10094 op 40, burn-in and functional test
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Fri Jun 26 06:00
End
Fri Jun 26 20:40
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 32 h to spare
WO-10241WO-10241 op 40, burn-in and functional test
1TB NVMe SSD, gray
State
Planned
Quantity
280
Start
Fri Jun 26 20:40
End
Sat Jun 27 08:40
Changeover
35 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10304WO-10304 op 40, burn-in and functional test
Mechanical Keyboard, TKL
State
Planned
Quantity
320
Start
Mon Jun 29 00:30
End
Mon Jun 29 04:00
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 42 h to spare
WO-10251WO-10251 op 40, burn-in and functional test
4K Conference Camera, gray
State
Planned
Quantity
105
Start
Mon Jun 29 06:00
End
Mon Jun 29 07:25
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 2.5 h late
WO-10318WO-10318 op 40, burn-in and functional test
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
400
Start
Mon Jun 29 09:15
End
Tue Jun 30 12:25
Changeover
35 min
For
ACCOUNT 3915, Standard
Order due
Thu Jul 2 15:00
Order
Late, 2.8 h late
WO-10133WO-10133 op 40, burn-in and functional test
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
145
Start
Tue Jun 30 12:25
End
Wed Jul 1 08:15
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 24 h to spare
WO-10325WO-10325 op 40, burn-in and functional test
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
250
Start
Wed Jul 1 08:15
End
Fri Jul 3 20:15
Changeover
35 min
For
ACCOUNT 7702, Gold
Order due
Mon Jul 6 15:00
Order
Late, 41 h late
WO-10100WO-10100 op 40, burn-in and functional test
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Fri Jul 3 20:15
End
Fri Jul 3 22:25
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 26 h to spare
WO-10145WO-10145 op 40, burn-in and functional test
4K Conference Camera
State
Planned
Quantity
490
Start
Sat Jul 4 11:20
End
Sat Jul 4 16:35
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 3.1 h to spare
WO-10176WO-10176 op 40, burn-in and functional test
8" Rugged Tablet, 64GB
State
Planned
Quantity
95
Start
Sat Jul 4 16:35
End
Sun Jul 5 04:55
Changeover
35 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.2 h to spare
WO-10013WO-10013 op 40, burn-in and functional test
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
45
Start
Mon Jul 6 08:00
End
Mon Jul 6 19:05
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
At risk, 1.7 h to spare
WO-10205WO-10205 op 40, burn-in and functional test
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
415
Start
Mon Jul 6 19:05
End
Thu Jul 9 18:00
Changeover
35 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 42 h late
WO-10186WO-10186 op 40, burn-in and functional test
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Thu Jul 9 18:00
End
Thu Jul 9 21:10
Changeover
35 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.7 h late
WO-10257WO-10257 op 40, burn-in and functional test
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
340
Start
Thu Jul 9 21:10
End
Sun Jul 12 06:15
Changeover
35 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 2.9 d late
CFG Imaging and configuration13%
WO-10329WO-10329 op 45, image, configure and asset-tag
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Finished
Quantity
400
Start
Fri May 29 06:25
End
Mon Jun 1 09:00
For
ACCOUNT 9148, Standard
Order due
Mon Jun 1 15:00
Order
Complete
WO-10317WO-10317 op 45, image, configure and asset-tag
All-in-One 24", 16GB / 512GB, gray
State
Finished
Quantity
150
Start
Mon Jun 1 16:05
End
Tue Jun 2 09:05
For
ACCOUNT 1466, Gold
Order due
Tue Jun 2 15:00
Order
Complete
WO-10310WO-10310 op 45, image, configure and asset-tag
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
80
Start
Thu Jun 4 06:00
End
Thu Jun 4 11:55
Changeover
25 min
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.3 d to spare
WO-10344WO-10344 op 45, image, configure and asset-tag
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
240
Start
Tue Jun 9 22:50
End
Wed Jun 10 22:05
Changeover
25 min
For
ACCOUNT 4340, Platinum
Order due
Fri Jun 12 15:00
Order
On time, 28 h to spare
WO-10339WO-10339 op 45, image, configure and asset-tag
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Mon Jun 15 06:00
End
Mon Jun 15 14:20
Changeover
25 min
For
ACCOUNT 3915, Standard
Order due
Wed Jun 17 15:00
Order
On time, 44 h to spare
WO-10319WO-10319 op 45, image, configure and asset-tag
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
120
Start
Wed Jun 17 11:10
End
Wed Jun 17 19:30
Changeover
25 min
For
ACCOUNT 9148, Standard
Order due
Mon Jun 22 15:00
Order
On time, 4.3 d to spare
WO-10307WO-10307 op 45, image, configure and asset-tag
27" QHD Monitor, 165Hz
State
Planned
Quantity
150
Start
Fri Jun 19 06:05
End
Fri Jun 19 16:20
Changeover
25 min
For
ACCOUNT 7702, Gold
Order due
Wed Jun 24 15:00
Order
On time, 4.8 d to spare
WO-10311WO-10311 op 45, image, configure and asset-tag
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
400
Start
Mon Jun 22 06:00
End
Tue Jun 23 15:40
Changeover
25 min
For
ACCOUNT 7463, Gold
Order due
Thu Jun 25 15:00
Order
On time, 31 h to spare
WO-10335WO-10335 op 45, image, configure and asset-tag
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
40
Start
Wed Jun 24 06:00
End
Wed Jun 24 08:55
Changeover
25 min
For
ACCOUNT 2800, Silver
Order due
Mon Jun 29 15:00
Order
On time, 5.2 d to spare
WO-10337WO-10337 op 45, image, configure and asset-tag
24" FHD Monitor, IPS
State
Planned
Quantity
40
Start
Thu Jun 25 06:00
End
Thu Jun 25 08:35
Changeover
5 min
For
ACCOUNT 2800, Silver
Order due
Tue Jun 30 15:00
Order
On time, 3.7 d to spare
WO-10308WO-10308 op 45, image, configure and asset-tag
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
300
Start
Mon Jun 29 06:00
End
Tue Jun 30 09:00
Changeover
25 min
For
ACCOUNT 5190, Silver
Order due
Tue Jun 30 15:00
Order
Late, 3.0 h late
WO-10318WO-10318 op 45, image, configure and asset-tag
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
400
Start
Tue Jun 30 12:55
End
Wed Jul 1 22:35
Changeover
25 min
For
ACCOUNT 3915, Standard
Order due
Thu Jul 2 15:00
Order
Late, 2.8 h late
WO-10314WO-10314 op 45, image, configure and asset-tag
22" Touch Monitor
State
Planned
Quantity
400
Start
Thu Jul 2 06:00
End
Mon Jul 6 15:40
Changeover
25 min
For
ACCOUNT 3327, Gold
Order due
Mon Jul 6 15:00
Order
Late, 17 h late
WO-10309WO-10309 op 45, image, configure and asset-tag
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Tue Jul 7 06:00
End
Tue Jul 7 14:20
Changeover
25 min
For
ACCOUNT 7702, Gold
Order due
Wed Jul 8 15:00
Order
On time, 22 h to spare
WO-10331WO-10331 op 45, image, configure and asset-tag
22" Touch Monitor
State
Planned
Quantity
300
Start
Wed Jul 8 06:00
End
Thu Jul 9 09:00
Changeover
25 min
For
ACCOUNT 6021, Standard
Order due
Wed Jul 8 15:00
Order
Late, 25 h late
WO-10312WO-10312 op 45, image, configure and asset-tag
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Thu Jul 9 15:55
End
Fri Jul 10 07:15
Changeover
25 min
For
ACCOUNT 9148, Standard
Order due
Thu Jul 9 15:00
Order
Late, 20 h late
WO-10323WO-10323 op 45, image, configure and asset-tag
Mini PC, 8-core, 16GB / 512GB
State
Finished
Quantity
60
Start
Mon Jun 1 06:00
End
Mon Jun 1 10:40
For
ACCOUNT 9148, Standard
Order due
Wed Jun 3 15:00
Order
Complete
WO-10315WO-10315 op 45, image, configure and asset-tag
22" Touch Monitor
State
Finished
Quantity
80
Start
Tue Jun 2 06:00
End
Tue Jun 2 11:55
For
ACCOUNT 1466, Gold
Order due
Fri Jun 5 15:00
Order
On time, 2.1 d to spare
WO-10326WO-10326 op 45, image, configure and asset-tag
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
40
Start
Thu Jun 4 12:40
End
Thu Jun 4 15:35
Changeover
25 min
For
ACCOUNT 8321, Platinum
Order due
Tue Jun 9 15:00
Order
On time, 4.9 d to spare
WO-10330WO-10330 op 45, image, configure and asset-tag
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
150
Start
Thu Jun 4 15:35
End
Fri Jun 5 08:50
Changeover
25 min
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.1 d to spare
WO-10324WO-10324 op 45, image, configure and asset-tag
22" Touch Monitor, gray
State
Planned
Quantity
400
Start
Tue Jun 23 19:30
End
Thu Jun 25 12:10
Changeover
25 min
For
ACCOUNT 6021, Standard
Order due
Fri Jun 26 15:00
Order
On time, 8.2 h to spare
WO-10313WO-10313 op 45, image, configure and asset-tag
22" Touch Monitor, gray
State
Planned
Quantity
80
Start
Mon Jul 6 06:00
End
Mon Jul 6 11:55
Changeover
25 min
For
ACCOUNT 3327, Gold
Order due
Tue Jul 7 15:00
Order
On time, 20 h to spare
WO-10325WO-10325 op 45, image, configure and asset-tag
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
250
Start
Mon Jul 6 15:40
End
Tue Jul 7 15:35
Changeover
25 min
For
ACCOUNT 7702, Gold
Order due
Mon Jul 6 15:00
Order
Late, 41 h late
WO-10338WO-10338 op 45, image, configure and asset-tag
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
150
Start
Tue Jul 7 15:35
End
Wed Jul 8 08:50
Changeover
25 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
At risk, 1.2 h to spare
WO-10333WO-10333 op 45, image, configure and asset-tag
10" Tablet, 64GB
State
Planned
Quantity
150
Start
Thu Jul 9 06:00
End
Thu Jul 9 15:55
Changeover
5 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
Late, 28 h late
PK Pack-out78%
WO-10092WO-10092 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Finished
Quantity
95
Start
Fri May 29 22:30
End
Mon Jun 1 06:15
For
Warehouse stock
Order due
Tue Jun 2 17:00
Order
Complete
WO-10239WO-10239 op 50, label, box and palletize
1TB NVMe SSD, gray
State
Finished
Quantity
320
Start
Mon Jun 1 07:35
End
Mon Jun 1 10:50
For
Warehouse stock
Order due
Tue Jun 2 17:00
Order
Complete
WO-10323WO-10323 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB
State
Finished
Quantity
60
Start
Mon Jun 1 10:55
End
Mon Jun 1 13:10
For
ACCOUNT 9148, Standard
Order due
Wed Jun 3 15:00
Order
Complete
WO-10077WO-10077 op 50, label, box and palletize
Thin Client, 4GB / 32GB, gray
State
Finished
Quantity
20
Start
Mon Jun 1 13:10
End
Mon Jun 1 13:55
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10178WO-10178 op 50, label, box and palletize
Wi-Fi 6 Access Point, ceiling, refresh
State
Finished
Quantity
70
Start
Mon Jun 1 13:55
End
Mon Jun 1 15:10
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10058WO-10058 op 50, label, box and palletize
128GB USB Flash Drive, 10-pack
State
Finished
Quantity
100
Start
Mon Jun 1 15:10
End
Mon Jun 1 16:10
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
Complete
WO-10329WO-10329 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Finished
Quantity
400
Start
Mon Jun 1 16:20
End
Tue Jun 2 06:55
For
ACCOUNT 9148, Standard
Order due
Mon Jun 1 15:00
Order
Complete
WO-10015WO-10015 op 50, label, box and palletize
4-Bay NAS Enclosure, gray
State
Finished
Quantity
150
Start
Tue Jun 2 07:50
End
Tue Jun 2 09:10
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
Complete
WO-10317WO-10317 op 50, label, box and palletize
All-in-One 24", 16GB / 512GB, gray
State
Finished
Quantity
150
Start
Tue Jun 2 09:35
End
Tue Jun 2 14:20
For
ACCOUNT 1466, Gold
Order due
Tue Jun 2 15:00
Order
Complete
WO-10302WO-10302 op 50, label, box and palletize
Mechanical Keyboard, TKL
State
Finished
Quantity
330
Start
Tue Jun 2 14:20
End
Tue Jun 2 16:55
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10102WO-10102 op 50, label, box and palletize
1080p Webcam with mic
State
Finished
Quantity
310
Start
Tue Jun 2 16:55
End
Tue Jun 2 19:55
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
Complete
WO-10155WO-10155 op 50, label, box and palletize
27" QHD Monitor, 165Hz, refresh
State
Running now
Quantity
203 left of 445
Start
Tue Jun 2 19:55
End
Wed Jun 3 10:45
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
On time, 30 h to spare
WO-10283WO-10283 op 50, label, box and palletize
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
130
Start
Wed Jun 3 10:45
End
Wed Jun 3 12:25
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 4 17:00
Order
On time, 29 h to spare
WO-10087WO-10087 op 50, label, box and palletize
12" Pro Tablet, 256GB
State
Held in the frozen window
Quantity
200
Start
Wed Jun 3 12:55
End
Wed Jun 3 16:05
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 2.0 d to spare
WO-10131WO-10131 op 50, label, box and palletize
8" Rugged Tablet, 64GB, gray
State
Held in the frozen window
Quantity
160
Start
Wed Jun 3 16:05
End
Wed Jun 3 19:25
Changeover
10 min
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 46 h to spare
WO-10188WO-10188 op 50, label, box and palletize
KVM Switch, 2-port 4K, gray
State
Held in the frozen window
Quantity
340
Start
Wed Jun 3 19:25
End
Thu Jun 4 06:30
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 34 h to spare
WO-10230WO-10230 op 50, label, box and palletize
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
110
Start
Thu Jun 4 06:30
End
Thu Jun 4 08:40
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 32 h to spare
WO-10326WO-10326 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
40
Start
Thu Jun 4 15:50
End
Thu Jun 4 16:45
Changeover
10 min
For
ACCOUNT 8321, Platinum
Order due
Tue Jun 9 15:00
Order
On time, 4.9 d to spare
WO-10117WO-10117 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
100
Start
Fri Jun 5 19:05
End
Fri Jun 5 21:20
Changeover
5 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.8 d to spare
WO-10136WO-10136 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
470
Start
Mon Jun 8 06:05
End
Mon Jun 8 15:00
Changeover
5 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
At risk, 2.0 h to spare
WO-10150WO-10150 op 50, label, box and palletize
2TB Portable SSD
State
Planned
Quantity
380
Start
Mon Jun 8 15:00
End
Mon Jun 8 17:50
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 47 h to spare
WO-10279WO-10279 op 50, label, box and palletize
Ergonomic Mouse, wireless
State
Planned
Quantity
500
Start
Mon Jun 8 17:50
End
Mon Jun 8 22:15
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10083WO-10083 op 50, label, box and palletize
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
155
Start
Mon Jun 8 22:15
End
Tue Jun 9 08:25
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.4 d to spare
WO-10156WO-10156 op 50, label, box and palletize
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
390
Start
Tue Jun 9 08:25
End
Tue Jun 9 17:20
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 48 h to spare
WO-10341WO-10341 op 50, label, box and palletize
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
30
Start
Tue Jun 9 17:20
End
Tue Jun 9 18:10
Changeover
15 min
For
ENGINEERING, Internal
Order due
Fri Jun 12 12:00
Order
On time, 2.7 d to spare
WO-10064WO-10064 op 50, label, box and palletize
1TB NVMe SSD, refresh
State
Planned
Quantity
230
Start
Tue Jun 9 18:10
End
Tue Jun 9 20:50
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10203WO-10203 op 50, label, box and palletize
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Tue Jun 9 21:50
End
Wed Jun 10 15:00
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
At risk, 2.0 h to spare
WO-10344WO-10344 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
240
Start
Wed Jun 10 22:20
End
Thu Jun 11 10:40
Changeover
10 min
For
ACCOUNT 4340, Platinum
Order due
Fri Jun 12 15:00
Order
On time, 28 h to spare
WO-10255WO-10255 op 50, label, box and palletize
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
350
Start
Fri Jun 12 19:35
End
Mon Jun 15 09:35
Changeover
10 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
Late, 2.7 d late
WO-10198WO-10198 op 50, label, box and palletize
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
240
Start
Mon Jun 15 09:35
End
Mon Jun 15 14:20
Changeover
10 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10274WO-10274 op 50, label, box and palletize
Wi-Fi 6E Router, gray
State
Planned
Quantity
50
Start
Mon Jun 15 14:20
End
Mon Jun 15 15:25
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 26 h to spare
WO-10339WO-10339 op 50, label, box and palletize
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Mon Jun 15 15:25
End
Mon Jun 15 19:10
Changeover
15 min
For
ACCOUNT 3915, Standard
Order due
Wed Jun 17 15:00
Order
On time, 44 h to spare
WO-10122WO-10122 op 50, label, box and palletize
27" QHD Monitor, 165Hz
State
Planned
Quantity
340
Start
Mon Jun 15 19:10
End
Tue Jun 16 11:00
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10260WO-10260 op 50, label, box and palletize
22" Touch Monitor, gray
State
Planned
Quantity
540
Start
Tue Jun 16 11:00
End
Wed Jun 17 08:55
Changeover
10 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 8.1 h to spare
WO-10284WO-10284 op 50, label, box and palletize
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
100
Start
Wed Jun 17 08:55
End
Wed Jun 17 10:45
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 30 h to spare
WO-10088WO-10088 op 50, label, box and palletize
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Wed Jun 17 10:45
End
Wed Jun 17 13:50
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.1 d to spare
WO-10132WO-10132 op 50, label, box and palletize
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
140
Start
Wed Jun 17 13:50
End
Wed Jun 17 16:20
Changeover
10 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10189WO-10189 op 50, label, box and palletize
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
340
Start
Wed Jun 17 16:20
End
Wed Jun 17 20:55
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 44 h to spare
WO-10319WO-10319 op 50, label, box and palletize
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
120
Start
Wed Jun 17 20:55
End
Thu Jun 18 07:25
Changeover
15 min
For
ACCOUNT 9148, Standard
Order due
Mon Jun 22 15:00
Order
On time, 4.3 d to spare
WO-10194WO-10194 op 50, label, box and palletize
10" Tablet, 64GB
State
Planned
Quantity
125
Start
Thu Jun 18 07:25
End
Thu Jun 18 09:25
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.3 d to spare
WO-10236WO-10236 op 50, label, box and palletize
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
35
Start
Thu Jun 18 09:25
End
Thu Jun 18 11:05
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10270WO-10270 op 50, label, box and palletize
Thin Client, 4GB / 32GB
State
Planned
Quantity
40
Start
Thu Jun 18 11:05
End
Thu Jun 18 12:30
Changeover
10 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10031WO-10031 op 50, label, box and palletize
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
200
Start
Thu Jun 18 12:30
End
Thu Jun 18 15:40
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10299WO-10299 op 50, label, box and palletize
USB-C Dock, 100W, dual display
State
Planned
Quantity
110
Start
Thu Jun 18 15:40
End
Thu Jun 18 17:00
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.0 d to spare
WO-10118WO-10118 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Thu Jun 18 21:50
End
Fri Jun 19 07:05
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.4 d to spare
WO-10217WO-10217 op 50, label, box and palletize
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
180
Start
Fri Jun 19 07:05
End
Fri Jun 19 09:20
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.3 d to spare
WO-10012WO-10012 op 50, label, box and palletize
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
40
Start
Fri Jun 19 12:50
End
Fri Jun 19 14:25
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.1 d to spare
WO-10151WO-10151 op 50, label, box and palletize
2TB Portable SSD
State
Planned
Quantity
330
Start
Fri Jun 19 19:00
End
Fri Jun 19 21:30
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 4.8 d to spare
WO-10137WO-10137 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
505
Start
Mon Jun 22 06:00
End
Mon Jun 22 15:45
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
At risk, 1.2 h to spare
WO-10041WO-10041 op 50, label, box and palletize
KVM Switch, 2-port 4K
State
Planned
Quantity
630
Start
Mon Jun 22 15:45
End
Mon Jun 22 22:30
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10227WO-10227 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Mon Jun 22 22:30
End
Tue Jun 23 08:10
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10266WO-10266 op 50, label, box and palletize
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Tue Jun 23 08:10
End
Tue Jun 23 10:55
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.3 d to spare
WO-10343WO-10343 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
30
Start
Tue Jun 23 10:55
End
Tue Jun 23 11:45
Changeover
15 min
For
ENGINEERING, Internal
Order due
Fri Jun 26 12:00
Order
On time, 3.0 d to spare
WO-10022WO-10022 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
75
Start
Tue Jun 23 13:00
End
Tue Jun 23 15:45
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 3.1 d to spare
WO-10065WO-10065 op 50, label, box and palletize
1TB NVMe SSD, refresh
State
Planned
Quantity
300
Start
Tue Jun 23 15:45
End
Tue Jun 23 18:30
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10109WO-10109 op 50, label, box and palletize
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
90
Start
Tue Jun 23 19:00
End
Tue Jun 23 20:25
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.9 d to spare
WO-10166WO-10166 op 50, label, box and palletize
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Tue Jun 23 20:25
End
Tue Jun 23 23:00
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 2.8 d to spare
WO-10099WO-10099 op 50, label, box and palletize
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Wed Jun 24 06:00
End
Wed Jun 24 06:35
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 10 h to spare
WO-10204WO-10204 op 50, label, box and palletize
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
475
Start
Wed Jun 24 06:35
End
Wed Jun 24 16:45
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
At risk, 0.2 h to spare
WO-10256WO-10256 op 50, label, box and palletize
13" Ultralight Laptop, 16GB / 512GB
State
Planned
Quantity
345
Start
Thu Jun 25 22:20
End
Fri Jun 26 12:45
Changeover
10 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
At risk, 4.2 h to spare
WO-10114WO-10114 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
125
Start
Fri Jun 26 12:45
End
Fri Jun 26 16:40
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10211WO-10211 op 50, label, box and palletize
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
420
Start
Fri Jun 26 16:40
End
Fri Jun 26 20:25
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 2.9 d to spare
WO-10337WO-10337 op 50, label, box and palletize
24" FHD Monitor, IPS
State
Planned
Quantity
40
Start
Fri Jun 26 20:25
End
Fri Jun 26 21:35
Changeover
15 min
For
ACCOUNT 2800, Silver
Order due
Tue Jun 30 15:00
Order
On time, 3.7 d to spare
WO-10007WO-10007 op 50, label, box and palletize
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
120
Start
Fri Jun 26 21:55
End
Mon Jun 29 08:10
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 33 h to spare
WO-10144WO-10144 op 50, label, box and palletize
4K Conference Camera
State
Planned
Quantity
480
Start
Mon Jun 29 08:10
End
Mon Jun 29 12:25
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 29 h to spare
WO-10241WO-10241 op 50, label, box and palletize
1TB NVMe SSD, gray
State
Planned
Quantity
280
Start
Mon Jun 29 12:25
End
Mon Jun 29 14:55
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10275WO-10275 op 50, label, box and palletize
Wi-Fi 6E Router, gray
State
Planned
Quantity
60
Start
Mon Jun 29 14:55
End
Mon Jun 29 16:10
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 25 h to spare
WO-10079WO-10079 op 50, label, box and palletize
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Mon Jun 29 16:10
End
Mon Jun 29 17:00
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 2.0 d to spare
WO-10222WO-10222 op 50, label, box and palletize
8-Port Gigabit Switch
State
Planned
Quantity
150
Start
Mon Jun 29 17:00
End
Mon Jun 29 20:15
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 45 h to spare
WO-10304WO-10304 op 50, label, box and palletize
Mechanical Keyboard, TKL
State
Planned
Quantity
320
Start
Mon Jun 29 20:15
End
Mon Jun 29 22:45
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 42 h to spare
WO-10180WO-10180 op 50, label, box and palletize
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
65
Start
Mon Jun 29 22:50
End
Tue Jun 30 07:00
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 34 h to spare
WO-10017WO-10017 op 50, label, box and palletize
4-Bay NAS Enclosure, gray
State
Planned
Quantity
135
Start
Tue Jun 30 07:00
End
Tue Jun 30 08:10
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.4 d to spare
WO-10060WO-10060 op 50, label, box and palletize
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Tue Jun 30 08:10
End
Tue Jun 30 09:10
Changeover
10 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 2.3 d to spare
WO-10308WO-10308 op 50, label, box and palletize
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
300
Start
Tue Jun 30 09:15
End
Tue Jun 30 18:00
Changeover
15 min
For
ACCOUNT 5190, Silver
Order due
Tue Jun 30 15:00
Order
Late, 3.0 h late
WO-10046WO-10046 op 50, label, box and palletize
24" FHD Monitor, IPS
State
Planned
Quantity
290
Start
Tue Jun 30 18:00
End
Wed Jul 1 08:05
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 33 h to spare
WO-10089WO-10089 op 50, label, box and palletize
12" Pro Tablet, 256GB
State
Planned
Quantity
190
Start
Wed Jul 1 08:05
End
Wed Jul 1 11:40
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 29 h to spare
WO-10104WO-10104 op 50, label, box and palletize
1080p Webcam with mic
State
Planned
Quantity
340
Start
Wed Jul 1 11:40
End
Wed Jul 1 14:25
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 27 h to spare
WO-10133WO-10133 op 50, label, box and palletize
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
145
Start
Wed Jul 1 14:25
End
Wed Jul 1 17:05
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
On time, 24 h to spare
WO-10159WO-10159 op 50, label, box and palletize
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
415
Start
Wed Jul 1 17:05
End
Thu Jul 2 09:30
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 7.5 h to spare
WO-10190WO-10190 op 50, label, box and palletize
KVM Switch, 2-port 4K, gray
State
Planned
Quantity
360
Start
Thu Jul 2 09:30
End
Thu Jul 2 14:20
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 2.7 h to spare
WO-10232WO-10232 op 50, label, box and palletize
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
100
Start
Thu Jul 2 14:20
End
Thu Jul 2 16:20
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
At risk, 0.7 h to spare
WO-10285WO-10285 op 50, label, box and palletize
USB-C Travel Hub, 7-in-1
State
Planned
Quantity
120
Start
Thu Jul 2 16:20
End
Thu Jul 2 17:55
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 0.9 h late
WO-10003WO-10003 op 50, label, box and palletize
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
480
Start
Thu Jul 2 17:55
End
Thu Jul 2 22:30
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 3.8 d to spare
WO-10195WO-10195 op 50, label, box and palletize
10" Tablet, 64GB
State
Planned
Quantity
115
Start
Thu Jul 2 22:30
End
Mon Jul 6 07:20
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.7 h to spare
WO-10212WO-10212 op 50, label, box and palletize
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
460
Start
Mon Jul 6 07:20
End
Mon Jul 6 11:20
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 5.7 h to spare
WO-10237WO-10237 op 50, label, box and palletize
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
30
Start
Mon Jul 6 11:20
End
Mon Jul 6 12:25
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 4.6 h to spare
WO-10271WO-10271 op 50, label, box and palletize
Thin Client, 4GB / 32GB
State
Planned
Quantity
35
Start
Mon Jul 6 12:25
End
Mon Jul 6 13:40
Changeover
10 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 3.3 h to spare
WO-10119WO-10119 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
90
Start
Mon Jul 6 13:40
End
Mon Jul 6 15:55
Changeover
15 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 25 h to spare
WO-10314WO-10314 op 50, label, box and palletize
22" Touch Monitor
State
Planned
Quantity
400
Start
Mon Jul 6 15:55
End
Tue Jul 7 08:05
Changeover
15 min
For
ACCOUNT 3327, Gold
Order due
Mon Jul 6 15:00
Order
Late, 17 h late
WO-10176WO-10176 op 50, label, box and palletize
8" Rugged Tablet, 64GB
State
Planned
Quantity
95
Start
Tue Jul 7 08:05
End
Tue Jul 7 09:50
Changeover
15 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.2 h to spare
WO-10218WO-10218 op 50, label, box and palletize
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
210
Start
Tue Jul 7 09:50
End
Tue Jul 7 12:55
Changeover
15 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 4.1 h to spare
WO-10300WO-10300 op 50, label, box and palletize
USB-C Dock, 100W, dual display
State
Planned
Quantity
130
Start
Tue Jul 7 12:55
End
Tue Jul 7 14:20
Changeover
10 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 2.7 h to spare
WO-10056WO-10056 op 50, label, box and palletize
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
130
Start
Tue Jul 7 14:20
End
Tue Jul 7 15:35
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 25 h to spare
WO-10325WO-10325 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
250
Start
Tue Jul 7 15:50
End
Wed Jul 8 07:45
Changeover
15 min
For
ACCOUNT 7702, Gold
Order due
Mon Jul 6 15:00
Order
Late, 41 h late
WO-10338WO-10338 op 50, label, box and palletize
All-in-One 24", 16GB / 512GB, gray
State
Planned
Quantity
150
Start
Wed Jul 8 09:05
End
Wed Jul 8 13:45
Changeover
10 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
At risk, 1.2 h to spare
WO-10013WO-10013 op 50, label, box and palletize
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
45
Start
Wed Jul 8 13:45
End
Wed Jul 8 15:20
Changeover
5 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
At risk, 1.7 h to spare
WO-10152WO-10152 op 50, label, box and palletize
2TB Portable SSD
State
Planned
Quantity
350
Start
Wed Jul 8 15:20
End
Wed Jul 8 17:55
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 0.9 h late
WO-10247WO-10247 op 50, label, box and palletize
Thunderbolt Dock, 4 ports
State
Planned
Quantity
415
Start
Wed Jul 8 17:55
End
Thu Jul 9 06:15
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 13 h late
WO-10281WO-10281 op 50, label, box and palletize
Ergonomic Mouse, wireless
State
Planned
Quantity
490
Start
Thu Jul 9 06:15
End
Thu Jul 9 10:35
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 18 h late
WO-10042WO-10042 op 50, label, box and palletize
KVM Switch, 2-port 4K
State
Planned
Quantity
550
Start
Thu Jul 9 10:35
End
Thu Jul 9 16:05
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
At risk, 0.9 h to spare
WO-10333WO-10333 op 50, label, box and palletize
10" Tablet, 64GB
State
Planned
Quantity
150
Start
Thu Jul 9 16:10
End
Thu Jul 9 18:30
Changeover
15 min
For
ACCOUNT 8321, Platinum
Order due
Wed Jul 8 15:00
Order
Late, 28 h late
WO-10085WO-10085 op 50, label, box and palletize
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
150
Start
Thu Jul 9 19:00
End
Thu Jul 9 22:05
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.1 h late
WO-10186WO-10186 op 50, label, box and palletize
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Thu Jul 9 22:05
End
Thu Jul 9 22:40
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 5.7 h late
WO-10110WO-10110 op 50, label, box and palletize
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
100
Start
Thu Jul 9 22:40
End
Fri Jul 10 07:10
Changeover
15 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 9.8 h to spare
WO-10312WO-10312 op 50, label, box and palletize
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Fri Jul 10 07:30
End
Fri Jul 10 10:55
Changeover
15 min
For
ACCOUNT 9148, Standard
Order due
Thu Jul 9 15:00
Order
Late, 20 h late
WO-10160WO-10160 op 50, label, box and palletize
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Fri Jul 10 10:55
End
Fri Jul 10 19:30
Changeover
10 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 26 h late
WO-10066WO-10066 op 50, label, box and palletize
1TB NVMe SSD, refresh
State
Planned
Quantity
270
Start
Fri Jul 10 19:30
End
Fri Jul 10 22:00
Changeover
15 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 5.0 h late
WO-10028WO-10028 op 50, label, box and palletize
1TB NVMe SSD
State
Planned
Quantity
530
Start
Fri Jul 10 22:15
End
Mon Jul 13 08:40
Changeover
5 min
For
Warehouse stock
Order due
Mon Jul 13 17:00
Order
On time, 8.3 h to spare
WO-10005WO-10005 op 50, label, box and palletize
Thin Client, 4GB / 32GB, gray
State
Finished
Quantity
120
Start
Mon Jun 1 06:00
End
Mon Jun 1 09:15
For
Warehouse stock
Order due
Tue Jun 2 17:00
Order
Complete
WO-10197WO-10197 op 50, label, box and palletize
Chromebook 11", 4GB / 64GB
State
Finished
Quantity
245
Start
Mon Jun 1 09:15
End
Mon Jun 1 14:10
For
Warehouse stock
Order due
Tue Jun 2 17:00
Order
Complete
WO-10034WO-10034 op 50, label, box and palletize
15" Laptop, 12-core, 32GB / 1TB
State
Finished
Quantity
170
Start
Mon Jun 1 14:10
End
Mon Jun 1 17:20
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10121WO-10121 op 50, label, box and palletize
27" QHD Monitor, 165Hz
State
Finished
Quantity
355
Start
Mon Jun 1 17:20
End
Tue Jun 2 08:35
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10220WO-10220 op 50, label, box and palletize
8-Port Gigabit Switch
State
Finished
Quantity
160
Start
Tue Jun 2 09:35
End
Tue Jun 2 13:00
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
Complete
WO-10259WO-10259 op 50, label, box and palletize
22" Touch Monitor, gray
State
Running now
Quantity
183 left of 490
Start
Tue Jun 2 13:00
End
Wed Jun 3 11:20
For
Warehouse stock
Order due
Wed Jun 3 17:00
Order
At risk, 5.7 h to spare
WO-10315WO-10315 op 50, label, box and palletize
22" Touch Monitor
State
Held in the frozen window
Quantity
80
Start
Wed Jun 3 11:50
End
Wed Jun 3 13:40
Changeover
5 min
For
ACCOUNT 1466, Gold
Order due
Fri Jun 5 15:00
Order
On time, 2.1 d to spare
WO-10044WO-10044 op 50, label, box and palletize
24" FHD Monitor, IPS
State
Held in the frozen window
Quantity
370
Start
Wed Jun 3 13:50
End
Wed Jun 3 22:35
Changeover
10 min
For
Warehouse stock
Order due
Fri Jun 5 17:00
Order
On time, 42 h to spare
WO-10001WO-10001 op 50, label, box and palletize
Ergonomic Mouse, wireless, gray
State
Held in the frozen window
Quantity
390
Start
Wed Jun 3 22:35
End
Thu Jun 4 09:00
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.3 d to spare
WO-10049WO-10049 op 50, label, box and palletize
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
190
Start
Thu Jun 4 09:00
End
Thu Jun 4 13:55
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.1 d to spare
WO-10193WO-10193 op 50, label, box and palletize
10" Tablet, 64GB
State
Planned
Quantity
120
Start
Thu Jun 4 13:55
End
Thu Jun 4 15:50
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 4.0 d to spare
WO-10208WO-10208 op 50, label, box and palletize
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
485
Start
Thu Jun 4 15:50
End
Thu Jun 4 20:00
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.9 d to spare
WO-10235WO-10235 op 50, label, box and palletize
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
30
Start
Thu Jun 4 20:00
End
Thu Jun 4 21:05
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.8 d to spare
WO-10269WO-10269 op 50, label, box and palletize
Thin Client, 4GB / 32GB
State
Planned
Quantity
30
Start
Thu Jun 4 21:05
End
Thu Jun 4 22:10
Changeover
10 min
For
Warehouse stock
Order due
Mon Jun 8 17:00
Order
On time, 3.8 d to spare
WO-10310WO-10310 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
80
Start
Thu Jun 4 22:10
End
Fri Jun 5 07:25
Changeover
10 min
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.3 d to spare
WO-10330WO-10330 op 50, label, box and palletize
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
150
Start
Fri Jun 5 09:05
End
Fri Jun 5 13:00
Changeover
15 min
For
ACCOUNT 8733, Silver
Order due
Tue Jun 9 15:00
Order
On time, 4.1 d to spare
WO-10030WO-10030 op 50, label, box and palletize
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
245
Start
Fri Jun 5 13:00
End
Fri Jun 5 16:50
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 4.0 d to spare
WO-10073WO-10073 op 50, label, box and palletize
4-Bay NAS Enclosure
State
Planned
Quantity
415
Start
Fri Jun 5 16:50
End
Fri Jun 5 20:10
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 3.9 d to spare
WO-10141WO-10141 op 50, label, box and palletize
4K Conference Camera
State
Planned
Quantity
430
Start
Fri Jun 5 20:10
End
Mon Jun 8 06:35
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 34 h to spare
WO-10174WO-10174 op 50, label, box and palletize
8" Rugged Tablet, 64GB
State
Planned
Quantity
85
Start
Mon Jun 8 06:35
End
Mon Jun 8 08:10
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 33 h to spare
WO-10216WO-10216 op 50, label, box and palletize
USB-C Travel Hub, 7-in-1, gray
State
Planned
Quantity
230
Start
Mon Jun 8 08:10
End
Mon Jun 8 11:25
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 30 h to spare
WO-10298WO-10298 op 50, label, box and palletize
USB-C Dock, 100W, dual display
State
Planned
Quantity
140
Start
Mon Jun 8 11:25
End
Mon Jun 8 12:55
Changeover
10 min
For
Warehouse stock
Order due
Tue Jun 9 17:00
Order
On time, 28 h to spare
WO-10011WO-10011 op 50, label, box and palletize
All-in-One 24", 16GB / 512GB
State
Planned
Quantity
45
Start
Mon Jun 8 12:55
End
Mon Jun 8 14:40
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.1 d to spare
WO-10054WO-10054 op 50, label, box and palletize
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
130
Start
Mon Jun 8 14:40
End
Mon Jun 8 15:55
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10098WO-10098 op 50, label, box and palletize
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Mon Jun 8 15:55
End
Mon Jun 8 16:30
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 2.0 d to spare
WO-10245WO-10245 op 50, label, box and palletize
Thunderbolt Dock, 4 ports
State
Planned
Quantity
415
Start
Mon Jun 8 16:30
End
Mon Jun 8 21:50
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 10 17:00
Order
On time, 43 h to spare
WO-10040WO-10040 op 50, label, box and palletize
KVM Switch, 2-port 4K
State
Planned
Quantity
540
Start
Mon Jun 8 21:50
End
Tue Jun 9 10:40
Changeover
10 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.3 d to spare
WO-10127WO-10127 op 50, label, box and palletize
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
155
Start
Tue Jun 9 10:40
End
Tue Jun 9 13:30
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.1 d to spare
WO-10226WO-10226 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
95
Start
Tue Jun 9 13:30
End
Tue Jun 9 16:10
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 2.0 d to spare
WO-10265WO-10265 op 50, label, box and palletize
24-Port PoE Switch, managed
State
Planned
Quantity
125
Start
Tue Jun 9 16:10
End
Tue Jun 9 18:25
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 47 h to spare
WO-10021WO-10021 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
85
Start
Tue Jun 9 18:25
End
Tue Jun 9 22:00
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.8 d to spare
WO-10184WO-10184 op 50, label, box and palletize
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
25
Start
Wed Jun 10 06:00
End
Wed Jun 10 06:40
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 11 17:00
Order
On time, 34 h to spare
WO-10108WO-10108 op 50, label, box and palletize
Wi-Fi 6 Access Point, ceiling
State
Planned
Quantity
100
Start
Wed Jun 10 06:40
End
Wed Jun 10 08:10
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.4 d to spare
WO-10165WO-10165 op 50, label, box and palletize
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Wed Jun 10 08:10
End
Wed Jun 10 11:15
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 2.2 d to spare
WO-10289WO-10289 op 50, label, box and palletize
27" 4K Monitor, USB-C
State
Planned
Quantity
355
Start
Wed Jun 10 12:35
End
Wed Jun 10 20:40
Changeover
10 min
For
Warehouse stock
Order due
Fri Jun 12 17:00
Order
On time, 44 h to spare
WO-10026WO-10026 op 50, label, box and palletize
1TB NVMe SSD
State
Planned
Quantity
450
Start
Wed Jun 10 20:40
End
Thu Jun 11 06:45
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.4 d to spare
WO-10069WO-10069 op 50, label, box and palletize
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
365
Start
Thu Jun 11 06:45
End
Thu Jun 11 13:20
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.2 d to spare
WO-10113WO-10113 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB, gray
State
Planned
Quantity
140
Start
Thu Jun 11 13:20
End
Thu Jun 11 17:45
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 4.0 d to spare
WO-10170WO-10170 op 50, label, box and palletize
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
90
Start
Fri Jun 12 06:00
End
Fri Jun 12 08:35
Changeover
10 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.4 d to spare
WO-10209WO-10209 op 50, label, box and palletize
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
435
Start
Fri Jun 12 08:35
End
Fri Jun 12 12:25
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 3.2 d to spare
WO-10294WO-10294 op 50, label, box and palletize
34" Ultrawide Monitor, curved
State
Planned
Quantity
265
Start
Fri Jun 12 12:25
End
Fri Jun 12 19:45
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 15 17:00
Order
On time, 2.9 d to spare
WO-10093WO-10093 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Fri Jun 12 20:30
End
Fri Jun 12 22:30
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 3.8 d to spare
WO-10006WO-10006 op 50, label, box and palletize
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
155
Start
Mon Jun 15 06:00
End
Mon Jun 15 10:35
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 30 h to spare
WO-10142WO-10142 op 50, label, box and palletize
4K Conference Camera
State
Planned
Quantity
400
Start
Mon Jun 15 10:35
End
Mon Jun 15 13:45
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 27 h to spare
WO-10240WO-10240 op 50, label, box and palletize
1TB NVMe SSD, gray
State
Planned
Quantity
300
Start
Mon Jun 15 13:45
End
Mon Jun 15 16:25
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 16 17:00
Order
On time, 25 h to spare
WO-10035WO-10035 op 50, label, box and palletize
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Mon Jun 15 16:25
End
Mon Jun 15 20:35
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10078WO-10078 op 50, label, box and palletize
Thin Client, 4GB / 32GB, gray
State
Planned
Quantity
20
Start
Mon Jun 15 20:35
End
Mon Jun 15 21:25
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 44 h to spare
WO-10179WO-10179 op 50, label, box and palletize
Wi-Fi 6 Access Point, ceiling, refresh
State
Planned
Quantity
75
Start
Mon Jun 15 21:25
End
Mon Jun 15 22:45
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 42 h to spare
WO-10221WO-10221 op 50, label, box and palletize
8-Port Gigabit Switch
State
Planned
Quantity
160
Start
Mon Jun 15 22:45
End
Tue Jun 16 08:35
Changeover
10 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 32 h to spare
WO-10303WO-10303 op 50, label, box and palletize
Mechanical Keyboard, TKL
State
Planned
Quantity
260
Start
Tue Jun 16 08:35
End
Tue Jun 16 11:10
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 17 17:00
Order
On time, 30 h to spare
WO-10016WO-10016 op 50, label, box and palletize
4-Bay NAS Enclosure, gray
State
Planned
Quantity
120
Start
Tue Jun 16 11:10
End
Tue Jun 16 12:15
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10059WO-10059 op 50, label, box and palletize
128GB USB Flash Drive, 10-pack
State
Planned
Quantity
110
Start
Tue Jun 16 12:15
End
Tue Jun 16 13:15
Changeover
10 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.2 d to spare
WO-10103WO-10103 op 50, label, box and palletize
1080p Webcam with mic
State
Planned
Quantity
350
Start
Tue Jun 16 13:15
End
Tue Jun 16 16:05
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 2.0 d to spare
WO-10157WO-10157 op 50, label, box and palletize
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
380
Start
Tue Jun 16 16:05
End
Wed Jun 17 07:45
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 33 h to spare
WO-10250WO-10250 op 50, label, box and palletize
4K Conference Camera, gray
State
Planned
Quantity
125
Start
Wed Jun 17 07:45
End
Wed Jun 17 09:00
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 18 17:00
Order
On time, 32 h to spare
WO-10342WO-10342 op 50, label, box and palletize
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
30
Start
Wed Jun 17 09:00
End
Wed Jun 17 09:50
Changeover
15 min
For
ENGINEERING, Internal
Order due
Fri Jun 19 12:00
Order
On time, 2.1 d to spare
WO-10045WO-10045 op 50, label, box and palletize
24" FHD Monitor, IPS
State
Planned
Quantity
280
Start
Wed Jun 17 09:50
End
Wed Jun 17 16:40
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 2.0 d to spare
WO-10231WO-10231 op 50, label, box and palletize
15" Laptop, 12-core, 32GB / 1TB, gray
State
Planned
Quantity
110
Start
Wed Jun 17 16:40
End
Wed Jun 17 19:20
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 19 17:00
Order
On time, 46 h to spare
WO-10002WO-10002 op 50, label, box and palletize
Ergonomic Mouse, wireless, gray
State
Planned
Quantity
370
Start
Wed Jun 17 19:20
End
Wed Jun 17 22:35
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.8 d to spare
WO-10050WO-10050 op 50, label, box and palletize
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
215
Start
Wed Jun 17 22:35
End
Thu Jun 18 11:05
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 4.2 d to spare
WO-10074WO-10074 op 50, label, box and palletize
4-Bay NAS Enclosure
State
Planned
Quantity
430
Start
Thu Jun 18 11:10
End
Thu Jun 18 14:05
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 5.1 d to spare
WO-10143WO-10143 op 50, label, box and palletize
4K Conference Camera
State
Planned
Quantity
410
Start
Thu Jun 18 15:40
End
Thu Jun 18 19:25
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 4.9 d to spare
WO-10210WO-10210 op 50, label, box and palletize
4-Bay NAS Enclosure, refresh
State
Planned
Quantity
485
Start
Fri Jun 19 06:00
End
Fri Jun 19 09:40
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 22 17:00
Order
On time, 3.3 d to spare
WO-10055WO-10055 op 50, label, box and palletize
128GB USB Flash Drive, 10-pack, refresh
State
Planned
Quantity
140
Start
Fri Jun 19 12:00
End
Fri Jun 19 13:15
Changeover
10 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 5.2 d to spare
WO-10307WO-10307 op 50, label, box and palletize
27" QHD Monitor, 165Hz
State
Planned
Quantity
150
Start
Fri Jun 19 16:35
End
Fri Jun 19 20:55
Changeover
15 min
For
ACCOUNT 7702, Gold
Order due
Wed Jun 24 15:00
Order
On time, 4.8 d to spare
WO-10175WO-10175 op 50, label, box and palletize
8" Rugged Tablet, 64GB
State
Planned
Quantity
110
Start
Mon Jun 22 06:00
End
Mon Jun 22 07:55
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 23 17:00
Order
On time, 33 h to spare
WO-10246WO-10246 op 50, label, box and palletize
Thunderbolt Dock, 4 ports
State
Planned
Quantity
410
Start
Mon Jun 22 07:55
End
Mon Jun 22 13:10
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 2.2 d to spare
WO-10280WO-10280 op 50, label, box and palletize
Ergonomic Mouse, wireless
State
Planned
Quantity
590
Start
Mon Jun 22 13:10
End
Mon Jun 22 17:45
Changeover
15 min
For
Warehouse stock
Order due
Wed Jun 24 17:00
Order
On time, 47 h to spare
WO-10084WO-10084 op 50, label, box and palletize
Chromebook 11", 4GB / 64GB, refresh
State
Planned
Quantity
165
Start
Mon Jun 22 17:45
End
Mon Jun 22 21:35
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.8 d to spare
WO-10128WO-10128 op 50, label, box and palletize
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Mon Jun 22 21:35
End
Tue Jun 23 07:30
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.4 d to spare
WO-10158WO-10158 op 50, label, box and palletize
27" QHD Monitor, 165Hz, refresh
State
Planned
Quantity
365
Start
Tue Jun 23 07:30
End
Tue Jun 23 15:50
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 2.0 d to spare
WO-10311WO-10311 op 50, label, box and palletize
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
400
Start
Tue Jun 23 16:00
End
Wed Jun 24 08:25
Changeover
10 min
For
ACCOUNT 7463, Gold
Order due
Thu Jun 25 15:00
Order
On time, 31 h to spare
WO-10185WO-10185 op 50, label, box and palletize
8" Rugged Tablet, 64GB, gray
State
Planned
Quantity
20
Start
Wed Jun 24 08:25
End
Wed Jun 24 09:00
Changeover
15 min
For
Warehouse stock
Order due
Thu Jun 25 17:00
Order
On time, 32 h to spare
WO-10335WO-10335 op 50, label, box and palletize
Tower Workstation, 32GB / 1TB
State
Planned
Quantity
40
Start
Wed Jun 24 09:10
End
Wed Jun 24 11:00
Changeover
15 min
For
ACCOUNT 2800, Silver
Order due
Mon Jun 29 15:00
Order
On time, 5.2 d to spare
WO-10290WO-10290 op 50, label, box and palletize
27" 4K Monitor, USB-C
State
Planned
Quantity
385
Start
Wed Jun 24 20:00
End
Thu Jun 25 11:50
Changeover
15 min
For
Warehouse stock
Order due
Fri Jun 26 17:00
Order
On time, 29 h to spare
WO-10324WO-10324 op 50, label, box and palletize
22" Touch Monitor, gray
State
Planned
Quantity
400
Start
Thu Jun 25 12:30
End
Fri Jun 26 06:45
Changeover
10 min
For
ACCOUNT 6021, Standard
Order due
Fri Jun 26 15:00
Order
On time, 8.2 h to spare
WO-10027WO-10027 op 50, label, box and palletize
1TB NVMe SSD
State
Planned
Quantity
410
Start
Fri Jun 26 06:45
End
Fri Jun 26 09:35
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.3 d to spare
WO-10070WO-10070 op 50, label, box and palletize
Mesh Wi-Fi Kit, 3-pack
State
Planned
Quantity
320
Start
Fri Jun 26 09:35
End
Fri Jun 26 15:25
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.1 d to spare
WO-10171WO-10171 op 50, label, box and palletize
Tower Workstation, 32GB / 1TB, refresh
State
Planned
Quantity
70
Start
Fri Jun 26 15:25
End
Fri Jun 26 17:30
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 3.0 d to spare
WO-10295WO-10295 op 50, label, box and palletize
34" Ultrawide Monitor, curved
State
Planned
Quantity
235
Start
Fri Jun 26 17:30
End
Mon Jun 29 07:05
Changeover
15 min
For
Warehouse stock
Order due
Mon Jun 29 17:00
Order
On time, 9.9 h to spare
WO-10094WO-10094 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
85
Start
Mon Jun 29 07:05
End
Mon Jun 29 09:00
Changeover
15 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 32 h to spare
WO-10199WO-10199 op 50, label, box and palletize
Chromebook 11", 4GB / 64GB
State
Planned
Quantity
305
Start
Mon Jun 29 09:00
End
Mon Jun 29 14:50
Changeover
10 min
For
Warehouse stock
Order due
Tue Jun 30 17:00
Order
On time, 26 h to spare
WO-10036WO-10036 op 50, label, box and palletize
15" Laptop, 12-core, 32GB / 1TB
State
Planned
Quantity
195
Start
Mon Jun 29 14:50
End
Mon Jun 29 18:25
Changeover
10 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 47 h to spare
WO-10123WO-10123 op 50, label, box and palletize
27" QHD Monitor, 165Hz
State
Planned
Quantity
350
Start
Mon Jun 29 18:25
End
Tue Jun 30 11:00
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 30 h to spare
WO-10261WO-10261 op 50, label, box and palletize
22" Touch Monitor, gray
State
Planned
Quantity
465
Start
Tue Jun 30 11:00
End
Wed Jul 1 06:55
Changeover
10 min
For
Warehouse stock
Order due
Wed Jul 1 17:00
Order
On time, 10 h to spare
WO-10318WO-10318 op 50, label, box and palletize
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
400
Start
Wed Jul 1 22:50
End
Thu Jul 2 17:50
Changeover
10 min
For
ACCOUNT 3915, Standard
Order due
Thu Jul 2 15:00
Order
Late, 2.8 h late
WO-10251WO-10251 op 50, label, box and palletize
4K Conference Camera, gray
State
Planned
Quantity
105
Start
Thu Jul 2 17:50
End
Thu Jul 2 19:30
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 2 17:00
Order
Late, 2.5 h late
WO-10051WO-10051 op 50, label, box and palletize
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
220
Start
Thu Jul 2 19:30
End
Mon Jul 6 07:35
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
On time, 9.4 h to spare
WO-10138WO-10138 op 50, label, box and palletize
14" Laptop, 8-core, 16GB / 512GB
State
Planned
Quantity
450
Start
Mon Jul 6 07:35
End
Mon Jul 6 16:20
Changeover
15 min
For
Warehouse stock
Order due
Mon Jul 6 17:00
Order
At risk, 0.7 h to spare
WO-10313WO-10313 op 50, label, box and palletize
22" Touch Monitor, gray
State
Planned
Quantity
80
Start
Mon Jul 6 16:20
End
Mon Jul 6 19:15
Changeover
15 min
For
ACCOUNT 3327, Gold
Order due
Tue Jul 7 15:00
Order
On time, 20 h to spare
WO-10032WO-10032 op 50, label, box and palletize
Mesh Wi-Fi Kit, 3-pack, refresh
State
Planned
Quantity
245
Start
Mon Jul 6 19:15
End
Tue Jul 7 06:05
Changeover
15 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
On time, 11 h to spare
WO-10075WO-10075 op 50, label, box and palletize
4-Bay NAS Enclosure
State
Planned
Quantity
530
Start
Tue Jul 7 06:05
End
Tue Jul 7 09:35
Changeover
15 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 7.4 h to spare
WO-10145WO-10145 op 50, label, box and palletize
4K Conference Camera
State
Planned
Quantity
490
Start
Tue Jul 7 09:35
End
Tue Jul 7 13:55
Changeover
15 min
For
Warehouse stock
Order due
Tue Jul 7 17:00
Order
At risk, 3.1 h to spare
WO-10100WO-10100 op 50, label, box and palletize
Wi-Fi 6E Router
State
Planned
Quantity
20
Start
Tue Jul 7 13:55
End
Tue Jul 7 14:30
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
On time, 26 h to spare
WO-10309WO-10309 op 50, label, box and palletize
27" 4K Monitor, USB-C, refresh
State
Planned
Quantity
120
Start
Tue Jul 7 14:35
End
Tue Jul 7 17:30
Changeover
15 min
For
ACCOUNT 7702, Gold
Order due
Wed Jul 8 15:00
Order
On time, 22 h to spare
WO-10291WO-10291 op 50, label, box and palletize
27" 4K Monitor, USB-C
State
Planned
Quantity
365
Start
Tue Jul 7 20:20
End
Wed Jul 8 11:35
Changeover
5 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 2.2 d to spare
WO-10167WO-10167 op 50, label, box and palletize
34" Ultrawide Monitor, curved, gray
State
Planned
Quantity
80
Start
Wed Jul 8 15:55
End
Wed Jul 8 18:25
Changeover
10 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
On time, 47 h to spare
WO-10331WO-10331 op 50, label, box and palletize
22" Touch Monitor
State
Planned
Quantity
300
Start
Thu Jul 9 09:15
End
Thu Jul 9 16:15
Changeover
10 min
For
ACCOUNT 6021, Standard
Order due
Wed Jul 8 15:00
Order
Late, 25 h late
WO-10267WO-10267 op 50, label, box and palletize
24-Port PoE Switch, managed
State
Planned
Quantity
115
Start
Thu Jul 9 16:15
End
Thu Jul 9 18:25
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 1.4 h late
WO-10205WO-10205 op 50, label, box and palletize
14" Rugged Laptop, 16GB / 256GB
State
Planned
Quantity
415
Start
Thu Jul 9 19:00
End
Fri Jul 10 11:00
Changeover
15 min
For
Warehouse stock
Order due
Wed Jul 8 17:00
Order
Late, 42 h late
WO-10129WO-10129 op 50, label, box and palletize
24-Port PoE Switch, managed, refresh
State
Planned
Quantity
160
Start
Fri Jul 10 11:00
End
Fri Jul 10 13:55
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 21 h late
WO-10228WO-10228 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB, refresh
State
Planned
Quantity
90
Start
Fri Jul 10 13:55
End
Fri Jul 10 16:30
Changeover
15 min
For
Warehouse stock
Order due
Thu Jul 9 17:00
Order
Late, 24 h late
WO-10023WO-10023 op 50, label, box and palletize
Mini PC, 8-core, 16GB / 512GB
State
Planned
Quantity
90
Start
Fri Jul 10 16:30
End
Fri Jul 10 20:00
Changeover
5 min
For
Warehouse stock
Order due
Fri Jul 10 17:00
Order
Late, 3.0 h late
On timeAt riskLateDesktopsDocks & HubsLaptopsMonitorsNetworkingPeripheralsStorageTabletsPlatinumGoldSilverStandardStockInternalCustomer buildStock replenishmentNew product buildFinishedRunning nowHeld in frozen windowChangeoverClosedPlanned downtime

Orders

Projected start and finish for every work order, with the reason and the fix for anything late. Click an order to open its routing, materials and diagnosis.

Sort
Status
Type
Order
Product
Qty
Customer
Due
Finish
Margin
Status
Progress
WO-10329
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
400
ACCOUNT 9148Standard, customer build
Mon Jun 1 15:00
Tue Jun 2 06:55
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01May 20 17:50May 26 13:0500.00.0Finished
20SUBSUB-AMay 22 19:55May 26 12:3500.00.0Finished
30FAFA-03May 22 22:55May 27 11:5000.00.0Finished
40TBTB-02May 26 11:10May 29 05:5500.00.0Finished
45CFGCFG-01May 29 06:25Jun 1 09:0000.00.0Finished
50PKPK-01Jun 1 16:20Jun 2 06:5500.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Tue Jun 2 06:55.

Order

ReferenceSO-71286
ReleasedSat May 9 06:00
DueMon Jun 1 15:00
Priority and weight4, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 1 06:00On hand
Enclosure setTidewell PlasticsFri May 1 06:00On hand
Power moduleAster PowerSat May 2 06:00On hand
SoC moduleKestrel SiliconFri May 1 06:00On hand
Display panelBrightline DisplaysSun May 3 06:00On hand
WO-10259
22" Touch Monitor, grayVW-1017, Monitors
490
Warehouse stockStock replenishment
Wed Jun 3 17:00
Wed Jun 3 11:20
5.7 h
At risk
Running at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01May 26 14:35May 28 05:0000.00.0Finished
20SUBSUB-CMay 27 14:25May 28 13:3000.00.0Finished
30FAFA-05May 27 22:20Jun 1 07:4500.00.0Finished
40TBTB-01May 31 19:20Jun 2 04:2000.00.0Finished
50PKPK-02Jun 2 13:00Jun 3 11:2004.80.0Running

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 5.7 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2889
ReleasedSat May 16 06:00
DueWed Jun 3 17:00
Priority and weight3, weight 1
Touch time left4.8 h
Sequence position1

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 8 06:00On hand
Enclosure setTidewell PlasticsWed May 13 06:00On hand
Power moduleAster PowerWed May 13 06:00On hand
Display panelBrightline DisplaysTue May 12 06:00On hand
WO-10136
14" Laptop, 8-core, 16GB / 512GBLM-5139, Laptops
470
Warehouse stockStock replenishment
Mon Jun 8 17:00
Mon Jun 8 15:00
2.0 h
At risk
Running at FA

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02May 28 18:05Jun 2 01:1500.00.0Finished
20SUBSUB-AJun 1 13:30Jun 2 14:3500.00.0Finished
30FAFA-03Jun 1 16:25Jun 3 22:25015.40.0Running
40TBTB-03Jun 3 03:00Jun 6 02:55068.90.0Running
50PKPK-01Jun 8 06:05Jun 8 15:0058.30.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 2.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2766
ReleasedSun May 17 06:00
DueMon Jun 8 17:00
Priority and weight3, weight 1
Touch time left92.8 h
Sequence position12

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 12 06:00On hand
Enclosure setTidewell PlasticsThu May 14 06:00On hand
Power moduleAster PowerThu May 14 06:00On hand
SoC moduleKestrel SiliconFri May 15 06:00On hand
Display panelBrightline DisplaysSun May 10 06:00On hand
WO-10197
Chromebook 11", 4GB / 64GBNB-7136, Laptops
245
Warehouse stockStock replenishment
Tue Jun 2 17:00
Mon Jun 1 14:10
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03May 26 04:35May 27 11:0500.00.0Finished
20SUBSUB-AMay 26 20:25May 27 13:2000.00.0Finished
30FAFA-01May 27 10:40May 28 13:5500.00.0Finished
40TBTB-03May 29 13:05May 31 01:0000.00.0Finished
50PKPK-02Jun 1 09:15Jun 1 14:1000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 14:10.

Order

ReferenceRP-2827
ReleasedTue May 19 06:00
DueTue Jun 2 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 9 06:00On hand
Enclosure setTidewell PlasticsSat May 16 06:00On hand
Power moduleAster PowerTue May 12 06:00On hand
SoC moduleKestrel SiliconSun May 17 06:00On hand
Display panelBrightline DisplaysThu May 14 06:00On hand
WO-10203
14" Rugged Laptop, 16GB / 256GBNB-7498, Laptops
475
Warehouse stockStock replenishment
Wed Jun 10 17:00
Wed Jun 10 15:00
2.0 h
At risk
Running at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 2 09:25Jun 5 10:00049.80.0Running
20SUBSUB-AJun 4 08:15Jun 5 13:055019.511.0Planned
30FAFA-03Jun 4 11:55Jun 9 06:402542.80.0Planned
40TBTB-04Jun 6 12:15Jun 9 21:203580.543.1Planned
50PKPK-01Jun 9 21:50Jun 10 15:00159.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 2.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2833
ReleasedTue May 19 06:00
DueWed Jun 10 17:00
Priority and weight3, weight 1
Touch time left204.1 h
Sequence position31

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 9 06:00On hand
Enclosure setTidewell PlasticsSun May 17 06:00On hand
Power moduleAster PowerSat May 16 06:00On hand
SoC moduleKestrel SiliconTue May 12 06:00On hand
Display panelBrightline DisplaysThu May 14 06:00On hand
WO-10317
All-in-One 24", 16GB / 512GB, grayKL-2287, Desktops
150
ACCOUNT 1466Gold, customer build
Tue Jun 2 15:00
Tue Jun 2 14:20
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05May 22 06:00May 22 22:5000.00.0Finished
20SUBSUB-BMay 26 07:00May 26 15:1500.00.0Finished
30FAFA-05May 26 13:55May 27 13:5000.00.0Finished
40TBTB-04May 29 07:35May 30 13:3000.00.0Finished
45CFGCFG-01Jun 1 16:05Jun 2 09:0500.00.0Finished
50PKPK-01Jun 2 09:35Jun 2 14:2000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Tue Jun 2 14:20.

Order

ReferenceSO-71130
ReleasedTue May 19 06:00
DueTue Jun 2 15:00
Priority and weight2, weight 3
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 12 06:00On hand
Enclosure setTidewell PlasticsWed May 13 06:00On hand
Power moduleAster PowerTue May 12 06:00On hand
SoC moduleKestrel SiliconSat May 9 06:00On hand
WO-10005
Thin Client, 4GB / 32GB, grayAF-4236, Desktops
120
Warehouse stockStock replenishment
Tue Jun 2 17:00
Mon Jun 1 09:15
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02May 22 16:50May 26 04:3500.00.0Finished
20SUBSUB-AMay 26 12:35May 26 18:3000.00.0Finished
30FAFA-04May 26 18:10May 27 14:1500.00.0Finished
40TBTB-01May 29 05:55May 30 04:0000.00.0Finished
50PKPK-02Jun 1 06:00Jun 1 09:1500.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 09:15.

Order

ReferenceRP-2635
ReleasedThu May 21 06:00
DueTue Jun 2 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 19 06:00On hand
Enclosure setTidewell PlasticsFri May 15 06:00On hand
Power moduleAster PowerTue May 12 06:00On hand
SoC moduleKestrel SiliconSun May 17 06:00On hand
WO-10092
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
95
Warehouse stockStock replenishment
Tue Jun 2 17:00
Mon Jun 1 06:15
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03May 22 17:20May 26 04:3500.00.0Finished
20SUBSUB-CMay 26 14:40May 26 19:5000.00.0Finished
30FAFA-01May 26 17:50May 27 10:4000.00.0Finished
40TBTB-02May 29 06:00May 29 22:0000.00.0Finished
50PKPK-01May 29 22:30Jun 1 06:1500.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 06:15.

Order

ReferenceRP-2722
ReleasedThu May 21 06:00
DueTue Jun 2 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 19 06:00On hand
Enclosure setTidewell PlasticsThu May 14 06:00On hand
Power moduleAster PowerTue May 19 06:00On hand
SoC moduleKestrel SiliconMon May 11 06:00On hand
Display panelBrightline DisplaysWed May 13 06:00On hand
WO-10121
27" QHD Monitor, 165HzLM-2177, Monitors
355
Warehouse stockStock replenishment
Wed Jun 3 17:00
Tue Jun 2 08:35
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06May 26 07:15May 27 08:5000.00.0Finished
20SUBSUB-BMay 27 10:30May 27 21:1000.00.0Finished
30FAFA-06May 27 16:35May 29 09:4000.00.0Finished
40TBTB-03May 31 04:00Jun 1 00:2500.00.0Finished
50PKPK-02Jun 1 17:20Jun 2 08:3500.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Tue Jun 2 08:35.

Order

ReferenceRP-2751
ReleasedThu May 21 06:00
DueWed Jun 3 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 14 06:00On hand
Enclosure setTidewell PlasticsTue May 19 06:00On hand
Power moduleAster PowerMon May 11 06:00On hand
Display panelBrightline DisplaysSat May 16 06:00On hand
WO-10155
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
445
Warehouse stockStock replenishment
Thu Jun 4 17:00
Wed Jun 3 10:45
30 h
On time
Running at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06May 27 08:50May 28 11:5000.00.0Finished
20SUBSUB-AMay 27 22:55May 28 17:3000.00.0Finished
30FAFA-04May 28 14:00Jun 1 07:3000.00.0Finished
40TBTB-02Jun 1 08:05Jun 2 06:3000.00.0Finished
50PKPK-01Jun 2 19:55Jun 3 10:4504.20.0Running

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time30 h to spare before the due date.

Order

ReferenceRP-2785
ReleasedThu May 21 06:00
DueThu Jun 4 17:00
Priority and weight3, weight 1
Touch time left4.2 h
Sequence position2

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 18 06:00On hand
Enclosure setTidewell PlasticsMon May 18 06:00On hand
Power moduleAster PowerFri May 15 06:00On hand
Display panelBrightline DisplaysSun May 17 06:00On hand
WO-10239
1TB NVMe SSD, grayQN-4854, Storage
320
Warehouse stockStock replenishment
Tue Jun 2 17:00
Mon Jun 1 10:50
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06May 22 22:15May 26 07:1500.00.0Finished
20SUBSUB-BMay 26 19:35May 26 22:4500.00.0Finished
30FAFA-03May 27 11:50May 27 18:1000.00.0Finished
40TBTB-01May 30 04:00May 30 17:4000.00.0Finished
50PKPK-01Jun 1 07:35Jun 1 10:5000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 10:50.

Order

ReferenceRP-2869
ReleasedThu May 21 06:00
DueTue Jun 2 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 13 06:00On hand
Enclosure setTidewell PlasticsTue May 12 06:00On hand
Power moduleAster PowerSun May 17 06:00On hand
WO-10034
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
170
Warehouse stockStock replenishment
Wed Jun 3 17:00
Mon Jun 1 17:20
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04May 26 06:40May 27 05:1500.00.0Finished
20SUBSUB-CMay 26 21:45May 27 12:1000.00.0Finished
30FAFA-02May 27 15:25May 28 13:3000.00.0Finished
40TBTB-01May 30 17:40May 31 19:2000.00.0Finished
50PKPK-02Jun 1 14:10Jun 1 17:2000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 17:20.

Order

ReferenceRP-2664
ReleasedFri May 22 06:00
DueWed Jun 3 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 17 06:00On hand
Enclosure setTidewell PlasticsSat May 16 06:00On hand
Power moduleAster PowerTue May 12 06:00On hand
SoC moduleKestrel SiliconTue May 19 06:00On hand
Display panelBrightline DisplaysThu May 14 06:00On hand
WO-10323
Mini PC, 8-core, 16GB / 512GBAF-7495, Desktops
60
ACCOUNT 9148Standard, customer build
Wed Jun 3 15:00
Mon Jun 1 13:10
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02May 26 06:00May 26 14:3500.00.0Finished
20SUBSUB-BMay 26 22:45May 27 10:0000.00.0Finished
30FAFA-05May 27 13:50May 27 22:2000.00.0Finished
40TBTB-04May 30 13:30May 31 04:0000.00.0Finished
45CFGCFG-02Jun 1 06:00Jun 1 10:4000.00.0Finished
50PKPK-01Jun 1 10:55Jun 1 13:1000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 13:10.

Order

ReferenceSO-71208
ReleasedFri May 22 06:00
DueWed Jun 3 15:00
Priority and weight4, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 17 06:00On hand
Enclosure setTidewell PlasticsTue May 19 06:00On hand
Power moduleAster PowerMon May 18 06:00On hand
SoC moduleKestrel SiliconWed May 20 06:00On hand
WO-10044
24" FHD Monitor, IPSBP-5281, Monitors
370
Warehouse stockStock replenishment
Fri Jun 5 17:00
Wed Jun 3 22:35
42 h
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02May 27 17:35May 28 18:0500.00.0Finished
20SUBSUB-BMay 28 13:50May 29 07:0500.00.0Finished
30FAFA-06May 29 15:35Jun 1 17:2500.00.0Finished
40TBTB-03Jun 1 14:50Jun 2 10:2000.00.0Finished
50PKPK-02Jun 3 13:50Jun 3 22:35108.17.3Frozen

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time42 h to spare before the due date.

Order

ReferenceRP-2674
ReleasedSat May 23 06:00
DueFri Jun 5 17:00
Priority and weight3, weight 1
Touch time left8.2 h
Sequence position5

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 14 06:00On hand
Enclosure setTidewell PlasticsThu May 21 06:00On hand
Power moduleAster PowerWed May 20 06:00On hand
Display panelBrightline DisplaysThu May 21 06:00On hand
WO-10077
Thin Client, 4GB / 32GB, grayKL-1432, Desktops
20
Warehouse stockStock replenishment
Wed Jun 3 17:00
Mon Jun 1 13:55
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07May 26 06:00May 26 09:0500.00.0Finished
20SUBSUB-AMay 26 19:00May 26 20:2000.00.0Finished
30FAFA-04May 27 14:15May 27 16:2000.00.0Finished
40TBTB-02May 31 01:00May 31 05:2500.00.0Finished
50PKPK-01Jun 1 13:10Jun 1 13:5500.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 13:55.

Order

ReferenceRP-2707
ReleasedSun May 24 06:00
DueWed Jun 3 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 14 06:00On hand
Enclosure setTidewell PlasticsFri May 22 06:00On hand
Power moduleAster PowerSat May 16 06:00On hand
SoC moduleKestrel SiliconFri May 15 06:00On hand
WO-10087
12" Pro Tablet, 256GBKL-2075, Tablets
200
Warehouse stockStock replenishment
Fri Jun 5 17:00
Wed Jun 3 16:05
2.0 d
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03May 27 23:20May 28 23:5500.00.0Finished
20SUBSUB-CMay 28 16:40May 29 07:4500.00.0Finished
30FAFA-03May 28 20:00May 29 19:1000.00.0Finished
40TBTB-01Jun 2 04:20Jun 3 04:2000.00.0Finished
50PKPK-01Jun 3 12:55Jun 3 16:05152.96.4Frozen

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2717
ReleasedSun May 24 06:00
DueFri Jun 5 17:00
Priority and weight3, weight 1
Touch time left3.2 h
Sequence position6

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 14 06:00On hand
Enclosure setTidewell PlasticsFri May 15 06:00On hand
Power moduleAster PowerMon May 18 06:00On hand
SoC moduleKestrel SiliconSat May 16 06:00On hand
Display panelBrightline DisplaysSun May 17 06:00On hand
WO-10131
8" Rugged Tablet, 64GB, grayLM-5109, Tablets
160
Warehouse stockStock replenishment
Fri Jun 5 17:00
Wed Jun 3 19:25
46 h
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04May 28 04:50May 29 02:5500.00.0Finished
20SUBSUB-AMay 28 17:35May 29 07:5500.00.0Finished
30FAFA-01May 28 21:05May 29 18:2000.00.0Finished
40TBTB-04Jun 2 06:00Jun 3 03:5000.00.0Finished
50PKPK-01Jun 3 16:05Jun 3 19:25102.79.6Frozen

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time46 h to spare before the due date.

Order

ReferenceRP-2761
ReleasedSun May 24 06:00
DueFri Jun 5 17:00
Priority and weight3, weight 1
Touch time left2.8 h
Sequence position7

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 20 06:00On hand
Enclosure setTidewell PlasticsSun May 17 06:00On hand
Power moduleAster PowerThu May 21 06:00On hand
SoC moduleKestrel SiliconFri May 22 06:00On hand
Display panelBrightline DisplaysThu May 21 06:00On hand
WO-10188
KVM Switch, 2-port 4K, grayNB-7003, Docks & Hubs
340
Warehouse stockStock replenishment
Fri Jun 5 17:00
Thu Jun 4 06:30
34 h
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05May 28 05:00May 29 18:1500.00.0Finished
20SUBSUB-BMay 29 13:15May 29 19:5000.00.0Finished
30FAFA-02May 29 15:10Jun 1 06:2500.00.0Finished
40TBTB-01Jun 3 06:00Jun 3 15:55359.30.0Frozen
50PKPK-01Jun 3 19:25Jun 4 06:30153.82.5Frozen

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time34 h to spare before the due date.

Order

ReferenceRP-2818
ReleasedSun May 24 06:00
DueFri Jun 5 17:00
Priority and weight3, weight 1
Touch time left14.0 h
Sequence position8

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 14 06:00On hand
Enclosure setTidewell PlasticsThu May 21 06:00On hand
Power moduleAster PowerWed May 20 06:00On hand
WO-10220
8-Port Gigabit SwitchQN-4070, Networking
160
Warehouse stockStock replenishment
Wed Jun 3 17:00
Tue Jun 2 13:00
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07May 26 09:05May 27 06:3000.00.0Finished
20SUBSUB-AMay 27 13:20May 27 17:5000.00.0Finished
30FAFA-04May 27 20:20May 28 11:3500.00.0Finished
40TBTB-02May 31 10:50Jun 1 00:0000.00.0Finished
50PKPK-02Jun 2 09:35Jun 2 13:0000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Tue Jun 2 13:00.

Order

ReferenceRP-2850
ReleasedSun May 24 06:00
DueWed Jun 3 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 21 06:00On hand
Enclosure setTidewell PlasticsFri May 15 06:00On hand
Power moduleAster PowerSat May 16 06:00On hand
SoC moduleKestrel SiliconWed May 20 06:00On hand
WO-10230
15" Laptop, 12-core, 32GB / 1TB, grayQN-4418, Laptops
110
Warehouse stockStock replenishment
Fri Jun 5 17:00
Thu Jun 4 08:40
32 h
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01May 28 06:00May 28 21:1500.00.0Finished
20SUBSUB-CMay 29 07:45May 29 13:0000.00.0Finished
30FAFA-03May 29 19:10Jun 1 08:0500.00.0Finished
40TBTB-03Jun 2 10:20Jun 3 03:0000.00.0Finished
50PKPK-01Jun 4 06:30Jun 4 08:40151.916.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time32 h to spare before the due date.

Order

ReferenceRP-2860
ReleasedSun May 24 06:00
DueFri Jun 5 17:00
Priority and weight3, weight 1
Touch time left2.2 h
Sequence position9

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 15 06:00On hand
Enclosure setTidewell PlasticsTue May 19 06:00On hand
Power moduleAster PowerSun May 17 06:00On hand
SoC moduleKestrel SiliconMon May 18 06:00On hand
Display panelBrightline DisplaysMon May 18 06:00On hand
WO-10283
USB-C Travel Hub, 7-in-1VW-4303, Docks & Hubs
130
Warehouse stockStock replenishment
Thu Jun 4 17:00
Wed Jun 3 12:25
29 h
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04May 27 14:05May 28 04:5000.00.0Finished
20SUBSUB-BMay 28 11:05May 28 13:5000.00.0Finished
30FAFA-01May 28 13:55May 28 18:1000.00.0Finished
40TBTB-03Jun 1 06:55Jun 1 10:5500.00.0Finished
50PKPK-01Jun 3 10:45Jun 3 12:25151.44.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time29 h to spare before the due date.

Order

ReferenceRP-2913
ReleasedSun May 24 06:00
DueThu Jun 4 17:00
Priority and weight3, weight 1
Touch time left1.7 h
Sequence position3

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 21 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerFri May 15 06:00On hand
WO-10058
128GB USB Flash Drive, 10-packBP-7439, Storage
100
Warehouse stockStock replenishment
Thu Jun 4 17:00
Mon Jun 1 16:10
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07May 27 06:30May 27 13:5000.00.0Finished
20SUBSUB-AMay 27 21:20May 27 22:5500.00.0Finished
30FAFA-04May 28 11:35May 28 14:0000.00.0Finished
40TBTB-02Jun 1 03:35Jun 1 07:5500.00.0Finished
50PKPK-01Jun 1 15:10Jun 1 16:1000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 16:10.

Order

ReferenceRP-2688
ReleasedMon May 25 06:00
DueThu Jun 4 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 23 06:00On hand
Enclosure setTidewell PlasticsTue May 19 06:00On hand
Power moduleAster PowerTue May 19 06:00On hand
WO-10178
Wi-Fi 6 Access Point, ceiling, refreshNB-4322, Networking
70
Warehouse stockStock replenishment
Wed Jun 3 17:00
Mon Jun 1 15:10
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05May 26 11:05May 26 17:4500.00.0Finished
20SUBSUB-CMay 27 12:10May 27 14:2500.00.0Finished
30FAFA-04May 27 16:20May 27 20:2000.00.0Finished
40TBTB-02May 31 05:25May 31 10:5000.00.0Finished
50PKPK-01Jun 1 13:55Jun 1 15:1000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Mon Jun 1 15:10.

Order

ReferenceRP-2808
ReleasedMon May 25 06:00
DueWed Jun 3 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 22 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerSun May 17 06:00On hand
SoC moduleKestrel SiliconSat May 23 06:00On hand
WO-10302
Mechanical Keyboard, TKLVW-8762, Peripherals
330
Warehouse stockStock replenishment
Wed Jun 3 17:00
Tue Jun 2 16:55
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02May 27 05:15May 27 17:3500.00.0Finished
20SUBSUB-AMay 27 17:50May 27 21:2000.00.0Finished
30FAFA-03May 27 19:45May 28 08:3500.00.0Finished
40TBTB-02Jun 1 00:00Jun 1 03:3500.00.0Finished
50PKPK-01Jun 2 14:20Jun 2 16:5500.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Tue Jun 2 16:55.

Order

ReferenceRP-2932
ReleasedMon May 25 06:00
DueWed Jun 3 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 23 06:00On hand
Enclosure setTidewell PlasticsMon May 18 06:00On hand
Power moduleAster PowerFri May 22 06:00On hand
WO-10015
4-Bay NAS Enclosure, grayAF-5514, Storage
150
Warehouse stockStock replenishment
Thu Jun 4 17:00
Tue Jun 2 09:10
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04May 27 06:00May 27 14:0500.00.0Finished
20SUBSUB-BMay 27 21:10May 27 23:0000.00.0Finished
30FAFA-03May 28 08:35May 28 12:0500.00.0Finished
40TBTB-03Jun 1 00:25Jun 1 06:5500.00.0Finished
50PKPK-01Jun 2 07:50Jun 2 09:1000.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Tue Jun 2 09:10.

Order

ReferenceRP-2645
ReleasedTue May 26 06:00
DueThu Jun 4 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 18 06:00On hand
Enclosure setTidewell PlasticsSun May 17 06:00On hand
Power moduleAster PowerSat May 23 06:00On hand
WO-10102
1080p Webcam with micKL-5125, Peripherals
310
Warehouse stockStock replenishment
Thu Jun 4 17:00
Tue Jun 2 19:55
Complete
Complete

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05May 27 06:00May 27 18:2000.00.0Finished
20SUBSUB-BMay 28 06:00May 28 09:0000.00.0Finished
30FAFA-02May 28 13:30May 28 19:5000.00.0Finished
40TBTB-04Jun 1 06:00Jun 1 09:3500.00.0Finished
50PKPK-01Jun 2 16:55Jun 2 19:5500.00.0Finished

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

CompleteFinished Tue Jun 2 19:55.

Order

ReferenceRP-2732
ReleasedTue May 26 06:00
DueThu Jun 4 17:00
Priority and weight3, weight 1
Touch time left0.0 h

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 17 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerThu May 21 06:00On hand
WO-10156
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
390
Warehouse stockStock replenishment
Thu Jun 11 17:00
Tue Jun 9 17:20
48 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 4 12:00Jun 5 12:259021.90.0Frozen
20SUBSUB-CJun 4 20:45Jun 5 14:05509.03.4Planned
30FAFA-06Jun 5 06:00Jun 8 15:254524.20.0Planned
40TBTB-02Jun 7 22:35Jun 8 18:103519.060.4Planned
50PKPK-01Jun 9 08:25Jun 9 17:20158.26.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time48 h to spare before the due date.

Order

ReferenceRP-2786
ReleasedTue May 26 06:00
DueThu Jun 11 17:00
Priority and weight3, weight 1
Touch time left86.2 h
Sequence position37

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 16 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
Display panelBrightline DisplaysSat May 23 06:00On hand
WO-10255
13" Ultralight Laptop, 16GB / 512GBQN-7885, Laptops
350
Warehouse stockStock replenishment
Fri Jun 12 17:00
Mon Jun 15 09:35
2.7 d late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 7 23:00Jun 10 00:154546.00.0Planned
20SUBSUB-BJun 9 16:10Jun 10 15:055014.124.6Planned
30FAFA-01Jun 9 19:50Jun 11 19:354531.00.0Planned
40TBTB-03Jun 10 08:20Jun 12 19:053558.20.0Planned
50PKPK-01Jun 12 19:35Jun 15 09:35106.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: materialSoC module from Kestrel Silicon arrives Sun Jun 7 06:00.
  • Expedite the SoC module to arrive by Thu Jun 4 13:25. Everything else fits before the due date.

Order

ReferenceRP-2885
ReleasedTue May 26 06:00
DueFri Jun 12 17:00
Priority and weight3, weight 1
Touch time left159.2 h
Sequence position47

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 18 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerWed May 20 06:00On hand
SoC moduleKestrel SiliconSun Jun 7 06:00In transit
Display panelBrightline DisplaysTue May 19 06:00On hand
WO-10315
22" Touch MonitorVW-1888, Monitors
80
ACCOUNT 1466Gold, customer build
Fri Jun 5 15:00
Wed Jun 3 13:40
2.1 d
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03May 27 16:45May 27 23:2000.00.0Finished
20SUBSUB-CMay 28 13:30May 28 15:5000.00.0Finished
30FAFA-06May 29 09:40May 29 15:3500.00.0Finished
40TBTB-04Jun 1 09:35Jun 1 14:1000.00.0Finished
45CFGCFG-02Jun 2 06:00Jun 2 11:5500.00.0Finished
50PKPK-02Jun 3 11:50Jun 3 13:4051.85.3Frozen

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.1 d to spare before the due date.

Order

ReferenceSO-71104
ReleasedWed May 27 06:00
DueFri Jun 5 15:00
Priority and weight2, weight 3
Touch time left1.8 h
Sequence position4

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 20 06:00On hand
Enclosure setTidewell PlasticsMon May 18 06:00On hand
Power moduleAster PowerThu May 21 06:00On hand
Display panelBrightline DisplaysTue May 19 06:00On hand
WO-10049
27" 4K Monitor, USB-C, refreshBP-5748, Monitors
190
Warehouse stockStock replenishment
Mon Jun 8 17:00
Thu Jun 4 13:55
4.1 d
On time
Running at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07May 28 06:00May 28 21:4500.00.0Finished
20SUBSUB-AMay 29 07:55May 29 13:5000.00.0Finished
30FAFA-04Jun 1 09:50Jun 2 06:2000.00.0Finished
40TBTB-04Jun 3 03:50Jun 3 13:4507.80.0Running
50PKPK-02Jun 4 09:00Jun 4 13:55154.211.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.1 d to spare before the due date.

Order

ReferenceRP-2679
ReleasedThu May 28 06:00
DueMon Jun 8 17:00
Priority and weight3, weight 1
Touch time left12.2 h
Sequence position11

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 25 06:00On hand
Enclosure setTidewell PlasticsSun May 24 06:00On hand
Power moduleAster PowerMon May 18 06:00On hand
Display panelBrightline DisplaysFri May 22 06:00On hand
WO-10073
4-Bay NAS EnclosureBP-8568, Storage
415
Warehouse stockStock replenishment
Tue Jun 9 17:00
Fri Jun 5 20:10
3.9 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06May 29 20:10Jun 1 08:3000.00.0Finished
20SUBSUB-CJun 1 09:35Jun 1 13:1500.00.0Finished
30FAFA-02Jun 1 22:45Jun 2 09:1500.00.0Finished
40TBTB-01Jun 4 10:10Jun 4 23:401513.228.2Planned
50PKPK-02Jun 5 16:50Jun 5 20:10152.610.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.9 d to spare before the due date.

Order

ReferenceRP-2703
ReleasedThu May 28 06:00
DueTue Jun 9 17:00
Priority and weight3, weight 1
Touch time left16.3 h
Sequence position21

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 21 06:00On hand
Enclosure setTidewell PlasticsMon May 25 06:00On hand
Power moduleAster PowerTue May 26 06:00On hand
WO-10083
Chromebook 11", 4GB / 64GB, refreshKL-1625, Laptops
155
Warehouse stockStock replenishment
Thu Jun 11 17:00
Tue Jun 9 08:25
2.4 d
On time
Running at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 3 05:05Jun 4 01:50018.80.0Running
20SUBSUB-BJun 4 06:50Jun 4 14:10506.010.0Planned
30FAFA-05Jun 4 09:55Jun 5 07:554513.20.0Planned
40TBTB-01Jun 6 08:30Jun 7 09:503524.840.8Planned
50PKPK-01Jun 8 22:15Jun 9 08:25152.915.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.4 d to spare before the due date.

Order

ReferenceRP-2713
ReleasedThu May 28 06:00
DueThu Jun 11 17:00
Priority and weight3, weight 1
Touch time left68.2 h
Sequence position35

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 21 06:00On hand
Enclosure setTidewell PlasticsMon May 18 06:00On hand
Power moduleAster PowerFri May 22 06:00On hand
SoC moduleKestrel SiliconThu May 21 06:00On hand
Display panelBrightline DisplaysWed May 20 06:00On hand
WO-10208
4-Bay NAS Enclosure, refreshQN-2129, Storage
485
Warehouse stockStock replenishment
Mon Jun 8 17:00
Thu Jun 4 20:00
3.9 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06May 28 21:15May 29 20:1000.00.0Finished
20SUBSUB-CMay 29 17:00May 29 21:3000.00.0Finished
30FAFA-01Jun 1 12:25Jun 1 21:1000.00.0Finished
40TBTB-01Jun 3 15:55Jun 4 10:103517.79.9Frozen
50PKPK-02Jun 4 15:50Jun 4 20:00153.45.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.9 d to spare before the due date.

Order

ReferenceRP-2838
ReleasedThu May 28 06:00
DueMon Jun 8 17:00
Priority and weight3, weight 1
Touch time left21.9 h
Sequence position14

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 24 06:00On hand
Enclosure setTidewell PlasticsTue May 19 06:00On hand
Power moduleAster PowerMon May 18 06:00On hand
WO-10245
Thunderbolt Dock, 4 portsQN-5393, Docks & Hubs
415
Warehouse stockStock replenishment
Wed Jun 10 17:00
Mon Jun 8 21:50
43 h
On time
Running at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 2 03:30Jun 4 01:55018.90.0Running
20SUBSUB-BJun 3 16:10Jun 4 06:50506.34.2Frozen
30FAFA-02Jun 3 18:05Jun 4 13:502511.30.0Frozen
40TBTB-01Jun 5 20:45Jun 6 08:303511.248.1Planned
50PKPK-02Jun 8 16:30Jun 8 21:50154.610.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time43 h to spare before the due date.

Order

ReferenceRP-2875
ReleasedThu May 28 06:00
DueWed Jun 10 17:00
Priority and weight3, weight 1
Touch time left54.4 h
Sequence position32

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 20 06:00On hand
Enclosure setTidewell PlasticsTue May 19 06:00On hand
Power moduleAster PowerTue May 19 06:00On hand
WO-10310
Mini PC, 8-core, 16GB / 512GB, refreshQN-4241, Desktops
80
ACCOUNT 8733Silver, customer build
Tue Jun 9 15:00
Fri Jun 5 07:25
4.3 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04May 29 10:55May 29 19:4500.00.0Finished
20SUBSUB-CMay 29 21:30Jun 1 06:3500.00.0Finished
30FAFA-05Jun 1 21:05Jun 2 11:1000.00.0Finished
40TBTB-04Jun 3 14:10Jun 4 05:303514.88.2Frozen
45CFGCFG-01Jun 4 06:00Jun 4 11:55255.00.0Planned
50PKPK-02Jun 4 22:10Jun 5 07:25102.19.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.3 d to spare before the due date.

Order

ReferenceSO-71039
ReleasedThu May 28 06:00
DueTue Jun 9 15:00
Priority and weight3, weight 2
Touch time left23.0 h
Sequence position17

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 22 06:00On hand
Enclosure setTidewell PlasticsMon May 25 06:00On hand
Power moduleAster PowerThu May 21 06:00On hand
SoC moduleKestrel SiliconThu May 21 06:00On hand
WO-10001
Ergonomic Mouse, wireless, grayAF-4219, Peripherals
390
Warehouse stockStock replenishment
Mon Jun 8 17:00
Thu Jun 4 09:00
4.3 d
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01May 29 06:00May 29 22:2500.00.0Finished
20SUBSUB-BMay 29 19:50Jun 1 06:4500.00.0Finished
30FAFA-01May 29 21:20Jun 1 07:4500.00.0Finished
40TBTB-04Jun 1 14:10Jun 1 18:5000.00.0Finished
50PKPK-02Jun 3 22:35Jun 4 09:00153.215.6Frozen

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.3 d to spare before the due date.

Order

ReferenceRP-2631
ReleasedFri May 29 06:00
DueMon Jun 8 17:00
Priority and weight3, weight 1
Touch time left3.4 h
Sequence position10

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsThu May 21 06:00On hand
Power moduleAster PowerThu May 21 06:00On hand
WO-10030
Mesh Wi-Fi Kit, 3-pack, refreshAF-9913, Networking
245
Warehouse stockStock replenishment
Tue Jun 9 17:00
Fri Jun 5 16:50
4.0 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03May 29 19:55Jun 1 14:5000.00.0Finished
20SUBSUB-CJun 1 15:15Jun 1 21:3000.00.0Finished
30FAFA-01Jun 1 21:10Jun 2 12:2000.00.0Finished
40TBTB-04Jun 4 12:10Jun 5 06:053517.330.2Planned
50PKPK-02Jun 5 13:00Jun 5 16:50153.65.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.0 d to spare before the due date.

Order

ReferenceRP-2660
ReleasedFri May 29 06:00
DueTue Jun 9 17:00
Priority and weight3, weight 1
Touch time left21.8 h
Sequence position20

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 21 06:00On hand
Enclosure setTidewell PlasticsMon May 25 06:00On hand
Power moduleAster PowerWed May 20 06:00On hand
SoC moduleKestrel SiliconSun May 24 06:00On hand
WO-10040
KVM Switch, 2-port 4KBP-5055, Docks & Hubs
540
Warehouse stockStock replenishment
Thu Jun 11 17:00
Tue Jun 9 10:40
2.3 d
On time
Running at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 2 05:30Jun 4 07:00023.80.0Running
20SUBSUB-CJun 4 06:00Jun 4 14:30507.211.2Planned
30FAFA-01Jun 4 07:45Jun 4 22:204512.80.0Planned
40TBTB-02Jun 6 08:15Jun 6 21:253512.646.2Planned
50PKPK-02Jun 8 21:50Jun 9 10:40105.214.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.3 d to spare before the due date.

Order

ReferenceRP-2670
ReleasedFri May 29 06:00
DueThu Jun 11 17:00
Priority and weight3, weight 1
Touch time left63.8 h
Sequence position34

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsTue May 19 06:00On hand
Power moduleAster PowerWed May 27 06:00On hand
WO-10117
14" Laptop, 8-core, 16GB / 512GB, grayKL-9462, Laptops
100
Warehouse stockStock replenishment
Tue Jun 9 17:00
Fri Jun 5 21:20
3.8 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 1 02:05Jun 1 18:1500.00.0Finished
20SUBSUB-BJun 1 15:25Jun 1 21:1500.00.0Finished
30FAFA-04Jun 2 06:40Jun 2 17:4000.00.0Finished
40TBTB-01Jun 4 23:40Jun 5 18:353518.341.7Planned
50PKPK-01Jun 5 19:05Jun 5 21:2052.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.8 d to spare before the due date.

Order

ReferenceRP-2747
ReleasedFri May 29 06:00
DueTue Jun 9 17:00
Priority and weight3, weight 1
Touch time left21.2 h
Sequence position22

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 21 06:00On hand
Enclosure setTidewell PlasticsFri May 22 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
SoC moduleKestrel SiliconSat May 23 06:00On hand
Display panelBrightline DisplaysWed May 20 06:00On hand
WO-10174
8" Rugged Tablet, 64GBNB-1986, Tablets
85
Warehouse stockStock replenishment
Tue Jun 9 17:00
Mon Jun 8 08:10
33 h
On time
Running at FA

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 1 20:20Jun 2 09:5000.00.0Finished
20SUBSUB-BJun 2 16:50Jun 2 21:1000.00.0Finished
30FAFA-05Jun 2 20:15Jun 3 08:3002.50.0Running
40TBTB-04Jun 5 06:05Jun 5 17:153510.645.3Planned
50PKPK-02Jun 8 06:35Jun 8 08:10151.35.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time33 h to spare before the due date.

Order

ReferenceRP-2804
ReleasedFri May 29 06:00
DueTue Jun 9 17:00
Priority and weight3, weight 1
Touch time left15.2 h
Sequence position24

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 22 06:00On hand
Enclosure setTidewell PlasticsTue May 26 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
SoC moduleKestrel SiliconMon May 25 06:00On hand
Display panelBrightline DisplaysSat May 23 06:00On hand
WO-10193
10" Tablet, 64GBNB-7024, Tablets
120
Warehouse stockStock replenishment
Mon Jun 8 17:00
Thu Jun 4 15:50
4.0 d
On time
Running at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03May 29 06:00May 29 19:5500.00.0Finished
20SUBSUB-AMay 29 17:25May 29 22:3000.00.0Finished
30FAFA-02Jun 1 08:55Jun 1 18:1500.00.0Finished
40TBTB-02Jun 3 04:35Jun 3 18:00012.00.0Running
50PKPK-02Jun 4 13:55Jun 4 15:50151.711.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.0 d to spare before the due date.

Order

ReferenceRP-2823
ReleasedFri May 29 06:00
DueMon Jun 8 17:00
Priority and weight3, weight 1
Touch time left13.9 h
Sequence position13

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 22 06:00On hand
Enclosure setTidewell PlasticsSat May 23 06:00On hand
Power moduleAster PowerWed May 27 06:00On hand
SoC moduleKestrel SiliconWed May 27 06:00On hand
Display panelBrightline DisplaysMon May 25 06:00On hand
WO-10216
USB-C Travel Hub, 7-in-1, grayQN-2461, Docks & Hubs
230
Warehouse stockStock replenishment
Tue Jun 9 17:00
Mon Jun 8 11:25
30 h
On time
Running at FA

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 1 06:00Jun 2 13:3500.00.0Finished
20SUBSUB-CJun 2 16:25Jun 2 21:1500.00.0Finished
30FAFA-02Jun 2 22:30Jun 3 09:0003.00.0Running
40TBTB-02Jun 4 13:55Jun 4 20:40356.230.2Planned
50PKPK-02Jun 8 08:10Jun 8 11:25152.520.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time30 h to spare before the due date.

Order

ReferenceRP-2846
ReleasedFri May 29 06:00
DueTue Jun 9 17:00
Priority and weight3, weight 1
Touch time left12.5 h
Sequence position25

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 22 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerWed May 27 06:00On hand
WO-10235
Tower Workstation, 32GB / 1TBQN-4437, Desktops
30
Warehouse stockStock replenishment
Mon Jun 8 17:00
Thu Jun 4 21:05
3.8 d
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04May 29 06:00May 29 10:5500.00.0Finished
20SUBSUB-CMay 29 13:00May 29 15:1000.00.0Finished
30FAFA-05Jun 1 13:00Jun 1 16:4500.00.0Finished
40TBTB-02Jun 2 16:40Jun 2 22:3500.00.0Finished
50PKPK-02Jun 4 20:00Jun 4 21:05150.829.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.8 d to spare before the due date.

Order

ReferenceRP-2865
ReleasedFri May 29 06:00
DueMon Jun 8 17:00
Priority and weight3, weight 1
Touch time left1.1 h
Sequence position15

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 25 06:00On hand
Enclosure setTidewell PlasticsSun May 24 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
SoC moduleKestrel SiliconTue May 26 06:00On hand
WO-10269
Thin Client, 4GB / 32GBVW-2014, Desktops
30
Warehouse stockStock replenishment
Mon Jun 8 17:00
Thu Jun 4 22:10
3.8 d
On time
Next at PK

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07May 29 06:00May 29 11:5500.00.0Finished
20SUBSUB-AMay 29 13:50May 29 16:1500.00.0Finished
30FAFA-05Jun 1 16:45Jun 1 21:0500.00.0Finished
40TBTB-02Jun 2 06:30Jun 2 13:3500.00.0Finished
50PKPK-02Jun 4 21:05Jun 4 22:10100.930.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.8 d to spare before the due date.

Order

ReferenceRP-2899
ReleasedFri May 29 06:00
DueMon Jun 8 17:00
Priority and weight3, weight 1
Touch time left1.1 h
Sequence position16

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsSun May 24 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
SoC moduleKestrel SiliconTue May 26 06:00On hand
WO-10326
14" Laptop, 8-core, 16GB / 512GBLM-5139, Laptops
40
ACCOUNT 8321Platinum, customer build
Tue Jun 9 15:00
Thu Jun 4 16:45
4.9 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04May 29 19:45Jun 1 02:0500.00.0Finished
20SUBSUB-AJun 1 06:00Jun 1 08:2000.00.0Finished
30FAFA-03Jun 1 08:35Jun 1 12:4500.00.0Finished
40TBTB-04Jun 4 05:30Jun 4 12:10356.123.5Frozen
45CFGCFG-02Jun 4 12:40Jun 4 15:35252.50.0Planned
50PKPK-01Jun 4 15:50Jun 4 16:45100.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.9 d to spare before the due date.

Order

ReferenceSO-71247
ReleasedFri May 29 06:00
DueTue Jun 9 15:00
Priority and weight1, weight 5
Touch time left10.5 h
Sequence position18

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsThu May 21 06:00On hand
Power moduleAster PowerWed May 27 06:00On hand
SoC moduleKestrel SiliconTue May 19 06:00On hand
Display panelBrightline DisplaysWed May 27 06:00On hand
WO-10330
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
150
ACCOUNT 8733Silver, customer build
Tue Jun 9 15:00
Fri Jun 5 13:00
4.1 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05May 29 18:15Jun 1 05:0000.00.0Finished
20SUBSUB-BJun 1 08:55Jun 1 13:4500.00.0Finished
30FAFA-06Jun 1 17:25Jun 2 10:5000.00.0Finished
40TBTB-02Jun 4 06:00Jun 4 13:55357.324.0Planned
45CFGCFG-02Jun 4 15:35Jun 5 08:50259.31.2Planned
50PKPK-02Jun 5 09:05Jun 5 13:00153.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.1 d to spare before the due date.

Order

ReferenceSO-71299
ReleasedFri May 29 06:00
DueTue Jun 9 15:00
Priority and weight3, weight 2
Touch time left21.1 h
Sequence position19

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 20 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerTue May 19 06:00On hand
Display panelBrightline DisplaysSat May 23 06:00On hand
WO-10021
Mini PC, 8-core, 16GB / 512GBAF-7495, Desktops
85
Warehouse stockStock replenishment
Fri Jun 12 17:00
Tue Jun 9 22:00
2.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 3 06:00Jun 3 20:459012.20.0Planned
20SUBSUB-BJun 4 19:40Jun 5 07:50254.819.4Planned
30FAFA-04Jun 5 11:30Jun 5 22:45510.75.0Planned
40TBTB-03Jun 8 08:35Jun 9 05:253520.262.4Planned
50PKPK-02Jun 9 18:25Jun 9 22:00152.811.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.8 d to spare before the due date.

Order

ReferenceRP-2651
ReleasedSat May 30 06:00
DueFri Jun 12 17:00
Priority and weight3, weight 1
Touch time left53.6 h
Sequence position43

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 25 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerThu May 21 06:00On hand
SoC moduleKestrel SiliconThu May 28 06:00On hand
WO-10069
Mesh Wi-Fi Kit, 3-packBP-8055, Networking
365
Warehouse stockStock replenishment
Mon Jun 15 17:00
Thu Jun 11 13:20
4.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 5 06:00Jun 8 19:504534.845.8Planned
20SUBSUB-CJun 8 12:10Jun 8 21:30508.015.6Planned
30FAFA-02Jun 8 14:25Jun 9 15:104516.00.0Planned
40TBTB-04Jun 10 01:10Jun 11 06:053528.331.5Planned
50PKPK-02Jun 11 06:45Jun 11 13:20155.80.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.2 d to spare before the due date.

Order

ReferenceRP-2699
ReleasedSat May 30 06:00
DueMon Jun 15 17:00
Priority and weight3, weight 1
Touch time left96.2 h
Sequence position50

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 20 06:00On hand
Enclosure setTidewell PlasticsTue May 26 06:00On hand
Power moduleAster PowerFri May 22 06:00On hand
SoC moduleKestrel SiliconThu May 28 06:00On hand
WO-10141
4K Conference CameraLM-5365, Peripherals
430
Warehouse stockStock replenishment
Tue Jun 9 17:00
Mon Jun 8 06:35
34 h
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 1 05:00Jun 1 20:2000.00.0Finished
20SUBSUB-CJun 1 21:30Jun 2 07:1000.00.0Finished
30FAFA-02Jun 2 12:40Jun 2 20:5000.00.0Finished
40TBTB-02Jun 3 18:20Jun 3 23:00354.112.3Frozen
50PKPK-02Jun 5 20:10Jun 8 06:35153.229.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time34 h to spare before the due date.

Order

ReferenceRP-2771
ReleasedSat May 30 06:00
DueTue Jun 9 17:00
Priority and weight3, weight 1
Touch time left8.1 h
Sequence position23

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 20 06:00On hand
Enclosure setTidewell PlasticsWed May 20 06:00On hand
Power moduleAster PowerThu May 28 06:00On hand
WO-10226
Mini PC, 8-core, 16GB / 512GB, refreshQN-4241, Desktops
95
Warehouse stockStock replenishment
Thu Jun 11 17:00
Tue Jun 9 16:10
2.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 3 23:10Jun 4 09:55909.016.2Frozen
20SUBSUB-BJun 4 14:10Jun 4 19:40504.27.5Planned
30FAFA-04Jun 4 17:30Jun 5 11:30459.20.0Planned
40TBTB-01Jun 7 09:50Jun 8 03:553517.550.9Planned
50PKPK-02Jun 9 13:30Jun 9 16:10152.423.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2856
ReleasedSat May 30 06:00
DueThu Jun 11 17:00
Priority and weight3, weight 1
Touch time left46.2 h
Sequence position39

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerThu May 21 06:00On hand
SoC moduleKestrel SiliconTue May 26 06:00On hand
WO-10279
Ergonomic Mouse, wirelessVW-4001, Peripherals
500
Warehouse stockStock replenishment
Wed Jun 10 17:00
Mon Jun 8 22:15
43 h
On time
Running at SUB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 2 09:50Jun 3 05:0500.00.0Finished
20SUBSUB-AJun 2 22:10Jun 3 07:0001.00.0Running
30FAFA-01Jun 3 06:40Jun 3 16:00458.10.0Frozen
40TBTB-02Jun 6 02:55Jun 6 08:15354.866.4Planned
50PKPK-01Jun 8 17:50Jun 8 22:15153.711.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time43 h to spare before the due date.

Order

ReferenceRP-2909
ReleasedSat May 30 06:00
DueWed Jun 10 17:00
Priority and weight3, weight 1
Touch time left19.1 h
Sequence position33

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsTue May 26 06:00On hand
Power moduleAster PowerWed May 20 06:00On hand
WO-10289
27" 4K Monitor, USB-CVW-6003, Monitors
355
Warehouse stockStock replenishment
Fri Jun 12 17:00
Wed Jun 10 20:40
44 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 4 15:15Jun 5 13:459020.031.5Planned
20SUBSUB-AJun 5 15:40Jun 8 08:10508.211.6Planned
30FAFA-04Jun 8 13:45Jun 9 20:402522.011.8Planned
40TBTB-02Jun 9 18:30Jun 10 12:051517.324.9Planned
50PKPK-02Jun 10 12:35Jun 10 20:40107.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time44 h to spare before the due date.

Order

ReferenceRP-2919
ReleasedSat May 30 06:00
DueFri Jun 12 17:00
Priority and weight3, weight 1
Touch time left78.1 h
Sequence position48

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsThu May 21 06:00On hand
Power moduleAster PowerSat May 23 06:00On hand
Display panelBrightline DisplaysThu May 28 06:00On hand
WO-10011
All-in-One 24", 16GB / 512GBAF-4434, Desktops
45
Warehouse stockStock replenishment
Wed Jun 10 17:00
Mon Jun 8 14:40
2.1 d
On time
Running at FA

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 1 20:00Jun 2 03:1000.00.0Finished
20SUBSUB-CJun 2 13:05Jun 2 16:2500.00.0Finished
30FAFA-06Jun 2 18:20Jun 3 06:4500.80.0Running
40TBTB-02Jun 5 09:25Jun 5 20:303510.550.4Planned
50PKPK-02Jun 8 12:55Jun 8 14:40151.58.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.1 d to spare before the due date.

Order

ReferenceRP-2641
ReleasedSun May 31 06:00
DueWed Jun 10 17:00
Priority and weight3, weight 1
Touch time left13.6 h
Sequence position27

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsMon May 25 06:00On hand
Power moduleAster PowerMon May 25 06:00On hand
SoC moduleKestrel SiliconSat May 23 06:00On hand
WO-10054
128GB USB Flash Drive, 10-pack, refreshBP-7381, Storage
130
Warehouse stockStock replenishment
Wed Jun 10 17:00
Mon Jun 8 15:55
2.0 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 1 20:45Jun 2 03:3000.00.0Finished
20SUBSUB-BJun 2 13:45Jun 2 15:3000.00.0Finished
30FAFA-04Jun 2 17:40Jun 2 21:0500.00.0Finished
40TBTB-04Jun 5 17:15Jun 5 22:50355.059.2Planned
50PKPK-02Jun 8 14:40Jun 8 15:55151.08.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2684
ReleasedSun May 31 06:00
DueWed Jun 10 17:00
Priority and weight3, weight 1
Touch time left6.8 h
Sequence position28

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsSat May 23 06:00On hand
Power moduleAster PowerFri May 29 06:00On hand
WO-10150
2TB Portable SSDLM-7276, Storage
380
Warehouse stockStock replenishment
Wed Jun 10 17:00
Mon Jun 8 17:50
47 h
On time
Running at FA

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 2 03:10Jun 2 20:1500.00.0Finished
20SUBSUB-AJun 2 19:00Jun 2 22:1000.00.0Finished
30FAFA-04Jun 2 21:05Jun 3 09:0003.00.0Running
40TBTB-04Jun 5 22:50Jun 6 12:151513.263.8Planned
50PKPK-01Jun 8 15:00Jun 8 17:50152.68.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time47 h to spare before the due date.

Order

ReferenceRP-2780
ReleasedSun May 31 06:00
DueWed Jun 10 17:00
Priority and weight3, weight 1
Touch time left19.2 h
Sequence position30

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 23 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerMon May 25 06:00On hand
WO-10260
22" Touch Monitor, grayVW-1017, Monitors
540
Warehouse stockStock replenishment
Wed Jun 17 17:00
Wed Jun 17 08:55
8.1 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 10 00:15Jun 11 18:159038.5108.5Planned
20SUBSUB-BJun 10 19:55Jun 11 20:305015.812.8Planned
30FAFA-04Jun 10 22:30Jun 15 17:054542.30.0Planned
40TBTB-03Jun 14 13:50Jun 15 23:453533.374.8Planned
50PKPK-01Jun 16 11:00Jun 17 08:551014.24.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.1 h to spare before the due date.

Order

ReferenceRP-2890
ReleasedSun May 31 06:00
DueWed Jun 17 17:00
Priority and weight3, weight 1
Touch time left148.0 h
Sequence position67

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 22 06:00On hand
Enclosure setTidewell PlasticsThu May 21 06:00On hand
Power moduleAster PowerThu May 28 06:00On hand
Display panelBrightline DisplaysFri May 29 06:00On hand
WO-10298
USB-C Dock, 100W, dual displayVW-7925, Docks & Hubs
140
Warehouse stockStock replenishment
Tue Jun 9 17:00
Mon Jun 8 12:55
28 h
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 1 06:00Jun 1 22:0500.00.0Finished
20SUBSUB-BJun 2 11:05Jun 2 13:4500.00.0Finished
30FAFA-01Jun 2 15:15Jun 2 19:4500.00.0Finished
40TBTB-02Jun 5 06:00Jun 5 09:25153.248.0Planned
50PKPK-02Jun 8 11:25Jun 8 12:55101.317.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time28 h to spare before the due date.

Order

ReferenceRP-2928
ReleasedSun May 31 06:00
DueTue Jun 9 17:00
Priority and weight3, weight 1
Touch time left4.9 h
Sequence position26

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerSat May 23 06:00On hand
WO-10341
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
30
ENGINEERINGInternal, new product build
Fri Jun 12 12:00
Tue Jun 9 18:10
2.7 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 2 06:00Jun 2 12:1000.00.0Finished
20SUBSUB-AJun 2 15:10Jun 2 16:5500.00.0Finished
30FAFA-01Jun 2 19:45Jun 2 22:5500.00.0Finished
40TBTB-03Jun 8 03:55Jun 8 08:35154.4117.9Planned
50PKPK-01Jun 9 17:20Jun 9 18:10150.623.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.7 d to spare before the due date.

Order

ReferenceNPI-510
ReleasedSun May 31 12:00
DueFri Jun 12 12:00
Priority and weight2, weight 2
Touch time left5.5 h
Sequence position41

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 21 12:00On hand
Enclosure setTidewell PlasticsMon May 25 12:00On hand
Power moduleAster PowerFri May 29 12:00On hand
SoC moduleKestrel SiliconWed May 27 12:00On hand
Display panelBrightline DisplaysThu May 28 12:00On hand
WO-10113
Mini PC, 8-core, 16GB / 512GB, grayKL-9030, Desktops
140
Warehouse stockStock replenishment
Mon Jun 15 17:00
Thu Jun 11 17:45
4.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 5 09:15Jun 8 03:259015.449.0Planned
20SUBSUB-BJun 5 21:05Jun 8 12:30507.13.2Planned
30FAFA-06Jun 8 15:25Jun 9 16:004515.87.2Planned
40TBTB-01Jun 10 06:00Jun 11 12:353530.031.4Planned
50PKPK-02Jun 11 13:20Jun 11 17:45154.20.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.0 d to spare before the due date.

Order

ReferenceRP-2743
ReleasedMon Jun 1 06:00
DueMon Jun 15 17:00
Priority and weight3, weight 1
Touch time left76.4 h
Sequence position51

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 25 06:00On hand
Enclosure setTidewell PlasticsSat May 23 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
SoC moduleKestrel SiliconTue May 26 06:00On hand
WO-10127
24-Port PoE Switch, managed, refreshLM-3668, Networking
155
Warehouse stockStock replenishment
Thu Jun 11 17:00
Tue Jun 9 13:30
2.1 d
On time
Running at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 3 02:20Jun 3 19:25012.40.0Running
20SUBSUB-CJun 3 16:50Jun 3 21:35403.64.8Planned
30FAFA-04Jun 3 19:25Jun 4 10:50457.20.0Planned
40TBTB-02Jun 6 21:25Jun 7 10:403512.770.7Planned
50PKPK-02Jun 9 10:40Jun 9 13:30152.620.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.1 d to spare before the due date.

Order

ReferenceRP-2757
ReleasedMon Jun 1 06:00
DueThu Jun 11 17:00
Priority and weight3, weight 1
Touch time left40.7 h
Sequence position36

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri May 29 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerFri May 29 06:00On hand
SoC moduleKestrel SiliconFri May 22 06:00On hand
WO-10198
Chromebook 11", 4GB / 64GBNB-7136, Laptops
240
Warehouse stockStock replenishment
Tue Jun 16 17:00
Mon Jun 15 14:20
27 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 8 20:10Jun 10 02:209027.481.7Planned
20SUBSUB-AJun 9 22:00Jun 10 14:45508.415.0Planned
30FAFA-03Jun 10 07:55Jun 11 11:202518.50.0Planned
40TBTB-02Jun 12 06:00Jun 13 17:153534.741.0Planned
50PKPK-01Jun 15 09:35Jun 15 14:20104.13.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time27 h to spare before the due date.

Order

ReferenceRP-2828
ReleasedMon Jun 1 06:00
DueTue Jun 16 17:00
Priority and weight3, weight 1
Touch time left96.6 h
Sequence position58

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 27 06:00On hand
Enclosure setTidewell PlasticsFri May 22 06:00On hand
Power moduleAster PowerWed May 27 06:00On hand
SoC moduleKestrel SiliconMon May 25 06:00On hand
Display panelBrightline DisplaysMon May 25 06:00On hand
WO-10265
24-Port PoE Switch, managedVW-1670, Networking
125
Warehouse stockStock replenishment
Thu Jun 11 17:00
Tue Jun 9 18:25
47 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 4 03:25Jun 4 17:259012.020.2Frozen
20SUBSUB-CJun 4 15:55Jun 4 20:05502.85.4Planned
30FAFA-02Jun 4 18:10Jun 5 08:00455.60.0Planned
40TBTB-02Jun 7 10:40Jun 7 20:40159.860.8Planned
50PKPK-02Jun 9 16:10Jun 9 18:25152.025.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time47 h to spare before the due date.

Order

ReferenceRP-2895
ReleasedMon Jun 1 06:00
DueThu Jun 11 17:00
Priority and weight3, weight 1
Touch time left35.8 h
Sequence position40

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 23 06:00On hand
Enclosure setTidewell PlasticsSat May 23 06:00On hand
Power moduleAster PowerFri May 22 06:00On hand
SoC moduleKestrel SiliconWed May 27 06:00On hand
WO-10006
Thin Client, 4GB / 32GB, grayAF-4236, Desktops
155
Warehouse stockStock replenishment
Tue Jun 16 17:00
Mon Jun 15 10:35
30 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 8 03:25Jun 8 20:109014.265.9Planned
20SUBSUB-BJun 8 15:05Jun 8 22:50406.64.6Planned
30FAFA-06Jun 9 16:00Jun 10 15:052514.713.8Planned
40TBTB-04Jun 11 23:45Jun 13 04:103527.849.8Planned
50PKPK-02Jun 15 06:00Jun 15 10:35153.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time30 h to spare before the due date.

Order

ReferenceRP-2636
ReleasedTue Jun 2 06:00
DueTue Jun 16 17:00
Priority and weight3, weight 1
Touch time left70.6 h
Sequence position55

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsSat May 30 06:00On hand
Power moduleAster PowerSun May 31 06:00On hand
SoC moduleKestrel SiliconSun May 31 06:00On hand
WO-10064
1TB NVMe SSD, refreshBP-7490, Storage
230
Warehouse stockStock replenishment
Fri Jun 12 17:00
Tue Jun 9 20:50
2.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 4 01:55Jun 4 15:359011.418.9Planned
20SUBSUB-AJun 5 13:05Jun 5 15:40501.821.9Planned
30FAFA-02Jun 5 14:35Jun 5 20:05454.20.0Planned
40TBTB-03Jun 9 05:25Jun 9 15:50359.884.8Planned
50PKPK-01Jun 9 18:10Jun 9 20:50151.91.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.8 d to spare before the due date.

Order

ReferenceRP-2694
ReleasedTue Jun 2 06:00
DueFri Jun 12 17:00
Priority and weight3, weight 1
Touch time left33.1 h
Sequence position44

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 25 06:00On hand
Enclosure setTidewell PlasticsMon May 25 06:00On hand
Power moduleAster PowerSun May 31 06:00On hand
WO-10098
Wi-Fi 6E RouterKL-3459, Networking
20
Warehouse stockStock replenishment
Wed Jun 10 17:00
Mon Jun 8 16:30
2.0 d
On time
Next at TB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 2 06:00Jun 2 09:2500.00.0Finished
20SUBSUB-BJun 2 15:30Jun 2 16:5000.00.0Finished
30FAFA-02Jun 2 20:50Jun 2 22:3000.00.0Finished
40TBTB-01Jun 5 18:35Jun 5 20:45351.660.6Planned
50PKPK-02Jun 8 15:55Jun 8 16:30150.311.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2728
ReleasedTue Jun 2 06:00
DueWed Jun 10 17:00
Priority and weight3, weight 1
Touch time left2.8 h
Sequence position29

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 27 06:00On hand
Enclosure setTidewell PlasticsSun May 24 06:00On hand
Power moduleAster PowerMon May 25 06:00On hand
SoC moduleKestrel SiliconSat May 30 06:00On hand
WO-10108
Wi-Fi 6 Access Point, ceilingKL-5384, Networking
100
Warehouse stockStock replenishment
Fri Jun 12 17:00
Wed Jun 10 08:10
2.4 d
On time
Running at SUB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 2 13:35Jun 2 22:5500.00.0Finished
20SUBSUB-CJun 2 21:20Jun 3 06:1000.20.0Running
30FAFA-06Jun 3 08:10Jun 3 12:50453.41.8Frozen
40TBTB-02Jun 9 06:00Jun 9 12:35356.0138.6Planned
50PKPK-02Jun 10 06:40Jun 10 08:10151.210.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.4 d to spare before the due date.

Order

ReferenceRP-2738
ReleasedTue Jun 2 06:00
DueFri Jun 12 17:00
Priority and weight3, weight 1
Touch time left12.4 h
Sequence position45

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 25 06:00On hand
Enclosure setTidewell PlasticsSat May 23 06:00On hand
Power moduleAster PowerThu May 28 06:00On hand
SoC moduleKestrel SiliconThu May 28 06:00On hand
WO-10122
27" QHD Monitor, 165HzLM-2177, Monitors
340
Warehouse stockStock replenishment
Wed Jun 17 17:00
Tue Jun 16 11:00
30 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 9 04:40Jun 10 05:209021.989.9Planned
20SUBSUB-CJun 10 11:05Jun 10 21:20508.916.7Planned
30FAFA-06Jun 10 17:10Jun 12 09:304524.13.7Planned
40TBTB-01Jun 13 21:40Jun 14 17:153519.071.4Planned
50PKPK-01Jun 15 19:10Jun 16 11:00158.112.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time30 h to spare before the due date.

Order

ReferenceRP-2752
ReleasedTue Jun 2 06:00
DueWed Jun 17 17:00
Priority and weight3, weight 1
Touch time left85.9 h
Sequence position64

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerFri May 29 06:00On hand
Display panelBrightline DisplaysThu May 28 06:00On hand
WO-10137
14" Laptop, 8-core, 16GB / 512GBLM-5139, Laptops
505
Warehouse stockStock replenishment
Mon Jun 22 17:00
Mon Jun 22 15:45
1.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 11 15:50Jun 16 08:509060.5146.1Planned
20SUBSUB-BJun 15 08:15Jun 16 12:105018.618.2Planned
30FAFA-03Jun 15 11:45Jun 17 21:454540.80.0Planned
40TBTB-04Jun 16 18:55Jun 20 00:003576.526.1Planned
50PKPK-01Jun 22 06:00Jun 22 15:45159.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 1.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2767
ReleasedTue Jun 2 06:00
DueMon Jun 22 17:00
Priority and weight3, weight 1
Touch time left209.2 h
Sequence position84

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 31 06:00On hand
Enclosure setTidewell PlasticsSun May 31 06:00On hand
Power moduleAster PowerSat May 30 06:00On hand
SoC moduleKestrel SiliconFri May 29 06:00On hand
Display panelBrightline DisplaysTue May 26 06:00On hand
WO-10184
8" Rugged Tablet, 64GB, grayNB-5680, Tablets
25
Warehouse stockStock replenishment
Thu Jun 11 17:00
Wed Jun 10 06:40
34 h
On time
Next at SUB

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 2 20:15Jun 3 00:4500.00.0Finished
20SUBSUB-BJun 3 06:00Jun 3 07:20250.90.0Frozen
30FAFA-04Jun 3 10:35Jun 3 13:20452.02.5Frozen
40TBTB-04Jun 9 21:20Jun 10 01:10353.2151.8Planned
50PKPK-02Jun 10 06:00Jun 10 06:40150.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time34 h to spare before the due date.

Order

ReferenceRP-2814
ReleasedTue Jun 2 06:00
DueThu Jun 11 17:00
Priority and weight3, weight 1
Touch time left8.6 h
Sequence position38

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 31 06:00On hand
Enclosure setTidewell PlasticsThu May 28 06:00On hand
Power moduleAster PowerSat May 30 06:00On hand
SoC moduleKestrel SiliconSun May 24 06:00On hand
Display panelBrightline DisplaysThu May 28 06:00On hand
WO-10204
14" Rugged Laptop, 16GB / 256GBNB-7498, Laptops
475
Warehouse stockStock replenishment
Wed Jun 24 17:00
Wed Jun 24 16:45
0.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 15 16:50Jun 18 13:459063.7192.8Planned
20SUBSUB-BJun 17 12:00Jun 18 16:205019.521.5Planned
30FAFA-06Jun 17 15:10Jun 22 10:454542.80.0Planned
40TBTB-04Jun 20 14:15Jun 23 23:203580.565.0Planned
50PKPK-01Jun 24 06:35Jun 24 16:45159.40.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2834
ReleasedTue Jun 2 06:00
DueWed Jun 24 17:00
Priority and weight3, weight 1
Touch time left219.8 h
Sequence position101

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsMon May 25 06:00On hand
Power moduleAster PowerSat May 23 06:00On hand
SoC moduleKestrel SiliconWed May 27 06:00On hand
Display panelBrightline DisplaysMon May 25 06:00On hand
WO-10294
34" Ultrawide Monitor, curvedVW-6938, Monitors
265
Warehouse stockStock replenishment
Mon Jun 15 17:00
Fri Jun 12 19:45
2.9 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 5 13:45Jun 8 08:554517.753.0Planned
20SUBSUB-AJun 8 12:20Jun 8 20:55507.210.0Planned
30FAFA-05Jun 9 12:40Jun 10 16:504519.413.8Planned
40TBTB-01Jun 11 12:35Jun 12 04:303515.343.2Planned
50PKPK-02Jun 12 12:25Jun 12 19:45156.65.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.9 d to spare before the due date.

Order

ReferenceRP-2924
ReleasedTue Jun 2 06:00
DueMon Jun 15 17:00
Priority and weight3, weight 1
Touch time left69.4 h
Sequence position54

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 27 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerWed May 27 06:00On hand
Display panelBrightline DisplaysSat May 23 06:00On hand
WO-10339
Thin Client, 4GB / 32GB, grayAF-4236, Desktops
120
ACCOUNT 3915Standard, customer build
Wed Jun 17 15:00
Mon Jun 15 19:10
44 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 8 19:50Jun 9 08:409011.181.3Planned
20SUBSUB-CJun 9 07:30Jun 9 13:55505.11.5Planned
30FAFA-04Jun 9 20:40Jun 10 16:154511.38.9Planned
40TBTB-04Jun 13 04:10Jun 14 01:551521.566.8Planned
45CFGCFG-01Jun 15 06:00Jun 15 14:20257.40.0Planned
50PKPK-01Jun 15 15:25Jun 15 19:10153.00.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time44 h to spare before the due date.

Order

ReferenceSO-71416
ReleasedTue Jun 2 06:00
DueWed Jun 17 15:00
Priority and weight4, weight 1
Touch time left63.4 h
Sequence position61

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon May 25 06:00On hand
Enclosure setTidewell PlasticsSun May 24 06:00On hand
Power moduleAster PowerThu May 28 06:00On hand
SoC moduleKestrel SiliconWed May 27 06:00On hand
WO-10165
34" Ultrawide Monitor, curved, grayLM-9032, Monitors
80
Warehouse stockStock replenishment
Fri Jun 12 17:00
Wed Jun 10 11:15
2.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 4 06:00Jun 4 15:15907.222.8Planned
20SUBSUB-CJun 5 14:05Jun 5 17:15402.517.0Planned
30FAFA-04Jun 5 22:45Jun 8 13:45456.85.7Planned
40TBTB-02Jun 9 12:35Jun 9 18:30355.325.1Planned
50PKPK-02Jun 10 08:10Jun 10 11:15152.36.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.2 d to spare before the due date.

Order

ReferenceRP-2795
ReleasedWed Jun 3 06:00
DueFri Jun 12 17:00
Priority and weight3, weight 1
Touch time left27.9 h
Sequence position46

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 30 06:00On hand
Enclosure setTidewell PlasticsFri May 29 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
Display panelBrightline DisplaysThu May 28 06:00On hand
WO-10209
4-Bay NAS Enclosure, refreshQN-2129, Storage
435
Warehouse stockStock replenishment
Mon Jun 15 17:00
Fri Jun 12 12:25
3.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 5 12:25Jun 8 09:009018.323.4Planned
20SUBSUB-AJun 8 08:10Jun 8 12:20502.88.1Planned
30FAFA-01Jun 8 09:35Jun 8 17:35456.80.0Planned
40TBTB-04Jun 11 06:05Jun 11 22:303515.866.2Planned
50PKPK-02Jun 12 08:35Jun 12 12:25153.12.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.2 d to spare before the due date.

Order

ReferenceRP-2839
ReleasedWed Jun 3 06:00
DueMon Jun 15 17:00
Priority and weight3, weight 1
Touch time left50.8 h
Sequence position53

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 24 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerSun May 24 06:00On hand
WO-10026
1TB NVMe SSDAF-7757, Storage
450
Warehouse stockStock replenishment
Mon Jun 15 17:00
Thu Jun 11 06:45
4.4 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 4 15:35Jun 5 09:151017.09.1Planned
20SUBSUB-CJun 5 17:15Jun 5 21:15502.715.1Planned
30FAFA-02Jun 5 20:05Jun 8 09:2556.21.1Planned
40TBTB-03Jun 9 15:50Jun 10 06:451514.790.7Planned
50PKPK-02Jun 10 20:40Jun 11 06:45152.812.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.4 d to spare before the due date.

Order

ReferenceRP-2656
ReleasedThu Jun 4 06:00
DueMon Jun 15 17:00
Priority and weight3, weight 1
Touch time left45.0 h
Sequence position49

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 27 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerMon May 25 06:00On hand
WO-10240
1TB NVMe SSD, grayQN-4854, Storage
300
Warehouse stockStock replenishment
Tue Jun 16 17:00
Mon Jun 15 16:25
25 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 8 09:00Jun 9 00:554514.243.2Planned
20SUBSUB-CJun 8 21:30Jun 9 07:30502.27.8Planned
30FAFA-02Jun 9 15:10Jun 9 21:40455.28.7Planned
40TBTB-01Jun 12 20:00Jun 13 08:503512.274.9Planned
50PKPK-02Jun 15 13:45Jun 15 16:25152.47.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time25 h to spare before the due date.

Order

ReferenceRP-2870
ReleasedThu Jun 4 06:00
DueTue Jun 16 17:00
Priority and weight3, weight 1
Touch time left39.4 h
Sequence position59

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsSun May 31 06:00On hand
Power moduleAster PowerMon May 25 06:00On hand
WO-10035
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
195
Warehouse stockStock replenishment
Wed Jun 17 17:00
Mon Jun 15 20:35
44 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 8 23:15Jun 10 08:154522.839.0Planned
20SUBSUB-CJun 9 19:45Jun 10 11:05507.04.2Planned
30FAFA-02Jun 9 22:40Jun 10 22:454515.30.0Planned
40TBTB-03Jun 13 08:50Jun 14 13:501528.869.7Planned
50PKPK-02Jun 15 16:25Jun 15 20:35153.49.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time44 h to spare before the due date.

Order

ReferenceRP-2665
ReleasedFri Jun 5 06:00
DueWed Jun 17 17:00
Priority and weight3, weight 1
Touch time left80.1 h
Sequence position62

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsFri May 29 06:00On hand
Power moduleAster PowerSun May 31 06:00On hand
SoC moduleKestrel SiliconTue May 26 06:00On hand
Display panelBrightline DisplaysSun May 31 06:00On hand
WO-10142
4K Conference CameraLM-5365, Peripherals
400
Warehouse stockStock replenishment
Tue Jun 16 17:00
Mon Jun 15 13:45
27 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 8 06:00Jun 8 21:309013.022.8Planned
20SUBSUB-BJun 8 22:50Jun 9 09:20502.712.2Planned
30FAFA-01Jun 9 07:15Jun 9 14:55456.40.0Planned
40TBTB-02Jun 10 12:05Jun 10 16:30353.827.0Planned
50PKPK-02Jun 15 10:35Jun 15 13:45152.941.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time27 h to spare before the due date.

Order

ReferenceRP-2772
ReleasedFri Jun 5 06:00
DueTue Jun 16 17:00
Priority and weight3, weight 1
Touch time left32.8 h
Sequence position57

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed May 27 06:00On hand
Enclosure setTidewell PlasticsWed Jun 3 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
WO-10157
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
380
Warehouse stockStock replenishment
Thu Jun 18 17:00
Wed Jun 17 07:45
33 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 10 05:20Jun 11 05:309021.467.6Planned
20SUBSUB-CJun 10 21:20Jun 11 14:00258.810.3Planned
30FAFA-05Jun 11 15:35Jun 15 07:254523.69.1Planned
40TBTB-02Jun 15 00:30Jun 15 19:403518.676.2Planned
50PKPK-02Jun 16 16:05Jun 17 07:45157.912.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time33 h to spare before the due date.

Order

ReferenceRP-2787
ReleasedFri Jun 5 06:00
DueThu Jun 18 17:00
Priority and weight3, weight 1
Touch time left83.8 h
Sequence position72

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 31 06:00On hand
Enclosure setTidewell PlasticsSun May 31 06:00On hand
Power moduleAster PowerMon Jun 1 06:00On hand
Display panelBrightline DisplaysFri May 29 06:00On hand
WO-10170
Tower Workstation, 32GB / 1TB, refreshLM-9819, Desktops
90
Warehouse stockStock replenishment
Mon Jun 15 17:00
Fri Jun 12 08:35
3.4 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 5 06:00Jun 5 18:259010.40.0Planned
20SUBSUB-CJun 5 21:15Jun 8 09:10504.16.4Planned
30FAFA-05Jun 8 19:20Jun 9 12:40459.110.7Planned
40TBTB-02Jun 11 06:00Jun 11 23:453517.245.6Planned
50PKPK-02Jun 12 06:00Jun 12 08:35102.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.4 d to spare before the due date.

Order

ReferenceRP-2800
ReleasedFri Jun 5 06:00
DueMon Jun 15 17:00
Priority and weight3, weight 1
Touch time left47.0 h
Sequence position52

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 31 06:00On hand
Enclosure setTidewell PlasticsThu May 28 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
SoC moduleKestrel SiliconSat May 30 06:00On hand
WO-10256
13" Ultralight Laptop, 16GB / 512GBQN-7885, Laptops
345
Warehouse stockStock replenishment
Fri Jun 26 17:00
Fri Jun 26 12:45
4.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 19 03:05Jun 23 04:309045.4225.1Planned
20SUBSUB-BJun 22 16:20Jun 23 15:055013.920.2Planned
30FAFA-02Jun 22 20:00Jun 24 19:204530.60.0Planned
40TBTB-03Jun 23 11:55Jun 25 21:503557.33.4Planned
50PKPK-01Jun 25 22:20Jun 26 12:45106.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2886
ReleasedFri Jun 5 06:00
DueFri Jun 26 17:00
Priority and weight3, weight 1
Touch time left157.8 h
Sequence position118

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 2 06:00On hand
Enclosure setTidewell PlasticsWed May 27 06:00On hand
Power moduleAster PowerTue May 26 06:00On hand
SoC moduleKestrel SiliconWed Jun 3 06:00On hand
Display panelBrightline DisplaysSun May 31 06:00On hand
WO-10324
22" Touch Monitor, grayVW-1017, Monitors
400
ACCOUNT 6021Standard, customer build
Fri Jun 26 15:00
Fri Jun 26 06:45
8.2 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 18 06:00Jun 19 13:309028.5205.0Planned
20SUBSUB-BJun 19 06:30Jun 19 20:005011.710.9Planned
30FAFA-04Jun 19 15:30Jun 23 15:404531.45.9Planned
40TBTB-01Jun 22 18:05Jun 23 19:001524.769.1Planned
45CFGCFG-02Jun 23 19:30Jun 25 12:102524.80.0Planned
50PKPK-02Jun 25 12:30Jun 26 06:451010.60.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.2 h to spare before the due date.

Order

ReferenceSO-71221
ReleasedFri Jun 5 06:00
DueFri Jun 26 15:00
Priority and weight4, weight 1
Touch time left135.5 h
Sequence position113

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue May 26 06:00On hand
Enclosure setTidewell PlasticsThu May 28 06:00On hand
Power moduleAster PowerMon Jun 1 06:00On hand
Display panelBrightline DisplaysTue May 26 06:00On hand
WO-10088
12" Pro Tablet, 256GBKL-2075, Tablets
190
Warehouse stockStock replenishment
Fri Jun 19 17:00
Wed Jun 17 13:50
2.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 10 16:20Jun 11 15:509020.862.1Planned
20SUBSUB-CJun 11 14:00Jun 11 21:45506.47.5Planned
30FAFA-02Jun 11 16:55Jun 12 15:254513.80.1Planned
40TBTB-02Jun 15 19:40Jun 16 18:453522.593.6Planned
50PKPK-01Jun 17 10:45Jun 17 13:50152.88.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.1 d to spare before the due date.

Order

ReferenceRP-2718
ReleasedSat Jun 6 06:00
DueFri Jun 19 17:00
Priority and weight3, weight 1
Touch time left70.2 h
Sequence position77

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 4 06:00On hand
Enclosure setTidewell PlasticsTue Jun 2 06:00On hand
Power moduleAster PowerSat May 30 06:00On hand
SoC moduleKestrel SiliconSun May 31 06:00On hand
Display panelBrightline DisplaysSat May 30 06:00On hand
WO-10093
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
90
Warehouse stockStock replenishment
Tue Jun 16 17:00
Fri Jun 12 22:30
3.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 8 08:55Jun 8 23:159011.89.7Planned
20SUBSUB-AJun 8 20:55Jun 9 08:25503.72.4Planned
30FAFA-03Jun 9 07:05Jun 9 16:00258.00.0Planned
40TBTB-01Jun 12 04:30Jun 12 20:003514.963.8Planned
50PKPK-02Jun 12 20:30Jun 12 22:30151.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.8 d to spare before the due date.

Order

ReferenceRP-2723
ReleasedSat Jun 6 06:00
DueTue Jun 16 17:00
Priority and weight3, weight 1
Touch time left43.8 h
Sequence position56

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerThu Jun 4 06:00On hand
SoC moduleKestrel SiliconWed May 27 06:00On hand
Display panelBrightline DisplaysSat May 30 06:00On hand
WO-10274
Wi-Fi 6E Router, grayVW-2128, Networking
50
Warehouse stockStock replenishment
Tue Jun 16 17:00
Mon Jun 15 15:25
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 8 06:00Jun 8 13:55905.96.8Planned
20SUBSUB-AJun 9 08:25Jun 9 10:55501.210.5Planned
30FAFA-01Jun 9 14:55Jun 9 18:00452.33.8Planned
40TBTB-02Jun 10 16:30Jun 10 21:10354.122.2Planned
50PKPK-01Jun 15 14:20Jun 15 15:25150.841.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2904
ReleasedSat Jun 6 06:00
DueTue Jun 16 17:00
Priority and weight3, weight 1
Touch time left18.2 h
Sequence position60

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 30 06:00On hand
Enclosure setTidewell PlasticsMon Jun 1 06:00On hand
Power moduleAster PowerThu Jun 4 06:00On hand
SoC moduleKestrel SiliconMon Jun 1 06:00On hand
WO-10045
24" FHD Monitor, IPSBP-5281, Monitors
280
Warehouse stockStock replenishment
Fri Jun 19 17:00
Wed Jun 17 16:40
2.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 10 08:15Jun 11 03:309016.546.5Planned
20SUBSUB-AJun 11 10:50Jun 11 18:25506.813.1Planned
30FAFA-06Jun 12 09:30Jun 15 12:352518.212.8Planned
40TBTB-04Jun 15 06:00Jun 15 20:553514.364.1Planned
50PKPK-02Jun 17 09:50Jun 17 16:40156.121.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2675
ReleasedSun Jun 7 06:00
DueFri Jun 19 17:00
Priority and weight3, weight 1
Touch time left65.4 h
Sequence position76

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 3 06:00On hand
Enclosure setTidewell PlasticsWed Jun 3 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
Display panelBrightline DisplaysSat May 30 06:00On hand
WO-10103
1080p Webcam with micKL-5125, Peripherals
350
Warehouse stockStock replenishment
Thu Jun 18 17:00
Tue Jun 16 16:05
2.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 10 02:25Jun 10 16:209011.748.9Planned
20SUBSUB-AJun 10 19:45Jun 10 23:00502.412.4Planned
30FAFA-05Jun 11 08:35Jun 11 15:35455.84.3Planned
40TBTB-04Jun 14 20:50Jun 15 00:30153.481.9Planned
50PKPK-02Jun 16 13:15Jun 16 16:05152.622.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2733
ReleasedSun Jun 7 06:00
DueThu Jun 18 17:00
Priority and weight3, weight 1
Touch time left29.4 h
Sequence position71

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsWed Jun 3 06:00On hand
Power moduleAster PowerFri Jun 5 06:00On hand
WO-10132
8" Rugged Tablet, 64GB, grayLM-5109, Tablets
140
Warehouse stockStock replenishment
Fri Jun 19 17:00
Wed Jun 17 16:20
2.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 10 21:10Jun 11 16:359017.266.4Planned
20SUBSUB-BJun 11 20:30Jun 12 09:35505.213.5Planned
30FAFA-01Jun 12 06:30Jun 12 19:354511.30.0Planned
40TBTB-04Jun 15 23:45Jun 16 18:553518.683.7Planned
50PKPK-01Jun 17 13:50Jun 17 16:20102.310.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2762
ReleasedSun Jun 7 06:00
DueFri Jun 19 17:00
Priority and weight3, weight 1
Touch time left58.5 h
Sequence position78

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 2 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
SoC moduleKestrel SiliconFri May 29 06:00On hand
Display panelBrightline DisplaysSun May 31 06:00On hand
WO-10189
KVM Switch, 2-port 4K, grayNB-7003, Docks & Hubs
340
Warehouse stockStock replenishment
Fri Jun 19 17:00
Wed Jun 17 20:55
44 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 11 03:30Jun 12 16:459034.272.5Planned
20SUBSUB-AJun 12 12:00Jun 12 18:05505.216.9Planned
30FAFA-03Jun 12 13:55Jun 15 07:20259.50.0Planned
40TBTB-01Jun 16 00:40Jun 16 10:35359.380.7Planned
50PKPK-01Jun 17 16:20Jun 17 20:55153.821.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time44 h to spare before the due date.

Order

ReferenceRP-2819
ReleasedSun Jun 7 06:00
DueFri Jun 19 17:00
Priority and weight3, weight 1
Touch time left65.8 h
Sequence position79

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu May 28 06:00On hand
Enclosure setTidewell PlasticsFri May 29 06:00On hand
Power moduleAster PowerSat May 30 06:00On hand
WO-10221
8-Port Gigabit SwitchQN-4070, Networking
160
Warehouse stockStock replenishment
Wed Jun 17 17:00
Tue Jun 16 08:35
32 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 9 06:00Jun 10 02:254518.729.5Planned
20SUBSUB-AJun 10 14:45Jun 10 19:45503.717.2Planned
30FAFA-05Jun 10 17:00Jun 11 08:35457.30.0Planned
40TBTB-02Jun 14 07:40Jun 14 20:501512.982.8Planned
50PKPK-02Jun 15 22:45Jun 16 08:35102.715.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time32 h to spare before the due date.

Order

ReferenceRP-2851
ReleasedSun Jun 7 06:00
DueWed Jun 17 17:00
Priority and weight3, weight 1
Touch time left48.0 h
Sequence position66

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 30 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerThu Jun 4 06:00On hand
SoC moduleKestrel SiliconWed Jun 3 06:00On hand
WO-10231
15" Laptop, 12-core, 32GB / 1TB, grayQN-4418, Laptops
110
Warehouse stockStock replenishment
Fri Jun 19 17:00
Wed Jun 17 19:20
46 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 11 05:30Jun 11 20:459012.866.5Planned
20SUBSUB-AJun 11 18:25Jun 12 06:40503.94.6Planned
30FAFA-02Jun 12 15:25Jun 15 08:15458.610.1Planned
40TBTB-03Jun 16 06:00Jun 16 22:403516.181.2Planned
50PKPK-02Jun 17 16:40Jun 17 19:20151.910.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time46 h to spare before the due date.

Order

ReferenceRP-2861
ReleasedSun Jun 7 06:00
DueFri Jun 19 17:00
Priority and weight3, weight 1
Touch time left47.2 h
Sequence position80

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 30 06:00On hand
Enclosure setTidewell PlasticsSat May 30 06:00On hand
Power moduleAster PowerSun May 31 06:00On hand
SoC moduleKestrel SiliconThu May 28 06:00On hand
Display panelBrightline DisplaysMon Jun 1 06:00On hand
WO-10311
27" 4K Monitor, USB-C, refreshBP-5748, Monitors
400
ACCOUNT 7463Gold, customer build
Thu Jun 25 15:00
Wed Jun 24 08:25
31 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 16 08:30Jun 17 11:259023.7146.0Planned
20SUBSUB-CJun 16 19:20Jun 17 13:10409.74.8Planned
30FAFA-05Jun 17 12:50Jun 19 06:452526.07.8Planned
40TBTB-01Jun 19 18:35Jun 20 15:403520.549.8Planned
45CFGCFG-01Jun 22 06:00Jun 23 15:402524.80.0Planned
50PKPK-02Jun 23 16:00Jun 24 08:25108.80.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time31 h to spare before the due date.

Order

ReferenceSO-71052
ReleasedSun Jun 7 06:00
DueThu Jun 25 15:00
Priority and weight2, weight 3
Touch time left117.1 h
Sequence position104

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 30 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerThu May 28 06:00On hand
Display panelBrightline DisplaysThu Jun 4 06:00On hand
WO-10342
Chromebook 11", 4GB / 64GB, refreshKL-1625, Laptops
30
ENGINEERINGInternal, new product build
Fri Jun 19 12:00
Wed Jun 17 09:50
2.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 10 06:00Jun 10 12:30904.552.2Planned
20SUBSUB-AJun 11 08:20Jun 11 10:50501.211.8Planned
30FAFA-02Jun 11 13:35Jun 11 16:55452.62.5Planned
40TBTB-01Jun 15 06:00Jun 15 11:25354.884.8Planned
50PKPK-02Jun 17 09:00Jun 17 09:50150.629.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.1 d to spare before the due date.

Order

ReferenceNPI-511
ReleasedSun Jun 7 12:00
DueFri Jun 19 12:00
Priority and weight2, weight 2
Touch time left17.6 h
Sequence position75

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 31 12:00On hand
Enclosure setTidewell PlasticsWed Jun 3 12:00On hand
Power moduleAster PowerMon Jun 1 12:00On hand
SoC moduleKestrel SiliconSun May 31 12:00On hand
Display panelBrightline DisplaysFri Jun 5 12:00On hand
WO-10059
128GB USB Flash Drive, 10-packBP-7439, Storage
110
Warehouse stockStock replenishment
Thu Jun 18 17:00
Tue Jun 16 13:15
2.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 10 02:20Jun 10 09:00904.942.1Planned
20SUBSUB-BJun 10 15:05Jun 10 16:45500.87.8Planned
30FAFA-02Jun 11 11:00Jun 11 13:35451.810.4Planned
40TBTB-01Jun 14 20:15Jun 15 01:10354.379.4Planned
50PKPK-02Jun 16 12:15Jun 16 13:15100.821.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.2 d to spare before the due date.

Order

ReferenceRP-2689
ReleasedMon Jun 8 06:00
DueThu Jun 18 17:00
Priority and weight3, weight 1
Touch time left16.6 h
Sequence position70

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 1 06:00On hand
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerFri Jun 5 06:00On hand
WO-10078
Thin Client, 4GB / 32GB, grayKL-1432, Desktops
20
Warehouse stockStock replenishment
Wed Jun 17 17:00
Mon Jun 15 21:25
44 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 9 00:55Jun 9 04:40902.017.9Planned
20SUBSUB-BJun 9 09:20Jun 9 11:35500.93.3Planned
30FAFA-06Jun 10 15:05Jun 10 17:1052.019.2Planned
40TBTB-01Jun 13 17:15Jun 13 21:40353.871.8Planned
50PKPK-02Jun 15 20:35Jun 15 21:25150.613.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time44 h to spare before the due date.

Order

ReferenceRP-2708
ReleasedMon Jun 8 06:00
DueWed Jun 17 17:00
Priority and weight3, weight 1
Touch time left12.6 h
Sequence position63

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 5 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerFri May 29 06:00On hand
SoC moduleKestrel SiliconWed Jun 3 06:00On hand
WO-10179
Wi-Fi 6 Access Point, ceiling, refreshNB-4322, Networking
75
Warehouse stockStock replenishment
Wed Jun 17 17:00
Mon Jun 15 22:45
42 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 9 06:00Jun 9 14:20906.322.8Planned
20SUBSUB-BJun 9 13:30Jun 9 15:50501.50.8Planned
30FAFA-04Jun 10 16:15Jun 10 20:25452.916.7Planned
40TBTB-02Jun 14 01:55Jun 14 07:40355.278.2Planned
50PKPK-02Jun 15 21:25Jun 15 22:45151.114.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time42 h to spare before the due date.

Order

ReferenceRP-2809
ReleasedMon Jun 8 06:00
DueWed Jun 17 17:00
Priority and weight3, weight 1
Touch time left20.9 h
Sequence position65

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 3 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerFri Jun 5 06:00On hand
SoC moduleKestrel SiliconFri Jun 5 06:00On hand
WO-10303
Mechanical Keyboard, TKLVW-8762, Peripherals
260
Warehouse stockStock replenishment
Wed Jun 17 17:00
Tue Jun 16 11:10
30 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 9 08:40Jun 9 19:20908.225.4Planned
20SUBSUB-AJun 9 17:40Jun 9 20:40501.74.9Planned
30FAFA-02Jun 10 22:45Jun 11 11:00454.019.2Planned
40TBTB-04Jun 14 17:15Jun 14 20:15352.481.7Planned
50PKPK-02Jun 16 08:35Jun 16 11:10151.818.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time30 h to spare before the due date.

Order

ReferenceRP-2933
ReleasedMon Jun 8 06:00
DueWed Jun 17 17:00
Priority and weight3, weight 1
Touch time left22.0 h
Sequence position68

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 2 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerFri Jun 5 06:00On hand
WO-10308
All-in-One 24", 16GB / 512GB, grayKL-2287, Desktops
300
ACCOUNT 5190Silver, customer build
Tue Jun 30 15:00
Tue Jun 30 18:00
3.0 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 22 05:15Jun 23 14:359030.1120.0Planned
20SUBSUB-CJun 23 08:20Jun 24 06:504013.812.0Planned
30FAFA-04Jun 24 07:00Jun 26 06:202530.911.4Planned
40TBTB-02Jun 25 19:55Jun 28 06:501558.730.6Planned
45CFGCFG-01Jun 29 06:00Jun 30 09:002518.60.0Planned
50PKPK-01Jun 30 09:15Jun 30 18:00158.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 120 working hours at SMT.
  • SMT-01 has a 39 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Mon Jun 22 18:00.

Order

ReferenceSO-71013
ReleasedMon Jun 8 06:00
DueTue Jun 30 15:00
Priority and weight3, weight 2
Touch time left163.6 h
Sequence position127

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat May 30 06:00On hand
Enclosure setTidewell PlasticsSun Jun 14 14:00In transit
Power moduleAster PowerMon Jun 1 06:00On hand
SoC moduleKestrel SiliconThu Jun 4 06:00On hand
WO-10016
4-Bay NAS Enclosure, grayAF-5514, Storage
120
Warehouse stockStock replenishment
Thu Jun 18 17:00
Tue Jun 16 12:15
2.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 15 10:30Jun 15 16:50904.80.0Planned
20SUBSUB-AJun 15 16:15Jun 15 17:40400.81.7Planned
30FAFA-01Jun 15 17:30Jun 15 20:35451.80.0Planned
40TBTB-01Jun 15 19:50Jun 16 00:40354.20.0Planned
50PKPK-02Jun 16 11:10Jun 16 12:15150.84.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.2 d to spare before the due date.

Order

ReferenceRP-2646
ReleasedTue Jun 9 06:00
DueThu Jun 18 17:00
Priority and weight3, weight 1
Touch time left16.2 h
Sequence position69

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun May 31 06:00On hand
Enclosure setTidewell PlasticsMon Jun 15 10:00In transit
Power moduleAster PowerFri Jun 5 06:00On hand
WO-10284
USB-C Travel Hub, 7-in-1VW-4303, Docks & Hubs
100
Warehouse stockStock replenishment
Thu Jun 18 17:00
Wed Jun 17 10:45
30 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 10 09:00Jun 10 21:10909.725.8Planned
20SUBSUB-AJun 11 06:00Jun 11 08:20501.56.2Planned
30FAFA-03Jun 11 14:20Jun 11 17:45452.76.0Planned
40TBTB-01Jun 15 02:45Jun 15 06:00352.782.1Planned
50PKPK-01Jun 17 08:55Jun 17 10:45151.134.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time30 h to spare before the due date.

Order

ReferenceRP-2914
ReleasedTue Jun 9 06:00
DueThu Jun 18 17:00
Priority and weight3, weight 1
Touch time left21.5 h
Sequence position74

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 3 06:00On hand
Enclosure setTidewell PlasticsMon Jun 1 06:00On hand
Power moduleAster PowerFri Jun 5 06:00On hand
WO-10041
KVM Switch, 2-port 4KBP-5055, Docks & Hubs
630
Warehouse stockStock replenishment
Thu Jun 25 17:00
Mon Jun 22 22:30
2.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 16 08:50Jun 18 20:009054.294.1Planned
20SUBSUB-AJun 18 11:30Jun 18 21:10508.327.8Planned
30FAFA-03Jun 18 13:15Jun 19 13:004515.00.0Planned
40TBTB-03Jun 19 23:05Jun 20 14:051514.831.6Planned
50PKPK-01Jun 22 15:45Jun 22 22:30156.09.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.8 d to spare before the due date.

Order

ReferenceRP-2671
ReleasedWed Jun 10 06:00
DueThu Jun 25 17:00
Priority and weight3, weight 1
Touch time left101.8 h
Sequence position105

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 1 06:00On hand
Enclosure setTidewell PlasticsTue Jun 2 06:00On hand
Power moduleAster PowerSat Jun 6 06:00On hand
WO-10158
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
365
Warehouse stockStock replenishment
Thu Jun 25 17:00
Tue Jun 23 15:50
2.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 18 05:45Jun 19 04:509020.6136.5Planned
20SUBSUB-CJun 18 21:20Jun 19 14:05508.49.8Planned
30FAFA-05Jun 19 06:45Jun 22 14:202522.70.2Planned
40TBTB-01Jun 21 22:40Jun 22 17:053517.859.6Planned
50PKPK-02Jun 23 07:30Jun 23 15:50157.66.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2788
ReleasedWed Jun 10 06:00
DueThu Jun 25 17:00
Priority and weight3, weight 1
Touch time left80.7 h
Sequence position108

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 6 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerMon Jun 1 06:00On hand
Display panelBrightline DisplaysWed Jun 3 06:00On hand
WO-10246
Thunderbolt Dock, 4 portsQN-5393, Docks & Hubs
410
Warehouse stockStock replenishment
Wed Jun 24 17:00
Mon Jun 22 13:10
2.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 16 05:25Jun 18 00:554540.590.7Planned
20SUBSUB-CJun 18 06:00Jun 18 13:35506.226.3Planned
30FAFA-02Jun 18 07:55Jun 18 20:504511.20.0Planned
40TBTB-03Jun 19 11:30Jun 19 23:053511.024.7Planned
50PKPK-02Jun 22 07:55Jun 22 13:10154.51.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.2 d to spare before the due date.

Order

ReferenceRP-2876
ReleasedWed Jun 10 06:00
DueWed Jun 24 17:00
Priority and weight3, weight 1
Touch time left76.6 h
Sequence position102

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 6 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerThu Jun 4 06:00On hand
WO-10250
4K Conference Camera, grayQN-6249, Peripherals
125
Warehouse stockStock replenishment
Thu Jun 18 17:00
Wed Jun 17 09:00
32 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 10 06:00Jun 10 12:30904.50.0Planned
20SUBSUB-BJun 10 16:45Jun 10 18:30500.96.4Planned
30FAFA-03Jun 11 11:20Jun 11 14:20452.29.1Planned
40TBTB-04Jun 15 01:10Jun 15 02:45151.383.9Planned
50PKPK-02Jun 17 07:45Jun 17 09:00151.033.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time32 h to spare before the due date.

Order

ReferenceRP-2880
ReleasedWed Jun 10 06:00
DueThu Jun 18 17:00
Priority and weight3, weight 1
Touch time left13.6 h
Sequence position73

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 3 06:00On hand
Enclosure setTidewell PlasticsMon Jun 1 06:00On hand
Power moduleAster PowerThu Jun 4 06:00On hand
WO-10318
34" Ultrawide Monitor, curved, grayLM-9032, Monitors
400
ACCOUNT 3915Standard, customer build
Thu Jul 2 15:00
Thu Jul 2 17:50
2.8 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 24 04:55Jun 25 14:509030.7226.9Planned
20SUBSUB-BJun 24 21:50Jun 25 19:105012.510.1Planned
30FAFA-04Jun 26 06:20Jun 30 08:504533.814.8Planned
40TBTB-04Jun 29 09:15Jun 30 12:253526.669.2Planned
45CFGCFG-01Jun 30 12:55Jul 1 22:352524.80.0Planned
50PKPK-02Jul 1 22:50Jul 2 17:501011.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 227 working hours at SMT.
  • SMT-07 has a 40 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jun 17 18:20.

Order

ReferenceSO-71143
ReleasedWed Jun 10 06:00
DueThu Jul 2 15:00
Priority and weight4, weight 1
Touch time left143.8 h
Sequence position142

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 4 06:00On hand
Enclosure setTidewell PlasticsTue Jun 2 06:00On hand
Power moduleAster PowerSun May 31 06:00On hand
Display panelBrightline DisplaysMon Jun 1 06:00On hand
WO-10319
All-in-One 24", 16GB / 512GB, grayKL-2287, Desktops
120
ACCOUNT 9148Standard, customer build
Mon Jun 22 15:00
Thu Jun 18 07:25
4.3 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 11 06:00Jun 11 20:359012.122.8Planned
20SUBSUB-CJun 11 21:45Jun 12 11:40505.67.7Planned
30FAFA-05Jun 15 07:25Jun 15 21:354512.415.2Planned
40TBTB-01Jun 16 10:35Jun 17 10:403523.520.4Planned
45CFGCFG-01Jun 17 11:10Jun 17 19:30257.40.0Planned
50PKPK-01Jun 17 20:55Jun 18 07:25153.21.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.3 d to spare before the due date.

Order

ReferenceSO-71156
ReleasedWed Jun 10 06:00
DueMon Jun 22 15:00
Priority and weight4, weight 1
Touch time left68.6 h
Sequence position81

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 4 06:00On hand
Enclosure setTidewell PlasticsMon Jun 1 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
SoC moduleKestrel SiliconFri Jun 5 06:00On hand
WO-10050
27" 4K Monitor, USB-C, refreshBP-5748, Monitors
215
Warehouse stockStock replenishment
Mon Jun 22 17:00
Thu Jun 18 11:05
4.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 11 16:35Jun 12 07:209012.810.1Planned
20SUBSUB-CJun 12 11:40Jun 12 17:45505.26.1Planned
30FAFA-06Jun 15 12:35Jun 16 11:002514.014.6Planned
40TBTB-02Jun 16 18:45Jun 17 06:203511.026.2Planned
50PKPK-02Jun 17 22:35Jun 18 11:05154.814.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.2 d to spare before the due date.

Order

ReferenceRP-2680
ReleasedThu Jun 11 06:00
DueMon Jun 22 17:00
Priority and weight3, weight 1
Touch time left51.3 h
Sequence position83

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 7 06:00On hand
Enclosure setTidewell PlasticsTue Jun 2 06:00On hand
Power moduleAster PowerMon Jun 1 06:00On hand
Display panelBrightline DisplaysTue Jun 2 06:00On hand
WO-10194
10" Tablet, 64GBNB-7024, Tablets
125
Warehouse stockStock replenishment
Mon Jun 22 17:00
Thu Jun 18 09:25
4.3 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 11 20:45Jun 12 11:259012.713.8Planned
20SUBSUB-BJun 12 09:35Jun 12 14:40403.93.6Planned
30FAFA-02Jun 15 08:15Jun 15 17:55458.412.2Planned
40TBTB-03Jun 17 06:00Jun 17 20:203513.840.8Planned
50PKPK-01Jun 18 07:25Jun 18 09:25151.83.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.3 d to spare before the due date.

Order

ReferenceRP-2824
ReleasedThu Jun 11 06:00
DueMon Jun 22 17:00
Priority and weight3, weight 1
Touch time left44.2 h
Sequence position85

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 7 06:00On hand
Enclosure setTidewell PlasticsTue Jun 2 06:00On hand
Power moduleAster PowerFri Jun 5 06:00On hand
SoC moduleKestrel SiliconTue Jun 9 06:00On hand
Display panelBrightline DisplaysTue Jun 2 06:00On hand
WO-10210
4-Bay NAS Enclosure, refreshQN-2129, Storage
485
Warehouse stockStock replenishment
Mon Jun 22 17:00
Fri Jun 19 09:40
3.3 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 17 10:30Jun 18 07:501020.40.0Planned
20SUBSUB-AJun 17 22:35Jun 18 09:35503.28.8Planned
30FAFA-01Jun 18 07:00Jun 18 15:0557.50.0Planned
40TBTB-01Jun 18 08:10Jun 19 02:253517.70.0Planned
50PKPK-02Jun 19 06:00Jun 19 09:40153.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.3 d to spare before the due date.

Order

ReferenceRP-2840
ReleasedThu Jun 11 06:00
DueMon Jun 22 17:00
Priority and weight3, weight 1
Touch time left54.1 h
Sequence position86

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 17 10:00In transit
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
WO-10270
Thin Client, 4GB / 32GBVW-2014, Desktops
40
Warehouse stockStock replenishment
Mon Jun 22 17:00
Thu Jun 18 12:30
4.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 15 10:30Jun 15 15:45454.50.0Planned
20SUBSUB-CJun 15 16:25Jun 15 19:40402.10.2Planned
30FAFA-05Jun 15 21:35Jun 16 09:35254.61.7Planned
40TBTB-01Jun 17 10:40Jun 17 19:35158.724.8Planned
50PKPK-01Jun 18 11:05Jun 18 12:30101.27.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.2 d to spare before the due date.

Order

ReferenceRP-2900
ReleasedThu Jun 11 06:00
DueMon Jun 22 17:00
Priority and weight3, weight 1
Touch time left23.3 h
Sequence position88

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 1 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerSat Jun 6 06:00On hand
SoC moduleKestrel SiliconMon Jun 15 10:00In transit
WO-10002
Ergonomic Mouse, wireless, grayAF-4219, Peripherals
370
Warehouse stockStock replenishment
Mon Jun 22 17:00
Wed Jun 17 22:35
4.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 12 06:00Jun 12 21:459013.20.0Planned
20SUBSUB-AJun 12 19:05Jun 12 22:40502.88.2Planned
30FAFA-01Jun 12 20:35Jun 15 11:20456.50.0Planned
40TBTB-01Jun 15 11:25Jun 15 15:50353.860.9Planned
50PKPK-02Jun 17 19:20Jun 17 22:35153.034.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.8 d to spare before the due date.

Order

ReferenceRP-2632
ReleasedFri Jun 12 06:00
DueMon Jun 22 17:00
Priority and weight3, weight 1
Touch time left33.2 h
Sequence position82

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 10 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerMon Jun 8 06:00On hand
WO-10031
Mesh Wi-Fi Kit, 3-pack, refreshAF-9913, Networking
200
Warehouse stockStock replenishment
Tue Jun 23 17:00
Thu Jun 18 15:40
5.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 12 06:00Jun 15 01:559017.40.0Planned
20SUBSUB-CJun 12 19:10Jun 15 07:00504.05.8Planned
30FAFA-02Jun 15 17:55Jun 16 14:40458.013.2Planned
40TBTB-02Jun 17 13:30Jun 18 04:153514.240.1Planned
50PKPK-01Jun 18 12:30Jun 18 15:40152.96.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time5.1 d to spare before the due date.

Order

ReferenceRP-2661
ReleasedFri Jun 12 06:00
DueTue Jun 23 17:00
Priority and weight3, weight 1
Touch time left50.4 h
Sequence position89

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 2 06:00On hand
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerThu Jun 4 06:00On hand
SoC moduleKestrel SiliconWed Jun 10 06:00On hand
WO-10084
Chromebook 11", 4GB / 64GB, refreshKL-1625, Laptops
165
Warehouse stockStock replenishment
Thu Jun 25 17:00
Mon Jun 22 21:35
2.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 17 06:05Jun 18 05:459020.968.3Planned
20SUBSUB-CJun 18 13:35Jun 18 21:20506.414.6Planned
30FAFA-04Jun 18 16:40Jun 19 15:304514.10.0Planned
40TBTB-03Jun 20 14:05Jun 21 17:053526.439.6Planned
50PKPK-02Jun 22 17:45Jun 22 21:35153.111.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.8 d to spare before the due date.

Order

ReferenceRP-2714
ReleasedFri Jun 12 06:00
DueThu Jun 25 17:00
Priority and weight3, weight 1
Touch time left74.8 h
Sequence position106

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 4 06:00On hand
Enclosure setTidewell PlasticsTue Jun 2 06:00On hand
Power moduleAster PowerSun Jun 7 06:00On hand
SoC moduleKestrel SiliconSat Jun 6 06:00On hand
Display panelBrightline DisplaysSat Jun 6 06:00On hand
WO-10118
14" Laptop, 8-core, 16GB / 512GB, grayKL-9462, Laptops
90
Warehouse stockStock replenishment
Tue Jun 23 17:00
Fri Jun 19 07:05
4.4 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 12 07:20Jun 12 22:559013.11.3Planned
20SUBSUB-AJun 15 08:25Jun 15 13:45504.07.8Planned
30FAFA-04Jun 15 21:50Jun 16 14:55458.89.1Planned
40TBTB-02Jun 18 04:15Jun 18 21:203516.541.0Planned
50PKPK-01Jun 18 21:50Jun 19 07:05152.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.4 d to spare before the due date.

Order

ReferenceRP-2748
ReleasedFri Jun 12 06:00
DueTue Jun 23 17:00
Priority and weight3, weight 1
Touch time left48.3 h
Sequence position91

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 7 06:00On hand
Enclosure setTidewell PlasticsSun Jun 7 06:00On hand
Power moduleAster PowerWed Jun 3 06:00On hand
SoC moduleKestrel SiliconWed Jun 10 06:00On hand
Display panelBrightline DisplaysWed Jun 10 06:00On hand
WO-10143
4K Conference CameraLM-5365, Peripherals
410
Warehouse stockStock replenishment
Tue Jun 23 17:00
Thu Jun 18 19:25
4.9 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 12 06:00Jun 15 00:109015.70.0Planned
20SUBSUB-CJun 15 07:00Jun 15 11:05502.813.1Planned
30FAFA-05Jun 16 09:35Jun 16 17:25456.617.1Planned
40TBTB-03Jun 18 10:40Jun 18 15:10353.946.8Planned
50PKPK-02Jun 18 15:40Jun 18 19:25153.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.9 d to spare before the due date.

Order

ReferenceRP-2773
ReleasedFri Jun 12 06:00
DueTue Jun 23 17:00
Priority and weight3, weight 1
Touch time left35.8 h
Sequence position92

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 7 06:00On hand
Enclosure setTidewell PlasticsWed Jun 10 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
WO-10199
Chromebook 11", 4GB / 64GBNB-7136, Laptops
305
Warehouse stockStock replenishment
Tue Jun 30 17:00
Mon Jun 29 14:50
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 23 04:30Jun 24 19:059034.8158.0Planned
20SUBSUB-BJun 24 09:20Jun 24 21:505010.713.1Planned
30FAFA-01Jun 24 13:35Jun 25 22:204523.50.9Planned
40TBTB-01Jun 26 15:15Jun 28 11:503544.044.8Planned
50PKPK-02Jun 29 09:00Jun 29 14:50105.23.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2829
ReleasedFri Jun 12 06:00
DueTue Jun 30 17:00
Priority and weight3, weight 1
Touch time left122.0 h
Sequence position132

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 3 06:00On hand
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerSun Jun 7 06:00On hand
SoC moduleKestrel SiliconWed Jun 3 06:00On hand
Display panelBrightline DisplaysThu Jun 4 06:00On hand
WO-10217
USB-C Travel Hub, 7-in-1, grayQN-2461, Docks & Hubs
180
Warehouse stockStock replenishment
Tue Jun 23 17:00
Fri Jun 19 09:20
4.3 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 15 00:10Jun 15 19:504517.717.2Planned
20SUBSUB-CJun 15 19:40Jun 16 06:15502.812.1Planned
30FAFA-02Jun 16 14:40Jun 16 20:50454.95.6Planned
40TBTB-03Jun 18 15:10Jun 18 20:35354.846.1Planned
50PKPK-01Jun 19 07:05Jun 19 09:20152.03.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.3 d to spare before the due date.

Order

ReferenceRP-2847
ReleasedFri Jun 12 06:00
DueTue Jun 23 17:00
Priority and weight3, weight 1
Touch time left35.3 h
Sequence position94

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 3 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerWed Jun 10 06:00On hand
WO-10280
Ergonomic Mouse, wirelessVW-4001, Peripherals
590
Warehouse stockStock replenishment
Wed Jun 24 17:00
Mon Jun 22 17:45
47 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 16 07:55Jun 17 06:059019.447.4Planned
20SUBSUB-AJun 17 06:00Jun 17 11:20504.010.4Planned
30FAFA-04Jun 17 07:30Jun 17 18:15459.50.0Planned
40TBTB-01Jun 19 12:20Jun 19 18:35355.751.0Planned
50PKPK-02Jun 22 13:10Jun 22 17:45154.310.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time47 h to spare before the due date.

Order

ReferenceRP-2910
ReleasedFri Jun 12 06:00
DueWed Jun 24 17:00
Priority and weight3, weight 1
Touch time left46.8 h
Sequence position103

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 5 06:00On hand
Enclosure setTidewell PlasticsSun Jun 7 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
WO-10307
27" QHD Monitor, 165HzLM-2177, Monitors
150
ACCOUNT 7702Gold, customer build
Wed Jun 24 15:00
Fri Jun 19 20:55
4.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 15 15:45Jun 16 05:259011.432.0Planned
20SUBSUB-CJun 16 08:20Jun 16 13:40504.03.2Planned
30FAFA-05Jun 16 17:25Jun 17 12:504510.76.2Planned
40TBTB-03Jun 18 20:35Jun 19 05:35358.446.1Planned
45CFGCFG-01Jun 19 06:05Jun 19 16:20259.30.0Planned
50PKPK-02Jun 19 16:35Jun 19 20:55153.60.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.8 d to spare before the due date.

Order

ReferenceSO-71000
ReleasedFri Jun 12 06:00
DueWed Jun 24 15:00
Priority and weight2, weight 3
Touch time left51.8 h
Sequence position96

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 5 06:00On hand
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand
Display panelBrightline DisplaysTue Jun 2 06:00On hand
WO-10012
All-in-One 24", 16GB / 512GBAF-4434, Desktops
40
Warehouse stockStock replenishment
Wed Jun 24 17:00
Fri Jun 19 14:25
5.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 15 01:55Jun 15 08:30904.82.9Planned
20SUBSUB-CJun 15 11:05Jun 15 14:10502.21.6Planned
30FAFA-04Jun 16 18:10Jun 17 07:20454.919.8Planned
40TBTB-01Jun 19 02:25Jun 19 12:20359.342.8Planned
50PKPK-01Jun 19 12:50Jun 19 14:25151.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time5.1 d to spare before the due date.

Order

ReferenceRP-2642
ReleasedSat Jun 13 06:00
DueWed Jun 24 17:00
Priority and weight3, weight 1
Touch time left26.6 h
Sequence position97

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 3 06:00On hand
Enclosure setTidewell PlasticsSun Jun 7 06:00On hand
Power moduleAster PowerTue Jun 9 06:00On hand
SoC moduleKestrel SiliconTue Jun 9 06:00On hand
WO-10074
4-Bay NAS EnclosureBP-8568, Storage
430
Warehouse stockStock replenishment
Tue Jun 23 17:00
Thu Jun 18 14:05
5.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 14 23:00Jun 15 17:059015.80.0Planned
20SUBSUB-AJun 15 17:40Jun 15 21:05252.511.2Planned
30FAFA-01Jun 15 20:35Jun 16 09:3055.81.6Planned
40TBTB-03Jun 17 20:20Jun 18 10:403513.846.7Planned
50PKPK-02Jun 18 11:10Jun 18 14:05152.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time5.1 d to spare before the due date.

Order

ReferenceRP-2704
ReleasedSat Jun 13 06:00
DueTue Jun 23 17:00
Priority and weight3, weight 1
Touch time left43.4 h
Sequence position90

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 11 06:00On hand
Enclosure setTidewell PlasticsTue Jun 9 06:00On hand
Power moduleAster PowerSat Jun 6 06:00On hand
WO-10175
8" Rugged Tablet, 64GBNB-1986, Tablets
110
Warehouse stockStock replenishment
Tue Jun 23 17:00
Mon Jun 22 07:55
33 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 15 17:05Jun 16 07:559012.617.3Planned
20SUBSUB-AJun 16 06:00Jun 16 11:15503.90.0Planned
30FAFA-06Jun 16 11:00Jun 16 20:35458.31.6Planned
40TBTB-04Jun 20 00:00Jun 20 14:153513.780.2Planned
50PKPK-02Jun 22 06:00Jun 22 07:55151.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time33 h to spare before the due date.

Order

ReferenceRP-2805
ReleasedSat Jun 13 06:00
DueTue Jun 23 17:00
Priority and weight3, weight 1
Touch time left44.1 h
Sequence position93

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 6 06:00On hand
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerMon Jun 8 06:00On hand
SoC moduleKestrel SiliconFri Jun 5 06:00On hand
Display panelBrightline DisplaysTue Jun 9 06:00On hand
WO-10236
Tower Workstation, 32GB / 1TBQN-4437, Desktops
35
Warehouse stockStock replenishment
Mon Jun 22 17:00
Thu Jun 18 11:05
4.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 14 23:00Jun 15 04:10903.40.0Planned
20SUBSUB-AJun 15 06:00Jun 15 08:25501.60.0Planned
30FAFA-04Jun 15 17:05Jun 15 21:50453.57.9Planned
40TBTB-02Jun 17 06:20Jun 17 13:30356.632.2Planned
50PKPK-01Jun 18 09:25Jun 18 11:05150.911.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.2 d to spare before the due date.

Order

ReferenceRP-2866
ReleasedSat Jun 13 06:00
DueMon Jun 22 17:00
Priority and weight3, weight 1
Touch time left19.9 h
Sequence position87

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 10 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
SoC moduleKestrel SiliconFri Jun 5 06:00On hand
WO-10290
27" 4K Monitor, USB-CVW-6003, Monitors
385
Warehouse stockStock replenishment
Fri Jun 26 17:00
Thu Jun 25 11:50
29 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 19 04:50Jun 22 05:159021.796.8Planned
20SUBSUB-AJun 19 17:25Jun 22 11:05508.87.2Planned
30FAFA-05Jun 22 22:00Jun 24 13:502523.917.8Planned
40TBTB-02Jun 24 00:05Jun 24 19:303518.815.2Planned
50PKPK-02Jun 24 20:00Jun 25 11:50158.10.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time29 h to spare before the due date.

Order

ReferenceRP-2920
ReleasedSat Jun 13 06:00
DueFri Jun 26 17:00
Priority and weight3, weight 1
Touch time left84.9 h
Sequence position119

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 5 06:00On hand
Enclosure setTidewell PlasticsWed Jun 10 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
Display panelBrightline DisplaysSat Jun 6 06:00On hand
WO-10055
128GB USB Flash Drive, 10-pack, refreshBP-7381, Storage
140
Warehouse stockStock replenishment
Wed Jun 24 17:00
Fri Jun 19 13:15
5.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 15 04:10Jun 15 13:25907.24.9Planned
20SUBSUB-AJun 15 13:45Jun 15 15:35501.04.4Planned
30FAFA-02Jun 16 20:50Jun 17 06:55452.317.1Planned
40TBTB-03Jun 19 05:35Jun 19 11:30355.354.9Planned
50PKPK-02Jun 19 12:00Jun 19 13:15101.10.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time5.2 d to spare before the due date.

Order

ReferenceRP-2685
ReleasedSun Jun 14 06:00
DueWed Jun 24 17:00
Priority and weight3, weight 1
Touch time left20.8 h
Sequence position98

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 6 06:00On hand
Enclosure setTidewell PlasticsWed Jun 10 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
WO-10070
Mesh Wi-Fi Kit, 3-packBP-8055, Networking
320
Warehouse stockStock replenishment
Mon Jun 29 17:00
Fri Jun 26 15:25
3.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 19 06:35Jun 22 16:209030.598.6Planned
20SUBSUB-AJun 22 11:05Jun 22 19:25507.013.2Planned
30FAFA-03Jun 22 13:20Jun 23 12:054514.00.0Planned
40TBTB-04Jun 24 06:00Jun 25 07:253524.837.4Planned
50PKPK-02Jun 26 09:35Jun 26 15:25155.117.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.1 d to spare before the due date.

Order

ReferenceRP-2700
ReleasedSun Jun 14 06:00
DueMon Jun 29 17:00
Priority and weight3, weight 1
Touch time left85.3 h
Sequence position122

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 7 06:00On hand
Enclosure setTidewell PlasticsThu Jun 4 06:00On hand
Power moduleAster PowerSun Jun 7 06:00On hand
SoC moduleKestrel SiliconSun Jun 7 06:00On hand
WO-10151
2TB Portable SSDLM-7276, Storage
330
Warehouse stockStock replenishment
Wed Jun 24 17:00
Fri Jun 19 21:30
4.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 15 17:05Jun 16 08:309013.217.3Planned
20SUBSUB-AJun 16 11:15Jun 16 14:10502.16.2Planned
30FAFA-06Jun 16 20:35Jun 17 09:10454.87.4Planned
40TBTB-02Jun 19 06:00Jun 19 18:003511.455.7Planned
50PKPK-01Jun 19 19:00Jun 19 21:30152.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time4.8 d to spare before the due date.

Order

ReferenceRP-2781
ReleasedSun Jun 14 06:00
DueWed Jun 24 17:00
Priority and weight3, weight 1
Touch time left37.7 h
Sequence position100

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 11 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
WO-10227
Mini PC, 8-core, 16GB / 512GB, refreshQN-4241, Desktops
95
Warehouse stockStock replenishment
Thu Jun 25 17:00
Tue Jun 23 08:10
2.4 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 16 06:00Jun 16 19:059010.629.5Planned
20SUBSUB-BJun 16 16:15Jun 16 21:45504.22.2Planned
30FAFA-04Jun 17 18:15Jun 18 12:15459.214.7Planned
40TBTB-02Jun 21 05:20Jun 21 23:253517.557.7Planned
50PKPK-01Jun 22 22:30Jun 23 08:10152.415.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.4 d to spare before the due date.

Order

ReferenceRP-2857
ReleasedSun Jun 14 06:00
DueThu Jun 25 17:00
Priority and weight3, weight 1
Touch time left47.8 h
Sequence position110

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 12 06:00On hand
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerMon Jun 8 06:00On hand
SoC moduleKestrel SiliconTue Jun 9 06:00On hand
WO-10266
24-Port PoE Switch, managedVW-1670, Networking
125
Warehouse stockStock replenishment
Thu Jun 25 17:00
Tue Jun 23 10:55
2.3 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 17 06:00Jun 17 22:409014.252.2Planned
20SUBSUB-AJun 18 22:45Jun 19 09:25502.824.1Planned
30FAFA-02Jun 19 08:20Jun 19 15:10455.60.3Planned
40TBTB-02Jun 21 23:25Jun 22 09:45359.847.3Planned
50PKPK-01Jun 23 08:10Jun 23 10:55152.014.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.3 d to spare before the due date.

Order

ReferenceRP-2896
ReleasedSun Jun 14 06:00
DueThu Jun 25 17:00
Priority and weight3, weight 1
Touch time left38.2 h
Sequence position111

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 4 06:00On hand
Enclosure setTidewell PlasticsSun Jun 7 06:00On hand
Power moduleAster PowerMon Jun 8 06:00On hand
SoC moduleKestrel SiliconWed Jun 10 06:00On hand
WO-10332
Thin Client, 4GB / 32GB, grayAF-4236, Desktops
400
ACCOUNT 5190Silver, customer build
Fri Jul 10 15:00
Wed Jul 15 09:30
4.8 d late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 6 06:00Jul 7 22:359036.8326.8Planned
20SUBSUB-BJul 7 11:25Jul 8 13:105016.914.2Planned
30FAFA-05Jul 7 22:20Jul 10 12:254537.87.2Planned
40TBTB-03Jul 9 06:00Jul 12 06:153571.718.4Planned
45CFGCFG-01Jul 13 06:00Jul 14 15:402524.80.0Planned
50PKPK-01Jul 14 16:05Jul 15 09:3059.80.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 327 working hours at SMT.
  • SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jun 23 13:30.

Order

ReferenceSO-71325
ReleasedSun Jun 14 06:00
DueFri Jul 10 15:00
Priority and weight3, weight 2
Touch time left202.0 h
Sequence position192

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 9 06:00On hand
Enclosure setTidewell PlasticsMon Jun 8 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
SoC moduleKestrel SiliconSat Jun 6 06:00On hand
WO-10343
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
30
ENGINEERINGInternal, new product build
Fri Jun 26 12:00
Tue Jun 23 11:45
3.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 18 06:00Jun 18 12:40904.775.0Planned
20SUBSUB-BJun 18 21:25Jun 19 06:30501.27.8Planned
30FAFA-01Jun 19 10:40Jun 19 14:05452.73.4Planned
40TBTB-03Jun 21 17:05Jun 21 22:20155.050.8Planned
50PKPK-01Jun 23 10:55Jun 23 11:45150.620.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.0 d to spare before the due date.

Order

ReferenceNPI-512
ReleasedSun Jun 14 12:00
DueFri Jun 26 12:00
Priority and weight2, weight 2
Touch time left17.8 h
Sequence position112

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 11 12:00On hand
Enclosure setTidewell PlasticsThu Jun 11 12:00On hand
Power moduleAster PowerThu Jun 4 12:00On hand
SoC moduleKestrel SiliconThu Jun 11 12:00On hand
Display panelBrightline DisplaysFri Jun 12 12:00On hand
WO-10065
1TB NVMe SSD, refreshBP-7490, Storage
300
Warehouse stockStock replenishment
Fri Jun 26 17:00
Tue Jun 23 18:30
2.9 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 18 13:45Jun 19 06:359014.875.5Planned
20SUBSUB-CJun 19 14:05Jun 19 17:15502.311.8Planned
30FAFA-03Jun 19 15:35Jun 19 22:20455.50.0Planned
40TBTB-03Jun 22 06:00Jun 22 19:253512.860.5Planned
50PKPK-01Jun 23 15:45Jun 23 18:30152.512.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.9 d to spare before the due date.

Order

ReferenceRP-2695
ReleasedMon Jun 15 06:00
DueFri Jun 26 17:00
Priority and weight3, weight 1
Touch time left41.9 h
Sequence position115

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 13 06:00On hand
Enclosure setTidewell PlasticsFri Jun 5 06:00On hand
Power moduleAster PowerTue Jun 9 06:00On hand
WO-10128
24-Port PoE Switch, managed, refreshLM-3668, Networking
160
Warehouse stockStock replenishment
Thu Jun 25 17:00
Tue Jun 23 07:30
2.4 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 18 00:55Jun 18 19:459016.163.4Planned
20SUBSUB-BJun 18 16:20Jun 18 21:25503.87.6Planned
30FAFA-01Jun 18 19:00Jun 19 10:40457.40.0Planned
40TBTB-01Jun 20 15:40Jun 21 05:203513.141.3Planned
50PKPK-02Jun 22 21:35Jun 23 07:30152.714.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.4 d to spare before the due date.

Order

ReferenceRP-2758
ReleasedMon Jun 15 06:00
DueThu Jun 25 17:00
Priority and weight3, weight 1
Touch time left46.9 h
Sequence position107

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 5 06:00On hand
Enclosure setTidewell PlasticsWed Jun 10 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
SoC moduleKestrel SiliconFri Jun 5 06:00On hand
WO-10299
USB-C Dock, 100W, dual displayVW-7925, Docks & Hubs
110
Warehouse stockStock replenishment
Tue Jun 23 17:00
Thu Jun 18 17:00
5.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 15 06:00Jun 15 17:05909.10.0Planned
20SUBSUB-CJun 16 06:15Jun 16 08:20401.410.1Planned
30FAFA-04Jun 16 14:55Jun 16 18:10452.56.6Planned
40TBTB-01Jun 17 19:35Jun 17 22:40352.526.5Planned
50PKPK-01Jun 18 15:40Jun 18 17:00151.19.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time5.0 d to spare before the due date.

Order

ReferenceRP-2929
ReleasedMon Jun 15 06:00
DueTue Jun 23 17:00
Priority and weight3, weight 1
Touch time left20.3 h
Sequence position95

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 8 06:00On hand
Enclosure setTidewell PlasticsMon Jun 8 06:00On hand
Power moduleAster PowerTue Jun 9 06:00On hand
WO-10022
Mini PC, 8-core, 16GB / 512GBAF-7495, Desktops
75
Warehouse stockStock replenishment
Fri Jun 26 17:00
Tue Jun 23 15:45
3.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 18 12:15Jun 18 23:25909.251.2Planned
20SUBSUB-AJun 19 09:25Jun 19 15:00504.25.5Planned
30FAFA-06Jun 22 10:45Jun 22 21:25459.412.9Planned
40TBTB-02Jun 22 18:05Jun 23 12:303517.80.0Planned
50PKPK-01Jun 23 13:00Jun 23 15:45152.50.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.1 d to spare before the due date.

Order

ReferenceRP-2652
ReleasedTue Jun 16 06:00
DueFri Jun 26 17:00
Priority and weight3, weight 1
Touch time left47.1 h
Sequence position114

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 11 06:00On hand
Enclosure setTidewell PlasticsFri Jun 12 06:00On hand
Power moduleAster PowerWed Jun 10 06:00On hand
SoC moduleKestrel SiliconFri Jun 12 06:00On hand
WO-10036
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
195
Warehouse stockStock replenishment
Wed Jul 1 17:00
Mon Jun 29 18:25
47 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 23 09:25Jun 24 10:404522.8117.4Planned
20SUBSUB-AJun 24 07:00Jun 24 15:10407.06.5Planned
30FAFA-03Jun 24 20:45Jun 25 20:504515.310.0Planned
40TBTB-03Jun 27 14:10Jun 28 19:303528.853.4Planned
50PKPK-02Jun 29 14:50Jun 29 18:25103.48.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time47 h to spare before the due date.

Order

ReferenceRP-2666
ReleasedTue Jun 16 06:00
DueWed Jul 1 17:00
Priority and weight3, weight 1
Touch time left80.2 h
Sequence position135

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 7 06:00On hand
Enclosure setTidewell PlasticsSat Jun 6 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
SoC moduleKestrel SiliconThu Jun 11 06:00On hand
Display panelBrightline DisplaysFri Jun 12 06:00On hand
WO-10099
Wi-Fi 6E RouterKL-3459, Networking
20
Warehouse stockStock replenishment
Wed Jun 24 17:00
Wed Jun 24 06:35
10 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 23 15:20Jun 23 17:25101.91.3Planned
20SUBSUB-AJun 23 17:55Jun 23 19:45500.50.0Planned
30FAFA-01Jun 23 20:00Jun 23 21:40450.90.0Planned
40TBTB-01Jun 23 21:55Jun 24 00:05351.60.0Planned
50PKPK-01Jun 24 06:00Jun 24 06:35150.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time10 h to spare before the due date.

Order

ReferenceRP-2729
ReleasedTue Jun 16 06:00
DueWed Jun 24 17:00
Priority and weight3, weight 1
Touch time left7.8 h
Sequence position99

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 6 06:00On hand
Enclosure setTidewell PlasticsTue Jun 9 06:00On hand
Power moduleAster PowerTue Jun 23 14:00In transit
SoC moduleKestrel SiliconSun Jun 14 06:00On hand
WO-10185
8" Rugged Tablet, 64GB, grayNB-5680, Tablets
20
Warehouse stockStock replenishment
Thu Jun 25 17:00
Wed Jun 24 09:00
32 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 18 07:50Jun 18 12:15902.447.3Planned
20SUBSUB-AJun 18 21:10Jun 18 22:45500.87.9Planned
30FAFA-02Jun 19 06:00Jun 19 08:20451.60.0Planned
40TBTB-04Jun 23 23:20Jun 24 02:30352.6110.8Planned
50PKPK-02Jun 24 08:25Jun 24 09:00150.32.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time32 h to spare before the due date.

Order

ReferenceRP-2815
ReleasedTue Jun 16 06:00
DueThu Jun 25 17:00
Priority and weight3, weight 1
Touch time left11.6 h
Sequence position109

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 14 06:00On hand
Enclosure setTidewell PlasticsSat Jun 13 06:00On hand
Power moduleAster PowerSat Jun 6 06:00On hand
SoC moduleKestrel SiliconSat Jun 13 06:00On hand
Display panelBrightline DisplaysTue Jun 9 06:00On hand
WO-10261
22" Touch Monitor, grayVW-1017, Monitors
465
Warehouse stockStock replenishment
Wed Jul 1 17:00
Wed Jul 1 06:55
10 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 23 14:35Jun 25 03:159033.2122.1Planned
20SUBSUB-CJun 24 20:10Jun 25 17:504013.515.5Planned
30FAFA-05Jun 25 13:00Jun 29 18:154536.56.9Planned
40TBTB-03Jun 28 19:30Jun 30 00:503528.873.5Planned
50PKPK-02Jun 30 11:00Jul 1 06:551012.24.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time10 h to spare before the due date.

Order

ReferenceRP-2891
ReleasedTue Jun 16 06:00
DueWed Jul 1 17:00
Priority and weight3, weight 1
Touch time left127.8 h
Sequence position140

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 10 06:00On hand
Enclosure setTidewell PlasticsSun Jun 7 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
Display panelBrightline DisplaysTue Jun 9 06:00On hand
WO-10325
Mini PC, 8-core, 16GB / 512GBAF-7495, Desktops
250
ACCOUNT 7702Gold, customer build
Mon Jul 6 15:00
Wed Jul 8 07:45
41 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 26 01:25Jun 29 11:109030.5177.9Planned
20SUBSUB-CJun 26 22:30Jun 29 21:205014.011.9Planned
30FAFA-06Jun 30 09:00Jul 2 09:054531.315.6Planned
40TBTB-04Jul 1 08:15Jul 3 20:153559.415.4Planned
45CFGCFG-02Jul 6 15:40Jul 7 15:352515.59.2Planned
50PKPK-01Jul 7 15:50Jul 8 07:45158.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 178 working hours at SMT.
  • Split op 10 across SMT-05 and SMT-01: SMT-01 has 71 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jun 23 14:55.

Order

ReferenceSO-71234
ReleasedTue Jun 16 06:00
DueMon Jul 6 15:00
Priority and weight2, weight 3
Touch time left163.2 h
Sequence position155

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 10 06:00On hand
Enclosure setTidewell PlasticsMon Jun 8 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
SoC moduleKestrel SiliconThu Jun 11 06:00On hand
WO-10027
1TB NVMe SSDAF-7757, Storage
410
Warehouse stockStock replenishment
Mon Jun 29 17:00
Fri Jun 26 09:35
3.3 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 19 06:00Jun 22 00:009015.545.8Planned
20SUBSUB-BJun 19 22:40Jun 22 08:55502.411.8Planned
30FAFA-01Jun 22 07:05Jun 22 14:00455.70.0Planned
40TBTB-01Jun 24 02:30Jun 24 16:303513.441.7Planned
50PKPK-02Jun 26 06:45Jun 26 09:35152.622.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.3 d to spare before the due date.

Order

ReferenceRP-2657
ReleasedWed Jun 17 06:00
DueMon Jun 29 17:00
Priority and weight3, weight 1
Touch time left43.5 h
Sequence position121

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 10 06:00On hand
Enclosure setTidewell PlasticsSun Jun 7 06:00On hand
Power moduleAster PowerSun Jun 14 06:00On hand
WO-10114
Mini PC, 8-core, 16GB / 512GB, grayKL-9030, Desktops
125
Warehouse stockStock replenishment
Mon Jun 29 17:00
Fri Jun 26 16:40
3.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 19 08:10Jun 22 03:059016.247.9Planned
20SUBSUB-CJun 19 21:05Jun 22 11:45506.33.4Planned
30FAFA-06Jun 23 08:50Jun 24 07:252514.217.1Planned
40TBTB-01Jun 24 16:30Jun 25 19:553526.824.8Planned
50PKPK-01Jun 26 12:45Jun 26 16:40153.78.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.0 d to spare before the due date.

Order

ReferenceRP-2744
ReleasedWed Jun 17 06:00
DueMon Jun 29 17:00
Priority and weight3, weight 1
Touch time left70.8 h
Sequence position123

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 15 06:00On hand
Enclosure setTidewell PlasticsSat Jun 13 06:00On hand
Power moduleAster PowerMon Jun 8 06:00On hand
SoC moduleKestrel SiliconSun Jun 14 06:00On hand
WO-10138
14" Laptop, 8-core, 16GB / 512GBLM-5139, Laptops
450
Warehouse stockStock replenishment
Mon Jul 6 17:00
Mon Jul 6 16:20
0.7 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 26 19:45Jul 1 05:559053.9172.5Planned
20SUBSUB-CJun 30 06:55Jul 1 08:155016.516.9Planned
30FAFA-02Jun 30 09:50Jul 2 15:254536.30.0Planned
40TBTB-02Jul 1 15:10Jul 4 11:351568.223.8Planned
50PKPK-02Jul 6 07:35Jul 6 16:20158.01.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.7 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2768
ReleasedWed Jun 17 06:00
DueMon Jul 6 17:00
Priority and weight3, weight 1
Touch time left186.5 h
Sequence position158

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 7 06:00On hand
Enclosure setTidewell PlasticsWed Jun 10 06:00On hand
Power moduleAster PowerTue Jun 9 06:00On hand
SoC moduleKestrel SiliconFri Jun 12 06:00On hand
Display panelBrightline DisplaysThu Jun 11 06:00On hand
WO-10159
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
415
Warehouse stockStock replenishment
Thu Jul 2 17:00
Thu Jul 2 09:30
7.5 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 25 06:00Jun 26 07:054523.3136.8Planned
20SUBSUB-CJun 25 17:50Jun 26 12:05409.67.3Planned
30FAFA-05Jun 29 18:15Jul 1 12:252525.830.3Planned
40TBTB-01Jun 30 18:20Jul 1 15:103520.219.8Planned
50PKPK-01Jul 1 17:05Jul 2 09:30158.71.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.5 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2789
ReleasedWed Jun 17 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left90.2 h
Sequence position149

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 8 06:00On hand
Enclosure setTidewell PlasticsThu Jun 11 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
Display panelBrightline DisplaysMon Jun 8 06:00On hand
WO-10166
34" Ultrawide Monitor, curved, grayLM-9032, Monitors
80
Warehouse stockStock replenishment
Fri Jun 26 17:00
Tue Jun 23 23:00
2.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 18 23:25Jun 19 08:10907.239.2Planned
20SUBSUB-CJun 19 17:15Jun 19 21:05502.510.8Planned
30FAFA-05Jun 22 14:20Jun 22 22:00256.810.4Planned
40TBTB-03Jun 23 06:00Jun 23 11:55355.310.2Planned
50PKPK-01Jun 23 20:25Jun 23 23:00152.37.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.8 d to spare before the due date.

Order

ReferenceRP-2796
ReleasedWed Jun 17 06:00
DueFri Jun 26 17:00
Priority and weight3, weight 1
Touch time left27.8 h
Sequence position117

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 8 06:00On hand
Enclosure setTidewell PlasticsFri Jun 12 06:00On hand
Power moduleAster PowerSun Jun 7 06:00On hand
Display panelBrightline DisplaysMon Jun 8 06:00On hand
WO-10295
34" Ultrawide Monitor, curvedVW-6938, Monitors
235
Warehouse stockStock replenishment
Mon Jun 29 17:00
Mon Jun 29 07:05
9.9 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 22 03:05Jun 22 20:304515.765.6Planned
20SUBSUB-AJun 23 06:00Jun 23 13:45506.414.3Planned
30FAFA-06Jun 24 07:25Jun 25 09:254517.214.9Planned
40TBTB-01Jun 25 19:55Jun 26 10:053513.631.2Planned
50PKPK-02Jun 26 17:30Jun 29 07:05155.86.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time9.9 h to spare before the due date.

Order

ReferenceRP-2925
ReleasedWed Jun 17 06:00
DueMon Jun 29 17:00
Priority and weight3, weight 1
Touch time left61.9 h
Sequence position126

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 12 06:00On hand
Enclosure setTidewell PlasticsSun Jun 14 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
Display panelBrightline DisplaysSun Jun 7 06:00On hand
WO-10109
Wi-Fi 6 Access Point, ceilingKL-5384, Networking
90
Warehouse stockStock replenishment
Fri Jun 26 17:00
Tue Jun 23 20:25
2.9 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 18 19:45Jun 19 03:05456.612.8Planned
20SUBSUB-AJun 19 15:00Jun 19 17:25501.68.5Planned
30FAFA-01Jun 19 17:00Jun 19 21:20453.10.0Planned
40TBTB-02Jun 22 09:45Jun 22 15:20155.349.5Planned
50PKPK-01Jun 23 19:00Jun 23 20:25151.218.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.9 d to spare before the due date.

Order

ReferenceRP-2739
ReleasedThu Jun 18 06:00
DueFri Jun 26 17:00
Priority and weight3, weight 1
Touch time left20.6 h
Sequence position116

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 15 06:00On hand
Enclosure setTidewell PlasticsFri Jun 12 06:00On hand
Power moduleAster PowerSun Jun 14 06:00On hand
SoC moduleKestrel SiliconTue Jun 16 06:00On hand
WO-10123
27" QHD Monitor, 165HzLM-2177, Monitors
350
Warehouse stockStock replenishment
Wed Jul 1 17:00
Tue Jun 30 11:00
30 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 23 06:50Jun 24 12:359026.569.3Planned
20SUBSUB-CJun 24 09:05Jun 24 20:10509.212.4Planned
30FAFA-06Jun 25 12:40Jun 26 22:454524.816.7Planned
40TBTB-02Jun 28 10:55Jun 29 07:053519.665.7Planned
50PKPK-02Jun 29 18:25Jun 30 11:00158.310.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time30 h to spare before the due date.

Order

ReferenceRP-2753
ReleasedThu Jun 18 06:00
DueWed Jul 1 17:00
Priority and weight3, weight 1
Touch time left92.4 h
Sequence position137

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 16 06:00On hand
Enclosure setTidewell PlasticsSat Jun 13 06:00On hand
Power moduleAster PowerSun Jun 14 06:00On hand
Display panelBrightline DisplaysWed Jun 10 06:00On hand
WO-10190
KVM Switch, 2-port 4K, grayNB-7003, Docks & Hubs
360
Warehouse stockStock replenishment
Thu Jul 2 17:00
Thu Jul 2 14:20
2.7 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 25 06:00Jun 26 21:459036.2114.0Planned
20SUBSUB-BJun 29 06:00Jun 29 12:55505.624.9Planned
30FAFA-02Jun 29 07:55Jun 29 19:404510.00.0Planned
40TBTB-01Jun 30 06:00Jun 30 16:25359.819.2Planned
50PKPK-01Jul 2 09:30Jul 2 14:20154.125.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 2.7 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2820
ReleasedThu Jun 18 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left69.7 h
Sequence position150

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 16 06:00On hand
Enclosure setTidewell PlasticsThu Jun 11 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
WO-10205
14" Rugged Laptop, 16GB / 256GBNB-7498, Laptops
415
Warehouse stockStock replenishment
Wed Jul 8 17:00
Fri Jul 10 11:00
42 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 1 20:50Jul 7 07:459055.7219.1Planned
20SUBSUB-BJul 6 09:00Jul 7 11:255017.119.0Planned
30FAFA-03Jul 6 12:40Jul 8 19:204537.40.0Planned
40TBTB-04Jul 6 19:05Jul 9 18:003570.30.8Planned
50PKPK-02Jul 9 19:00Jul 10 11:00158.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 219 working hours at SMT.
  • Split op 10 across SMT-03 and SMT-01: SMT-01 has 71 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Fri Jun 26 06:20.

Order

ReferenceRP-2835
ReleasedThu Jun 18 06:00
DueWed Jul 8 17:00
Priority and weight3, weight 1
Touch time left192.7 h
Sequence position180

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 15 06:00On hand
Enclosure setTidewell PlasticsSat Jun 13 06:00On hand
Power moduleAster PowerSat Jun 13 06:00On hand
SoC moduleKestrel SiliconSun Jun 14 06:00On hand
Display panelBrightline DisplaysSat Jun 13 06:00On hand
WO-10211
4-Bay NAS Enclosure, refreshQN-2129, Storage
420
Warehouse stockStock replenishment
Mon Jun 29 17:00
Fri Jun 26 20:25
2.9 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 22 00:00Jun 22 20:309017.840.0Planned
20SUBSUB-AJun 22 19:25Jun 22 23:00502.812.4Planned
30FAFA-01Jun 22 20:50Jun 23 11:15256.50.0Planned
40TBTB-04Jun 25 07:25Jun 25 23:203515.357.1Planned
50PKPK-01Jun 26 16:40Jun 26 20:25153.010.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.9 d to spare before the due date.

Order

ReferenceRP-2841
ReleasedThu Jun 18 06:00
DueMon Jun 29 17:00
Priority and weight3, weight 1
Touch time left48.9 h
Sequence position125

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 15 06:00On hand
Enclosure setTidewell PlasticsSun Jun 14 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
WO-10257
13" Ultralight Laptop, 16GB / 512GBQN-7885, Laptops
340
Warehouse stockStock replenishment
Fri Jul 10 17:00
Mon Jul 13 13:25
2.9 d late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 7 07:45Jul 9 07:454544.8276.2Planned
20SUBSUB-AJul 8 12:20Jul 9 10:505013.712.2Planned
30FAFA-01Jul 8 15:30Jul 10 14:204530.10.0Planned
40TBTB-04Jul 9 21:10Jul 12 06:153556.523.7Planned
50PKPK-02Jul 13 06:00Jul 13 13:25156.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 276 working hours at SMT.
  • SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Thu Jun 25 13:25.

Order

ReferenceRP-2887
ReleasedThu Jun 18 06:00
DueFri Jul 10 17:00
Priority and weight3, weight 1
Touch time left154.8 h
Sequence position196

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 11 06:00On hand
Enclosure setTidewell PlasticsSat Jun 13 06:00On hand
Power moduleAster PowerTue Jun 9 06:00On hand
SoC moduleKestrel SiliconThu Jun 11 06:00On hand
Display panelBrightline DisplaysWed Jun 10 06:00On hand
WO-10314
22" Touch MonitorVW-1888, Monitors
400
ACCOUNT 3327Gold, customer build
Mon Jul 6 15:00
Tue Jul 7 08:05
17 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 25 18:05Jun 26 19:459022.7125.6Planned
20SUBSUB-CJun 26 12:05Jun 26 22:30409.25.6Planned
30FAFA-04Jun 30 08:50Jul 1 19:051525.027.2Planned
40TBTB-03Jul 1 06:00Jul 2 02:153519.717.0Planned
45CFGCFG-01Jul 2 06:00Jul 6 15:402524.80.0Planned
50PKPK-01Jul 6 15:55Jul 7 08:05158.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 126 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-06: SMT-06 has 41 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jun 24 23:00.

Order

ReferenceSO-71091
ReleasedThu Jun 18 06:00
DueMon Jul 6 15:00
Priority and weight2, weight 3
Touch time left113.4 h
Sequence position154

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 8 06:00On hand
Enclosure setTidewell PlasticsFri Jun 12 06:00On hand
Power moduleAster PowerTue Jun 9 06:00On hand
Display panelBrightline DisplaysFri Jun 12 06:00On hand
WO-10007
Thin Client, 4GB / 32GB, grayAF-4236, Desktops
120
Warehouse stockStock replenishment
Tue Jun 30 17:00
Mon Jun 29 08:10
33 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 22 16:55Jun 23 06:501013.033.2Planned
20SUBSUB-BJun 23 15:05Jun 23 21:30505.18.6Planned
30FAFA-05Jun 24 16:55Jun 25 13:004511.314.6Planned
40TBTB-03Jun 25 23:20Jun 26 21:253521.524.2Planned
50PKPK-01Jun 26 21:55Jun 29 08:10153.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time33 h to spare before the due date.

Order

ReferenceRP-2637
ReleasedFri Jun 19 06:00
DueTue Jun 30 17:00
Priority and weight3, weight 1
Touch time left56.5 h
Sequence position129

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 13 06:00On hand
Enclosure setTidewell PlasticsSun Jun 14 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
SoC moduleKestrel SiliconSat Jun 13 06:00On hand
WO-10046
24" FHD Monitor, IPSBP-5281, Monitors
290
Warehouse stockStock replenishment
Thu Jul 2 17:00
Wed Jul 1 08:05
33 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 24 10:40Jun 25 06:009017.172.4Planned
20SUBSUB-AJun 25 08:05Jun 25 16:25507.08.9Planned
30FAFA-06Jun 26 22:45Jun 30 09:002518.827.3Planned
40TBTB-02Jun 29 20:25Jun 30 11:503514.810.8Planned
50PKPK-01Jun 30 18:00Jul 1 08:05156.35.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time33 h to spare before the due date.

Order

ReferenceRP-2676
ReleasedFri Jun 19 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left67.7 h
Sequence position144

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 17 06:00On hand
Enclosure setTidewell PlasticsWed Jun 10 06:00On hand
Power moduleAster PowerTue Jun 9 06:00On hand
Display panelBrightline DisplaysSat Jun 13 06:00On hand
WO-10089
12" Pro Tablet, 256GBKL-2075, Tablets
190
Warehouse stockStock replenishment
Thu Jul 2 17:00
Wed Jul 1 11:40
29 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 24 19:05Jun 25 18:059020.880.3Planned
20SUBSUB-AJun 25 18:05Jun 26 08:50506.411.6Planned
30FAFA-03Jun 25 21:25Jun 26 19:554513.80.0Planned
40TBTB-03Jun 30 00:50Jun 30 23:553522.587.8Planned
50PKPK-01Jul 1 08:05Jul 1 11:40152.82.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time29 h to spare before the due date.

Order

ReferenceRP-2719
ReleasedFri Jun 19 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left70.2 h
Sequence position146

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 15 06:00On hand
Enclosure setTidewell PlasticsSun Jun 14 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
SoC moduleKestrel SiliconTue Jun 9 06:00On hand
Display panelBrightline DisplaysSat Jun 13 06:00On hand
WO-10171
Tower Workstation, 32GB / 1TB, refreshLM-9819, Desktops
70
Warehouse stockStock replenishment
Mon Jun 29 17:00
Fri Jun 26 17:30
3.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 22 14:00Jun 22 22:55906.90.0Planned
20SUBSUB-CJun 22 21:30Jun 23 08:20403.20.0Planned
30FAFA-04Jun 23 15:40Jun 24 07:00457.17.4Planned
40TBTB-02Jun 25 06:00Jun 25 19:553513.331.8Planned
50PKPK-02Jun 26 15:25Jun 26 17:30151.811.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.0 d to spare before the due date.

Order

ReferenceRP-2801
ReleasedFri Jun 19 06:00
DueMon Jun 29 17:00
Priority and weight3, weight 1
Touch time left36.1 h
Sequence position124

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 12 06:00On hand
Enclosure setTidewell PlasticsFri Jun 12 06:00On hand
Power moduleAster PowerMon Jun 22 14:00In transit
SoC moduleKestrel SiliconTue Jun 9 06:00On hand
WO-10241
1TB NVMe SSD, grayQN-4854, Storage
280
Warehouse stockStock replenishment
Tue Jun 30 17:00
Mon Jun 29 14:55
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 23 06:00Jun 23 21:409013.245.5Planned
20SUBSUB-BJun 23 21:30Jun 24 07:25502.110.5Planned
30FAFA-03Jun 24 14:40Jun 24 20:45454.88.2Planned
40TBTB-04Jun 26 20:40Jun 27 08:403511.452.1Planned
50PKPK-01Jun 29 12:25Jun 29 14:55152.25.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2871
ReleasedFri Jun 19 06:00
DueTue Jun 30 17:00
Priority and weight3, weight 1
Touch time left37.7 h
Sequence position133

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 11 06:00On hand
Enclosure setTidewell PlasticsThu Jun 11 06:00On hand
Power moduleAster PowerThu Jun 11 06:00On hand
WO-10335
Tower Workstation, 32GB / 1TBQN-4437, Desktops
40
ACCOUNT 2800Silver, customer build
Mon Jun 29 15:00
Wed Jun 24 11:00
5.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 19 06:00Jun 19 11:55903.90.0Planned
20SUBSUB-BJun 19 20:00Jun 19 22:40501.87.1Planned
30FAFA-06Jun 22 21:25Jun 23 08:50254.014.5Planned
40TBTB-02Jun 23 12:30Jun 23 20:20157.63.4Planned
45CFGCFG-01Jun 24 06:00Jun 24 08:55252.52.2Planned
50PKPK-02Jun 24 09:10Jun 24 11:00151.10.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time5.2 d to spare before the due date.

Order

ReferenceSO-71364
ReleasedFri Jun 19 06:00
DueMon Jun 29 15:00
Priority and weight3, weight 2
Touch time left24.6 h
Sequence position120

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 11 06:00On hand
Enclosure setTidewell PlasticsTue Jun 9 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
SoC moduleKestrel SiliconThu Jun 11 06:00On hand
WO-10094
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
85
Warehouse stockStock replenishment
Tue Jun 30 17:00
Mon Jun 29 09:00
32 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 22 20:30Jun 23 09:259011.220.2Planned
20SUBSUB-AJun 23 19:45Jun 24 07:00503.412.8Planned
30FAFA-03Jun 23 22:55Jun 24 14:40457.50.0Planned
40TBTB-04Jun 26 06:00Jun 26 20:403514.142.2Planned
50PKPK-02Jun 29 07:05Jun 29 09:00151.72.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time32 h to spare before the due date.

Order

ReferenceRP-2724
ReleasedSat Jun 20 06:00
DueTue Jun 30 17:00
Priority and weight3, weight 1
Touch time left41.8 h
Sequence position130

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 10 06:00On hand
Enclosure setTidewell PlasticsMon Jun 15 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
SoC moduleKestrel SiliconWed Jun 17 06:00On hand
Display panelBrightline DisplaysThu Jun 18 06:00On hand
WO-10222
8-Port Gigabit SwitchQN-4070, Networking
150
Warehouse stockStock replenishment
Wed Jul 1 17:00
Mon Jun 29 20:15
45 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 24 14:00Jun 25 06:254514.90.0Planned
20SUBSUB-AJun 24 20:50Jun 25 08:05503.40.1Planned
30FAFA-02Jun 25 06:00Jun 25 13:45256.80.0Planned
40TBTB-01Jun 28 11:50Jun 29 00:303512.174.8Planned
50PKPK-01Jun 29 17:00Jun 29 20:15152.510.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time45 h to spare before the due date.

Order

ReferenceRP-2852
ReleasedSat Jun 20 06:00
DueWed Jul 1 17:00
Priority and weight3, weight 1
Touch time left42.6 h
Sequence position139

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 14 06:00On hand
Enclosure setTidewell PlasticsFri Jun 12 06:00On hand
Power moduleAster PowerWed Jun 24 14:00In transit
SoC moduleKestrel SiliconWed Jun 17 06:00On hand
WO-10275
Wi-Fi 6E Router, grayVW-2128, Networking
60
Warehouse stockStock replenishment
Tue Jun 30 17:00
Mon Jun 29 16:10
25 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 23 06:00Jun 23 14:00906.029.5Planned
20SUBSUB-CJun 24 06:50Jun 24 09:05501.49.8Planned
30FAFA-02Jun 24 19:20Jun 24 22:55452.89.2Planned
40TBTB-03Jun 27 08:40Jun 27 14:10354.957.9Planned
50PKPK-01Jun 29 14:55Jun 29 16:10151.08.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time25 h to spare before the due date.

Order

ReferenceRP-2905
ReleasedSat Jun 20 06:00
DueTue Jun 30 17:00
Priority and weight3, weight 1
Touch time left20.1 h
Sequence position134

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 12 06:00On hand
Enclosure setTidewell PlasticsSun Jun 14 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
SoC moduleKestrel SiliconWed Jun 17 06:00On hand
WO-10133
8" Rugged Tablet, 64GB, grayLM-5109, Tablets
145
Warehouse stockStock replenishment
Thu Jul 2 17:00
Wed Jul 1 17:05
24 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 26 10:30Jun 29 06:309017.80.0Planned
20SUBSUB-AJun 26 19:35Jun 29 08:55505.50.6Planned
30FAFA-03Jun 26 22:35Jun 29 18:152511.80.0Planned
40TBTB-04Jun 30 12:25Jul 1 08:153519.225.6Planned
50PKPK-01Jul 1 14:25Jul 1 17:05152.45.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time24 h to spare before the due date.

Order

ReferenceRP-2763
ReleasedSun Jun 21 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left60.2 h
Sequence position148

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 13 06:00On hand
Enclosure setTidewell PlasticsFri Jun 12 06:00On hand
Power moduleAster PowerFri Jun 26 10:00In transit
SoC moduleKestrel SiliconWed Jun 17 06:00On hand
Display panelBrightline DisplaysFri Jun 19 06:00On hand
WO-10144
4K Conference CameraLM-5365, Peripherals
480
Warehouse stockStock replenishment
Tue Jun 30 17:00
Mon Jun 29 12:25
29 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 22 20:30Jun 23 14:259015.720.2Planned
20SUBSUB-AJun 23 13:45Jun 23 17:50503.27.2Planned
30FAFA-01Jun 23 21:40Jun 24 13:35457.75.9Planned
40TBTB-01Jun 26 10:05Jun 26 15:15354.651.6Planned
50PKPK-01Jun 29 08:10Jun 29 12:25153.58.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time29 h to spare before the due date.

Order

ReferenceRP-2774
ReleasedSun Jun 21 06:00
DueTue Jun 30 17:00
Priority and weight3, weight 1
Touch time left38.6 h
Sequence position131

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 14 06:00On hand
Enclosure setTidewell PlasticsWed Jun 17 06:00On hand
Power moduleAster PowerFri Jun 12 06:00On hand
WO-10232
15" Laptop, 12-core, 32GB / 1TB, grayQN-4418, Laptops
100
Warehouse stockStock replenishment
Thu Jul 2 17:00
Thu Jul 2 16:20
0.7 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 25 14:50Jun 26 04:259011.683.3Planned
20SUBSUB-BJun 26 06:00Jun 26 10:55503.60.0Planned
30FAFA-02Jun 26 08:55Jun 26 18:00457.80.0Planned
40TBTB-02Jun 30 23:55Jul 1 15:103514.7105.6Planned
50PKPK-01Jul 2 14:20Jul 2 16:20151.814.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.7 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2862
ReleasedSun Jun 21 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left43.3 h
Sequence position151

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 18 06:00On hand
Enclosure setTidewell PlasticsThu Jun 11 06:00On hand
Power moduleAster PowerMon Jun 15 06:00On hand
SoC moduleKestrel SiliconMon Jun 15 06:00On hand
Display panelBrightline DisplaysSun Jun 14 06:00On hand
WO-10304
Mechanical Keyboard, TKLVW-8762, Peripherals
320
Warehouse stockStock replenishment
Wed Jul 1 17:00
Mon Jun 29 22:45
42 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 23 17:25Jun 24 04:554510.040.4Planned
20SUBSUB-AJun 24 15:10Jun 24 18:05502.110.9Planned
30FAFA-02Jun 25 13:45Jun 25 19:55454.913.2Planned
40TBTB-04Jun 29 00:30Jun 29 04:00352.980.9Planned
50PKPK-01Jun 29 20:15Jun 29 22:45152.213.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time42 h to spare before the due date.

Order

ReferenceRP-2934
ReleasedSun Jun 21 06:00
DueWed Jul 1 17:00
Priority and weight3, weight 1
Touch time left25.3 h
Sequence position141

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 13 06:00On hand
Enclosure setTidewell PlasticsThu Jun 11 06:00On hand
Power moduleAster PowerThu Jun 18 06:00On hand
WO-10337
24" FHD Monitor, IPSBP-5281, Monitors
40
ACCOUNT 2800Silver, customer build
Tue Jun 30 15:00
Fri Jun 26 21:35
3.7 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 22 06:00Jun 22 09:55902.46.8Planned
20SUBSUB-BJun 22 10:30Jun 22 12:20501.00.0Planned
30FAFA-05Jun 24 13:50Jun 24 16:55252.733.2Planned
40TBTB-02Jun 24 19:30Jun 24 21:50152.12.3Planned
45CFGCFG-01Jun 25 06:00Jun 25 08:3552.50.0Planned
50PKPK-01Jun 26 20:25Jun 26 21:35150.926.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.7 d to spare before the due date.

Order

ReferenceSO-71390
ReleasedSun Jun 21 06:00
DueTue Jun 30 15:00
Priority and weight3, weight 2
Touch time left14.9 h
Sequence position128

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 18 06:00On hand
Enclosure setTidewell PlasticsTue Jun 16 06:00On hand
Power moduleAster PowerSat Jun 13 06:00On hand
Display panelBrightline DisplaysSat Jun 13 06:00On hand
WO-10060
128GB USB Flash Drive, 10-packBP-7439, Storage
110
Warehouse stockStock replenishment
Thu Jul 2 17:00
Tue Jun 30 09:10
2.3 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 24 12:45Jun 24 18:25454.951.8Planned
20SUBSUB-AJun 25 16:25Jun 25 18:05500.816.2Planned
30FAFA-02Jun 25 22:40Jun 26 07:55251.84.2Planned
40TBTB-01Jun 29 09:20Jun 29 13:55154.374.2Planned
50PKPK-01Jun 30 08:10Jun 30 09:10100.810.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.3 d to spare before the due date.

Order

ReferenceRP-2690
ReleasedMon Jun 22 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left15.2 h
Sequence position145

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 13 06:00On hand
Enclosure setTidewell PlasticsMon Jun 15 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
WO-10079
Thin Client, 4GB / 32GB, grayKL-1432, Desktops
20
Warehouse stockStock replenishment
Wed Jul 1 17:00
Mon Jun 29 17:00
2.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 22 06:00Jun 22 09:05452.30.0Planned
20SUBSUB-CJun 22 11:45Jun 22 13:20400.91.7Planned
30FAFA-06Jun 25 09:25Jun 25 12:40452.044.3Planned
40TBTB-02Jun 28 06:50Jun 28 10:55153.865.9Planned
50PKPK-01Jun 29 16:10Jun 29 17:00150.69.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2709
ReleasedMon Jun 22 06:00
DueWed Jul 1 17:00
Priority and weight3, weight 1
Touch time left12.3 h
Sequence position136

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 17 06:00On hand
Enclosure setTidewell PlasticsSat Jun 20 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
SoC moduleKestrel SiliconSat Jun 20 06:00On hand
WO-10285
USB-C Travel Hub, 7-in-1VW-4303, Docks & Hubs
120
Warehouse stockStock replenishment
Thu Jul 2 17:00
Thu Jul 2 17:55
0.9 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 25 11:50Jun 26 01:259011.673.6Planned
20SUBSUB-BJun 26 10:55Jun 26 13:35501.88.4Planned
30FAFA-01Jun 26 14:30Jun 26 18:30453.21.7Planned
40TBTB-02Jun 29 11:00Jun 29 14:45353.266.1Planned
50PKPK-01Jul 2 16:20Jul 2 17:55151.349.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 74 working hours at SMT.
  • Split op 10 across SMT-05 and SMT-06: SMT-06 has 28 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jun 23 12:10.

Order

ReferenceRP-2915
ReleasedMon Jun 22 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left25.1 h
Sequence position153

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 18 06:00On hand
Enclosure setTidewell PlasticsFri Jun 19 06:00On hand
Power moduleAster PowerTue Jun 16 06:00On hand
WO-10338
All-in-One 24", 16GB / 512GB, grayKL-2287, Desktops
150
ACCOUNT 8321Platinum, customer build
Wed Jul 8 15:00
Wed Jul 8 13:45
1.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 30 06:00Jun 30 23:359015.164.5Planned
20SUBSUB-BJul 1 06:25Jul 1 14:15256.99.3Planned
30FAFA-06Jul 2 09:05Jul 6 09:002515.515.7Planned
40TBTB-03Jul 5 13:10Jul 6 19:053529.369.8Planned
45CFGCFG-02Jul 7 15:35Jul 8 08:50259.312.5Planned
50PKPK-01Jul 8 09:05Jul 8 13:45104.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 1.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceSO-71403
ReleasedMon Jun 22 06:00
DueWed Jul 8 15:00
Priority and weight1, weight 5
Touch time left83.7 h
Sequence position168

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 19 06:00On hand
Enclosure setTidewell PlasticsMon Jun 15 06:00On hand
Power moduleAster PowerThu Jun 25 10:00In transit
SoC moduleKestrel SiliconFri Jun 19 06:00On hand
WO-10017
4-Bay NAS Enclosure, grayAF-5514, Storage
135
Warehouse stockStock replenishment
Thu Jul 2 17:00
Tue Jun 30 08:10
2.4 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 24 06:00Jun 24 12:45455.522.8Planned
20SUBSUB-AJun 24 18:05Jun 24 20:15500.88.2Planned
30FAFA-02Jun 25 19:55Jun 25 22:40452.015.9Planned
40TBTB-01Jun 29 04:00Jun 29 09:20354.878.3Planned
50PKPK-01Jun 30 07:00Jun 30 08:10150.913.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.4 d to spare before the due date.

Order

ReferenceRP-2647
ReleasedTue Jun 23 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left17.2 h
Sequence position143

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 19 06:00On hand
Enclosure setTidewell PlasticsMon Jun 15 06:00On hand
Power moduleAster PowerMon Jun 15 06:00On hand
WO-10104
1080p Webcam with micKL-5125, Peripherals
340
Warehouse stockStock replenishment
Thu Jul 2 17:00
Wed Jul 1 14:25
27 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 25 03:15Jun 25 18:309013.242.8Planned
20SUBSUB-BJun 25 19:10Jun 25 22:20502.310.9Planned
30FAFA-01Jun 25 22:20Jun 26 12:10455.61.7Planned
40TBTB-02Jun 29 07:05Jun 29 11:00353.371.9Planned
50PKPK-01Jul 1 11:40Jul 1 14:25152.532.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time27 h to spare before the due date.

Order

ReferenceRP-2734
ReleasedTue Jun 23 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left30.9 h
Sequence position147

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 21 06:00On hand
Enclosure setTidewell PlasticsWed Jun 17 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
WO-10180
Wi-Fi 6 Access Point, ceiling, refreshNB-4322, Networking
65
Warehouse stockStock replenishment
Wed Jul 1 17:00
Tue Jun 30 07:00
34 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 29 06:00Jun 29 12:45455.50.0Planned
20SUBSUB-AJun 29 12:05Jun 29 14:15501.30.1Planned
30FAFA-01Jun 29 14:15Jun 29 17:35452.60.0Planned
40TBTB-01Jun 29 17:15Jun 29 22:20354.50.0Planned
50PKPK-01Jun 29 22:50Jun 30 07:00150.90.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time34 h to spare before the due date.

Order

ReferenceRP-2810
ReleasedTue Jun 23 06:00
DueWed Jul 1 17:00
Priority and weight3, weight 1
Touch time left18.0 h
Sequence position138

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 29 06:00In transit
Enclosure setTidewell PlasticsSat Jun 20 06:00On hand
Power moduleAster PowerTue Jun 16 06:00On hand
SoC moduleKestrel SiliconMon Jun 15 06:00On hand
WO-10212
4-Bay NAS Enclosure, refreshQN-2129, Storage
460
Warehouse stockStock replenishment
Mon Jul 6 17:00
Mon Jul 6 11:20
5.7 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 29 06:30Jun 30 04:409019.491.8Planned
20SUBSUB-AJun 29 20:55Jun 30 07:45503.09.2Planned
30FAFA-03Jun 30 12:05Jun 30 20:30457.26.2Planned
40TBTB-01Jul 2 14:00Jul 3 07:203516.848.1Planned
50PKPK-01Jul 6 07:20Jul 6 11:20153.21.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 5.7 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2842
ReleasedTue Jun 23 06:00
DueMon Jul 6 17:00
Priority and weight3, weight 1
Touch time left53.5 h
Sequence position160

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 15 06:00On hand
Enclosure setTidewell PlasticsThu Jun 18 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
WO-10032
Mesh Wi-Fi Kit, 3-pack, refreshAF-9913, Networking
245
Warehouse stockStock replenishment
Tue Jul 7 17:00
Tue Jul 7 06:05
11 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 29 12:45Jun 30 12:054521.36.2Planned
20SUBSUB-BJun 30 07:50Jun 30 14:05504.95.9Planned
30FAFA-01Jun 30 10:45Jun 30 21:50459.80.2Planned
40TBTB-01Jul 3 15:30Jul 4 09:253517.373.7Planned
50PKPK-02Jul 6 19:15Jul 7 06:05153.612.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time11 h to spare before the due date.

Order

ReferenceRP-2662
ReleasedWed Jun 24 06:00
DueTue Jul 7 17:00
Priority and weight3, weight 1
Touch time left60.2 h
Sequence position164

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 18 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerMon Jun 29 06:00In transit
SoC moduleKestrel SiliconWed Jun 17 06:00On hand
WO-10051
27" 4K Monitor, USB-C, refreshBP-5748, Monitors
220
Warehouse stockStock replenishment
Mon Jul 6 17:00
Mon Jul 6 07:35
9.4 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 28 23:00Jun 29 14:159013.00.0Planned
20SUBSUB-AJun 29 14:15Jun 29 20:55505.37.8Planned
30FAFA-05Jul 1 12:25Jul 2 11:102514.327.8Planned
40TBTB-01Jul 2 02:30Jul 2 14:001511.210.1Planned
50PKPK-02Jul 2 19:30Jul 6 07:35154.84.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time9.4 h to spare before the due date.

Order

ReferenceRP-2681
ReleasedWed Jun 24 06:00
DueMon Jul 6 17:00
Priority and weight3, weight 1
Touch time left52.0 h
Sequence position157

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 22 06:00On hand
Enclosure setTidewell PlasticsTue Jun 16 06:00On hand
Power moduleAster PowerSat Jun 27 10:00In transit
Display panelBrightline DisplaysFri Jun 19 06:00On hand
WO-10075
4-Bay NAS EnclosureBP-8568, Storage
530
Warehouse stockStock replenishment
Tue Jul 7 17:00
Tue Jul 7 09:35
7.4 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 29 11:25Jun 30 13:059022.973.4Planned
20SUBSUB-AJun 30 10:30Jun 30 13:55253.010.9Planned
30FAFA-03Jun 30 20:30Jul 1 11:1557.28.5Planned
40TBTB-03Jul 3 17:50Jul 4 11:203516.968.2Planned
50PKPK-02Jul 7 06:05Jul 7 09:35153.216.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.4 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2705
ReleasedWed Jun 24 06:00
DueTue Jul 7 17:00
Priority and weight3, weight 1
Touch time left56.1 h
Sequence position165

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 21 06:00On hand
Enclosure setTidewell PlasticsSat Jun 20 06:00On hand
Power moduleAster PowerFri Jun 19 06:00On hand
WO-10160
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
380
Warehouse stockStock replenishment
Thu Jul 9 17:00
Fri Jul 10 19:30
26 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 5 23:25Jul 6 23:359021.4154.2Planned
20SUBSUB-AJul 6 18:15Jul 7 11:50508.811.8Planned
30FAFA-04Jul 7 06:00Jul 8 14:302523.62.0Planned
40TBTB-03Jul 8 06:00Jul 9 01:103518.620.2Planned
50PKPK-01Jul 10 10:55Jul 10 19:30107.920.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 154 working hours at SMT.
  • Split op 10 across SMT-01 and SMT-07: SMT-07 has 60 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Mon Jun 29 10:35.

Order

ReferenceRP-2790
ReleasedWed Jun 24 06:00
DueThu Jul 9 17:00
Priority and weight3, weight 1
Touch time left83.8 h
Sequence position187

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 20 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerTue Jun 16 06:00On hand
Display panelBrightline DisplaysMon Jun 22 06:00On hand
WO-10251
4K Conference Camera, grayQN-6249, Peripherals
105
Warehouse stockStock replenishment
Thu Jul 2 17:00
Thu Jul 2 19:30
2.5 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 25 06:00Jun 25 11:50903.822.8Planned
20SUBSUB-AJun 26 08:50Jun 26 11:00500.815.0Planned
30FAFA-01Jun 26 12:10Jun 26 14:30251.91.3Planned
40TBTB-04Jun 29 06:00Jun 29 07:25151.264.2Planned
50PKPK-02Jul 2 17:50Jul 2 19:30150.957.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: laborWaits 64 working hours for test technicians at TB.
  • Add test technicians to the shifts before Thu Jul 2; the TB stations are free but not staffed.

With every resource to itself it would finish Wed Jun 24 19:05.

Order

ReferenceRP-2881
ReleasedWed Jun 24 06:00
DueThu Jul 2 17:00
Priority and weight3, weight 1
Touch time left11.9 h
Sequence position152

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 14 06:00On hand
Enclosure setTidewell PlasticsThu Jun 18 06:00On hand
Power moduleAster PowerMon Jun 22 06:00On hand
WO-10333
10" Tablet, 64GBNB-7024, Tablets
150
ACCOUNT 8321Platinum, customer build
Wed Jul 8 15:00
Thu Jul 9 18:30
28 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 1 03:55Jul 1 20:504515.2111.9Planned
20SUBSUB-CJul 1 17:25Jul 2 06:25504.76.9Planned
30FAFA-03Jul 2 09:45Jul 2 21:354510.16.2Planned
40TBTB-02Jul 5 00:30Jul 5 17:353516.557.8Planned
45CFGCFG-02Jul 9 06:00Jul 9 15:5559.348.0Planned
50PKPK-01Jul 9 16:10Jul 9 18:30152.10.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 112 working hours at SMT.
  • SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Fri Jun 26 20:30.

Order

ReferenceSO-71338
ReleasedWed Jun 24 06:00
DueWed Jul 8 15:00
Priority and weight1, weight 5
Touch time left61.1 h
Sequence position174

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 16 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerSun Jun 21 06:00On hand
SoC moduleKestrel SiliconThu Jun 18 06:00On hand
Display panelBrightline DisplaysMon Jun 22 06:00On hand
WO-10003
Ergonomic Mouse, wireless, grayAF-4219, Peripherals
480
Warehouse stockStock replenishment
Mon Jul 6 17:00
Thu Jul 2 22:30
3.8 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 26 07:05Jun 29 03:009017.224.1Planned
20SUBSUB-BJun 29 12:55Jun 29 17:15503.517.5Planned
30FAFA-01Jun 29 17:35Jun 30 10:45458.43.2Planned
40TBTB-02Jun 30 11:50Jun 30 17:25355.015.8Planned
50PKPK-01Jul 2 17:55Jul 2 22:30153.832.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.8 d to spare before the due date.

Order

ReferenceRP-2633
ReleasedThu Jun 25 06:00
DueMon Jul 6 17:00
Priority and weight3, weight 1
Touch time left41.8 h
Sequence position156

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 21 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
WO-10139
14" Laptop, 8-core, 16GB / 512GBLM-5139, Laptops
470
Warehouse stockStock replenishment
Mon Jul 20 17:00
Mon Jul 20 17:35
0.6 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 13 19:35Jul 16 08:059056.2264.3Planned
20SUBSUB-AJul 15 08:20Jul 16 10:555017.218.3Planned
30FAFA-01Jul 15 11:50Jul 17 18:304537.90.0Planned
40TBTB-02Jul 16 15:45Jul 19 15:101571.222.8Planned
50PKPK-01Jul 20 08:30Jul 20 17:35158.32.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 264 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-01: SMT-01 has 63 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Mon Jul 6 06:35.

Order

ReferenceRP-2769
ReleasedThu Jun 25 06:00
DueMon Jul 20 17:00
Priority and weight3, weight 1
Touch time left194.5 h
Sequence position231

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 16 06:00On hand
Enclosure setTidewell PlasticsMon Jun 22 06:00On hand
Power moduleAster PowerTue Jun 16 06:00On hand
SoC moduleKestrel SiliconMon Jun 15 06:00On hand
Display panelBrightline DisplaysTue Jun 23 06:00On hand
WO-10195
10" Tablet, 64GBNB-7024, Tablets
115
Warehouse stockStock replenishment
Mon Jul 6 17:00
Mon Jul 6 07:20
9.7 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 29 03:00Jun 29 16:409011.742.8Planned
20SUBSUB-BJun 29 17:15Jun 29 22:10503.66.8Planned
30FAFA-03Jun 29 20:25Jun 30 12:05257.80.0Planned
40TBTB-03Jul 2 06:00Jul 2 19:153512.746.5Planned
50PKPK-01Jul 2 22:30Jul 6 07:20151.62.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time9.7 h to spare before the due date.

Order

ReferenceRP-2825
ReleasedThu Jun 25 06:00
DueMon Jul 6 17:00
Priority and weight3, weight 1
Touch time left40.8 h
Sequence position159

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 18 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
SoC moduleKestrel SiliconMon Jun 22 06:00On hand
Display panelBrightline DisplaysSat Jun 20 06:00On hand
WO-10262
22" Touch Monitor, grayVW-1017, Monitors
525
Warehouse stockStock replenishment
Wed Jul 15 17:00
Thu Jul 16 21:00
28 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 9 06:00Jul 10 22:559037.4206.0Planned
20SUBSUB-CJul 10 10:40Jul 13 10:455015.214.6Planned
30FAFA-06Jul 10 22:35Jul 15 16:004541.28.8Planned
40TBTB-04Jul 14 16:10Jul 16 01:103532.429.1Planned
50PKPK-02Jul 16 06:00Jul 16 21:001013.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 206 working hours at SMT.
  • Split op 10 across SMT-05 and SMT-07: SMT-07 has 83 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Thu Jul 2 20:55.

Order

ReferenceRP-2892
ReleasedThu Jun 25 06:00
DueWed Jul 15 17:00
Priority and weight3, weight 1
Touch time left143.9 h
Sequence position214

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 23 06:00On hand
Enclosure setTidewell PlasticsSat Jun 20 06:00On hand
Power moduleAster PowerTue Jun 16 06:00On hand
Display panelBrightline DisplaysThu Jun 18 06:00On hand
WO-10313
22" Touch Monitor, grayVW-1017, Monitors
80
ACCOUNT 3327Gold, customer build
Tue Jul 7 15:00
Mon Jul 6 19:15
20 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 26 04:25Jun 26 13:10906.821.4Planned
20SUBSUB-BJun 26 13:35Jun 26 16:45502.32.4Planned
30FAFA-05Jul 2 11:10Jul 2 17:55256.359.0Planned
40TBTB-03Jul 3 12:15Jul 3 17:50355.020.4Planned
45CFGCFG-02Jul 6 06:00Jul 6 11:55255.00.0Planned
50PKPK-02Jul 6 16:20Jul 6 19:15152.24.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time20 h to spare before the due date.

Order

ReferenceSO-71078
ReleasedThu Jun 25 06:00
DueTue Jul 7 15:00
Priority and weight2, weight 3
Touch time left31.6 h
Sequence position163

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 21 06:00On hand
Enclosure setTidewell PlasticsWed Jun 17 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
Display panelBrightline DisplaysTue Jun 23 06:00On hand
WO-10331
22" Touch MonitorVW-1888, Monitors
300
ACCOUNT 6021Standard, customer build
Wed Jul 8 15:00
Thu Jul 9 16:15
25 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jun 30 23:35Jul 1 19:209017.085.1Planned
20SUBSUB-AJul 1 13:35Jul 1 21:55507.07.1Planned
30FAFA-04Jul 2 19:50Jul 6 23:002518.819.5Planned
40TBTB-01Jul 6 10:25Jul 7 01:453514.83.8Planned
45CFGCFG-01Jul 8 06:00Jul 9 09:002518.616.0Planned
50PKPK-02Jul 9 09:15Jul 9 16:15106.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 85 working hours at SMT.
  • SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 1 08:25.

Order

ReferenceSO-71312
ReleasedThu Jun 25 06:00
DueWed Jul 8 15:00
Priority and weight4, weight 1
Touch time left86.3 h
Sequence position173

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 15 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerMon Jun 22 06:00On hand
Display panelBrightline DisplaysMon Jun 15 06:00On hand
WO-10042
KVM Switch, 2-port 4KBP-5055, Docks & Hubs
550
Warehouse stockStock replenishment
Thu Jul 9 17:00
Thu Jul 9 16:05
0.9 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 1 19:20Jul 6 21:359047.280.6Planned
20SUBSUB-CJul 6 14:10Jul 6 22:45507.223.7Planned
30FAFA-01Jul 6 15:55Jul 7 13:454513.10.0Planned
40TBTB-03Jul 7 06:50Jul 7 19:551512.812.7Planned
50PKPK-01Jul 9 10:35Jul 9 16:05155.222.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.9 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2672
ReleasedFri Jun 26 06:00
DueThu Jul 9 17:00
Priority and weight3, weight 1
Touch time left89.2 h
Sequence position184

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 23 06:00On hand
Enclosure setTidewell PlasticsFri Jun 19 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
WO-10176
8" Rugged Tablet, 64GBNB-1986, Tablets
95
Warehouse stockStock replenishment
Tue Jul 7 17:00
Tue Jul 7 09:50
7.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 30 08:00Jun 30 21:259010.947.5Planned
20SUBSUB-AJul 1 06:25Jul 1 11:05503.36.7Planned
30FAFA-01Jul 1 14:55Jul 2 06:20457.25.1Planned
40TBTB-04Jul 4 16:35Jul 5 04:553511.868.3Planned
50PKPK-01Jul 7 08:05Jul 7 09:50151.518.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2806
ReleasedFri Jun 26 06:00
DueTue Jul 7 17:00
Priority and weight3, weight 1
Touch time left38.6 h
Sequence position169

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 17 06:00On hand
Enclosure setTidewell PlasticsThu Jun 18 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
SoC moduleKestrel SiliconFri Jun 19 06:00On hand
Display panelBrightline DisplaysWed Jun 24 06:00On hand
WO-10247
Thunderbolt Dock, 4 portsQN-5393, Docks & Hubs
415
Warehouse stockStock replenishment
Wed Jul 8 17:00
Thu Jul 9 06:15
13 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 1 06:35Jul 6 02:209041.052.8Planned
20SUBSUB-AJul 6 06:00Jul 6 13:40506.324.4Planned
30FAFA-02Jul 6 07:55Jul 6 21:004511.30.0Planned
40TBTB-03Jul 6 19:05Jul 7 06:503511.28.2Planned
50PKPK-01Jul 8 17:55Jul 9 06:15154.626.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 53 working hours at SMT.
  • Split op 10 across SMT-06 and SMT-01: SMT-01 has 23 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 1 11:10.

Order

ReferenceRP-2877
ReleasedFri Jun 26 06:00
DueWed Jul 8 17:00
Priority and weight3, weight 1
Touch time left78.3 h
Sequence position181

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 16 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
WO-10291
27" 4K Monitor, USB-CVW-6003, Monitors
365
Warehouse stockStock replenishment
Fri Jul 10 17:00
Wed Jul 8 11:35
2.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 1 05:55Jul 2 05:159020.668.2Planned
20SUBSUB-BJul 1 18:00Jul 2 10:50258.46.8Planned
30FAFA-06Jul 6 09:00Jul 7 16:554522.721.7Planned
40TBTB-01Jul 7 01:45Jul 7 19:501517.812.1Planned
50PKPK-02Jul 7 20:20Jul 8 11:3557.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.2 d to spare before the due date.

Order

ReferenceRP-2921
ReleasedFri Jun 26 06:00
DueFri Jul 10 17:00
Priority and weight3, weight 1
Touch time left80.2 h
Sequence position176

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 17 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
Display panelBrightline DisplaysSat Jun 20 06:00On hand
WO-10023
Mini PC, 8-core, 16GB / 512GBAF-7495, Desktops
90
Warehouse stockStock replenishment
Fri Jul 10 17:00
Fri Jul 10 20:00
3.0 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 6 14:35Jul 7 03:509011.090.8Planned
20SUBSUB-CJul 7 12:35Jul 7 18:05255.16.1Planned
30FAFA-06Jul 8 09:55Jul 8 22:20511.310.3Planned
40TBTB-02Jul 9 06:30Jul 10 04:101521.413.4Planned
50PKPK-02Jul 10 16:30Jul 10 20:0052.910.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 91 working hours at SMT.
  • Split op 10 across SMT-06 and SMT-07: SMT-07 has 30 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 1 07:40.

Order

ReferenceRP-2653
ReleasedSat Jun 27 06:00
DueFri Jul 10 17:00
Priority and weight3, weight 1
Touch time left54.1 h
Sequence position193

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 19 06:00On hand
Enclosure setTidewell PlasticsMon Jun 22 06:00On hand
Power moduleAster PowerFri Jun 19 06:00On hand
SoC moduleKestrel SiliconFri Jun 19 06:00On hand
WO-10119
14" Laptop, 8-core, 16GB / 512GB, grayKL-9462, Laptops
90
Warehouse stockStock replenishment
Tue Jul 7 17:00
Mon Jul 6 15:55
25 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jun 29 16:40Jun 30 08:009013.116.9Planned
20SUBSUB-AJun 30 13:55Jun 30 19:15504.07.4Planned
30FAFA-01Jun 30 21:50Jul 1 14:55458.84.1Planned
40TBTB-01Jul 4 09:25Jul 5 02:303516.570.2Planned
50PKPK-01Jul 6 13:40Jul 6 15:55152.07.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time25 h to spare before the due date.

Order

ReferenceRP-2749
ReleasedSat Jun 27 06:00
DueTue Jul 7 17:00
Priority and weight3, weight 1
Touch time left48.3 h
Sequence position166

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 20 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerFri Jun 19 06:00On hand
SoC moduleKestrel SiliconTue Jun 23 06:00On hand
Display panelBrightline DisplaysSun Jun 21 06:00On hand
WO-10145
4K Conference CameraLM-5365, Peripherals
490
Warehouse stockStock replenishment
Tue Jul 7 17:00
Tue Jul 7 13:55
3.1 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 30 04:40Jun 30 23:059015.928.2Planned
20SUBSUB-AJun 30 19:15Jul 1 06:25503.39.9Planned
30FAFA-03Jul 1 11:15Jul 1 20:20457.87.0Planned
40TBTB-04Jul 4 11:20Jul 4 16:35354.770.2Planned
50PKPK-02Jul 7 09:35Jul 7 13:55153.619.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 3.1 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2775
ReleasedSat Jun 27 06:00
DueTue Jul 7 17:00
Priority and weight3, weight 1
Touch time left39.2 h
Sequence position167

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 20 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
WO-10206
14" Rugged Laptop, 16GB / 256GBNB-7498, Laptops
495
Warehouse stockStock replenishment
Wed Jul 22 17:00
Fri Jul 24 08:35
40 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 15 06:00Jul 20 05:209066.3258.2Planned
20SUBSUB-CJul 16 19:55Jul 20 08:055020.320.2Planned
30FAFA-02Jul 17 06:00Jul 21 20:052544.70.0Planned
40TBTB-04Jul 20 02:05Jul 23 14:303583.862.3Planned
50PKPK-01Jul 23 15:00Jul 24 08:35159.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 258 working hours at SMT.
  • Split op 10 across SMT-02 and SMT-01: SMT-01 has 25 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 8 09:25.

Order

ReferenceRP-2836
ReleasedSat Jun 27 06:00
DueWed Jul 22 17:00
Priority and weight3, weight 1
Touch time left228.6 h
Sequence position243

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 18 06:00On hand
Enclosure setTidewell PlasticsThu Jun 18 06:00On hand
Power moduleAster PowerThu Jun 25 06:00On hand
SoC moduleKestrel SiliconMon Jun 22 06:00On hand
Display panelBrightline DisplaysFri Jun 19 06:00On hand
WO-10218
USB-C Travel Hub, 7-in-1, grayQN-2461, Docks & Hubs
210
Warehouse stockStock replenishment
Tue Jul 7 17:00
Tue Jul 7 12:55
4.1 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jun 30 12:05Jul 1 11:259020.635.1Planned
20SUBSUB-CJul 1 08:15Jul 1 12:45503.26.2Planned
30FAFA-03Jul 1 20:20Jul 2 09:45455.79.3Planned
40TBTB-02Jul 4 11:35Jul 4 17:45355.660.8Planned
50PKPK-01Jul 7 09:50Jul 7 12:55152.319.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.1 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2848
ReleasedSat Jun 27 06:00
DueTue Jul 7 17:00
Priority and weight3, weight 1
Touch time left41.2 h
Sequence position170

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 17 06:00On hand
Enclosure setTidewell PlasticsMon Jun 22 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
WO-10237
Tower Workstation, 32GB / 1TBQN-4437, Desktops
30
Warehouse stockStock replenishment
Mon Jul 6 17:00
Mon Jul 6 12:25
4.6 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 29 06:00Jun 29 11:25903.46.8Planned
20SUBSUB-CJun 29 21:20Jun 30 06:20401.38.9Planned
30FAFA-04Jul 1 19:05Jul 1 22:50453.027.5Planned
40TBTB-03Jul 3 06:00Jul 3 12:15355.730.9Planned
50PKPK-01Jul 6 11:20Jul 6 12:25150.84.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.6 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2867
ReleasedSat Jun 27 06:00
DueMon Jul 6 17:00
Priority and weight3, weight 1
Touch time left18.0 h
Sequence position161

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 21 06:00On hand
Enclosure setTidewell PlasticsMon Jun 22 06:00On hand
Power moduleAster PowerFri Jun 19 06:00On hand
SoC moduleKestrel SiliconWed Jun 17 06:00On hand
WO-10271
Thin Client, 4GB / 32GBVW-2014, Desktops
35
Warehouse stockStock replenishment
Mon Jul 6 17:00
Mon Jul 6 13:40
3.3 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 29 11:10Jun 29 15:50453.911.4Planned
20SUBSUB-BJun 29 22:10Jun 30 07:50501.85.3Planned
30FAFA-04Jul 1 22:50Jul 2 10:45254.029.8Planned
40TBTB-01Jul 3 07:20Jul 3 15:30357.620.3Planned
50PKPK-01Jul 6 12:25Jul 6 13:40101.15.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 3.3 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2901
ReleasedSat Jun 27 06:00
DueMon Jul 6 17:00
Priority and weight3, weight 1
Touch time left21.2 h
Sequence position162

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 23 06:00On hand
Enclosure setTidewell PlasticsThu Jun 18 06:00On hand
Power moduleAster PowerWed Jun 17 06:00On hand
SoC moduleKestrel SiliconThu Jun 18 06:00On hand
WO-10309
27" 4K Monitor, USB-C, refreshBP-5748, Monitors
120
ACCOUNT 7702Gold, customer build
Wed Jul 8 15:00
Tue Jul 7 17:30
22 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jun 30 23:05Jul 1 06:35107.129.6Planned
20SUBSUB-BJul 1 14:15Jul 1 18:00502.97.8Planned
30FAFA-04Jul 2 10:45Jul 2 19:50457.810.2Planned
40TBTB-02Jul 4 17:45Jul 5 00:30356.250.7Planned
45CFGCFG-01Jul 7 06:00Jul 7 14:20257.416.0Planned
50PKPK-02Jul 7 14:35Jul 7 17:30152.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time22 h to spare before the due date.

Order

ReferenceSO-71026
ReleasedSat Jun 27 06:00
DueWed Jul 8 15:00
Priority and weight2, weight 3
Touch time left37.1 h
Sequence position172

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 23 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerThu Jun 18 06:00On hand
Display panelBrightline DisplaysTue Jun 23 06:00On hand
WO-10312
27" 4K Monitor, USB-C, refreshBP-5748, Monitors
120
ACCOUNT 9148Standard, customer build
Thu Jul 9 15:00
Fri Jul 10 10:55
20 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 1 09:45Jul 1 20:35908.356.0Planned
20SUBSUB-AJul 1 21:55Jul 2 08:30402.95.7Planned
30FAFA-05Jul 6 07:45Jul 6 16:50457.816.7Planned
40TBTB-02Jul 7 06:00Jul 7 12:45356.217.4Planned
45CFGCFG-01Jul 9 15:55Jul 10 07:15257.434.7Planned
50PKPK-01Jul 10 07:30Jul 10 10:55152.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 56 working hours at SMT.
  • SMT-06 has a 15 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jun 30 15:10.

Order

ReferenceSO-71065
ReleasedSat Jun 27 06:00
DueThu Jul 9 15:00
Priority and weight4, weight 1
Touch time left39.5 h
Sequence position183

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 23 06:00On hand
Enclosure setTidewell PlasticsThu Jun 18 06:00On hand
Power moduleAster PowerSun Jun 21 06:00On hand
Display panelBrightline DisplaysWed Jun 24 06:00On hand
WO-10085
Chromebook 11", 4GB / 64GB, refreshKL-1625, Laptops
150
Warehouse stockStock replenishment
Thu Jul 9 17:00
Thu Jul 9 22:05
5.1 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 2 05:15Jul 6 01:459019.074.2Planned
20SUBSUB-CJul 6 06:00Jul 6 13:10505.88.4Planned
30FAFA-05Jul 6 16:50Jul 7 14:204512.87.2Planned
40TBTB-02Jul 7 12:45Jul 8 13:203524.014.2Planned
50PKPK-01Jul 9 19:00Jul 9 22:05152.820.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 74 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-02: SMT-02 has 11 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 1 19:10.

Order

ReferenceRP-2715
ReleasedSun Jun 28 06:00
DueThu Jul 9 17:00
Priority and weight3, weight 1
Touch time left68.3 h
Sequence position185

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 20 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
SoC moduleKestrel SiliconFri Jun 26 06:00On hand
Display panelBrightline DisplaysThu Jun 25 06:00On hand
WO-10152
2TB Portable SSDLM-7276, Storage
350
Warehouse stockStock replenishment
Wed Jul 8 17:00
Wed Jul 8 17:55
0.9 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 2 06:00Jul 2 22:259013.90.0Planned
20SUBSUB-BJul 6 06:00Jul 6 09:00502.212.0Planned
30FAFA-01Jul 6 07:25Jul 6 13:50455.20.0Planned
40TBTB-02Jul 6 09:10Jul 6 21:553512.20.0Planned
50PKPK-01Jul 8 15:20Jul 8 17:55152.325.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 25 working hours at PK.
  • Run Saturday overtime on PK (set allow_overtime to Y and list PK in overtime_work_centers).

With every resource to itself it would finish Tue Jul 7 07:40.

Order

ReferenceRP-2782
ReleasedSun Jun 28 06:00
DueWed Jul 8 17:00
Priority and weight3, weight 1
Touch time left39.7 h
Sequence position179

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 2 06:00In transit
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
WO-10267
24-Port PoE Switch, managedVW-1670, Networking
115
Warehouse stockStock replenishment
Thu Jul 9 17:00
Thu Jul 9 18:25
1.4 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 6 05:55Jul 6 19:309011.198.7Planned
20SUBSUB-AJul 7 11:50Jul 7 15:15502.614.6Planned
30FAFA-01Jul 7 14:05Jul 7 20:25455.10.0Planned
40TBTB-01Jul 9 01:30Jul 9 10:45159.032.2Planned
50PKPK-02Jul 9 16:15Jul 9 18:25151.95.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 99 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-07: SMT-07 has 30 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jun 30 08:10.

Order

ReferenceRP-2897
ReleasedSun Jun 28 06:00
DueThu Jul 9 17:00
Priority and weight3, weight 1
Touch time left33.2 h
Sequence position191

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 25 06:00On hand
Enclosure setTidewell PlasticsFri Jun 19 06:00On hand
Power moduleAster PowerSun Jun 21 06:00On hand
SoC moduleKestrel SiliconThu Jun 18 06:00On hand
WO-10281
Ergonomic Mouse, wirelessVW-4001, Peripherals
490
Warehouse stockStock replenishment
Wed Jul 8 17:00
Thu Jul 9 10:35
18 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 1 11:25Jul 2 05:509016.257.2Planned
20SUBSUB-CJul 2 06:25Jul 2 11:05503.37.8Planned
30FAFA-01Jul 2 15:10Jul 6 07:20457.96.8Planned
40TBTB-01Jul 6 02:50Jul 6 08:05354.781.8Planned
50PKPK-01Jul 9 06:15Jul 9 10:35153.645.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 82 working hours at TB.
  • TB-04 has a 22 h opening before this order starts but no test technicians free then. Add crew to that shift.

With every resource to itself it would finish Tue Jun 30 13:25.

Order

ReferenceRP-2911
ReleasedSun Jun 28 06:00
DueWed Jul 8 17:00
Priority and weight3, weight 1
Touch time left39.6 h
Sequence position182

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 25 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerSun Jun 21 06:00On hand
WO-10300
USB-C Dock, 100W, dual displayVW-7925, Docks & Hubs
130
Warehouse stockStock replenishment
Tue Jul 7 17:00
Tue Jul 7 14:20
2.7 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jun 30 13:05Jul 1 03:559012.636.1Planned
20SUBSUB-AJul 1 11:05Jul 1 13:35501.77.1Planned
30FAFA-01Jul 2 06:20Jul 2 10:35453.010.0Planned
40TBTB-03Jul 2 19:15Jul 2 22:45352.910.8Planned
50PKPK-01Jul 7 12:55Jul 7 14:20101.222.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 2.7 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2930
ReleasedSun Jun 28 06:00
DueTue Jul 7 17:00
Priority and weight3, weight 1
Touch time left25.2 h
Sequence position171

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 24 06:00On hand
Enclosure setTidewell PlasticsThu Jun 25 06:00On hand
Power moduleAster PowerThu Jun 25 06:00On hand
WO-10013
All-in-One 24", 16GB / 512GBAF-4434, Desktops
45
Warehouse stockStock replenishment
Wed Jul 8 17:00
Wed Jul 8 15:20
1.7 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jun 29 15:50Jun 29 22:30455.49.3Planned
20SUBSUB-BJun 30 14:05Jun 30 17:25502.57.6Planned
30FAFA-05Jul 2 17:55Jul 6 07:45455.632.2Planned
40TBTB-04Jul 6 08:00Jul 6 19:053510.50.0Planned
50PKPK-01Jul 8 13:45Jul 8 15:2051.526.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 1.7 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2643
ReleasedMon Jun 29 06:00
DueWed Jul 8 17:00
Priority and weight3, weight 1
Touch time left28.5 h
Sequence position175

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 22 06:00On hand
Enclosure setTidewell PlasticsWed Jun 24 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
SoC moduleKestrel SiliconThu Jun 25 06:00On hand
WO-10056
128GB USB Flash Drive, 10-pack, refreshBP-7381, Storage
130
Warehouse stockStock replenishment
Wed Jul 8 17:00
Tue Jul 7 15:35
25 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 1 06:00Jul 1 13:45905.845.5Planned
20SUBSUB-CJul 1 12:55Jul 1 14:40500.92.4Planned
30FAFA-01Jul 2 10:35Jul 2 13:30452.212.2Planned
40TBTB-01Jul 5 02:30Jul 5 08:05355.062.1Planned
50PKPK-01Jul 7 14:20Jul 7 15:35151.023.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time25 h to spare before the due date.

Order

ReferenceRP-2686
ReleasedMon Jun 29 06:00
DueWed Jul 8 17:00
Priority and weight3, weight 1
Touch time left18.8 h
Sequence position177

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 21 06:00On hand
Enclosure setTidewell PlasticsMon Jun 22 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
WO-10100
Wi-Fi 6E RouterKL-3459, Networking
20
Warehouse stockStock replenishment
Wed Jul 8 17:00
Tue Jul 7 14:30
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 1 06:00Jul 1 09:45902.245.5Planned
20SUBSUB-CJul 1 14:40Jul 1 16:00500.54.2Planned
30FAFA-01Jul 2 13:30Jul 2 15:10450.913.2Planned
40TBTB-04Jul 3 20:15Jul 3 22:25351.628.8Planned
50PKPK-02Jul 7 13:55Jul 7 14:30150.323.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2730
ReleasedMon Jun 29 06:00
DueWed Jul 8 17:00
Priority and weight3, weight 1
Touch time left9.5 h
Sequence position178

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 27 06:00On hand
Enclosure setTidewell PlasticsFri Jun 19 06:00On hand
Power moduleAster PowerSat Jun 27 06:00On hand
SoC moduleKestrel SiliconThu Jun 25 06:00On hand
WO-10129
24-Port PoE Switch, managed, refreshLM-3668, Networking
160
Warehouse stockStock replenishment
Thu Jul 9 17:00
Fri Jul 10 13:55
21 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 2 05:50Jul 5 23:259016.168.1Planned
20SUBSUB-AJul 6 13:40Jul 6 18:15503.816.2Planned
30FAFA-02Jul 6 21:00Jul 7 12:40457.44.5Planned
40TBTB-01Jul 7 19:50Jul 8 09:303513.112.5Planned
50PKPK-02Jul 10 11:00Jul 10 13:55152.732.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 68 working hours at SMT.
  • Split op 10 across SMT-02 and SMT-05: SMT-05 has 18 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 1 08:55.

Order

ReferenceRP-2759
ReleasedMon Jun 29 06:00
DueThu Jul 9 17:00
Priority and weight3, weight 1
Touch time left46.9 h
Sequence position186

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 24 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerSat Jun 20 06:00On hand
SoC moduleKestrel SiliconSat Jun 27 06:00On hand
WO-10228
Mini PC, 8-core, 16GB / 512GB, refreshQN-4241, Desktops
90
Warehouse stockStock replenishment
Thu Jul 9 17:00
Fri Jul 10 16:30
24 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 6 02:20Jul 6 14:359010.088.6Planned
20SUBSUB-CJul 7 07:20Jul 7 12:35503.913.3Planned
30FAFA-06Jul 7 16:55Jul 8 09:55458.85.8Planned
40TBTB-02Jul 8 13:20Jul 9 06:303516.67.0Planned
50PKPK-02Jul 10 13:55Jul 10 16:30152.322.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 89 working hours at SMT.
  • Split op 10 across SMT-07 and SMT-05: SMT-05 has 18 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 1 08:35.

Order

ReferenceRP-2858
ReleasedMon Jun 29 06:00
DueThu Jul 9 17:00
Priority and weight3, weight 1
Touch time left45.5 h
Sequence position190

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 25 06:00On hand
Enclosure setTidewell PlasticsFri Jun 26 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
SoC moduleKestrel SiliconSun Jun 21 06:00On hand
WO-10028
1TB NVMe SSDAF-7757, Storage
530
Warehouse stockStock replenishment
Mon Jul 13 17:00
Mon Jul 13 08:40
8.3 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 7 03:50Jul 8 02:209020.089.8Planned
20SUBSUB-CJul 7 21:10Jul 8 08:05503.112.4Planned
30FAFA-02Jul 7 22:55Jul 8 13:5057.30.3Planned
40TBTB-01Jul 10 04:10Jul 10 21:451517.345.2Planned
50PKPK-01Jul 10 22:15Jul 13 08:4053.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.3 h to spare before the due date.

Order

ReferenceRP-2658
ReleasedTue Jun 30 06:00
DueMon Jul 13 17:00
Priority and weight3, weight 1
Touch time left53.8 h
Sequence position197

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jun 25 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerSun Jun 28 06:00On hand
WO-10037
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
170
Warehouse stockStock replenishment
Wed Jul 15 17:00
Wed Jul 15 08:10
8.8 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 8 21:05Jul 9 19:409019.8128.8Planned
20SUBSUB-BJul 9 14:35Jul 9 22:00506.18.1Planned
30FAFA-03Jul 9 22:35Jul 10 20:202513.34.6Planned
40TBTB-02Jul 13 19:50Jul 14 21:303525.181.6Planned
50PKPK-02Jul 14 22:00Jul 15 08:10103.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.8 h to spare before the due date.

Order

ReferenceRP-2667
ReleasedTue Jun 30 06:00
DueWed Jul 15 17:00
Priority and weight3, weight 1
Touch time left70.8 h
Sequence position209

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsFri Jun 26 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
SoC moduleKestrel SiliconWed Jun 24 06:00On hand
Display panelBrightline DisplaysWed Jun 24 06:00On hand
WO-10066
1TB NVMe SSD, refreshBP-7490, Storage
270
Warehouse stockStock replenishment
Fri Jul 10 17:00
Fri Jul 10 22:00
5.0 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 6 19:30Jul 7 11:059013.381.8Planned
20SUBSUB-AJul 7 15:15Jul 7 18:10502.18.8Planned
30FAFA-02Jul 7 16:45Jul 7 22:55454.90.0Planned
40TBTB-01Jul 9 10:45Jul 9 22:553511.640.1Planned
50PKPK-01Jul 10 19:30Jul 10 22:00152.212.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 82 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-07: SMT-07 has 28 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 1 15:25.

Order

ReferenceRP-2696
ReleasedTue Jun 30 06:00
DueFri Jul 10 17:00
Priority and weight3, weight 1
Touch time left38.1 h
Sequence position194

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsThu Jun 25 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
WO-10110
Wi-Fi 6 Access Point, ceilingKL-5384, Networking
100
Warehouse stockStock replenishment
Fri Jul 10 17:00
Fri Jul 10 07:10
9.8 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 6 23:35Jul 7 08:40907.385.8Planned
20SUBSUB-CJul 7 18:05Jul 7 21:10501.811.6Planned
30FAFA-01Jul 7 20:35Jul 8 07:25253.40.0Planned
40TBTB-01Jul 8 15:25Jul 8 22:00356.016.4Planned
50PKPK-01Jul 9 22:40Jul 10 07:10151.216.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time9.8 h to spare before the due date.

Order

ReferenceRP-2740
ReleasedTue Jun 30 06:00
DueFri Jul 10 17:00
Priority and weight3, weight 1
Touch time left23.3 h
Sequence position195

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 22 06:00On hand
Enclosure setTidewell PlasticsSun Jun 28 06:00On hand
Power moduleAster PowerMon Jun 22 06:00On hand
SoC moduleKestrel SiliconWed Jun 24 06:00On hand
WO-10167
34" Ultrawide Monitor, curved, grayLM-9032, Monitors
80
Warehouse stockStock replenishment
Fri Jul 10 17:00
Wed Jul 8 18:25
47 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 2 06:00Jul 2 14:30457.245.5Planned
20SUBSUB-BJul 2 13:25Jul 2 16:35402.51.1Planned
30FAFA-05Jul 7 14:20Jul 7 22:20456.830.4Planned
40TBTB-01Jul 8 09:30Jul 8 15:25355.313.4Planned
50PKPK-02Jul 8 15:55Jul 8 18:25102.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time47 h to spare before the due date.

Order

ReferenceRP-2797
ReleasedTue Jun 30 06:00
DueFri Jul 10 17:00
Priority and weight3, weight 1
Touch time left27.1 h
Sequence position189

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 22 06:00On hand
Enclosure setTidewell PlasticsWed Jun 24 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
Display panelBrightline DisplaysSun Jun 21 06:00On hand
WO-10186
8" Rugged Tablet, 64GB, grayNB-5680, Tablets
20
Warehouse stockStock replenishment
Thu Jul 9 17:00
Thu Jul 9 22:40
5.7 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 6 01:45Jul 6 05:55902.465.2Planned
20SUBSUB-CJul 6 22:45Jul 7 07:20500.815.3Planned
30FAFA-02Jul 7 12:40Jul 7 15:00451.64.6Planned
40TBTB-04Jul 9 18:00Jul 9 21:10352.650.8Planned
50PKPK-01Jul 9 22:05Jul 9 22:40150.30.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 65 working hours at SMT.
  • SMT-02 has a 10 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jun 30 18:25.

Order

ReferenceRP-2816
ReleasedTue Jun 30 06:00
DueThu Jul 9 17:00
Priority and weight3, weight 1
Touch time left11.6 h
Sequence position188

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsMon Jun 22 06:00On hand
Power moduleAster PowerMon Jun 22 06:00On hand
SoC moduleKestrel SiliconSun Jun 28 06:00On hand
Display panelBrightline DisplaysSat Jun 27 06:00On hand
WO-10296
34" Ultrawide Monitor, curvedVW-6938, Monitors
265
Warehouse stockStock replenishment
Mon Jul 13 17:00
Tue Jul 14 09:05
16 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 8 00:40Jul 8 21:059017.7109.7Planned
20SUBSUB-BJul 8 17:30Jul 9 09:05507.210.8Planned
30FAFA-04Jul 9 14:30Jul 10 19:104519.410.5Planned
40TBTB-01Jul 12 12:55Jul 13 04:503515.365.2Planned
50PKPK-01Jul 13 19:15Jul 14 09:05156.612.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 110 working hours at SMT.
  • Split op 10 across SMT-02 and SMT-07: SMT-07 has 38 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Mon Jul 6 06:55.

Order

ReferenceRP-2926
ReleasedTue Jun 30 06:00
DueMon Jul 13 17:00
Priority and weight3, weight 1
Touch time left70.2 h
Sequence position202

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerMon Jun 22 06:00On hand
Display panelBrightline DisplaysSat Jun 27 06:00On hand
WO-10071
Mesh Wi-Fi Kit, 3-packBP-8055, Networking
320
Warehouse stockStock replenishment
Mon Jul 13 17:00
Mon Jul 13 14:30
2.5 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 7 06:00Jul 8 15:459030.569.2Planned
20SUBSUB-CJul 8 09:05Jul 8 17:25507.012.2Planned
30FAFA-02Jul 8 13:50Jul 9 12:354514.02.0Planned
40TBTB-02Jul 10 06:00Jul 11 07:253524.836.9Planned
50PKPK-01Jul 13 08:40Jul 13 14:30155.12.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 2.5 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2701
ReleasedWed Jul 1 06:00
DueMon Jul 13 17:00
Priority and weight3, weight 1
Touch time left85.3 h
Sequence position198

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 21 06:00On hand
Enclosure setTidewell PlasticsSun Jun 21 06:00On hand
Power moduleAster PowerSat Jun 27 06:00On hand
SoC moduleKestrel SiliconWed Jun 24 06:00On hand
WO-10115
Mini PC, 8-core, 16GB / 512GB, grayKL-9030, Desktops
135
Warehouse stockStock replenishment
Mon Jul 13 17:00
Mon Jul 13 19:15
2.2 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 7 06:00Jul 8 00:401017.569.2Planned
20SUBSUB-AJul 7 18:10Jul 8 09:20506.84.5Planned
30FAFA-04Jul 8 14:30Jul 9 14:304515.28.7Planned
40TBTB-01Jul 11 07:25Jul 12 12:553528.957.8Planned
50PKPK-01Jul 13 14:30Jul 13 19:15154.08.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 69 working hours at SMT.
  • Split op 10 across SMT-07 and SMT-02: SMT-02 has 17 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jul 7 08:05.

Order

ReferenceRP-2745
ReleasedWed Jul 1 06:00
DueMon Jul 13 17:00
Priority and weight3, weight 1
Touch time left75.1 h
Sequence position199

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerSun Jun 21 06:00On hand
SoC moduleKestrel SiliconSun Jun 21 06:00On hand
WO-10200
Chromebook 11", 4GB / 64GBNB-7136, Laptops
235
Warehouse stockStock replenishment
Tue Jul 14 17:00
Tue Jul 14 21:25
4.4 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 8 15:55Jul 9 22:009026.8101.4Planned
20SUBSUB-AJul 9 14:55Jul 10 07:20408.28.4Planned
30FAFA-02Jul 9 19:55Jul 10 22:454518.11.8Planned
40TBTB-04Jul 13 06:00Jul 14 16:101533.970.2Planned
50PKPK-02Jul 14 16:40Jul 14 21:25154.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 101 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-02: SMT-02 has 19 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jul 7 07:10.

Order

ReferenceRP-2830
ReleasedWed Jul 1 06:00
DueTue Jul 14 17:00
Priority and weight3, weight 1
Touch time left94.5 h
Sequence position206

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsMon Jun 22 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
SoC moduleKestrel SiliconFri Jun 26 06:00On hand
Display panelBrightline DisplaysTue Jun 23 06:00On hand
WO-10213
4-Bay NAS Enclosure, refreshQN-2129, Storage
460
Warehouse stockStock replenishment
Mon Jul 13 17:00
Mon Jul 13 19:45
2.8 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 7 19:00Jul 8 15:554519.481.2Planned
20SUBSUB-CJul 8 17:25Jul 8 21:45503.011.5Planned
30FAFA-03Jul 8 19:20Jul 9 10:45457.20.0Planned
40TBTB-03Jul 12 06:15Jul 12 23:353516.881.1Planned
50PKPK-02Jul 13 15:45Jul 13 19:45153.29.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 81 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-07: SMT-07 has 36 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Mon Jul 6 09:30.

Order

ReferenceRP-2843
ReleasedWed Jul 1 06:00
DueMon Jul 13 17:00
Priority and weight3, weight 1
Touch time left52.8 h
Sequence position201

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 23 06:00On hand
Enclosure setTidewell PlasticsMon Jun 29 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
WO-10095
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
85
Warehouse stockStock replenishment
Tue Jul 14 17:00
Tue Jul 14 08:30
8.5 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 8 14:55Jul 9 04:209011.260.7Planned
20SUBSUB-AJul 9 10:50Jul 9 14:55403.44.3Planned
30FAFA-03Jul 9 13:50Jul 9 22:35457.50.0Planned
40TBTB-03Jul 12 23:35Jul 13 14:153514.175.8Planned
50PKPK-02Jul 14 06:35Jul 14 08:30151.78.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.5 h to spare before the due date.

Order

ReferenceRP-2725
ReleasedThu Jul 2 06:00
DueTue Jul 14 17:00
Priority and weight3, weight 1
Touch time left41.6 h
Sequence position204

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsThu Jun 25 06:00On hand
Power moduleAster PowerSat Jul 4 10:00In transit
SoC moduleKestrel SiliconFri Jun 26 06:00On hand
Display panelBrightline DisplaysThu Jun 25 06:00On hand
WO-10124
27" QHD Monitor, 165HzLM-2177, Monitors
315
Warehouse stockStock replenishment
Wed Jul 15 17:00
Wed Jul 15 16:25
0.6 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 8 15:45Jul 9 14:509020.378.5Planned
20SUBSUB-CJul 9 11:10Jul 9 20:50508.36.2Planned
30FAFA-05Jul 10 12:25Jul 13 20:004522.314.8Planned
40TBTB-03Jul 14 01:00Jul 14 19:103517.680.0Planned
50PKPK-02Jul 15 08:10Jul 15 16:25157.55.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.6 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2754
ReleasedThu Jul 2 06:00
DueWed Jul 15 17:00
Priority and weight3, weight 1
Touch time left80.0 h
Sequence position211

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 24 06:00On hand
Enclosure setTidewell PlasticsSun Jun 28 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
Display panelBrightline DisplaysWed Jun 24 06:00On hand
WO-10161
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
425
Warehouse stockStock replenishment
Thu Jul 16 17:00
Thu Jul 16 15:35
1.4 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 9 14:50Jul 10 22:009028.253.8Planned
20SUBSUB-BJul 10 20:15Jul 13 14:20509.815.6Planned
30FAFA-04Jul 13 09:45Jul 14 21:504526.34.2Planned
40TBTB-02Jul 15 04:40Jul 16 02:003520.838.2Planned
50PKPK-01Jul 16 06:00Jul 16 15:35158.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 1.4 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2791
ReleasedThu Jul 2 06:00
DueThu Jul 16 17:00
Priority and weight3, weight 1
Touch time left97.8 h
Sequence position219

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jul 7 06:00In transit
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerWed Jun 24 06:00On hand
Display panelBrightline DisplaysThu Jun 25 06:00On hand
WO-10340
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
300
ACCOUNT 7463Gold, customer build
Fri Jul 17 15:00
Fri Jul 17 14:50
0.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 10 01:10Jul 10 20:359016.993.2Planned
20SUBSUB-CJul 13 10:45Jul 13 18:20406.920.2Planned
30FAFA-05Jul 13 20:00Jul 14 22:40518.66.7Planned
40TBTB-03Jul 15 06:00Jul 15 21:153514.723.5Planned
45CFGCFG-01Jul 15 21:45Jul 17 07:452518.60.0Planned
50PKPK-01Jul 17 08:00Jul 17 14:5056.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceSO-71429
ReleasedThu Jul 2 06:00
DueFri Jul 17 15:00
Priority and weight2, weight 3
Touch time left85.2 h
Sequence position222

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 10:00In transit
Enclosure setTidewell PlasticsWed Jun 24 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
Display panelBrightline DisplaysMon Jun 22 06:00On hand
WO-10008
Thin Client, 4GB / 32GB, grayAF-4236, Desktops
120
Warehouse stockStock replenishment
Tue Jul 14 17:00
Tue Jul 14 06:35
10 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 8 02:20Jul 8 14:554511.148.8Planned
20SUBSUB-CJul 8 21:45Jul 9 11:10505.112.2Planned
30FAFA-06Jul 9 14:20Jul 10 09:352511.35.8Planned
40TBTB-02Jul 12 22:05Jul 13 19:501521.573.8Planned
50PKPK-02Jul 13 20:20Jul 14 06:35153.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time10 h to spare before the due date.

Order

ReferenceRP-2638
ReleasedFri Jul 3 06:00
DueTue Jul 14 17:00
Priority and weight3, weight 1
Touch time left54.5 h
Sequence position203

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 23 06:00On hand
Enclosure setTidewell PlasticsWed Jun 24 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
SoC moduleKestrel SiliconSat Jun 27 06:00On hand
WO-10047
24" FHD Monitor, IPSBP-5281, Monitors
280
Warehouse stockStock replenishment
Fri Jul 17 17:00
Fri Jul 17 10:45
6.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 10 01:05Jul 10 20:059016.533.3Planned
20SUBSUB-BJul 13 14:20Jul 13 22:15406.823.8Planned
30FAFA-04Jul 14 21:50Jul 16 07:252518.220.8Planned
40TBTB-03Jul 15 21:15Jul 16 11:501514.312.5Planned
50PKPK-02Jul 16 21:00Jul 17 10:45106.18.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 6.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2677
ReleasedFri Jul 3 06:00
DueFri Jul 17 17:00
Priority and weight3, weight 1
Touch time left64.8 h
Sequence position223

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 29 06:00On hand
Enclosure setTidewell PlasticsWed Jul 8 14:00In transit
Power moduleAster PowerFri Jun 26 06:00On hand
Display panelBrightline DisplaysSun Jun 28 06:00On hand
WO-10090
12" Pro Tablet, 256GBKL-2075, Tablets
190
Warehouse stockStock replenishment
Fri Jul 17 17:00
Fri Jul 17 13:50
3.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 10 20:05Jul 13 19:359020.8111.1Planned
20SUBSUB-AJul 13 14:30Jul 13 22:15506.48.0Planned
30FAFA-02Jul 13 17:20Jul 14 15:504513.80.0Planned
40TBTB-04Jul 16 01:10Jul 17 00:153522.550.7Planned
50PKPK-02Jul 17 10:45Jul 17 13:50152.84.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 3.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2720
ReleasedFri Jul 3 06:00
DueFri Jul 17 17:00
Priority and weight3, weight 1
Touch time left70.2 h
Sequence position224

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsWed Jun 24 06:00On hand
Power moduleAster PowerSat Jun 27 06:00On hand
SoC moduleKestrel SiliconMon Jun 29 06:00On hand
Display panelBrightline DisplaysWed Jun 24 06:00On hand
WO-10172
Tower Workstation, 32GB / 1TB, refreshLM-9819, Desktops
80
Warehouse stockStock replenishment
Mon Jul 13 17:00
Mon Jul 13 15:45
1.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 7 08:40Jul 7 18:30907.832.2Planned
20SUBSUB-BJul 8 13:10Jul 8 17:30403.713.1Planned
30FAFA-06Jul 8 22:20Jul 9 14:20258.15.4Planned
40TBTB-02Jul 12 06:15Jul 12 22:053515.266.7Planned
50PKPK-02Jul 13 13:25Jul 13 15:45152.16.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 1.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2802
ReleasedFri Jul 3 06:00
DueMon Jul 13 17:00
Priority and weight3, weight 1
Touch time left40.3 h
Sequence position200

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jun 24 06:00On hand
Enclosure setTidewell PlasticsThu Jun 25 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
SoC moduleKestrel SiliconThu Jun 25 06:00On hand
WO-10191
KVM Switch, 2-port 4K, grayNB-7003, Docks & Hubs
350
Warehouse stockStock replenishment
Fri Jul 17 17:00
Fri Jul 17 19:30
2.5 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 10 17:30Jul 14 08:159035.2109.0Planned
20SUBSUB-AJul 13 22:15Jul 14 12:00505.415.2Planned
30FAFA-01Jul 14 07:10Jul 14 18:10459.80.0Planned
40TBTB-01Jul 15 09:50Jul 15 19:40159.624.2Planned
50PKPK-01Jul 17 14:50Jul 17 19:30153.927.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 109 working hours at SMT.
  • Split op 10 across SMT-06 and SMT-07: SMT-07 has 39 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 8 09:25.

Order

ReferenceRP-2821
ReleasedFri Jul 3 06:00
DueFri Jul 17 17:00
Priority and weight3, weight 1
Touch time left67.5 h
Sequence position226

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsSun Jun 28 06:00On hand
Power moduleAster PowerTue Jun 30 06:00On hand
WO-10223
8-Port Gigabit SwitchQN-4070, Networking
150
Warehouse stockStock replenishment
Wed Jul 15 17:00
Wed Jul 15 12:45
4.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 9 07:45Jul 10 01:109014.976.8Planned
20SUBSUB-CJul 10 06:05Jul 10 10:40403.47.3Planned
30FAFA-04Jul 10 19:10Jul 13 09:45456.810.0Planned
40TBTB-01Jul 14 11:25Jul 14 23:451512.184.9Planned
50PKPK-01Jul 15 09:30Jul 15 12:45152.53.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2853
ReleasedFri Jul 3 06:00
DueWed Jul 15 17:00
Priority and weight3, weight 1
Touch time left43.2 h
Sequence position213

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsTue Jun 23 06:00On hand
Power moduleAster PowerTue Jun 23 06:00On hand
SoC moduleKestrel SiliconThu Jun 25 06:00On hand
WO-10242
1TB NVMe SSD, grayQN-4854, Storage
270
Warehouse stockStock replenishment
Tue Jul 14 17:00
Tue Jul 14 12:00
5.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 10 06:00Jul 10 21:159012.80.0Planned
20SUBSUB-AJul 10 19:20Jul 10 22:10502.08.3Planned
30FAFA-01Jul 10 21:10Jul 13 09:15254.70.3Planned
40TBTB-01Jul 13 09:00Jul 13 20:353511.058.2Planned
50PKPK-01Jul 14 09:05Jul 14 12:00152.25.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 5.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2872
ReleasedFri Jul 3 06:00
DueTue Jul 14 17:00
Priority and weight3, weight 1
Touch time left36.2 h
Sequence position207

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 10 06:00In transit
Enclosure setTidewell PlasticsFri Jun 26 06:00On hand
Power moduleAster PowerWed Jul 1 06:00On hand
WO-10276
Wi-Fi 6E Router, grayVW-2128, Networking
50
Warehouse stockStock replenishment
Tue Jul 14 17:00
Tue Jul 14 13:05
3.9 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 6 06:00Jul 6 13:00905.06.8Planned
20SUBSUB-AJul 8 09:20Jul 8 11:50501.228.3Planned
30FAFA-01Jul 8 12:05Jul 8 14:50252.30.0Planned
40TBTB-03Jul 13 14:15Jul 13 18:55354.1119.2Planned
50PKPK-01Jul 14 12:00Jul 14 13:05150.89.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 3.9 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2906
ReleasedSat Jul 4 06:00
DueTue Jul 14 17:00
Priority and weight3, weight 1
Touch time left17.0 h
Sequence position208

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsFri Jun 26 06:00On hand
Power moduleAster PowerSat Jun 27 06:00On hand
SoC moduleKestrel SiliconTue Jun 30 06:00On hand
WO-10146
4K Conference CameraLM-5365, Peripherals
380
Warehouse stockStock replenishment
Tue Jul 14 17:00
Tue Jul 14 12:00
5.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 8 06:00Jul 8 20:559012.452.2Planned
20SUBSUB-BJul 9 09:05Jul 9 13:00502.615.4Planned
30FAFA-02Jul 9 12:35Jul 9 19:55456.11.5Planned
40TBTB-01Jul 13 04:50Jul 13 09:00353.686.4Planned
50PKPK-02Jul 14 08:30Jul 14 12:00152.815.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 5.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2776
ReleasedSun Jul 5 06:00
DueTue Jul 14 17:00
Priority and weight3, weight 1
Touch time left31.3 h
Sequence position205

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
WO-10233
15" Laptop, 12-core, 32GB / 1TB, grayQN-4418, Laptops
90
Warehouse stockStock replenishment
Fri Jul 17 17:00
Fri Jul 17 21:20
4.3 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 13 08:55Jul 13 21:509010.4123.7Planned
20SUBSUB-BJul 13 22:15Jul 14 09:20503.24.5Planned
30FAFA-02Jul 14 15:50Jul 15 07:05457.07.2Planned
40TBTB-02Jul 16 02:00Jul 16 15:453513.228.8Planned
50PKPK-01Jul 17 19:30Jul 17 21:20151.618.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 124 working hours at SMT.
  • SMT-02 has a 20 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Tue Jul 7 08:25.

Order

ReferenceRP-2863
ReleasedSun Jul 5 06:00
DueFri Jul 17 17:00
Priority and weight3, weight 1
Touch time left39.3 h
Sequence position227

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jun 26 06:00On hand
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerThu Jul 2 06:00On hand
SoC moduleKestrel SiliconThu Jun 25 06:00On hand
Display panelBrightline DisplaysWed Jul 1 06:00On hand
WO-10018
4-Bay NAS Enclosure, grayAF-5514, Storage
140
Warehouse stockStock replenishment
Thu Jul 16 17:00
Wed Jul 15 14:00
27 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 13 06:00Jul 13 13:40905.70.0Planned
20SUBSUB-AJul 13 12:45Jul 13 14:30500.92.2Planned
30FAFA-01Jul 13 14:10Jul 13 16:40252.10.0Planned
40TBTB-03Jul 14 19:10Jul 15 00:40354.927.6Planned
50PKPK-01Jul 15 12:45Jul 15 14:00151.06.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time27 h to spare before the due date.

Order

ReferenceRP-2648
ReleasedMon Jul 6 06:00
DueThu Jul 16 17:00
Priority and weight3, weight 1
Touch time left18.2 h
Sequence position216

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 3 06:00On hand
Enclosure setTidewell PlasticsMon Jul 13 06:00In transit
Power moduleAster PowerMon Jun 29 06:00On hand
WO-10080
Thin Client, 4GB / 32GB, grayKL-1432, Desktops
20
Warehouse stockStock replenishment
Wed Jul 15 17:00
Tue Jul 14 13:55
27 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 10 14:00Jul 10 17:30902.00.0Planned
20SUBSUB-BJul 10 18:00Jul 10 20:15500.90.0Planned
30FAFA-06Jul 10 20:30Jul 10 22:3552.00.0Planned
40TBTB-01Jul 13 20:35Jul 14 01:00353.869.8Planned
50PKPK-01Jul 14 13:05Jul 14 13:55150.66.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time27 h to spare before the due date.

Order

ReferenceRP-2710
ReleasedMon Jul 6 06:00
DueWed Jul 15 17:00
Priority and weight3, weight 1
Touch time left12.6 h
Sequence position210

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 10 14:00In transit
Enclosure setTidewell PlasticsTue Jun 30 06:00On hand
Power moduleAster PowerThu Jul 9 06:00In transit
SoC moduleKestrel SiliconSat Jul 4 06:00On hand
WO-10134
8" Rugged Tablet, 64GB, grayLM-5109, Tablets
135
Warehouse stockStock replenishment
Fri Jul 17 17:00
Fri Jul 17 21:25
4.4 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 10 20:35Jul 13 15:209016.5104.8Planned
20SUBSUB-CJul 13 18:20Jul 14 07:45505.111.8Planned
30FAFA-03Jul 13 21:50Jul 14 17:004510.90.0Planned
40TBTB-04Jul 17 00:15Jul 17 18:251517.962.3Planned
50PKPK-02Jul 17 19:00Jul 17 21:25102.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 105 working hours at SMT.
  • Split op 10 across SMT-03 and SMT-01: SMT-01 has 14 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 8 12:15.

Order

ReferenceRP-2764
ReleasedMon Jul 6 06:00
DueFri Jul 17 17:00
Priority and weight3, weight 1
Touch time left56.2 h
Sequence position225

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 30 06:00On hand
Enclosure setTidewell PlasticsFri Jul 3 06:00On hand
Power moduleAster PowerSun Jun 28 06:00On hand
SoC moduleKestrel SiliconThu Jul 2 06:00On hand
Display panelBrightline DisplaysFri Jul 3 06:00On hand
WO-10181
Wi-Fi 6 Access Point, ceiling, refreshNB-4322, Networking
70
Warehouse stockStock replenishment
Wed Jul 15 17:00
Tue Jul 14 13:15
28 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 9 04:20Jul 9 13:20907.066.6Planned
20SUBSUB-CJul 9 20:50Jul 10 06:05501.48.5Planned
30FAFA-01Jul 10 14:20Jul 10 17:50452.87.8Planned
40TBTB-01Jul 14 06:00Jul 14 11:25354.884.7Planned
50PKPK-02Jul 14 12:00Jul 14 13:15151.00.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time28 h to spare before the due date.

Order

ReferenceRP-2811
ReleasedMon Jul 6 06:00
DueWed Jul 15 17:00
Priority and weight3, weight 1
Touch time left20.9 h
Sequence position212

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 30 06:00On hand
Enclosure setTidewell PlasticsSat Jul 4 06:00On hand
Power moduleAster PowerTue Jun 30 06:00On hand
SoC moduleKestrel SiliconMon Jun 29 06:00On hand
WO-10258
13" Ultralight Laptop, 16GB / 512GBQN-7885, Laptops
305
Warehouse stockStock replenishment
Fri Jul 24 17:00
Mon Jul 27 12:40
2.8 d late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 20 07:00Jul 22 03:059040.1229.0Planned
20SUBSUB-AJul 21 11:25Jul 22 08:055012.311.3Planned
30FAFA-01Jul 21 14:35Jul 23 09:504527.00.0Planned
40TBTB-02Jul 23 08:15Jul 25 11:303550.735.7Planned
50PKPK-01Jul 27 06:00Jul 27 12:40106.00.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 229 working hours at SMT.
  • Split op 10 across SMT-03 and SMT-01: SMT-01 has 32 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Fri Jul 10 12:45.

Order

ReferenceRP-2888
ReleasedMon Jul 6 06:00
DueFri Jul 24 17:00
Priority and weight3, weight 1
Touch time left139.9 h
Sequence position265

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 3 06:00On hand
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerWed Jul 1 06:00On hand
SoC moduleKestrel SiliconFri Jul 3 06:00On hand
Display panelBrightline DisplaysSat Jul 4 06:00On hand
WO-10286
USB-C Travel Hub, 7-in-1VW-4303, Docks & Hubs
120
Warehouse stockStock replenishment
Thu Jul 16 17:00
Wed Jul 15 20:55
20 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 9 19:40Jul 10 08:459011.680.9Planned
20SUBSUB-BJul 10 08:15Jul 10 11:25501.82.2Planned
30FAFA-02Jul 13 12:45Jul 13 16:45453.218.2Planned
40TBTB-01Jul 15 06:05Jul 15 09:50353.238.9Planned
50PKPK-01Jul 15 19:20Jul 15 20:55151.38.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time20 h to spare before the due date.

Order

ReferenceRP-2916
ReleasedMon Jul 6 06:00
DueThu Jul 16 17:00
Priority and weight3, weight 1
Touch time left25.1 h
Sequence position221

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 27 06:00On hand
Enclosure setTidewell PlasticsSat Jul 4 06:00On hand
Power moduleAster PowerFri Jun 26 06:00On hand
WO-10305
Mechanical Keyboard, TKLVW-8762, Peripherals
260
Warehouse stockStock replenishment
Wed Jul 15 17:00
Tue Jul 14 15:20
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 12 23:00Jul 13 08:55908.20.0Planned
20SUBSUB-AJul 13 07:15Jul 13 09:45501.71.2Planned
30FAFA-03Jul 13 09:00Jul 13 13:55254.00.3Planned
40TBTB-03Jul 13 18:55Jul 13 21:55352.47.9Planned
50PKPK-02Jul 14 13:15Jul 14 15:20151.87.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2935
ReleasedMon Jul 6 06:00
DueWed Jul 15 17:00
Priority and weight3, weight 1
Touch time left21.7 h
Sequence position215

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsSun Jul 12 06:00In transit
Power moduleAster PowerMon Jun 29 06:00On hand
WO-10316
34" Ultrawide Monitor, curvedVW-6938, Monitors
400
ACCOUNT 9148Standard, customer build
Fri Jul 24 15:00
Wed Jul 22 09:30
2.2 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 14 17:40Jul 15 23:309026.6147.9Planned
20SUBSUB-CJul 15 18:10Jul 16 13:555010.911.7Planned
30FAFA-04Jul 16 07:25Jul 17 22:102529.33.2Planned
40TBTB-03Jul 19 00:10Jul 19 23:503523.159.9Planned
45CFGCFG-02Jul 20 06:00Jul 21 15:402524.80.0Planned
50PKPK-01Jul 21 15:55Jul 22 09:30159.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.2 d to spare before the due date.

Order

ReferenceSO-71117
ReleasedMon Jul 6 06:00
DueFri Jul 24 15:00
Priority and weight4, weight 1
Touch time left128.5 h
Sequence position240

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 27 06:00On hand
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerSat Jun 27 06:00On hand
Display panelBrightline DisplaysSun Jun 28 06:00On hand
WO-10043
KVM Switch, 2-port 4KBP-5055, Docks & Hubs
600
Warehouse stockStock replenishment
Thu Jul 23 17:00
Wed Jul 22 13:20
28 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 16 07:25Jul 20 15:159051.6160.9Planned
20SUBSUB-CJul 20 08:05Jul 20 17:20507.926.3Planned
30FAFA-04Jul 20 09:50Jul 21 08:504514.20.0Planned
40TBTB-03Jul 20 23:55Jul 21 14:303514.011.3Planned
50PKPK-02Jul 22 06:50Jul 22 13:20155.88.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time28 h to spare before the due date.

Order

ReferenceRP-2673
ReleasedTue Jul 7 06:00
DueThu Jul 23 17:00
Priority and weight3, weight 1
Touch time left97.4 h
Sequence position254

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsFri Jul 3 06:00On hand
Power moduleAster PowerSun Jun 28 06:00On hand
WO-10052
27" 4K Monitor, USB-C, refreshBP-5748, Monitors
215
Warehouse stockStock replenishment
Mon Jul 20 17:00
Mon Jul 20 09:25
7.6 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 13 15:20Jul 14 06:209012.8100.1Planned
20SUBSUB-AJul 14 12:00Jul 14 18:05505.27.7Planned
30FAFA-05Jul 14 22:40Jul 15 21:052514.07.8Planned
40TBTB-01Jul 16 16:05Jul 17 03:403511.030.4Planned
50PKPK-02Jul 17 21:25Jul 20 09:25154.814.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.6 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2682
ReleasedTue Jul 7 06:00
DueMon Jul 20 17:00
Priority and weight3, weight 1
Touch time left51.3 h
Sequence position230

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsTue Jun 30 06:00On hand
Power moduleAster PowerTue Jun 30 06:00On hand
Display panelBrightline DisplaysWed Jul 1 06:00On hand
WO-10061
128GB USB Flash Drive, 10-packBP-7439, Storage
100
Warehouse stockStock replenishment
Thu Jul 16 17:00
Wed Jul 15 14:55
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 8 06:00Jul 8 13:20905.322.8Planned
20SUBSUB-BJul 9 13:00Jul 9 14:35500.817.8Planned
30FAFA-01Jul 10 17:50Jul 10 20:45451.719.3Planned
40TBTB-01Jul 14 23:45Jul 15 04:15353.999.6Planned
50PKPK-01Jul 15 14:00Jul 15 14:55100.87.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2691
ReleasedTue Jul 7 06:00
DueThu Jul 16 17:00
Priority and weight3, weight 1
Touch time left16.2 h
Sequence position217

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 30 06:00On hand
Enclosure setTidewell PlasticsMon Jun 29 06:00On hand
Power moduleAster PowerFri Jul 3 06:00On hand
WO-10105
1080p Webcam with micKL-5125, Peripherals
350
Warehouse stockStock replenishment
Thu Jul 16 17:00
Wed Jul 15 17:45
23 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 9 06:00Jul 9 20:109011.745.5Planned
20SUBSUB-BJul 9 22:00Jul 10 08:15502.411.3Planned
30FAFA-02Jul 10 22:45Jul 13 12:45455.815.2Planned
40TBTB-02Jul 15 00:40Jul 15 04:40353.441.1Planned
50PKPK-01Jul 15 14:55Jul 15 17:45152.68.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time23 h to spare before the due date.

Order

ReferenceRP-2735
ReleasedTue Jul 7 06:00
DueThu Jul 16 17:00
Priority and weight3, weight 1
Touch time left29.8 h
Sequence position218

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jun 27 06:00On hand
Enclosure setTidewell PlasticsSat Jun 27 06:00On hand
Power moduleAster PowerMon Jun 29 06:00On hand
WO-10162
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
395
Warehouse stockStock replenishment
Thu Jul 23 17:00
Thu Jul 23 13:00
4.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 17 06:00Jul 20 07:009022.2182.5Planned
20SUBSUB-AJul 17 15:15Jul 20 08:40509.13.9Planned
30FAFA-06Jul 20 08:50Jul 21 19:054524.57.8Planned
40TBTB-02Jul 22 00:40Jul 22 20:303519.235.2Planned
50PKPK-01Jul 22 21:00Jul 23 13:00158.20.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2792
ReleasedTue Jul 7 06:00
DueThu Jul 23 17:00
Priority and weight3, weight 1
Touch time left87.2 h
Sequence position257

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jun 28 06:00On hand
Enclosure setTidewell PlasticsWed Jul 1 06:00On hand
Power moduleAster PowerSat Jun 27 06:00On hand
Display panelBrightline DisplaysSat Jun 27 06:00On hand
WO-10248
Thunderbolt Dock, 4 portsQN-5393, Docks & Hubs
485
Warehouse stockStock replenishment
Wed Jul 22 17:00
Tue Jul 21 21:20
20 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 16 02:15Jul 20 05:254547.987.5Planned
20SUBSUB-BJul 20 06:00Jul 20 14:40507.329.2Planned
30FAFA-03Jul 20 07:55Jul 20 22:554513.20.0Planned
40TBTB-02Jul 20 11:00Jul 21 00:353513.00.2Planned
50PKPK-02Jul 21 15:15Jul 21 21:20155.38.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time20 h to spare before the due date.

Order

ReferenceRP-2878
ReleasedTue Jul 7 06:00
DueWed Jul 22 17:00
Priority and weight3, weight 1
Touch time left90.0 h
Sequence position250

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 10 06:00In transit
Enclosure setTidewell PlasticsThu Jul 2 06:00On hand
Power moduleAster PowerMon Jun 29 06:00On hand
WO-10252
4K Conference Camera, grayQN-6249, Peripherals
115
Warehouse stockStock replenishment
Thu Jul 16 17:00
Wed Jul 15 19:20
22 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 9 20:10Jul 10 01:05454.258.7Planned
20SUBSUB-AJul 10 07:20Jul 10 09:05500.91.3Planned
30FAFA-03Jul 10 20:20Jul 13 06:10452.110.5Planned
40TBTB-01Jul 15 04:15Jul 15 06:05351.2102.0Planned
50PKPK-01Jul 15 17:45Jul 15 19:20100.910.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time22 h to spare before the due date.

Order

ReferenceRP-2882
ReleasedTue Jul 7 06:00
DueThu Jul 16 17:00
Priority and weight3, weight 1
Touch time left12.4 h
Sequence position220

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jul 4 06:00On hand
Enclosure setTidewell PlasticsSun Jul 5 06:00On hand
Power moduleAster PowerSat Jul 4 06:00On hand
WO-10120
14" Laptop, 8-core, 16GB / 512GB, grayKL-9462, Laptops
90
Warehouse stockStock replenishment
Tue Jul 21 17:00
Tue Jul 21 06:40
10 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 14 10:45Jul 15 01:509013.195.5Planned
20SUBSUB-CJul 15 13:20Jul 15 18:10504.09.2Planned
30FAFA-02Jul 15 22:05Jul 16 14:50258.84.9Planned
40TBTB-01Jul 18 21:35Jul 19 14:201516.558.4Planned
50PKPK-02Jul 20 21:25Jul 21 06:40152.014.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time10 h to spare before the due date.

Order

ReferenceRP-2750
ReleasedWed Jul 8 06:00
DueTue Jul 21 17:00
Priority and weight3, weight 1
Touch time left47.7 h
Sequence position239

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 1 06:00On hand
Enclosure setTidewell PlasticsMon Jun 29 06:00On hand
Power moduleAster PowerMon Jun 29 06:00On hand
SoC moduleKestrel SiliconTue Jun 30 06:00On hand
Display panelBrightline DisplaysTue Jun 30 06:00On hand
WO-10004
Ergonomic Mouse, wireless, grayAF-4219, Peripherals
490
Warehouse stockStock replenishment
Mon Jul 20 17:00
Mon Jul 20 08:30
8.5 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 10 22:55Jul 13 19:109017.538.9Planned
20SUBSUB-CJul 14 07:45Jul 14 12:40503.617.8Planned
30FAFA-01Jul 14 18:10Jul 15 11:30458.68.4Planned
40TBTB-03Jul 16 11:50Jul 16 17:30355.139.2Planned
50PKPK-01Jul 17 21:20Jul 20 08:30153.918.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.5 h to spare before the due date.

Order

ReferenceRP-2634
ReleasedThu Jul 9 06:00
DueMon Jul 20 17:00
Priority and weight3, weight 1
Touch time left42.6 h
Sequence position229

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 29 06:00On hand
Enclosure setTidewell PlasticsMon Jun 29 06:00On hand
Power moduleAster PowerMon Jun 29 06:00On hand
WO-10033
Mesh Wi-Fi Kit, 3-pack, refreshAF-9913, Networking
245
Warehouse stockStock replenishment
Tue Jul 21 17:00
Mon Jul 20 21:25
20 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 14 06:45Jul 15 06:054521.369.2Planned
20SUBSUB-CJul 14 20:40Jul 15 09:25504.97.2Planned
30FAFA-03Jul 15 14:45Jul 16 08:50459.88.4Planned
40TBTB-04Jul 18 03:40Jul 18 21:353517.357.8Planned
50PKPK-02Jul 20 17:05Jul 20 21:25153.610.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time20 h to spare before the due date.

Order

ReferenceRP-2663
ReleasedThu Jul 9 06:00
DueTue Jul 21 17:00
Priority and weight3, weight 1
Touch time left60.2 h
Sequence position237

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 3 06:00On hand
Enclosure setTidewell PlasticsWed Jul 1 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconMon Jun 29 06:00On hand
WO-10076
4-Bay NAS EnclosureBP-8568, Storage
445
Warehouse stockStock replenishment
Tue Jul 21 17:00
Mon Jul 20 21:05
20 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 14 08:15Jul 15 03:259016.470.8Planned
20SUBSUB-CJul 15 09:25Jul 15 13:20502.613.2Planned
30FAFA-05Jul 15 21:05Jul 16 11:25456.19.2Planned
40TBTB-03Jul 18 09:25Jul 19 00:103514.258.6Planned
50PKPK-01Jul 20 17:35Jul 20 21:05152.811.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time20 h to spare before the due date.

Order

ReferenceRP-2706
ReleasedThu Jul 9 06:00
DueTue Jul 21 17:00
Priority and weight3, weight 1
Touch time left45.9 h
Sequence position238

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jun 29 06:00On hand
Enclosure setTidewell PlasticsThu Jul 2 06:00On hand
Power moduleAster PowerWed Jul 1 06:00On hand
WO-10214
4-Bay NAS Enclosure, refreshQN-2129, Storage
395
Warehouse stockStock replenishment
Mon Jul 20 17:00
Mon Jul 20 12:55
4.1 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 14 00:25Jul 14 19:509016.763.2Planned
20SUBSUB-CJul 14 16:45Jul 14 20:40502.610.2Planned
30FAFA-02Jul 15 07:05Jul 15 14:30456.25.4Planned
40TBTB-01Jul 17 06:00Jul 17 21:003514.445.1Planned
50PKPK-02Jul 20 09:25Jul 20 12:55152.84.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.1 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2844
ReleasedThu Jul 9 06:00
DueMon Jul 20 17:00
Priority and weight3, weight 1
Touch time left46.5 h
Sequence position233

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 3 06:00On hand
Enclosure setTidewell PlasticsSun Jul 5 06:00On hand
Power moduleAster PowerWed Jul 1 06:00On hand
WO-10292
27" 4K Monitor, USB-CVW-6003, Monitors
350
Warehouse stockStock replenishment
Fri Jul 24 17:00
Fri Jul 24 14:00
3.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 20 15:15Jul 21 13:459019.8168.5Planned
20SUBSUB-CJul 21 07:00Jul 21 16:25508.13.4Planned
30FAFA-04Jul 21 13:30Jul 22 20:304521.83.8Planned
40TBTB-01Jul 23 10:55Jul 24 04:151517.141.2Planned
50PKPK-02Jul 24 06:00Jul 24 14:00107.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 3.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2922
ReleasedThu Jul 9 06:00
DueFri Jul 24 17:00
Priority and weight3, weight 1
Touch time left77.5 h
Sequence position266

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsTue Jul 7 06:00On hand
Power moduleAster PowerSat Jul 4 06:00On hand
Display panelBrightline DisplaysTue Jun 30 06:00On hand
WO-10196
10" Tablet, 64GBNB-7024, Tablets
105
Warehouse stockStock replenishment
Mon Jul 20 17:00
Fri Jul 17 17:55
3.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 13 21:50Jul 14 10:459010.737.6Planned
20SUBSUB-CJul 14 12:40Jul 14 16:45503.26.2Planned
30FAFA-03Jul 15 06:45Jul 15 14:45257.17.9Planned
40TBTB-03Jul 17 03:40Jul 17 15:503511.640.3Planned
50PKPK-02Jul 17 16:20Jul 17 17:55101.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.0 d to spare before the due date.

Order

ReferenceRP-2826
ReleasedFri Jul 10 06:00
DueMon Jul 20 17:00
Priority and weight3, weight 1
Touch time left37.5 h
Sequence position232

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 6 06:00On hand
Enclosure setTidewell PlasticsMon Jul 6 06:00On hand
Power moduleAster PowerSun Jul 5 06:00On hand
SoC moduleKestrel SiliconTue Jul 7 06:00On hand
Display panelBrightline DisplaysWed Jul 8 06:00On hand
WO-10219
USB-C Travel Hub, 7-in-1, grayQN-2461, Docks & Hubs
180
Warehouse stockStock replenishment
Tue Jul 21 17:00
Tue Jul 21 09:50
7.2 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 15 06:05Jul 16 02:159017.768.3Planned
20SUBSUB-AJul 16 14:45Jul 16 18:20502.817.2Planned
30FAFA-06Jul 16 21:30Jul 17 10:40454.94.3Planned
40TBTB-01Jul 19 15:10Jul 19 20:35354.856.2Planned
50PKPK-01Jul 21 07:35Jul 21 09:50152.017.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.2 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2849
ReleasedFri Jul 10 06:00
DueTue Jul 21 17:00
Priority and weight3, weight 1
Touch time left36.1 h
Sequence position244

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 2 06:00On hand
Enclosure setTidewell PlasticsTue Jul 7 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
WO-10322
12" Pro Tablet, 256GBKL-2075, Tablets
80
ACCOUNT 5190Silver, customer build
Mon Jul 20 15:00
Fri Jul 17 15:05
3.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 13 13:40Jul 14 00:25908.829.9Planned
20SUBSUB-BJul 14 09:20Jul 14 13:25502.84.7Planned
30FAFA-03Jul 14 17:00Jul 15 06:45255.84.3Planned
40TBTB-01Jul 16 06:00Jul 16 16:05359.532.2Planned
45CFGCFG-02Jul 17 06:00Jul 17 11:55255.05.9Planned
50PKPK-02Jul 17 13:50Jul 17 15:0551.21.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.0 d to spare before the due date.

Order

ReferenceSO-71195
ReleasedFri Jul 10 06:00
DueMon Jul 20 15:00
Priority and weight3, weight 2
Touch time left36.8 h
Sequence position228

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsSun Jul 5 06:00On hand
Power moduleAster PowerTue Jun 30 06:00On hand
SoC moduleKestrel SiliconThu Jul 2 06:00On hand
Display panelBrightline DisplaysWed Jul 8 06:00On hand
WO-10024
Mini PC, 8-core, 16GB / 512GBAF-7495, Desktops
80
Warehouse stockStock replenishment
Fri Jul 24 17:00
Thu Jul 23 15:35
25 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 17 08:50Jul 17 21:05909.867.3Planned
20SUBSUB-BJul 20 14:40Jul 20 20:30504.513.2Planned
30FAFA-05Jul 20 21:40Jul 21 15:20510.12.7Planned
40TBTB-03Jul 22 16:45Jul 23 12:203519.028.9Planned
50PKPK-02Jul 23 12:50Jul 23 15:3552.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time25 h to spare before the due date.

Order

ReferenceRP-2654
ReleasedSat Jul 11 06:00
DueFri Jul 24 17:00
Priority and weight3, weight 1
Touch time left49.1 h
Sequence position261

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jul 14 10:00In transit
Enclosure setTidewell PlasticsSat Jul 4 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconTue Jul 14 10:00In transit
WO-10147
4K Conference CameraLM-5365, Peripherals
450
Warehouse stockStock replenishment
Tue Jul 21 17:00
Tue Jul 21 07:35
9.4 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 15 03:25Jul 15 20:359014.749.7Planned
20SUBSUB-AJul 16 10:55Jul 16 14:45503.019.3Planned
30FAFA-03Jul 16 12:20Jul 16 20:45457.20.0Planned
40TBTB-03Jul 16 17:30Jul 16 22:00154.23.3Planned
50PKPK-01Jul 20 21:05Jul 21 07:35153.230.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time9.4 h to spare before the due date.

Order

ReferenceRP-2777
ReleasedSat Jul 11 06:00
DueTue Jul 21 17:00
Priority and weight3, weight 1
Touch time left35.9 h
Sequence position241

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsFri Jul 3 06:00On hand
Power moduleAster PowerFri Jul 3 06:00On hand
WO-10153
2TB Portable SSDLM-7276, Storage
370
Warehouse stockStock replenishment
Wed Jul 22 17:00
Tue Jul 21 15:15
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 15 23:30Jul 16 16:309014.868.8Planned
20SUBSUB-BJul 16 19:00Jul 16 22:05502.212.0Planned
30FAFA-05Jul 17 07:55Jul 17 14:35455.44.5Planned
40TBTB-01Jul 20 06:35Jul 20 19:401512.868.9Planned
50PKPK-02Jul 21 12:30Jul 21 15:15152.58.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2783
ReleasedSat Jul 11 06:00
DueWed Jul 22 17:00
Priority and weight3, weight 1
Touch time left41.3 h
Sequence position249

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsWed Jul 8 06:00On hand
Power moduleAster PowerThu Jul 9 06:00On hand
WO-10177
8" Rugged Tablet, 64GBNB-1986, Tablets
90
Warehouse stockStock replenishment
Tue Jul 21 17:00
Tue Jul 21 08:20
8.7 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 15 01:50Jul 15 14:259010.348.3Planned
20SUBSUB-CJul 16 13:55Jul 16 17:55503.219.6Planned
30FAFA-05Jul 16 16:50Jul 17 07:55456.80.0Planned
40TBTB-04Jul 19 14:20Jul 20 02:053511.264.2Planned
50PKPK-02Jul 21 06:40Jul 21 08:20151.416.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.7 h to spare before the due date.

Order

ReferenceRP-2807
ReleasedSat Jul 11 06:00
DueTue Jul 21 17:00
Priority and weight3, weight 1
Touch time left36.8 h
Sequence position242

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 2 06:00On hand
Enclosure setTidewell PlasticsWed Jul 1 06:00On hand
Power moduleAster PowerThu Jul 9 06:00On hand
SoC moduleKestrel SiliconSun Jul 5 06:00On hand
Display panelBrightline DisplaysSat Jul 4 06:00On hand
WO-10238
Tower Workstation, 32GB / 1TBQN-4437, Desktops
30
Warehouse stockStock replenishment
Mon Jul 20 17:00
Mon Jul 20 14:00
3.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 13 06:00Jul 13 11:25903.46.8Planned
20SUBSUB-BJul 14 13:25Jul 14 15:35501.317.5Planned
30FAFA-06Jul 15 16:00Jul 15 20:15453.016.2Planned
40TBTB-03Jul 17 15:50Jul 17 22:05355.743.3Planned
50PKPK-02Jul 20 12:55Jul 20 14:00150.86.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 3.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2868
ReleasedSat Jul 11 06:00
DueMon Jul 20 17:00
Priority and weight3, weight 1
Touch time left18.2 h
Sequence position234

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsTue Jul 7 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconFri Jul 3 06:00On hand
WO-10263
22" Touch Monitor, grayVW-1017, Monitors
595
Warehouse stockStock replenishment
Wed Jul 29 17:00
Wed Jul 29 20:55
3.9 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 22 05:40Jul 24 03:509042.4165.9Planned
20SUBSUB-BJul 22 22:20Jul 24 07:305017.310.1Planned
30FAFA-05Jul 23 17:45Jul 28 17:104546.79.3Planned
40TBTB-01Jul 27 07:10Jul 28 20:303536.879.9Planned
50PKPK-01Jul 28 21:00Jul 29 20:551515.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 166 working hours at SMT.
  • Split op 10 across SMT-02 and SMT-07: SMT-07 has 98 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Mon Jul 20 11:40.

Order

ReferenceRP-2893
ReleasedSat Jul 11 06:00
DueWed Jul 29 17:00
Priority and weight3, weight 1
Touch time left162.8 h
Sequence position280

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jul 4 06:00On hand
Enclosure setTidewell PlasticsMon Jul 6 06:00On hand
Power moduleAster PowerSun Jul 5 06:00On hand
Display panelBrightline DisplaysSun Jul 5 06:00On hand
WO-10272
Thin Client, 4GB / 32GBVW-2014, Desktops
40
Warehouse stockStock replenishment
Mon Jul 20 17:00
Mon Jul 20 15:25
1.6 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 16 06:00Jul 16 12:30904.50.0Planned
20SUBSUB-BJul 16 13:00Jul 16 15:45402.10.0Planned
30FAFA-06Jul 16 16:00Jul 16 21:30254.60.0Planned
40TBTB-04Jul 17 18:25Jul 18 03:40358.720.7Planned
50PKPK-02Jul 20 14:00Jul 20 15:25101.27.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 1.6 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2902
ReleasedSat Jul 11 06:00
DueMon Jul 20 17:00
Priority and weight3, weight 1
Touch time left24.4 h
Sequence position235

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsWed Jul 1 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconThu Jul 16 06:00In transit
WO-10301
USB-C Dock, 100W, dual displayVW-7925, Docks & Hubs
150
Warehouse stockStock replenishment
Tue Jul 21 17:00
Tue Jul 21 10:00
7.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 15 06:00Jul 15 23:059014.60.0Planned
20SUBSUB-BJul 16 15:45Jul 16 18:30501.918.3Planned
30FAFA-03Jul 16 20:45Jul 17 07:55453.42.8Planned
40TBTB-01Jul 19 20:35Jul 20 00:15153.469.7Planned
50PKPK-02Jul 21 08:20Jul 21 10:00151.418.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2931
ReleasedSat Jul 11 06:00
DueTue Jul 21 17:00
Priority and weight3, weight 1
Touch time left28.3 h
Sequence position245

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 15 06:00In transit
Enclosure setTidewell PlasticsWed Jul 8 06:00On hand
Power moduleAster PowerSat Jul 4 06:00On hand
WO-10321
Tower Workstation, 32GB / 1TB, refreshLM-9819, Desktops
150
ACCOUNT 6021Standard, customer build
Mon Jul 27 15:00
Mon Jul 27 21:10
6.2 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 20 19:00Jul 21 11:559014.7132.8Planned
20SUBSUB-BJul 21 15:25Jul 22 06:30506.88.9Planned
30FAFA-06Jul 22 07:35Jul 23 07:254515.15.6Planned
40TBTB-01Jul 24 06:00Jul 25 11:103528.639.8Planned
45CFGCFG-01Jul 27 06:00Jul 27 16:15259.30.0Planned
50PKPK-02Jul 27 16:35Jul 27 21:10103.90.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 133 working hours at SMT.
  • SMT-07 has a 18 h opening before this order starts but no smt operators free then. Add crew to that shift.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 15 21:10.

Order

ReferenceSO-71182
ReleasedSat Jul 11 06:00
DueMon Jul 27 15:00
Priority and weight4, weight 1
Touch time left82.6 h
Sequence position270

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 6 06:00On hand
Enclosure setTidewell PlasticsMon Jul 6 06:00On hand
Power moduleAster PowerSat Jul 4 06:00On hand
SoC moduleKestrel SiliconTue Jul 7 06:00On hand
WO-10327
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
80
ACCOUNT 8733Silver, customer build
Tue Jul 21 15:00
Mon Jul 20 17:05
22 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 14 06:20Jul 14 17:40909.329.8Planned
20SUBSUB-AJul 14 18:05Jul 14 22:20502.93.4Planned
30FAFA-02Jul 15 14:30Jul 15 22:05456.39.5Planned
40TBTB-01Jul 17 21:00Jul 18 09:253511.849.0Planned
45CFGCFG-01Jul 20 06:00Jul 20 11:55255.00.0Planned
50PKPK-02Jul 20 15:25Jul 20 17:05151.43.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time22 h to spare before the due date.

Order

ReferenceSO-71260
ReleasedSat Jul 11 06:00
DueTue Jul 21 15:00
Priority and weight3, weight 2
Touch time left41.2 h
Sequence position236

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 8 06:00On hand
Enclosure setTidewell PlasticsWed Jul 8 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconSun Jul 5 06:00On hand
Display panelBrightline DisplaysThu Jul 9 06:00On hand
WO-10014
All-in-One 24", 16GB / 512GBAF-4434, Desktops
35
Warehouse stockStock replenishment
Wed Jul 22 17:00
Tue Jul 21 11:45
29 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 14 06:00Jul 14 12:15455.029.5Planned
20SUBSUB-BJul 14 15:35Jul 14 18:15402.02.8Planned
30FAFA-06Jul 15 20:15Jul 16 08:00254.317.2Planned
40TBTB-03Jul 19 23:50Jul 20 08:35358.287.6Planned
50PKPK-01Jul 21 09:50Jul 21 11:45151.216.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time29 h to spare before the due date.

Order

ReferenceRP-2644
ReleasedSun Jul 12 06:00
DueWed Jul 22 17:00
Priority and weight3, weight 1
Touch time left23.3 h
Sequence position246

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsFri Jul 10 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconFri Jul 10 06:00On hand
WO-10057
128GB USB Flash Drive, 10-pack, refreshBP-7381, Storage
150
Warehouse stockStock replenishment
Wed Jul 22 17:00
Tue Jul 21 11:55
29 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 15 23:05Jul 16 07:25906.668.3Planned
20SUBSUB-AJul 16 18:20Jul 16 20:45501.111.8Planned
30FAFA-03Jul 17 07:55Jul 17 11:40452.54.6Planned
40TBTB-01Jul 20 00:15Jul 20 06:35355.862.5Planned
50PKPK-02Jul 21 10:30Jul 21 11:55151.218.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time29 h to spare before the due date.

Order

ReferenceRP-2687
ReleasedSun Jul 12 06:00
DueWed Jul 22 17:00
Priority and weight3, weight 1
Touch time left21.0 h
Sequence position247

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jul 7 06:00On hand
Enclosure setTidewell PlasticsMon Jul 6 06:00On hand
Power moduleAster PowerThu Jul 2 06:00On hand
WO-10072
Mesh Wi-Fi Kit, 3-packBP-8055, Networking
325
Warehouse stockStock replenishment
Mon Jul 27 17:00
Mon Jul 27 18:05
1.1 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 21 06:00Jul 22 15:304531.0143.5Planned
20SUBSUB-BJul 22 08:40Jul 22 17:10507.212.6Planned
30FAFA-02Jul 22 11:25Jul 23 09:554514.20.0Planned
40TBTB-03Jul 25 01:40Jul 26 03:303525.259.0Planned
50PKPK-01Jul 27 12:40Jul 27 18:05155.26.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 144 working hours at SMT.
  • Split op 10 across SMT-04 and SMT-07: SMT-07 has 87 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Wed Jul 15 20:15.

Order

ReferenceRP-2702
ReleasedSun Jul 12 06:00
DueMon Jul 27 17:00
Priority and weight3, weight 1
Touch time left86.0 h
Sequence position272

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jul 4 06:00On hand
Enclosure setTidewell PlasticsThu Jul 9 06:00On hand
Power moduleAster PowerSat Jul 4 06:00On hand
SoC moduleKestrel SiliconFri Jul 10 06:00On hand
WO-10086
Chromebook 11", 4GB / 64GB, refreshKL-1625, Laptops
145
Warehouse stockStock replenishment
Thu Jul 23 17:00
Wed Jul 22 13:00
28 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 16 12:30Jul 17 08:509018.381.0Planned
20SUBSUB-AJul 17 06:05Jul 17 12:55405.71.8Planned
30FAFA-05Jul 17 14:35Jul 20 11:404512.35.1Planned
40TBTB-01Jul 21 06:00Jul 22 05:453523.281.6Planned
50PKPK-01Jul 22 09:30Jul 22 13:00152.83.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time28 h to spare before the due date.

Order

ReferenceRP-2716
ReleasedSun Jul 12 06:00
DueThu Jul 23 17:00
Priority and weight3, weight 1
Touch time left66.0 h
Sequence position255

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsSat Jul 4 06:00On hand
Power moduleAster PowerThu Jul 9 06:00On hand
SoC moduleKestrel SiliconSun Jul 5 06:00On hand
Display panelBrightline DisplaysMon Jul 6 06:00On hand
WO-10130
24-Port PoE Switch, managed, refreshLM-3668, Networking
185
Warehouse stockStock replenishment
Thu Jul 23 17:00
Wed Jul 22 16:40
24 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 16 14:00Jul 17 11:059018.682.5Planned
20SUBSUB-BJul 17 08:00Jul 17 13:40504.33.4Planned
30FAFA-06Jul 17 16:00Jul 20 08:50458.65.2Planned
40TBTB-02Jul 21 09:00Jul 22 00:403515.185.2Planned
50PKPK-02Jul 22 13:20Jul 22 16:40153.16.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time24 h to spare before the due date.

Order

ReferenceRP-2760
ReleasedSun Jul 12 06:00
DueThu Jul 23 17:00
Priority and weight3, weight 1
Touch time left53.6 h
Sequence position256

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 2 06:00On hand
Enclosure setTidewell PlasticsTue Jul 7 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconThu Jul 2 06:00On hand
WO-10229
Mini PC, 8-core, 16GB / 512GB, refreshQN-4241, Desktops
90
Warehouse stockStock replenishment
Thu Jul 23 17:00
Thu Jul 23 08:35
8.4 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 17 06:00Jul 17 16:401010.064.5Planned
20SUBSUB-BJul 17 15:05Jul 17 20:20503.92.3Planned
30FAFA-05Jul 20 11:40Jul 20 21:40458.89.2Planned
40TBTB-01Jul 22 05:45Jul 22 22:553516.636.2Planned
50PKPK-02Jul 23 06:00Jul 23 08:35152.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time8.4 h to spare before the due date.

Order

ReferenceRP-2859
ReleasedSun Jul 12 06:00
DueThu Jul 23 17:00
Priority and weight3, weight 1
Touch time left44.2 h
Sequence position259

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsThu Jul 9 06:00On hand
Power moduleAster PowerTue Jul 14 10:00In transit
SoC moduleKestrel SiliconThu Jul 2 06:00On hand
WO-10268
24-Port PoE Switch, managedVW-1670, Networking
130
Warehouse stockStock replenishment
Thu Jul 23 17:00
Wed Jul 22 19:55
21 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 20 05:20Jul 20 18:301012.5120.1Planned
20SUBSUB-CJul 20 17:20Jul 20 21:35502.96.0Planned
30FAFA-03Jul 20 22:55Jul 21 12:55455.82.8Planned
40TBTB-03Jul 22 06:20Jul 22 16:451510.221.2Planned
50PKPK-02Jul 22 17:15Jul 22 19:5552.10.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time21 h to spare before the due date.

Order

ReferenceRP-2898
ReleasedSun Jul 12 06:00
DueThu Jul 23 17:00
Priority and weight3, weight 1
Touch time left35.5 h
Sequence position260

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsSat Jul 4 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconThu Jul 2 06:00On hand
WO-10282
Ergonomic Mouse, wirelessVW-4001, Peripherals
500
Warehouse stockStock replenishment
Wed Jul 22 17:00
Tue Jul 21 15:40
25 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 19 23:00Jul 20 17:459016.50.0Planned
20SUBSUB-AJul 20 14:25Jul 20 19:10503.47.9Planned
30FAFA-01Jul 20 15:55Jul 21 08:15458.10.0Planned
40TBTB-02Jul 21 03:40Jul 21 09:00354.89.9Planned
50PKPK-01Jul 21 11:45Jul 21 15:40153.71.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time25 h to spare before the due date.

Order

ReferenceRP-2912
ReleasedSun Jul 12 06:00
DueWed Jul 22 17:00
Priority and weight3, weight 1
Touch time left40.3 h
Sequence position251

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jul 18 14:00In transit
Enclosure setTidewell PlasticsSat Jul 4 06:00On hand
Power moduleAster PowerSat Jul 4 06:00On hand
WO-10336
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
40
ACCOUNT 5190Silver, customer build
Thu Jul 23 15:00
Wed Jul 22 06:50
32 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 16 08:05Jul 16 14:00454.777.1Planned
20SUBSUB-AJul 16 20:45Jul 17 06:05501.55.8Planned
30FAFA-03Jul 17 11:40Jul 17 15:35453.24.8Planned
40TBTB-03Jul 20 17:25Jul 20 23:55355.973.6Planned
45CFGCFG-01Jul 21 08:55Jul 21 12:20252.52.9Planned
50PKPK-02Jul 21 22:50Jul 22 06:50150.89.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time32 h to spare before the due date.

Order

ReferenceSO-71377
ReleasedSun Jul 12 06:00
DueThu Jul 23 15:00
Priority and weight3, weight 2
Touch time left22.1 h
Sequence position253

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 2 06:00On hand
Enclosure setTidewell PlasticsThu Jul 9 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconSun Jul 5 06:00On hand
Display panelBrightline DisplaysWed Jul 8 06:00On hand
WO-10101
Wi-Fi 6E RouterKL-3459, Networking
20
Warehouse stockStock replenishment
Wed Jul 22 17:00
Tue Jul 21 12:30
28 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 13 19:10Jul 13 22:35901.912.2Planned
20SUBSUB-AJul 14 22:20Jul 15 06:40500.515.3Planned
30FAFA-03Jul 16 08:50Jul 16 10:40250.917.9Planned
40TBTB-02Jul 20 06:00Jul 20 08:10351.691.1Planned
50PKPK-02Jul 21 11:55Jul 21 12:30150.318.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time28 h to spare before the due date.

Order

ReferenceRP-2731
ReleasedMon Jul 13 06:00
DueWed Jul 22 17:00
Priority and weight3, weight 1
Touch time left8.8 h
Sequence position248

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsWed Jul 8 06:00On hand
Power moduleAster PowerSat Jul 11 06:00On hand
SoC moduleKestrel SiliconFri Jul 3 06:00On hand
WO-10116
Mini PC, 8-core, 16GB / 512GB, grayKL-9030, Desktops
140
Warehouse stockStock replenishment
Mon Jul 27 17:00
Mon Jul 27 23:00
6.0 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 21 11:55Jul 22 04:504515.4142.2Planned
20SUBSUB-CJul 21 20:20Jul 22 11:45507.11.3Planned
30FAFA-04Jul 22 20:30Jul 23 21:054515.812.5Planned
40TBTB-01Jul 25 11:10Jul 26 17:251530.049.0Planned
50PKPK-01Jul 27 18:05Jul 27 23:00154.211.6Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 142 working hours at SMT.
  • Split op 10 across SMT-05 and SMT-07: SMT-07 has 80 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Thu Jul 16 10:55.

Order

ReferenceRP-2746
ReleasedMon Jul 13 06:00
DueMon Jul 27 17:00
Priority and weight3, weight 1
Touch time left75.3 h
Sequence position273

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsSat Jul 4 06:00On hand
Power moduleAster PowerMon Jul 6 06:00On hand
SoC moduleKestrel SiliconWed Jul 8 06:00On hand
WO-10163
27" QHD Monitor, 165Hz, refreshLM-8095, Monitors
450
Warehouse stockStock replenishment
Thu Jul 30 17:00
Thu Jul 30 16:05
0.9 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 23 18:00Jul 24 21:001025.3193.8Planned
20SUBSUB-AJul 24 11:00Jul 24 22:405010.35.5Planned
30FAFA-06Jul 24 16:40Jul 28 13:204527.93.4Planned
40TBTB-04Jul 29 00:30Jul 29 22:401521.999.2Planned
50PKPK-02Jul 30 06:00Jul 30 16:05159.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.9 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2793
ReleasedMon Jul 13 06:00
DueThu Jul 30 17:00
Priority and weight3, weight 1
Touch time left97.1 h
Sequence position291

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 10 06:00On hand
Enclosure setTidewell PlasticsSat Jul 11 06:00On hand
Power moduleAster PowerFri Jul 10 06:00On hand
Display panelBrightline DisplaysSat Jul 11 06:00On hand
WO-10297
34" Ultrawide Monitor, curvedVW-6938, Monitors
255
Warehouse stockStock replenishment
Mon Jul 27 17:00
Mon Jul 27 09:30
7.5 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 20 17:45Jul 21 13:309017.0125.2Planned
20SUBSUB-BJul 21 07:35Jul 21 15:25256.91.6Planned
30FAFA-05Jul 21 22:05Jul 23 07:55518.811.4Planned
40TBTB-03Jul 24 04:15Jul 24 19:151514.843.1Planned
50PKPK-02Jul 24 19:55Jul 27 09:30156.30.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.5 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2927
ReleasedMon Jul 13 06:00
DueMon Jul 27 17:00
Priority and weight3, weight 1
Touch time left66.2 h
Sequence position269

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsWed Jul 8 06:00On hand
Power moduleAster PowerFri Jul 10 06:00On hand
Display panelBrightline DisplaysSat Jul 4 06:00On hand
WO-10334
Mini PC, 8-core, 16GB / 512GB, grayKL-9030, Desktops
40
ACCOUNT 4340Platinum, customer build
Thu Jul 23 15:00
Tue Jul 21 22:50
40 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 16 06:00Jul 16 13:15905.268.2Planned
20SUBSUB-BJul 16 22:05Jul 17 08:00502.17.8Planned
30FAFA-06Jul 17 10:40Jul 17 16:00454.61.9Planned
40TBTB-03Jul 20 08:35Jul 20 17:25158.664.3Planned
45CFGCFG-01Jul 21 06:00Jul 21 08:55252.54.6Planned
50PKPK-02Jul 21 21:20Jul 21 22:50151.211.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time40 h to spare before the due date.

Order

ReferenceSO-71351
ReleasedMon Jul 13 06:00
DueThu Jul 23 15:00
Priority and weight1, weight 5
Touch time left28.2 h
Sequence position252

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jul 4 06:00On hand
Enclosure setTidewell PlasticsThu Jul 9 06:00On hand
Power moduleAster PowerSat Jul 11 06:00On hand
SoC moduleKestrel SiliconTue Jul 7 06:00On hand
WO-10201
Chromebook 11", 4GB / 64GBNB-7136, Laptops
285
Warehouse stockStock replenishment
Tue Jul 28 17:00
Tue Jul 28 20:55
3.9 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 22 04:10Jul 23 15:154532.6134.9Planned
20SUBSUB-CJul 23 06:10Jul 23 17:305010.011.0Planned
30FAFA-01Jul 23 09:50Jul 24 16:402521.90.8Planned
40TBTB-02Jul 26 21:30Jul 28 14:551541.278.6Planned
50PKPK-02Jul 28 15:25Jul 28 20:55104.80.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 135 working hours at SMT.
  • Split op 10 across SMT-03 and SMT-04: SMT-04 has 28 idle hours while this order waits, in gaps too short for the whole job.
  • Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).

With every resource to itself it would finish Fri Jul 17 16:15.

Order

ReferenceRP-2831
ReleasedTue Jul 14 06:00
DueTue Jul 28 17:00
Priority and weight3, weight 1
Touch time left112.9 h
Sequence position278

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 12 06:00On hand
Enclosure setTidewell PlasticsThu Jul 9 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconFri Jul 10 06:00On hand
Display panelBrightline DisplaysFri Jul 10 06:00On hand
WO-10029
1TB NVMe SSDAF-7757, Storage
440
Warehouse stockStock replenishment
Mon Jul 27 17:00
Mon Jul 27 13:00
4.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 20 20:45Jul 21 14:151016.682.2Planned
20SUBSUB-CJul 21 16:25Jul 21 20:20502.69.9Planned
30FAFA-03Jul 21 17:50Jul 22 08:10456.10.0Planned
40TBTB-04Jul 24 11:00Jul 25 01:401514.462.9Planned
50PKPK-02Jul 27 09:30Jul 27 13:00152.83.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2659
ReleasedWed Jul 15 06:00
DueMon Jul 27 17:00
Priority and weight3, weight 1
Touch time left44.7 h
Sequence position271

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 12 06:00On hand
Enclosure setTidewell PlasticsWed Jul 8 06:00On hand
Power moduleAster PowerSun Jul 5 06:00On hand
WO-10038
15" Laptop, 12-core, 32GB / 1TBBP-4957, Laptops
195
Warehouse stockStock replenishment
Wed Jul 29 17:00
Tue Jul 28 19:50
21 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 22 15:30Jul 23 17:009022.8123.0Planned
20SUBSUB-AJul 23 13:00Jul 23 21:20507.06.5Planned
30FAFA-02Jul 23 21:45Jul 24 21:504515.35.3Planned
40TBTB-03Jul 27 09:50Jul 28 15:103528.872.1Planned
50PKPK-01Jul 28 15:40Jul 28 19:50153.40.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time21 h to spare before the due date.

Order

ReferenceRP-2668
ReleasedWed Jul 15 06:00
DueWed Jul 29 17:00
Priority and weight3, weight 1
Touch time left81.2 h
Sequence position282

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 6 06:00On hand
Enclosure setTidewell PlasticsMon Jul 6 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
SoC moduleKestrel SiliconWed Jul 8 06:00On hand
Display panelBrightline DisplaysMon Jul 13 06:00On hand
WO-10067
1TB NVMe SSD, refreshBP-7490, Storage
260
Warehouse stockStock replenishment
Fri Jul 24 17:00
Thu Jul 23 18:00
23 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 20 05:25Jul 20 20:459012.867.9Planned
20SUBSUB-AJul 20 19:10Jul 20 22:00502.08.2Planned
30FAFA-01Jul 21 08:15Jul 21 14:15454.84.6Planned
40TBTB-02Jul 22 20:30Jul 23 08:153511.234.3Planned
50PKPK-02Jul 23 15:35Jul 23 18:00152.26.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time23 h to spare before the due date.

Order

ReferenceRP-2697
ReleasedWed Jul 15 06:00
DueFri Jul 24 17:00
Priority and weight3, weight 1
Touch time left36.8 h
Sequence position262

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 13 06:00On hand
Enclosure setTidewell PlasticsSun Jul 12 06:00On hand
Power moduleAster PowerThu Jul 9 06:00On hand
WO-10111
Wi-Fi 6 Access Point, ceilingKL-5384, Networking
100
Warehouse stockStock replenishment
Fri Jul 24 17:00
Wed Jul 22 14:30
2.1 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 20 06:00Jul 20 15:20907.368.5Planned
20SUBSUB-CJul 20 21:35Jul 21 07:00401.88.9Planned
30FAFA-04Jul 21 08:50Jul 21 13:30453.42.4Planned
40TBTB-03Jul 21 14:30Jul 21 21:05356.02.4Planned
50PKPK-01Jul 22 13:00Jul 22 14:30151.27.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.1 d to spare before the due date.

Order

ReferenceRP-2741
ReleasedWed Jul 15 06:00
DueFri Jul 24 17:00
Priority and weight3, weight 1
Touch time left23.5 h
Sequence position263

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsMon Jul 6 06:00On hand
Power moduleAster PowerMon Jul 13 06:00On hand
SoC moduleKestrel SiliconFri Jul 10 06:00On hand
WO-10125
27" QHD Monitor, 165HzLM-2177, Monitors
265
Warehouse stockStock replenishment
Wed Jul 29 17:00
Wed Jul 29 12:00
5.0 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 22 18:15Jul 23 14:059017.1125.8Planned
20SUBSUB-CJul 23 17:30Jul 24 08:50507.011.0Planned
30FAFA-04Jul 23 21:05Jul 27 07:404518.80.7Planned
40TBTB-04Jul 28 06:00Jul 28 21:253514.893.3Planned
50PKPK-02Jul 28 21:55Jul 29 12:00156.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 5.0 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2755
ReleasedWed Jul 15 06:00
DueWed Jul 29 17:00
Priority and weight3, weight 1
Touch time left68.0 h
Sequence position284

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 5 06:00On hand
Enclosure setTidewell PlasticsSun Jul 12 06:00On hand
Power moduleAster PowerMon Jul 13 06:00On hand
Display panelBrightline DisplaysSat Jul 11 06:00On hand
WO-10168
34" Ultrawide Monitor, curved, grayLM-9032, Monitors
65
Warehouse stockStock replenishment
Fri Jul 24 17:00
Thu Jul 23 21:25
20 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 20 06:00Jul 20 13:55905.968.5Planned
20SUBSUB-BJul 20 20:30Jul 21 06:25502.16.9Planned
30FAFA-05Jul 21 15:20Jul 21 22:05455.58.8Planned
40TBTB-01Jul 23 06:00Jul 23 10:55354.332.9Planned
50PKPK-02Jul 23 19:15Jul 23 21:25151.97.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time20 h to spare before the due date.

Order

ReferenceRP-2798
ReleasedWed Jul 15 06:00
DueFri Jul 24 17:00
Priority and weight3, weight 1
Touch time left23.7 h
Sequence position264

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 8 06:00On hand
Enclosure setTidewell PlasticsSun Jul 12 06:00On hand
Power moduleAster PowerSun Jul 12 06:00On hand
Display panelBrightline DisplaysMon Jul 13 06:00On hand
WO-10173
Tower Workstation, 32GB / 1TB, refreshLM-9819, Desktops
85
Warehouse stockStock replenishment
Mon Jul 27 17:00
Mon Jul 27 15:30
1.5 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 21 06:00Jul 21 17:50909.891.2Planned
20SUBSUB-AJul 22 08:05Jul 22 13:15503.810.2Planned
30FAFA-05Jul 23 07:55Jul 23 17:45458.612.4Planned
40TBTB-02Jul 25 11:30Jul 26 04:203516.245.0Planned
50PKPK-02Jul 27 13:00Jul 27 15:30152.26.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 1.5 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2803
ReleasedWed Jul 15 06:00
DueMon Jul 27 17:00
Priority and weight3, weight 1
Touch time left44.7 h
Sequence position274

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 6 06:00On hand
Enclosure setTidewell PlasticsFri Jul 10 06:00On hand
Power moduleAster PowerMon Jul 6 06:00On hand
SoC moduleKestrel SiliconSun Jul 5 06:00On hand
WO-10187
8" Rugged Tablet, 64GB, grayNB-5680, Tablets
20
Warehouse stockStock replenishment
Thu Jul 23 17:00
Thu Jul 23 19:15
2.2 h late
Late
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 16 16:30Jul 16 20:55902.432.8Planned
20SUBSUB-AJul 17 12:55Jul 17 14:30500.88.0Planned
30FAFA-03Jul 17 15:35Jul 17 17:55451.60.8Planned
40TBTB-04Jul 23 14:30Jul 23 17:40352.6140.3Planned
50PKPK-02Jul 23 18:10Jul 23 19:15150.30.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

Why it is late: capacityQueues 140 working hours at TB.
  • Review the TB sequence on the dispatch list; a lower-weight order may be able to wait.

With every resource to itself it would finish Wed Jul 15 18:10.

Order

ReferenceRP-2817
ReleasedWed Jul 15 06:00
DueThu Jul 23 17:00
Priority and weight3, weight 1
Touch time left11.6 h
Sequence position258

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 10 06:00On hand
Enclosure setTidewell PlasticsMon Jul 13 06:00On hand
Power moduleAster PowerSun Jul 5 06:00On hand
SoC moduleKestrel SiliconFri Jul 10 06:00On hand
Display panelBrightline DisplaysSun Jul 12 06:00On hand
WO-10215
4-Bay NAS Enclosure, refreshQN-2129, Storage
460
Warehouse stockStock replenishment
Mon Jul 27 17:00
Fri Jul 24 19:55
2.9 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 22 14:00Jul 23 12:109019.40.0Planned
20SUBSUB-AJul 23 08:40Jul 23 13:00503.07.0Planned
30FAFA-03Jul 23 10:30Jul 23 18:25457.20.0Planned
40TBTB-04Jul 23 17:40Jul 24 11:003516.85.3Planned
50PKPK-02Jul 24 15:55Jul 24 19:55153.24.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.9 d to spare before the due date.

Order

ReferenceRP-2845
ReleasedWed Jul 15 06:00
DueMon Jul 27 17:00
Priority and weight3, weight 1
Touch time left53.5 h
Sequence position268

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 22 14:00In transit
Enclosure setTidewell PlasticsFri Jul 10 06:00On hand
Power moduleAster PowerMon Jul 6 06:00On hand
WO-10096
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
100
Warehouse stockStock replenishment
Tue Jul 28 17:00
Tue Jul 28 09:55
7.1 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 21 14:15Jul 22 05:409013.276.2Planned
20SUBSUB-CJul 22 11:45Jul 22 16:40504.15.2Planned
30FAFA-03Jul 22 14:55Jul 23 08:00458.80.0Planned
40TBTB-02Jul 26 04:20Jul 26 21:303516.679.5Planned
50PKPK-02Jul 28 07:40Jul 28 09:55152.017.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.1 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2726
ReleasedThu Jul 16 06:00
DueTue Jul 28 17:00
Priority and weight3, weight 1
Touch time left48.6 h
Sequence position276

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 6 06:00On hand
Enclosure setTidewell PlasticsThu Jul 9 06:00On hand
Power moduleAster PowerMon Jul 13 06:00On hand
SoC moduleKestrel SiliconMon Jul 6 06:00On hand
Display panelBrightline DisplaysSat Jul 11 06:00On hand
WO-10320
34" Ultrawide Monitor, curved, grayLM-9032, Monitors
60
ACCOUNT 4340Platinum, customer build
Mon Jul 27 15:00
Fri Jul 24 15:55
3.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 20 15:20Jul 20 21:25105.454.6Planned
20SUBSUB-AJul 20 22:00Jul 21 07:45501.90.9Planned
30FAFA-06Jul 21 19:05Jul 22 07:35255.110.3Planned
40TBTB-03Jul 23 12:20Jul 23 16:55354.029.3Planned
45CFGCFG-02Jul 23 17:25Jul 23 22:05253.80.0Planned
50PKPK-02Jul 24 14:00Jul 24 15:55101.88.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time3.0 d to spare before the due date.

Order

ReferenceSO-71169
ReleasedThu Jul 16 06:00
DueMon Jul 27 15:00
Priority and weight1, weight 5
Touch time left24.5 h
Sequence position267

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 10 06:00On hand
Enclosure setTidewell PlasticsMon Jul 6 06:00On hand
Power moduleAster PowerTue Jul 7 06:00On hand
Display panelBrightline DisplaysFri Jul 10 06:00On hand
WO-10009
Thin Client, 4GB / 32GB, grayAF-4236, Desktops
135
Warehouse stockStock replenishment
Tue Jul 28 17:00
Tue Jul 28 07:40
9.3 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 21 13:30Jul 22 04:109012.452.5Planned
20SUBSUB-AJul 22 13:15Jul 22 20:10405.89.1Planned
30FAFA-06Jul 23 07:25Jul 23 21:352512.87.6Planned
40TBTB-03Jul 26 03:30Jul 27 04:203524.262.2Planned
50PKPK-02Jul 27 21:10Jul 28 07:40103.314.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time9.3 h to spare before the due date.

Order

ReferenceRP-2639
ReleasedFri Jul 17 06:00
DueTue Jul 28 17:00
Priority and weight3, weight 1
Touch time left61.8 h
Sequence position275

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsFri Jul 10 06:00On hand
Power moduleAster PowerThu Jul 9 06:00On hand
SoC moduleKestrel SiliconSun Jul 12 06:00On hand
WO-10135
8" Rugged Tablet, 64GB, grayLM-5109, Tablets
160
Warehouse stockStock replenishment
Fri Jul 31 17:00
Fri Jul 31 06:55
10 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 24 03:50Jul 27 01:559019.6111.8Planned
20SUBSUB-AJul 24 22:40Jul 27 13:00506.09.7Planned
30FAFA-01Jul 27 08:40Jul 28 06:254513.00.0Planned
40TBTB-04Jul 29 22:40Jul 30 20:303521.256.4Planned
50PKPK-02Jul 30 21:00Jul 31 06:55152.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time10 h to spare before the due date.

Order

ReferenceRP-2765
ReleasedFri Jul 17 06:00
DueFri Jul 31 17:00
Priority and weight3, weight 1
Touch time left66.4 h
Sequence position296

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 12 06:00On hand
Enclosure setTidewell PlasticsSat Jul 11 06:00On hand
Power moduleAster PowerSat Jul 11 06:00On hand
SoC moduleKestrel SiliconWed Jul 8 06:00On hand
Display panelBrightline DisplaysFri Jul 10 06:00On hand
WO-10243
1TB NVMe SSD, grayQN-4854, Storage
290
Warehouse stockStock replenishment
Tue Jul 28 17:00
Tue Jul 28 12:15
4.8 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 22 04:50Jul 22 21:009013.767.1Planned
20SUBSUB-BJul 22 18:25Jul 22 21:55502.28.7Planned
30FAFA-03Jul 23 18:25Jul 24 07:25255.114.5Planned
40TBTB-04Jul 26 21:50Jul 27 09:551511.873.3Planned
50PKPK-01Jul 28 09:10Jul 28 12:15152.315.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 4.8 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2873
ReleasedFri Jul 17 06:00
DueTue Jul 28 17:00
Priority and weight3, weight 1
Touch time left38.3 h
Sequence position279

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 15 06:00On hand
Enclosure setTidewell PlasticsFri Jul 10 06:00On hand
Power moduleAster PowerTue Jul 14 06:00On hand
WO-10148
4K Conference CameraLM-5365, Peripherals
405
Warehouse stockStock replenishment
Tue Jul 28 17:00
Tue Jul 28 09:10
7.8 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 22 03:05Jul 22 18:159013.249.3Planned
20SUBSUB-CJul 22 16:40Jul 22 20:45502.89.4Planned
30FAFA-02Jul 23 09:55Jul 23 17:40456.58.2Planned
40TBTB-01Jul 26 17:25Jul 26 21:50353.877.2Planned
50PKPK-01Jul 28 06:00Jul 28 09:10152.916.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 7.8 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2778
ReleasedSat Jul 18 06:00
DueTue Jul 28 17:00
Priority and weight3, weight 1
Touch time left33.1 h
Sequence position277

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 8 06:00On hand
Enclosure setTidewell PlasticsTue Jul 14 06:00On hand
Power moduleAster PowerMon Jul 13 06:00On hand
WO-10048
24" FHD Monitor, IPSBP-5281, Monitors
330
Warehouse stockStock replenishment
Fri Jul 31 17:00
Thu Jul 30 13:20
28 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 24 00:30Jul 24 22:259019.492.5Planned
20SUBSUB-CJul 24 14:55Jul 27 07:10507.98.4Planned
30FAFA-04Jul 27 07:40Jul 28 14:002521.46.9Planned
40TBTB-03Jul 29 02:15Jul 29 19:403516.838.2Planned
50PKPK-01Jul 29 22:25Jul 30 13:20157.22.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time28 h to spare before the due date.

Order

ReferenceRP-2678
ReleasedSun Jul 19 06:00
DueFri Jul 31 17:00
Priority and weight3, weight 1
Touch time left76.3 h
Sequence position294

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 13 06:00On hand
Enclosure setTidewell PlasticsWed Jul 15 06:00On hand
Power moduleAster PowerWed Jul 15 06:00On hand
Display panelBrightline DisplaysSun Jul 12 06:00On hand
WO-10106
1080p Webcam with micKL-5125, Peripherals
350
Warehouse stockStock replenishment
Thu Jul 30 17:00
Wed Jul 29 22:15
19 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 23 17:00Jul 24 06:409011.785.5Planned
20SUBSUB-BJul 24 09:15Jul 24 13:00502.45.1Planned
30FAFA-01Jul 24 16:40Jul 27 06:40455.85.4Planned
40TBTB-01Jul 28 20:30Jul 29 00:30353.498.0Planned
50PKPK-02Jul 29 19:25Jul 29 22:15152.612.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time19 h to spare before the due date.

Order

ReferenceRP-2736
ReleasedSun Jul 19 06:00
DueThu Jul 30 17:00
Priority and weight3, weight 1
Touch time left29.8 h
Sequence position290

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 15 06:00On hand
Enclosure setTidewell PlasticsMon Jul 13 06:00On hand
Power moduleAster PowerSun Jul 12 06:00On hand
WO-10182
Wi-Fi 6 Access Point, ceiling, refreshNB-4322, Networking
65
Warehouse stockStock replenishment
Wed Jul 29 17:00
Tue Jul 28 14:35
26 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 22 06:00Jul 22 14:30906.552.2Planned
20SUBSUB-CJul 22 20:45Jul 22 22:55501.36.8Planned
30FAFA-03Jul 24 07:25Jul 24 11:15452.617.5Planned
40TBTB-04Jul 27 14:20Jul 27 19:25354.575.4Planned
50PKPK-01Jul 28 13:30Jul 28 14:35100.910.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time26 h to spare before the due date.

Order

ReferenceRP-2812
ReleasedSun Jul 19 06:00
DueWed Jul 29 17:00
Priority and weight3, weight 1
Touch time left19.7 h
Sequence position285

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jul 14 06:00On hand
Enclosure setTidewell PlasticsThu Jul 9 06:00On hand
Power moduleAster PowerWed Jul 15 06:00On hand
SoC moduleKestrel SiliconThu Jul 16 06:00On hand
WO-10224
8-Port Gigabit SwitchQN-4070, Networking
130
Warehouse stockStock replenishment
Wed Jul 29 17:00
Wed Jul 29 14:25
2.6 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 23 06:00Jul 23 21:259012.975.0Planned
20SUBSUB-AJul 23 21:20Jul 24 08:10503.07.3Planned
30FAFA-06Jul 24 06:40Jul 24 13:50455.90.1Planned
40TBTB-03Jul 28 15:10Jul 29 02:153510.5101.2Planned
50PKPK-02Jul 29 12:00Jul 29 14:25152.25.5Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 2.6 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2854
ReleasedSun Jul 19 06:00
DueWed Jul 29 17:00
Priority and weight3, weight 1
Touch time left38.4 h
Sequence position286

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 12 06:00On hand
Enclosure setTidewell PlasticsSun Jul 12 06:00On hand
Power moduleAster PowerTue Jul 14 06:00On hand
SoC moduleKestrel SiliconTue Jul 14 06:00On hand
WO-10277
Wi-Fi 6E Router, grayVW-2128, Networking
60
Warehouse stockStock replenishment
Tue Jul 28 17:00
Tue Jul 28 13:30
3.5 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 22 06:00Jul 22 14:00906.052.2Planned
20SUBSUB-AJul 22 20:10Jul 22 22:25501.46.2Planned
30FAFA-02Jul 23 17:40Jul 23 21:45452.811.7Planned
40TBTB-03Jul 27 04:20Jul 27 09:50354.978.8Planned
50PKPK-01Jul 28 12:15Jul 28 13:30151.017.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 3.5 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2907
ReleasedSun Jul 19 06:00
DueTue Jul 28 17:00
Priority and weight3, weight 1
Touch time left20.1 h
Sequence position281

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 16 06:00On hand
Enclosure setTidewell PlasticsSat Jul 11 06:00On hand
Power moduleAster PowerThu Jul 9 06:00On hand
SoC moduleKestrel SiliconFri Jul 17 06:00On hand
WO-10306
Mechanical Keyboard, TKLVW-8762, Peripherals
280
Warehouse stockStock replenishment
Wed Jul 29 17:00
Wed Jul 29 16:40
0.3 h
At risk
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-07Jul 23 06:00Jul 23 18:209010.375.0Planned
20SUBSUB-CJul 24 08:50Jul 24 12:00501.814.9Planned
30FAFA-03Jul 24 11:15Jul 24 16:20454.30.8Planned
40TBTB-03Jul 24 19:15Jul 24 22:25352.66.2Planned
50PKPK-02Jul 29 14:25Jul 29 16:40152.040.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

At riskFinishes 0.3 h before it is due. Any slip on the floor makes it late.

Order

ReferenceRP-2936
ReleasedSun Jul 19 06:00
DueWed Jul 29 17:00
Priority and weight3, weight 1
Touch time left25.0 h
Sequence position287

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 9 06:00On hand
Enclosure setTidewell PlasticsWed Jul 15 06:00On hand
Power moduleAster PowerMon Jul 13 06:00On hand
WO-10081
Thin Client, 4GB / 32GB, grayKL-1432, Desktops
20
Warehouse stockStock replenishment
Wed Jul 29 17:00
Mon Jul 27 16:15
2.0 d
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-06Jul 21 17:50Jul 21 21:50902.034.1Planned
20SUBSUB-BJul 22 06:30Jul 22 08:05400.91.2Planned
30FAFA-06Jul 23 21:35Jul 24 06:4052.028.2Planned
40TBTB-04Jul 27 09:55Jul 27 14:20353.875.0Planned
50PKPK-02Jul 27 15:30Jul 27 16:15100.60.7Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time2.0 d to spare before the due date.

Order

ReferenceRP-2711
ReleasedMon Jul 20 06:00
DueWed Jul 29 17:00
Priority and weight3, weight 1
Touch time left12.3 h
Sequence position283

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jul 14 06:00On hand
Enclosure setTidewell PlasticsFri Jul 10 06:00On hand
Power moduleAster PowerSat Jul 11 06:00On hand
SoC moduleKestrel SiliconTue Jul 14 06:00On hand
WO-10091
12" Pro Tablet, 256GBKL-2075, Tablets
160
Warehouse stockStock replenishment
Fri Jul 31 17:00
Thu Jul 30 15:55
25 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-02Jul 24 10:30Jul 27 06:159017.50.0Planned
20SUBSUB-BJul 24 19:15Jul 27 08:30505.40.8Planned
30FAFA-02Jul 24 22:05Jul 27 17:554511.60.0Planned
40TBTB-02Jul 29 04:30Jul 30 00:003518.942.8Planned
50PKPK-01Jul 30 13:20Jul 30 15:55152.36.8Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time25 h to spare before the due date.

Order

ReferenceRP-2721
ReleasedMon Jul 20 06:00
DueFri Jul 31 17:00
Priority and weight3, weight 1
Touch time left59.7 h
Sequence position295

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsFri Jul 24 10:00In transit
Enclosure setTidewell PlasticsFri Jul 17 06:00On hand
Power moduleAster PowerMon Jul 13 06:00On hand
SoC moduleKestrel SiliconFri Jul 17 06:00On hand
Display panelBrightline DisplaysTue Jul 14 06:00On hand
WO-10192
KVM Switch, 2-port 4K, grayNB-7003, Docks & Hubs
290
Warehouse stockStock replenishment
Fri Jul 31 17:00
Thu Jul 30 19:55
21 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jul 24 06:40Jul 27 15:109029.291.9Planned
20SUBSUB-BJul 27 11:10Jul 27 16:30504.512.9Planned
30FAFA-03Jul 27 13:05Jul 27 22:05258.10.0Planned
40TBTB-01Jul 29 06:00Jul 29 14:30357.938.8Planned
50PKPK-01Jul 30 15:55Jul 30 19:55153.216.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time21 h to spare before the due date.

Order

ReferenceRP-2822
ReleasedMon Jul 20 06:00
DueFri Jul 31 17:00
Priority and weight3, weight 1
Touch time left56.6 h
Sequence position297

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSat Jul 18 06:00On hand
Enclosure setTidewell PlasticsTue Jul 14 06:00On hand
Power moduleAster PowerTue Jul 14 06:00On hand
WO-10019
4-Bay NAS Enclosure, grayAF-5514, Storage
140
Warehouse stockStock replenishment
Thu Jul 30 17:00
Wed Jul 29 17:55
23 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 23 12:10Jul 23 18:00105.751.2Planned
20SUBSUB-BJul 24 07:30Jul 24 09:15500.99.1Planned
30FAFA-06Jul 24 13:50Jul 24 16:40452.14.4Planned
40TBTB-02Jul 28 14:55Jul 28 20:25354.995.3Planned
50PKPK-02Jul 29 16:40Jul 29 17:55151.012.2Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time23 h to spare before the due date.

Order

ReferenceRP-2649
ReleasedTue Jul 21 06:00
DueThu Jul 30 17:00
Priority and weight3, weight 1
Touch time left17.2 h
Sequence position288

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsThu Jul 16 06:00On hand
Enclosure setTidewell PlasticsSat Jul 11 06:00On hand
Power moduleAster PowerSat Jul 18 06:00On hand
WO-10062
128GB USB Flash Drive, 10-packBP-7439, Storage
110
Warehouse stockStock replenishment
Thu Jul 30 17:00
Wed Jul 29 19:25
22 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-03Jul 23 15:15Jul 23 22:10904.954.2Planned
20SUBSUB-AJul 24 08:10Jul 24 09:50500.85.2Planned
30FAFA-03Jul 24 16:20Jul 24 19:25451.86.2Planned
40TBTB-02Jul 28 20:25Jul 29 01:00154.398.2Planned
50PKPK-02Jul 29 17:55Jul 29 19:25100.811.4Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time22 h to spare before the due date.

Order

ReferenceRP-2692
ReleasedTue Jul 21 06:00
DueThu Jul 30 17:00
Priority and weight3, weight 1
Touch time left16.2 h
Sequence position289

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsSun Jul 12 06:00On hand
Enclosure setTidewell PlasticsWed Jul 15 06:00On hand
Power moduleAster PowerFri Jul 17 06:00On hand
WO-10234
15" Laptop, 12-core, 32GB / 1TB, grayQN-4418, Laptops
100
Warehouse stockStock replenishment
Fri Jul 31 17:00
Thu Jul 30 18:05
23 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 24 22:25Jul 27 12:159011.683.9Planned
20SUBSUB-CJul 27 09:40Jul 27 14:35503.63.2Planned
30FAFA-02Jul 27 17:55Jul 28 10:00457.84.8Planned
40TBTB-01Jul 29 14:30Jul 30 05:453514.732.2Planned
50PKPK-02Jul 30 16:05Jul 30 18:05151.89.3Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time23 h to spare before the due date.

Order

ReferenceRP-2864
ReleasedTue Jul 21 06:00
DueFri Jul 31 17:00
Priority and weight3, weight 1
Touch time left43.3 h
Sequence position298

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jul 14 06:00On hand
Enclosure setTidewell PlasticsThu Jul 16 06:00On hand
Power moduleAster PowerTue Jul 14 06:00On hand
SoC moduleKestrel SiliconSun Jul 19 06:00On hand
Display panelBrightline DisplaysSun Jul 12 06:00On hand
WO-10253
4K Conference Camera, grayQN-6249, Peripherals
115
Warehouse stockStock replenishment
Thu Jul 30 17:00
Tue Jul 28 21:00
44 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-01Jul 23 18:20Jul 24 00:30904.257.3Planned
20SUBSUB-BJul 24 13:00Jul 24 14:35400.96.8Planned
30FAFA-03Jul 24 19:25Jul 24 22:15452.14.6Planned
40TBTB-04Jul 27 19:25Jul 27 21:15351.270.1Planned
50PKPK-01Jul 28 19:50Jul 28 21:00150.914.1Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time44 h to spare before the due date.

Order

ReferenceRP-2883
ReleasedTue Jul 21 06:00
DueThu Jul 30 17:00
Priority and weight3, weight 1
Touch time left13.1 h
Sequence position292

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsMon Jul 13 06:00On hand
Enclosure setTidewell PlasticsFri Jul 17 06:00On hand
Power moduleAster PowerSat Jul 11 06:00On hand
WO-10287
USB-C Travel Hub, 7-in-1VW-4303, Docks & Hubs
110
Warehouse stockStock replenishment
Thu Jul 30 17:00
Wed Jul 29 22:25
19 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-05Jul 23 21:25Jul 24 09:309010.659.9Planned
20SUBSUB-CJul 24 12:00Jul 24 14:30501.75.5Planned
30FAFA-03Jul 24 22:15Jul 27 08:55452.97.8Planned
40TBTB-02Jul 29 01:00Jul 29 04:30352.941.4Planned
50PKPK-01Jul 29 20:55Jul 29 22:25151.213.9Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time19 h to spare before the due date.

Order

ReferenceRP-2917
ReleasedTue Jul 21 06:00
DueThu Jul 30 17:00
Priority and weight3, weight 1
Touch time left23.2 h
Sequence position293

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsWed Jul 15 06:00On hand
Enclosure setTidewell PlasticsSat Jul 11 06:00On hand
Power moduleAster PowerTue Jul 14 06:00On hand
WO-10344
14" Laptop, 8-core, 16GB / 512GB, refreshKL-2645, Laptops
240
ACCOUNT 4340Platinum, customer build
Fri Jun 12 15:00
Thu Jun 11 10:40
28 h
On time
Next at SMT

Routing

OpWork centerResourceStartEndSetup minRun hWaited hStateTimeline
10SMTSMT-04Jun 4 07:00Jun 5 17:309031.523.8Planned
20SUBSUB-BJun 5 09:35Jun 5 21:05509.710.0Planned
30FAFA-05Jun 5 13:15Jun 8 19:202521.20.0Planned
40TBTB-01Jun 8 06:00Jun 9 22:203539.859.7Planned
45CFGCFG-01Jun 9 22:50Jun 10 22:052514.80.0Planned
50PKPK-01Jun 10 22:20Jun 11 10:40104.70.0Planned

In the timeline, dotted amber is time spent waiting and the red line is the due date.

Diagnosis

On time28 h to spare before the due date.

Order

ReferenceSO-79344
ReleasedWed Jun 3 06:00
DueFri Jun 12 15:00
Priority and weight1, weight 5
Touch time left125.5 h
Sequence position42

Key materials

ComponentSupplierArrivesStatus
Bare circuit boardNorra CircuitsTue Jun 2 06:00On hand
Enclosure setTidewell PlasticsTue Jun 2 06:00On hand
Power moduleAster PowerTue Jun 2 06:00On hand

Resources

Daily load on every resource for the next three weeks, and where the shared crews run out. Hatched cells include planned downtime.

Daily load

Percent of open hours booked for run and changeover. Utilization and changeover share cover the next 14 days.

ResourceUtil.ChangeoverStationsWed
3
Thu
4
Fri
5
Sat
6
Sun
7
Mon
8
Tue
9
Wed
10
Thu
11
Fri
12
Sat
13
Sun
14
Mon
15
Tue
16
Wed
17
Thu
18
Fri
19
Sat
20
Sun
21
Mon
22
Tue
23
SMT Surface mount
SMT-01 SMT line 169%7%175677310010079997767056057978610010061
SMT-02 SMT line 291%6%1751004510010010091100100100701001001001001008487
SMT-03 SMT line 390%8%158791001001001001009150100100100100100470100100
SMT-04 SMT line 496%5%1751007708610010010010010010010010082731005481
SMT-05 SMT line 585%9%101001001001005478837310083100479692100100100
SMT-06 SMT line 682%6%175100100100788149867408177100795907264
SMT-07 SMT line 752%12%160385403375370731007376693010010055100
SUB Sub-assembly
SUB-A Sub-assembly cell A74%16%668610010049100100658448339110010099
SUB-B Sub-assembly cell B80%11%648100898486941005186676610010068100
SUB-C Sub-assembly cell C81%14%6288710084671001009486684210010052100
FA Final assembly
FA-01 Final assembly cell 162%7%555850478410079916122072715448
FA-02 Final assembly cell 284%8%546736272941001001001001006745419100
FA-03 Final assembly cell 381%3%5966610010057887054761009258805735
FA-04 Final assembly cell 490%6%55858100100100871001001001009972100100100
FA-05 Final assembly cell 586%6%516767010010099100100100100100100100100100
FA-06 Final assembly cell 683%4%531010010010010010010010010066100100100100
TB Burn-in and test
TB-01 Burn-in bank 192%4%4751001001001009193751001006588771009466100100289688
TB-02 Burn-in bank 281%4%46961608892767588747572799810010089500788985
TB-03 Burn-in bank 377%1%47510010012084100931008063100996975100100100935675
TB-04 Burn-in bank 493%3%473100100100100100100100951001003472100100100100100100100100
CFG Imaging and configuration
CFG-01 Imaging cell 118%4%1203400194004904906110057
CFG-02 Imaging cell 28%7%12061180000000000022
PK Pack-out
PK-01 Pack-out line 163%5%49722149994572621100100100734610092
PK-02 Pack-out line 293%7%4961009010094927092100100100675510099
Under 50%50 to 75%75 to 90%90 to 100%Downtime

Crew limits

Hours per shift when a line or bank is free but everyone on the shared crew is already assigned. This is time the crew, not the equipment, is the limit. The schedule never books more people than the shift has.

Crew and shiftWed
3
Thu
4
Fri
5
Sat
6
Sun
7
Mon
8
Tue
9
Wed
10
Thu
11
Fri
12
Sat
13
Sun
14
Mon
15
Tue
16
SMT operators day shift············
SMT operators swing shift·2.93.06.54.3·3.82.24.84.1
SMT operators night shift5.27.06.86.86.86.8·6.86.86.8
Test technicians day shift···8.58.5·····8.58.5··
Test technicians swing shift···8.56.6·····8.58.5··
Test technicians night shift7.07.07.07.07.07.07.07.07.07.07.07.07.07.0
Imaging engineers day shift············
Imaging engineers swing shift·8.0···7.1····

Resource setup

How each resource is modelled. Run time per unit is divided by stations, efficiency and speed. Hours cover the next 14 days.

ResourceNameWork centerStationsEfficiencySpeedCalendarCapabilitiesCrew poolBooked hOpen h
SMT-01SMT line 1SMT178%1.00C3X5fine-pitchSMT-OPS158228
SMT-02SMT line 2SMT178%1.00C3X5fine-pitchSMT-OPS207228
SMT-03SMT line 3SMT178%1.00C3X5fine-pitchSMT-OPS198220
SMT-04SMT line 4SMT178%1.00C3X5fine-pitchSMT-OPS219228
SMT-05SMT line 5SMT178%1.00C3X5standardSMT-OPS170200
SMT-06SMT line 6SMT178%1.00C3X5standardSMT-OPS187228
SMT-07SMT line 7SMT178%0.85C3X5npiSMT-OPS118228
SUB-ASub-assembly cell ASUB685%1.00C2X5standardnone118160
SUB-BSub-assembly cell BSUB685%1.00C2X5standardnone129160
SUB-CSub-assembly cell CSUB685%1.00C2X5standardnone130160
FA-01Final assembly cell 1FA585%1.00C2X5standardnone100160
FA-02Final assembly cell 2FA585%1.00C2X5standardnone132156
FA-03Final assembly cell 3FA585%1.00C2X5standardnone129160
FA-04Final assembly cell 4FA585%1.00C2X5large-formatnone145160
FA-05Final assembly cell 5FA585%1.00C2X5large-formatnone138160
FA-06Final assembly cell 6FA585%1.00C2X5large-formatnone133160
TB-01Burn-in bank 1TB490%1.00C24X7standardTEST-TECH309336
TB-02Burn-in bank 2TB490%1.00C24X7standardTEST-TECH272336
TB-03Burn-in bank 3TB490%1.00C24X7standardTEST-TECH258336
TB-04Burn-in bank 4TB490%1.00C24X7environmentalTEST-TECH312336
CFG-01Imaging cell 1CFG1290%1.00C2X5standardIMG-ENG28160
CFG-02Imaging cell 2CFG1290%1.00C2X5standardIMG-ENG13160
PK-01Pack-out line 1PK488%1.00C2X5standardnone101160
PK-02Pack-out line 2PK488%1.00C2X5standardnone149160

Dispatch lists

The run sequence for each resource over the next ten days, grouped by day. Print from the browser to get a shift sheet for the resource on screen.

SMT-01 SMT line 1

Work center SMTCalendar C3X5Stations 1Load, next 14 days 69%Crew 3 from SMT-OPSAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Thu Jun 4 01:50WO-10083 op 10
Running
Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key LT-02
14918.8Thu Jun 11 17:00Warehouse stock
Thursday June 4
203:25Thu Jun 4 17:25WO-10265 op 10
Frozen
24-Port PoE Switch, managed
VW-1670, setup key NW-04
12590 min from LT-0212.0Thu Jun 11 17:00Warehouse stock
Friday June 5
306:00Mon Jun 8 19:50WO-10069 op 10Mesh Wi-Fi Kit, 3-pack
BP-8055, setup key NW-01
36545 min from NW-0434.8Mon Jun 15 17:00Warehouse stock
Monday June 8
419:50Tue Jun 9 08:40WO-10339 op 10Thin Client, 4GB / 32GB, gray
AF-4236, setup key DT-01
12090 min from NW-0111.1Wed Jun 17 15:00ACCOUNT 3915
Tuesday June 9
508:40Tue Jun 9 19:20WO-10303 op 10Mechanical Keyboard, TKL
VW-8762, setup key PR-05
26090 min from DT-018.2Wed Jun 17 17:00Warehouse stock
Wednesday June 10
600:15Thu Jun 11 18:15WO-10260 op 1022" Touch Monitor, gray
VW-1017, setup key MN-05
54090 min from PR-0538.5Wed Jun 17 17:00Warehouse stock
Friday June 12
706:00Fri Jun 12 21:45WO-10002 op 10Ergonomic Mouse, wireless, gray
AF-4219, setup key PR-01
37090 min from MN-0513.2Mon Jun 22 17:00Warehouse stock

39 more jobs after Sat Jun 13.

SMT-02 SMT line 2

Work center SMTCalendar C3X5Stations 1Load, next 14 days 91%Crew 3 from SMT-OPSAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Fri Jun 5 10:00WO-10203 op 10
Running
14" Rugged Laptop, 16GB / 256GB
NB-7498, setup key LT-04
37149.8Wed Jun 10 17:00Warehouse stock
Sunday June 7
223:00Wed Jun 10 00:15WO-10255 op 10
Late order
13" Ultralight Laptop, 16GB / 512GB
QN-7885, setup key LT-05
35045 min from LT-0446.0Fri Jun 12 17:00Warehouse stock
Wednesday June 10
302:20Wed Jun 10 09:00WO-10059 op 10128GB USB Flash Drive, 10-pack
BP-7439, setup key ST-03
11090 min from LT-054.9Thu Jun 18 17:00Warehouse stock
409:00Wed Jun 10 21:10WO-10284 op 10USB-C Travel Hub, 7-in-1
VW-4303, setup key DK-03
10090 min from ST-039.7Thu Jun 18 17:00Warehouse stock
521:10Thu Jun 11 16:35WO-10132 op 108" Rugged Tablet, 64GB, gray
LM-5109, setup key TB-02
14090 min from DK-0317.2Fri Jun 19 17:00Warehouse stock
Thursday June 11
616:35Fri Jun 12 07:20WO-10050 op 1027" 4K Monitor, USB-C, refresh
BP-5748, setup key MN-02
21590 min from TB-0212.8Mon Jun 22 17:00Warehouse stock
Friday June 12
707:20Fri Jun 12 22:55WO-10118 op 1014" Laptop, 8-core, 16GB / 512GB, gray
KL-9462, setup key LT-03
9090 min from MN-0213.1Tue Jun 23 17:00Warehouse stock

27 more jobs after Sat Jun 13.

SMT-03 SMT line 3

Work center SMTCalendar C3X5Stations 1Load, next 14 days 90%Crew 3 from SMT-OPSAs of Wed Jun 3 06:00

Planned downtime

  • Tue Jun 9 06:00 to Tue Jun 9 14:30: Preventive maintenance: reflow oven
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 19:25WO-10127 op 10
Running
24-Port PoE Switch, managed, refresh
LM-3668, setup key NW-04
12312.4Thu Jun 11 17:00Warehouse stock
223:10Thu Jun 4 09:55WO-10226 op 10
Frozen
Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key DT-03
9590 min from NW-049.0Thu Jun 11 17:00Warehouse stock
Thursday June 4
315:15Fri Jun 5 13:45WO-10289 op 1027" 4K Monitor, USB-C
VW-6003, setup key MN-02
35590 min from DT-0320.0Fri Jun 12 17:00Warehouse stock
Friday June 5
413:45Mon Jun 8 08:55WO-10294 op 1034" Ultrawide Monitor, curved
VW-6938, setup key MN-04
26545 min from MN-0217.7Mon Jun 15 17:00Warehouse stock
Monday June 8
508:55Mon Jun 8 23:15WO-10093 op 1014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
9090 min from MN-0411.8Tue Jun 16 17:00Warehouse stock
623:15Wed Jun 10 08:15WO-10035 op 1015" Laptop, 12-core, 32GB / 1TB
BP-4957, setup key LT-01
19545 min from LT-0322.8Wed Jun 17 17:00Warehouse stock
Wednesday June 10
708:15Thu Jun 11 03:30WO-10045 op 1024" FHD Monitor, IPS
BP-5281, setup key MN-01
28090 min from LT-0116.5Fri Jun 19 17:00Warehouse stock
Thursday June 11
805:30Thu Jun 11 20:45WO-10231 op 1015" Laptop, 12-core, 32GB / 1TB, gray
QN-4418, setup key LT-01
11090 min from MN-0112.8Fri Jun 19 17:00Warehouse stock
920:45Fri Jun 12 11:25WO-10194 op 1010" Tablet, 64GB
NB-7024, setup key TB-03
12590 min from LT-0112.7Mon Jun 22 17:00Warehouse stock

31 more jobs after Sat Jun 13.

SMT-04 SMT line 4

Work center SMTCalendar C3X5Stations 1Load, next 14 days 96%Crew 3 from SMT-OPSAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Thu Jun 4 07:00WO-10040 op 10
Running
KVM Switch, 2-port 4K
BP-5055, setup key DK-01
27623.8Thu Jun 11 17:00Warehouse stock
Thursday June 4
207:00Fri Jun 5 17:30WO-10344 op 1014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
24090 min from DK-0131.5Fri Jun 12 15:00ACCOUNT 4340
Monday June 8
303:25Mon Jun 8 20:10WO-10006 op 10Thin Client, 4GB / 32GB, gray
AF-4236, setup key DT-01
15590 min from LT-0314.2Tue Jun 16 17:00Warehouse stock
420:10Wed Jun 10 02:20WO-10198 op 10Chromebook 11", 4GB / 64GB
NB-7136, setup key LT-02
24090 min from DT-0127.4Tue Jun 16 17:00Warehouse stock
Wednesday June 10
502:25Wed Jun 10 16:20WO-10103 op 101080p Webcam with mic
KL-5125, setup key PR-02
35090 min from LT-0211.7Thu Jun 18 17:00Warehouse stock
616:20Thu Jun 11 15:50WO-10088 op 1012" Pro Tablet, 256GB
KL-2075, setup key TB-01
19090 min from PR-0220.8Fri Jun 19 17:00Warehouse stock
Thursday June 11
715:50Tue Jun 16 08:50WO-10137 op 1014" Laptop, 8-core, 16GB / 512GB
LM-5139, setup key LT-03
50590 min from TB-0160.5Mon Jun 22 17:00Warehouse stock

25 more jobs after Sat Jun 13.

SMT-05 SMT line 5

Work center SMTCalendar C3X5Stations 1Load, next 14 days 85%Crew 3 from SMT-OPSAs of Wed Jun 3 06:00

Planned downtime

  • Wed Jun 3 06:00 to Thu Jun 4 12:00: Placement head failure, awaiting spare
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Thursday June 4
112:00Fri Jun 5 12:25WO-10156 op 10
Frozen
27" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
39090 min21.9Thu Jun 11 17:00Warehouse stock
Friday June 5
212:25Mon Jun 8 09:00WO-10209 op 104-Bay NAS Enclosure, refresh
QN-2129, setup key ST-01
43590 min from MN-0318.3Mon Jun 15 17:00Warehouse stock
Monday June 8
309:00Tue Jun 9 00:55WO-10240 op 101TB NVMe SSD, gray
QN-4854, setup key ST-02
30045 min from ST-0114.2Tue Jun 16 17:00Warehouse stock
Tuesday June 9
400:55Tue Jun 9 04:40WO-10078 op 10Thin Client, 4GB / 32GB, gray
KL-1432, setup key DT-01
2090 min from ST-022.0Wed Jun 17 17:00Warehouse stock
506:00Tue Jun 9 14:20WO-10179 op 10Wi-Fi 6 Access Point, ceiling, refresh
NB-4322, setup key NW-03
7590 min from DT-016.3Wed Jun 17 17:00Warehouse stock
Wednesday June 10
605:20Thu Jun 11 05:30WO-10157 op 1027" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
38090 min from NW-0321.4Thu Jun 18 17:00Warehouse stock
Thursday June 11
706:00Thu Jun 11 20:35WO-10319 op 10All-in-One 24", 16GB / 512GB, gray
KL-2287, setup key DT-02
12090 min from MN-0312.1Mon Jun 22 15:00ACCOUNT 9148
Friday June 12
806:00Mon Jun 15 01:55WO-10031 op 10Mesh Wi-Fi Kit, 3-pack, refresh
AF-9913, setup key NW-01
20090 min from DT-0217.4Tue Jun 23 17:00Warehouse stock

30 more jobs after Sat Jun 13.

SMT-06 SMT line 6

Work center SMTCalendar C3X5Stations 1Load, next 14 days 82%Crew 3 from SMT-OPSAs of Wed Jun 3 06:00

Planned downtime

  • Tue Jun 30 06:00 to Tue Jun 30 23:00: Placement head overhaul
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Thu Jun 4 01:55WO-10245 op 10
Running
Thunderbolt Dock, 4 ports
QN-5393, setup key DK-04
19118.9Wed Jun 10 17:00Warehouse stock
Thursday June 4
201:55Thu Jun 4 15:35WO-10064 op 101TB NVMe SSD, refresh
BP-7490, setup key ST-02
23090 min from DK-0411.4Fri Jun 12 17:00Warehouse stock
315:35Fri Jun 5 09:15WO-10026 op 101TB NVMe SSD
AF-7757, setup key ST-02
45010 min17.0Mon Jun 15 17:00Warehouse stock
Friday June 5
409:15Mon Jun 8 03:25WO-10113 op 10Mini PC, 8-core, 16GB / 512GB, gray
KL-9030, setup key DT-03
14090 min from ST-0215.4Mon Jun 15 17:00Warehouse stock
Monday June 8
506:00Mon Jun 8 21:30WO-10142 op 104K Conference Camera
LM-5365, setup key PR-03
40090 min from DT-0313.0Tue Jun 16 17:00Warehouse stock
Tuesday June 9
604:40Wed Jun 10 05:20WO-10122 op 1027" QHD Monitor, 165Hz
LM-2177, setup key MN-03
34090 min from PR-0321.9Wed Jun 17 17:00Warehouse stock
Wednesday June 10
706:00Wed Jun 10 12:30WO-10250 op 104K Conference Camera, gray
QN-6249, setup key PR-03
12590 min from MN-034.5Thu Jun 18 17:00Warehouse stock
Thursday June 11
803:30Fri Jun 12 16:45WO-10189 op 10KVM Switch, 2-port 4K, gray
NB-7003, setup key DK-01
34090 min from PR-0334.2Fri Jun 19 17:00Warehouse stock

26 more jobs after Sat Jun 13.

SMT-07 SMT line 7

Work center SMTCalendar C3X5Stations 1Load, next 14 days 52%Crew 3 from SMT-OPSAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 20:45WO-10021 op 10Mini PC, 8-core, 16GB / 512GB
AF-7495, setup key DT-03
8590 min12.2Fri Jun 12 17:00Warehouse stock
Thursday June 4
206:00Thu Jun 4 15:15WO-10165 op 1034" Ultrawide Monitor, curved, gray
LM-9032, setup key MN-04
8090 min from DT-037.2Fri Jun 12 17:00Warehouse stock
Friday June 5
306:00Fri Jun 5 18:25WO-10170 op 10Tower Workstation, 32GB / 1TB, refresh
LM-9819, setup key DT-04
9090 min from MN-0410.4Mon Jun 15 17:00Warehouse stock
Monday June 8
406:00Mon Jun 8 13:55WO-10274 op 10Wi-Fi 6E Router, gray
VW-2128, setup key NW-02
5090 min from DT-045.9Tue Jun 16 17:00Warehouse stock
Tuesday June 9
506:00Wed Jun 10 02:25WO-10221 op 108-Port Gigabit Switch
QN-4070, setup key NW-05
16045 min from NW-0218.7Wed Jun 17 17:00Warehouse stock
Wednesday June 10
606:00Wed Jun 10 12:30WO-10342 op 10Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key LT-02
3090 min from NW-054.5Fri Jun 19 12:00ENGINEERING
Friday June 12
706:00Mon Jun 15 00:10WO-10143 op 104K Conference Camera
LM-5365, setup key PR-03
41090 min from LT-0215.7Tue Jun 23 17:00Warehouse stock

33 more jobs after Sat Jun 13.

SUB-A Sub-assembly cell A

Work center SUBCalendar C2X5Stations 6Load, next 14 days 74%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 07:00WO-10279 op 20
Running
Ergonomic Mouse, wireless
VW-4001, setup key PR-01
1461.0Wed Jun 10 17:00Warehouse stock
Thursday June 4
208:15Fri Jun 5 13:05WO-10203 op 2014" Rugged Laptop, 16GB / 256GB
NB-7498, setup key LT-04
47550 min from PR-0119.5Wed Jun 10 17:00Warehouse stock
Friday June 5
313:05Fri Jun 5 15:40WO-10064 op 201TB NVMe SSD, refresh
BP-7490, setup key ST-02
23050 min from LT-041.8Fri Jun 12 17:00Warehouse stock
415:40Mon Jun 8 08:10WO-10289 op 2027" 4K Monitor, USB-C
VW-6003, setup key MN-02
35550 min from ST-028.2Fri Jun 12 17:00Warehouse stock
Monday June 8
508:10Mon Jun 8 12:20WO-10209 op 204-Bay NAS Enclosure, refresh
QN-2129, setup key ST-01
43550 min from MN-022.8Mon Jun 15 17:00Warehouse stock
612:20Mon Jun 8 20:55WO-10294 op 2034" Ultrawide Monitor, curved
VW-6938, setup key MN-04
26550 min from ST-017.2Mon Jun 15 17:00Warehouse stock
720:55Tue Jun 9 08:25WO-10093 op 2014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
9050 min from MN-043.7Tue Jun 16 17:00Warehouse stock
Tuesday June 9
808:25Tue Jun 9 10:55WO-10274 op 20Wi-Fi 6E Router, gray
VW-2128, setup key NW-02
5050 min from LT-031.2Tue Jun 16 17:00Warehouse stock
917:40Tue Jun 9 20:40WO-10303 op 20Mechanical Keyboard, TKL
VW-8762, setup key PR-05
26050 min from NW-021.7Wed Jun 17 17:00Warehouse stock
1022:00Wed Jun 10 14:45WO-10198 op 20Chromebook 11", 4GB / 64GB
NB-7136, setup key LT-02
24050 min from PR-058.4Tue Jun 16 17:00Warehouse stock
Wednesday June 10
1114:45Wed Jun 10 19:45WO-10221 op 208-Port Gigabit Switch
QN-4070, setup key NW-05
16050 min from LT-023.7Wed Jun 17 17:00Warehouse stock
1219:45Wed Jun 10 23:00WO-10103 op 201080p Webcam with mic
KL-5125, setup key PR-02
35050 min from NW-052.4Thu Jun 18 17:00Warehouse stock
Thursday June 11
1306:00Thu Jun 11 08:20WO-10284 op 20USB-C Travel Hub, 7-in-1
VW-4303, setup key DK-03
10050 min from PR-021.5Thu Jun 18 17:00Warehouse stock
1408:20Thu Jun 11 10:50WO-10342 op 20Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key LT-02
3050 min from DK-031.2Fri Jun 19 12:00ENGINEERING
1510:50Thu Jun 11 18:25WO-10045 op 2024" FHD Monitor, IPS
BP-5281, setup key MN-01
28050 min from LT-026.8Fri Jun 19 17:00Warehouse stock
1618:25Fri Jun 12 06:40WO-10231 op 2015" Laptop, 12-core, 32GB / 1TB, gray
QN-4418, setup key LT-01
11050 min from MN-013.9Fri Jun 19 17:00Warehouse stock
Friday June 12
1712:00Fri Jun 12 18:05WO-10189 op 20KVM Switch, 2-port 4K, gray
NB-7003, setup key DK-01
34050 min from LT-015.2Fri Jun 19 17:00Warehouse stock
1819:05Fri Jun 12 22:40WO-10002 op 20Ergonomic Mouse, wireless, gray
AF-4219, setup key PR-01
37050 min from DK-012.8Mon Jun 22 17:00Warehouse stock

80 more jobs after Sat Jun 13.

SUB-B Sub-assembly cell B

Work center SUBCalendar C2X5Stations 6Load, next 14 days 80%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 07:20WO-10184 op 20
Frozen
8" Rugged Tablet, 64GB, gray
NB-5680, setup key TB-02
2525 min0.9Thu Jun 11 17:00Warehouse stock
216:10Thu Jun 4 06:50WO-10245 op 20
Frozen
Thunderbolt Dock, 4 ports
QN-5393, setup key DK-04
41550 min from TB-026.3Wed Jun 10 17:00Warehouse stock
Thursday June 4
306:50Thu Jun 4 14:10WO-10083 op 20Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key LT-02
15550 min from DK-046.0Thu Jun 11 17:00Warehouse stock
414:10Thu Jun 4 19:40WO-10226 op 20Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key DT-03
9550 min from LT-024.2Thu Jun 11 17:00Warehouse stock
519:40Fri Jun 5 07:50WO-10021 op 20Mini PC, 8-core, 16GB / 512GB
AF-7495, setup key DT-03
8525 min4.8Fri Jun 12 17:00Warehouse stock
Friday June 5
609:35Fri Jun 5 21:05WO-10344 op 2014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
24050 min from DT-039.7Fri Jun 12 15:00ACCOUNT 4340
721:05Mon Jun 8 12:30WO-10113 op 20Mini PC, 8-core, 16GB / 512GB, gray
KL-9030, setup key DT-03
14050 min from LT-037.1Mon Jun 15 17:00Warehouse stock
Monday June 8
815:05Mon Jun 8 22:50WO-10006 op 20Thin Client, 4GB / 32GB, gray
AF-4236, setup key DT-01
15540 min from DT-036.6Tue Jun 16 17:00Warehouse stock
922:50Tue Jun 9 09:20WO-10142 op 204K Conference Camera
LM-5365, setup key PR-03
40050 min from DT-012.7Tue Jun 16 17:00Warehouse stock
Tuesday June 9
1009:20Tue Jun 9 11:35WO-10078 op 20Thin Client, 4GB / 32GB, gray
KL-1432, setup key DT-01
2050 min from PR-030.9Wed Jun 17 17:00Warehouse stock
1113:30Tue Jun 9 15:50WO-10179 op 20Wi-Fi 6 Access Point, ceiling, refresh
NB-4322, setup key NW-03
7550 min from DT-011.5Wed Jun 17 17:00Warehouse stock
1216:10Wed Jun 10 15:05WO-10255 op 20
Late order
13" Ultralight Laptop, 16GB / 512GB
QN-7885, setup key LT-05
35050 min from NW-0314.1Fri Jun 12 17:00Warehouse stock
Wednesday June 10
1315:05Wed Jun 10 16:45WO-10059 op 20128GB USB Flash Drive, 10-pack
BP-7439, setup key ST-03
11050 min from LT-050.8Thu Jun 18 17:00Warehouse stock
1416:45Wed Jun 10 18:30WO-10250 op 204K Conference Camera, gray
QN-6249, setup key PR-03
12550 min from ST-030.9Thu Jun 18 17:00Warehouse stock
1519:55Thu Jun 11 20:30WO-10260 op 2022" Touch Monitor, gray
VW-1017, setup key MN-05
54050 min from PR-0315.8Wed Jun 17 17:00Warehouse stock
Thursday June 11
1620:30Fri Jun 12 09:35WO-10132 op 208" Rugged Tablet, 64GB, gray
LM-5109, setup key TB-02
14050 min from MN-055.2Fri Jun 19 17:00Warehouse stock
Friday June 12
1709:35Fri Jun 12 14:40WO-10194 op 2010" Tablet, 64GB
NB-7024, setup key TB-03
12540 min from TB-023.9Mon Jun 22 17:00Warehouse stock

65 more jobs after Sat Jun 13.

SUB-C Sub-assembly cell C

Work center SUBCalendar C2X5Stations 6Load, next 14 days 81%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 06:10WO-10108 op 20
Running
Wi-Fi 6 Access Point, ceiling
KL-5384, setup key NW-03
90.2Fri Jun 12 17:00Warehouse stock
216:50Wed Jun 3 21:35WO-10127 op 2024-Port PoE Switch, managed, refresh
LM-3668, setup key NW-04
15540 min from NW-033.6Thu Jun 11 17:00Warehouse stock
Thursday June 4
306:00Thu Jun 4 14:30WO-10040 op 20KVM Switch, 2-port 4K
BP-5055, setup key DK-01
54050 min from NW-047.2Thu Jun 11 17:00Warehouse stock
415:55Thu Jun 4 20:05WO-10265 op 2024-Port PoE Switch, managed
VW-1670, setup key NW-04
12550 min from DK-012.8Thu Jun 11 17:00Warehouse stock
520:45Fri Jun 5 14:05WO-10156 op 2027" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
39050 min from NW-049.0Thu Jun 11 17:00Warehouse stock
Friday June 5
614:05Fri Jun 5 17:15WO-10165 op 2034" Ultrawide Monitor, curved, gray
LM-9032, setup key MN-04
8040 min from MN-032.5Fri Jun 12 17:00Warehouse stock
717:15Fri Jun 5 21:15WO-10026 op 201TB NVMe SSD
AF-7757, setup key ST-02
45050 min from MN-042.7Mon Jun 15 17:00Warehouse stock
821:15Mon Jun 8 09:10WO-10170 op 20Tower Workstation, 32GB / 1TB, refresh
LM-9819, setup key DT-04
9050 min from ST-024.1Mon Jun 15 17:00Warehouse stock
Monday June 8
912:10Mon Jun 8 21:30WO-10069 op 20Mesh Wi-Fi Kit, 3-pack
BP-8055, setup key NW-01
36550 min from DT-048.0Mon Jun 15 17:00Warehouse stock
1021:30Tue Jun 9 07:30WO-10240 op 201TB NVMe SSD, gray
QN-4854, setup key ST-02
30050 min from NW-012.2Tue Jun 16 17:00Warehouse stock
Tuesday June 9
1107:30Tue Jun 9 13:55WO-10339 op 20Thin Client, 4GB / 32GB, gray
AF-4236, setup key DT-01
12050 min from ST-025.1Wed Jun 17 15:00ACCOUNT 3915
1219:45Wed Jun 10 11:05WO-10035 op 2015" Laptop, 12-core, 32GB / 1TB
BP-4957, setup key LT-01
19550 min from DT-017.0Wed Jun 17 17:00Warehouse stock
Wednesday June 10
1311:05Wed Jun 10 21:20WO-10122 op 2027" QHD Monitor, 165Hz
LM-2177, setup key MN-03
34050 min from LT-018.9Wed Jun 17 17:00Warehouse stock
1421:20Thu Jun 11 14:00WO-10157 op 2027" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
38025 min8.8Thu Jun 18 17:00Warehouse stock
Thursday June 11
1514:00Thu Jun 11 21:45WO-10088 op 2012" Pro Tablet, 256GB
KL-2075, setup key TB-01
19050 min from MN-036.4Fri Jun 19 17:00Warehouse stock
1621:45Fri Jun 12 11:40WO-10319 op 20All-in-One 24", 16GB / 512GB, gray
KL-2287, setup key DT-02
12050 min from TB-015.6Mon Jun 22 15:00ACCOUNT 9148
Friday June 12
1711:40Fri Jun 12 17:45WO-10050 op 2027" 4K Monitor, USB-C, refresh
BP-5748, setup key MN-02
21550 min from DT-025.2Mon Jun 22 17:00Warehouse stock
1819:10Mon Jun 15 07:00WO-10031 op 20Mesh Wi-Fi Kit, 3-pack, refresh
AF-9913, setup key NW-01
20050 min from MN-024.0Tue Jun 23 17:00Warehouse stock

69 more jobs after Sat Jun 13.

FA-01 Final assembly cell 1

Work center FACalendar C2X5Stations 5Load, next 14 days 62%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:40Wed Jun 3 16:00WO-10279 op 30
Frozen
Ergonomic Mouse, wireless
VW-4001, setup key PR-01
50045 min8.1Wed Jun 10 17:00Warehouse stock
Thursday June 4
207:45Thu Jun 4 22:20WO-10040 op 30KVM Switch, 2-port 4K
BP-5055, setup key DK-01
54045 min from PR-0112.8Thu Jun 11 17:00Warehouse stock
Monday June 8
309:35Mon Jun 8 17:35WO-10209 op 304-Bay NAS Enclosure, refresh
QN-2129, setup key ST-01
43545 min from DK-016.8Mon Jun 15 17:00Warehouse stock
Tuesday June 9
407:15Tue Jun 9 14:55WO-10142 op 304K Conference Camera
LM-5365, setup key PR-03
40045 min from ST-016.4Tue Jun 16 17:00Warehouse stock
514:55Tue Jun 9 18:00WO-10274 op 30Wi-Fi 6E Router, gray
VW-2128, setup key NW-02
5045 min from PR-032.3Tue Jun 16 17:00Warehouse stock
619:50Thu Jun 11 19:35WO-10255 op 30
Late order
13" Ultralight Laptop, 16GB / 512GB
QN-7885, setup key LT-05
35045 min from NW-0231.0Fri Jun 12 17:00Warehouse stock
Friday June 12
706:30Fri Jun 12 19:35WO-10132 op 308" Rugged Tablet, 64GB, gray
LM-5109, setup key TB-02
14045 min from LT-0511.3Fri Jun 19 17:00Warehouse stock
820:35Mon Jun 15 11:20WO-10002 op 30Ergonomic Mouse, wireless, gray
AF-4219, setup key PR-01
37045 min from TB-026.5Mon Jun 22 17:00Warehouse stock

42 more jobs after Sat Jun 13.

FA-02 Final assembly cell 2

Work center FACalendar C2X5Stations 5Load, next 14 days 84%As of Wed Jun 3 06:00

Planned downtime

  • Tue Jun 16 06:00 to Tue Jun 16 10:00: Fixture rebuild
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 09:00WO-10216 op 30
Running
USB-C Travel Hub, 7-in-1, gray
QN-2461, setup key DK-03
1113.0Tue Jun 9 17:00Warehouse stock
218:05Thu Jun 4 13:50WO-10245 op 30
Frozen
Thunderbolt Dock, 4 ports
QN-5393, setup key DK-04
41525 min from DK-0311.3Wed Jun 10 17:00Warehouse stock
Thursday June 4
318:10Fri Jun 5 08:00WO-10265 op 3024-Port PoE Switch, managed
VW-1670, setup key NW-04
12545 min from DK-045.6Thu Jun 11 17:00Warehouse stock
Friday June 5
414:35Fri Jun 5 20:05WO-10064 op 301TB NVMe SSD, refresh
BP-7490, setup key ST-02
23045 min from NW-044.2Fri Jun 12 17:00Warehouse stock
520:05Mon Jun 8 09:25WO-10026 op 301TB NVMe SSD
AF-7757, setup key ST-02
4505 min6.2Mon Jun 15 17:00Warehouse stock
Monday June 8
614:25Tue Jun 9 15:10WO-10069 op 30Mesh Wi-Fi Kit, 3-pack
BP-8055, setup key NW-01
36545 min from ST-0216.0Mon Jun 15 17:00Warehouse stock
Tuesday June 9
715:10Tue Jun 9 21:40WO-10240 op 301TB NVMe SSD, gray
QN-4854, setup key ST-02
30045 min from NW-015.2Tue Jun 16 17:00Warehouse stock
822:40Wed Jun 10 22:45WO-10035 op 3015" Laptop, 12-core, 32GB / 1TB
BP-4957, setup key LT-01
19545 min from ST-0215.3Wed Jun 17 17:00Warehouse stock
Wednesday June 10
922:45Thu Jun 11 11:00WO-10303 op 30Mechanical Keyboard, TKL
VW-8762, setup key PR-05
26045 min from LT-014.0Wed Jun 17 17:00Warehouse stock
Thursday June 11
1011:00Thu Jun 11 13:35WO-10059 op 30128GB USB Flash Drive, 10-pack
BP-7439, setup key ST-03
11045 min from PR-051.8Thu Jun 18 17:00Warehouse stock
1113:35Thu Jun 11 16:55WO-10342 op 30Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key LT-02
3045 min from ST-032.6Fri Jun 19 12:00ENGINEERING
1216:55Fri Jun 12 15:25WO-10088 op 3012" Pro Tablet, 256GB
KL-2075, setup key TB-01
19045 min from LT-0213.8Fri Jun 19 17:00Warehouse stock
Friday June 12
1315:25Mon Jun 15 08:15WO-10231 op 3015" Laptop, 12-core, 32GB / 1TB, gray
QN-4418, setup key LT-01
11045 min from TB-018.6Fri Jun 19 17:00Warehouse stock

38 more jobs after Sat Jun 13.

FA-03 Final assembly cell 3

Work center FACalendar C2X5Stations 5Load, next 14 days 81%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 22:25WO-10136 op 30
Running
14" Laptop, 8-core, 16GB / 512GB
LM-5139, setup key LT-03
19115.4Mon Jun 8 17:00Warehouse stock
Thursday June 4
211:55Tue Jun 9 06:40WO-10203 op 3014" Rugged Laptop, 16GB / 256GB
NB-7498, setup key LT-04
47525 min from LT-0342.8Wed Jun 10 17:00Warehouse stock
Tuesday June 9
307:05Tue Jun 9 16:00WO-10093 op 3014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
9025 min from LT-048.0Tue Jun 16 17:00Warehouse stock
Wednesday June 10
407:55Thu Jun 11 11:20WO-10198 op 30Chromebook 11", 4GB / 64GB
NB-7136, setup key LT-02
24025 min from LT-0318.5Tue Jun 16 17:00Warehouse stock
Thursday June 11
511:20Thu Jun 11 14:20WO-10250 op 304K Conference Camera, gray
QN-6249, setup key PR-03
12545 min from LT-022.2Thu Jun 18 17:00Warehouse stock
614:20Thu Jun 11 17:45WO-10284 op 30USB-C Travel Hub, 7-in-1
VW-4303, setup key DK-03
10045 min from PR-032.7Thu Jun 18 17:00Warehouse stock
Friday June 12
713:55Mon Jun 15 07:20WO-10189 op 30KVM Switch, 2-port 4K, gray
NB-7003, setup key DK-01
34025 min from DK-039.5Fri Jun 19 17:00Warehouse stock

43 more jobs after Sat Jun 13.

FA-04 Final assembly cell 4

Work center FACalendar C2X5Stations 5Load, next 14 days 90%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 09:00WO-10150 op 30
Running
2TB Portable SSD
LM-7276, setup key ST-04
2003.0Wed Jun 10 17:00Warehouse stock
210:35Wed Jun 3 13:20WO-10184 op 30
Frozen
8" Rugged Tablet, 64GB, gray
NB-5680, setup key TB-02
2545 min from ST-042.0Thu Jun 11 17:00Warehouse stock
319:25Thu Jun 4 10:50WO-10127 op 3024-Port PoE Switch, managed, refresh
LM-3668, setup key NW-04
15545 min from TB-027.2Thu Jun 11 17:00Warehouse stock
Thursday June 4
417:30Fri Jun 5 11:30WO-10226 op 30Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key DT-03
9545 min from NW-049.2Thu Jun 11 17:00Warehouse stock
Friday June 5
511:30Fri Jun 5 22:45WO-10021 op 30Mini PC, 8-core, 16GB / 512GB
AF-7495, setup key DT-03
855 min10.7Fri Jun 12 17:00Warehouse stock
622:45Mon Jun 8 13:45WO-10165 op 3034" Ultrawide Monitor, curved, gray
LM-9032, setup key MN-04
8045 min from DT-036.8Fri Jun 12 17:00Warehouse stock
Monday June 8
713:45Tue Jun 9 20:40WO-10289 op 3027" 4K Monitor, USB-C
VW-6003, setup key MN-02
35525 min from MN-0422.0Fri Jun 12 17:00Warehouse stock
Tuesday June 9
820:40Wed Jun 10 16:15WO-10339 op 30Thin Client, 4GB / 32GB, gray
AF-4236, setup key DT-01
12045 min from MN-0211.3Wed Jun 17 15:00ACCOUNT 3915
Wednesday June 10
916:15Wed Jun 10 20:25WO-10179 op 30Wi-Fi 6 Access Point, ceiling, refresh
NB-4322, setup key NW-03
7545 min from DT-012.9Wed Jun 17 17:00Warehouse stock
1022:30Mon Jun 15 17:05WO-10260 op 3022" Touch Monitor, gray
VW-1017, setup key MN-05
54045 min from NW-0342.3Wed Jun 17 17:00Warehouse stock

29 more jobs after Sat Jun 13.

FA-05 Final assembly cell 5

Work center FACalendar C2X5Stations 5Load, next 14 days 86%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 08:30WO-10174 op 30
Running
8" Rugged Tablet, 64GB
NB-1986, setup key TB-02
332.5Tue Jun 9 17:00Warehouse stock
Thursday June 4
209:55Fri Jun 5 07:55WO-10083 op 30Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key LT-02
15545 min from TB-0213.2Thu Jun 11 17:00Warehouse stock
Friday June 5
313:15Mon Jun 8 19:20WO-10344 op 3014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
24025 min from LT-0221.2Fri Jun 12 15:00ACCOUNT 4340
Monday June 8
419:20Tue Jun 9 12:40WO-10170 op 30Tower Workstation, 32GB / 1TB, refresh
LM-9819, setup key DT-04
9045 min from LT-039.1Mon Jun 15 17:00Warehouse stock
Tuesday June 9
512:40Wed Jun 10 16:50WO-10294 op 3034" Ultrawide Monitor, curved
VW-6938, setup key MN-04
26545 min from DT-0419.4Mon Jun 15 17:00Warehouse stock
Wednesday June 10
617:00Thu Jun 11 08:35WO-10221 op 308-Port Gigabit Switch
QN-4070, setup key NW-05
16045 min from MN-047.3Wed Jun 17 17:00Warehouse stock
Thursday June 11
708:35Thu Jun 11 15:35WO-10103 op 301080p Webcam with mic
KL-5125, setup key PR-02
35045 min from NW-055.8Thu Jun 18 17:00Warehouse stock
815:35Mon Jun 15 07:25WO-10157 op 3027" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
38045 min from PR-0223.6Thu Jun 18 17:00Warehouse stock

32 more jobs after Sat Jun 13.

FA-06 Final assembly cell 6

Work center FACalendar C2X5Stations 5Load, next 14 days 83%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 06:45WO-10011 op 30
Running
All-in-One 24", 16GB / 512GB
AF-4434, setup key DT-02
60.8Wed Jun 10 17:00Warehouse stock
208:10Wed Jun 3 12:50WO-10108 op 30
Frozen
Wi-Fi 6 Access Point, ceiling
KL-5384, setup key NW-03
10045 min from DT-023.4Fri Jun 12 17:00Warehouse stock
Friday June 5
306:00Mon Jun 8 15:25WO-10156 op 3027" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
39045 min from NW-0324.2Thu Jun 11 17:00Warehouse stock
Monday June 8
415:25Tue Jun 9 16:00WO-10113 op 30Mini PC, 8-core, 16GB / 512GB, gray
KL-9030, setup key DT-03
14045 min from MN-0315.8Mon Jun 15 17:00Warehouse stock
Tuesday June 9
516:00Wed Jun 10 15:05WO-10006 op 30Thin Client, 4GB / 32GB, gray
AF-4236, setup key DT-01
15525 min from DT-0314.7Tue Jun 16 17:00Warehouse stock
Wednesday June 10
615:05Wed Jun 10 17:10WO-10078 op 30Thin Client, 4GB / 32GB, gray
KL-1432, setup key DT-01
205 min2.0Wed Jun 17 17:00Warehouse stock
717:10Fri Jun 12 09:30WO-10122 op 3027" QHD Monitor, 165Hz
LM-2177, setup key MN-03
34045 min from DT-0124.1Wed Jun 17 17:00Warehouse stock
Friday June 12
809:30Mon Jun 15 12:35WO-10045 op 3024" FHD Monitor, IPS
BP-5281, setup key MN-01
28025 min from MN-0318.2Fri Jun 19 17:00Warehouse stock

34 more jobs after Sat Jun 13.

TB-01 Burn-in bank 1

Work center TBCalendar C24X7Stations 4Load, next 14 days 92%Crew 0.5 from TEST-TECHAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 15:55WO-10188 op 40
Frozen
KVM Switch, 2-port 4K, gray
NB-7003, setup key Docks & Hubs
34035 min9.3Fri Jun 5 17:00Warehouse stock
215:55Thu Jun 4 10:10WO-10208 op 40
Frozen
4-Bay NAS Enclosure, refresh
QN-2129, setup key Storage
48535 min from Docks & Hubs17.7Mon Jun 8 17:00Warehouse stock
Thursday June 4
310:10Thu Jun 4 23:40WO-10073 op 404-Bay NAS Enclosure
BP-8568, setup key Storage
41515 min13.2Tue Jun 9 17:00Warehouse stock
423:40Fri Jun 5 18:35WO-10117 op 4014" Laptop, 8-core, 16GB / 512GB, gray
KL-9462, setup key Laptops
10035 min from Storage18.3Tue Jun 9 17:00Warehouse stock
Friday June 5
518:35Fri Jun 5 20:45WO-10098 op 40Wi-Fi 6E Router
KL-3459, setup key Networking
2035 min from Laptops1.6Wed Jun 10 17:00Warehouse stock
620:45Sat Jun 6 08:30WO-10245 op 40Thunderbolt Dock, 4 ports
QN-5393, setup key Docks & Hubs
41535 min from Networking11.2Wed Jun 10 17:00Warehouse stock
Saturday June 6
708:30Sun Jun 7 09:50WO-10083 op 40Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key Laptops
15535 min from Docks & Hubs24.8Thu Jun 11 17:00Warehouse stock
Sunday June 7
809:50Mon Jun 8 03:55WO-10226 op 40Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key Desktops
9535 min from Laptops17.5Thu Jun 11 17:00Warehouse stock
Monday June 8
906:00Tue Jun 9 22:20WO-10344 op 4014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key Laptops
24035 min from Desktops39.8Fri Jun 12 15:00ACCOUNT 4340
Wednesday June 10
1006:00Thu Jun 11 12:35WO-10113 op 40Mini PC, 8-core, 16GB / 512GB, gray
KL-9030, setup key Desktops
14035 min from Laptops30.0Mon Jun 15 17:00Warehouse stock
Thursday June 11
1112:35Fri Jun 12 04:30WO-10294 op 4034" Ultrawide Monitor, curved
VW-6938, setup key Monitors
26535 min from Desktops15.3Mon Jun 15 17:00Warehouse stock
Friday June 12
1204:30Fri Jun 12 20:00WO-10093 op 4014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key Laptops
9035 min from Monitors14.9Tue Jun 16 17:00Warehouse stock
1320:00Sat Jun 13 08:50WO-10240 op 401TB NVMe SSD, gray
QN-4854, setup key Storage
30035 min from Laptops12.2Tue Jun 16 17:00Warehouse stock

76 more jobs after Sat Jun 13.

TB-02 Burn-in bank 2

Work center TBCalendar C24X7Stations 4Load, next 14 days 81%Crew 0.5 from TEST-TECHAs of Wed Jun 3 06:00

Planned downtime

  • Sat Jun 20 00:00 to Sat Jun 20 12:00: Chamber calibration
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 18:00WO-10193 op 40
Running
10" Tablet, 64GB
NB-7024, setup key Tablets
10912.0Mon Jun 8 17:00Warehouse stock
218:20Wed Jun 3 23:00WO-10141 op 40
Frozen
4K Conference Camera
LM-5365, setup key Peripherals
43035 min from Tablets4.1Tue Jun 9 17:00Warehouse stock
Thursday June 4
306:00Thu Jun 4 13:55WO-10330 op 4027" QHD Monitor, 165Hz, refresh
LM-8095, setup key Monitors
15035 min from Peripherals7.3Tue Jun 9 15:00ACCOUNT 8733
413:55Thu Jun 4 20:40WO-10216 op 40USB-C Travel Hub, 7-in-1, gray
QN-2461, setup key Docks & Hubs
23035 min from Monitors6.2Tue Jun 9 17:00Warehouse stock
Friday June 5
506:00Fri Jun 5 09:25WO-10298 op 40USB-C Dock, 100W, dual display
VW-7925, setup key Docks & Hubs
14015 min3.2Tue Jun 9 17:00Warehouse stock
609:25Fri Jun 5 20:30WO-10011 op 40All-in-One 24", 16GB / 512GB
AF-4434, setup key Desktops
4535 min from Docks & Hubs10.5Wed Jun 10 17:00Warehouse stock
Saturday June 6
702:55Sat Jun 6 08:15WO-10279 op 40Ergonomic Mouse, wireless
VW-4001, setup key Peripherals
50035 min from Desktops4.8Wed Jun 10 17:00Warehouse stock
808:15Sat Jun 6 21:25WO-10040 op 40KVM Switch, 2-port 4K
BP-5055, setup key Docks & Hubs
54035 min from Peripherals12.6Thu Jun 11 17:00Warehouse stock
921:25Sun Jun 7 10:40WO-10127 op 4024-Port PoE Switch, managed, refresh
LM-3668, setup key Networking
15535 min from Docks & Hubs12.7Thu Jun 11 17:00Warehouse stock
Sunday June 7
1010:40Sun Jun 7 20:40WO-10265 op 4024-Port PoE Switch, managed
VW-1670, setup key Networking
12515 min9.8Thu Jun 11 17:00Warehouse stock
1122:35Mon Jun 8 18:10WO-10156 op 4027" QHD Monitor, 165Hz, refresh
LM-8095, setup key Monitors
39035 min from Networking19.0Thu Jun 11 17:00Warehouse stock
Tuesday June 9
1206:00Tue Jun 9 12:35WO-10108 op 40Wi-Fi 6 Access Point, ceiling
KL-5384, setup key Networking
10035 min from Monitors6.0Fri Jun 12 17:00Warehouse stock
1312:35Tue Jun 9 18:30WO-10165 op 4034" Ultrawide Monitor, curved, gray
LM-9032, setup key Monitors
8035 min from Networking5.3Fri Jun 12 17:00Warehouse stock
1418:30Wed Jun 10 12:05WO-10289 op 4027" 4K Monitor, USB-C
VW-6003, setup key Monitors
35515 min17.3Fri Jun 12 17:00Warehouse stock
Wednesday June 10
1512:05Wed Jun 10 16:30WO-10142 op 404K Conference Camera
LM-5365, setup key Peripherals
40035 min from Monitors3.8Tue Jun 16 17:00Warehouse stock
1616:30Wed Jun 10 21:10WO-10274 op 40Wi-Fi 6E Router, gray
VW-2128, setup key Networking
5035 min from Peripherals4.1Tue Jun 16 17:00Warehouse stock
Thursday June 11
1706:00Thu Jun 11 23:45WO-10170 op 40Tower Workstation, 32GB / 1TB, refresh
LM-9819, setup key Desktops
9035 min from Networking17.2Mon Jun 15 17:00Warehouse stock
Friday June 12
1806:00Sat Jun 13 17:15WO-10198 op 40Chromebook 11", 4GB / 64GB
NB-7136, setup key Laptops
24035 min from Desktops34.7Tue Jun 16 17:00Warehouse stock

56 more jobs after Sat Jun 13.

TB-03 Burn-in bank 3

Work center TBCalendar C24X7Stations 4Load, next 14 days 77%Crew 0.5 from TEST-TECHAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Sat Jun 6 02:55WO-10136 op 40
Running
14" Laptop, 8-core, 16GB / 512GB
LM-5139, setup key Laptops
45568.9Mon Jun 8 17:00Warehouse stock
Monday June 8
203:55Mon Jun 8 08:35WO-10341 op 4015" Laptop, 12-core, 32GB / 1TB
BP-4957, setup key Laptops
3015 min4.4Fri Jun 12 12:00ENGINEERING
308:35Tue Jun 9 05:25WO-10021 op 40Mini PC, 8-core, 16GB / 512GB
AF-7495, setup key Desktops
8535 min from Laptops20.2Fri Jun 12 17:00Warehouse stock
Tuesday June 9
405:25Tue Jun 9 15:50WO-10064 op 401TB NVMe SSD, refresh
BP-7490, setup key Storage
23035 min from Desktops9.8Fri Jun 12 17:00Warehouse stock
515:50Wed Jun 10 06:45WO-10026 op 401TB NVMe SSD
AF-7757, setup key Storage
45015 min14.7Mon Jun 15 17:00Warehouse stock
Wednesday June 10
608:20Fri Jun 12 19:05WO-10255 op 40
Late order
13" Ultralight Laptop, 16GB / 512GB
QN-7885, setup key Laptops
35035 min from Storage58.2Fri Jun 12 17:00Warehouse stock

62 more jobs after Sat Jun 13.

TB-04 Burn-in bank 4

Work center TBCalendar C24X7Stations 4Load, next 14 days 93%Crew 0.5 from TEST-TECHAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 13:45WO-10049 op 40
Running
27" 4K Monitor, USB-C, refresh
BP-5748, setup key Monitors
1517.8Mon Jun 8 17:00Warehouse stock
214:10Thu Jun 4 05:30WO-10310 op 40
Frozen
Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key Desktops
8035 min from Monitors14.8Tue Jun 9 15:00ACCOUNT 8733
Thursday June 4
305:30Thu Jun 4 12:10WO-10326 op 40
Frozen
14" Laptop, 8-core, 16GB / 512GB
LM-5139, setup key Laptops
4035 min from Desktops6.1Tue Jun 9 15:00ACCOUNT 8321
412:10Fri Jun 5 06:05WO-10030 op 40Mesh Wi-Fi Kit, 3-pack, refresh
AF-9913, setup key Networking
24535 min from Laptops17.3Tue Jun 9 17:00Warehouse stock
Friday June 5
506:05Fri Jun 5 17:15WO-10174 op 408" Rugged Tablet, 64GB
NB-1986, setup key Tablets
8535 min from Networking10.6Tue Jun 9 17:00Warehouse stock
617:15Fri Jun 5 22:50WO-10054 op 40128GB USB Flash Drive, 10-pack, refresh
BP-7381, setup key Storage
13035 min from Tablets5.0Wed Jun 10 17:00Warehouse stock
722:50Sat Jun 6 12:15WO-10150 op 402TB Portable SSD
LM-7276, setup key Storage
38015 min13.2Wed Jun 10 17:00Warehouse stock
Saturday June 6
812:15Tue Jun 9 21:20WO-10203 op 4014" Rugged Laptop, 16GB / 256GB
NB-7498, setup key Laptops
47535 min from Storage80.5Wed Jun 10 17:00Warehouse stock
Tuesday June 9
921:20Wed Jun 10 01:10WO-10184 op 408" Rugged Tablet, 64GB, gray
NB-5680, setup key Tablets
2535 min from Laptops3.2Thu Jun 11 17:00Warehouse stock
Wednesday June 10
1001:10Thu Jun 11 06:05WO-10069 op 40Mesh Wi-Fi Kit, 3-pack
BP-8055, setup key Networking
36535 min from Tablets28.3Mon Jun 15 17:00Warehouse stock
Thursday June 11
1106:05Thu Jun 11 22:30WO-10209 op 404-Bay NAS Enclosure, refresh
QN-2129, setup key Storage
43535 min from Networking15.8Mon Jun 15 17:00Warehouse stock
1223:45Sat Jun 13 04:10WO-10006 op 40Thin Client, 4GB / 32GB, gray
AF-4236, setup key Desktops
15535 min from Storage27.8Tue Jun 16 17:00Warehouse stock
Saturday June 13
1304:10Sun Jun 14 01:55WO-10339 op 40Thin Client, 4GB / 32GB, gray
AF-4236, setup key Desktops
12015 min21.5Wed Jun 17 15:00ACCOUNT 3915

43 more jobs after Sat Jun 13.

CFG-01 Imaging cell 1

Work center CFGCalendar C2X5Stations 12Load, next 14 days 18%Crew 1 from IMG-ENGAs of Wed Jun 3 06:00

Planned downtime

  • Wed Jun 24 14:30 to Wed Jun 24 23:00: Image server patching
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Thursday June 4
106:00Thu Jun 4 11:55WO-10310 op 45Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key ACCOUNT 8733
8025 min5.0Tue Jun 9 15:00ACCOUNT 8733
Tuesday June 9
222:50Wed Jun 10 22:05WO-10344 op 4514" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key ACCOUNT 4340
24025 min from ACCOUNT 873314.8Fri Jun 12 15:00ACCOUNT 4340

18 more jobs after Sat Jun 13.

CFG-02 Imaging cell 2

Work center CFGCalendar C2X5Stations 12Load, next 14 days 8%Crew 1 from IMG-ENGAs of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Thursday June 4
112:40Thu Jun 4 15:35WO-10326 op 4514" Laptop, 8-core, 16GB / 512GB
LM-5139, setup key ACCOUNT 8321
4025 min2.5Tue Jun 9 15:00ACCOUNT 8321
215:35Fri Jun 5 08:50WO-10330 op 4527" QHD Monitor, 165Hz, refresh
LM-8095, setup key ACCOUNT 8733
15025 min from ACCOUNT 83219.3Tue Jun 9 15:00ACCOUNT 8733

8 more jobs after Sat Jun 13.

PK-01 Pack-out line 1

Work center PKCalendar C2X5Stations 4Load, next 14 days 63%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 10:45WO-10155 op 50
Running
27" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
2034.2Thu Jun 4 17:00Warehouse stock
210:45Wed Jun 3 12:25WO-10283 op 50USB-C Travel Hub, 7-in-1
VW-4303, setup key DK-03
13015 min from MN-031.4Thu Jun 4 17:00Warehouse stock
312:55Wed Jun 3 16:05WO-10087 op 50
Frozen
12" Pro Tablet, 256GB
KL-2075, setup key TB-01
20015 min from DK-032.9Fri Jun 5 17:00Warehouse stock
416:05Wed Jun 3 19:25WO-10131 op 50
Frozen
8" Rugged Tablet, 64GB, gray
LM-5109, setup key TB-02
16010 min from TB-012.7Fri Jun 5 17:00Warehouse stock
519:25Thu Jun 4 06:30WO-10188 op 50
Frozen
KVM Switch, 2-port 4K, gray
NB-7003, setup key DK-01
34015 min from TB-023.8Fri Jun 5 17:00Warehouse stock
Thursday June 4
606:30Thu Jun 4 08:40WO-10230 op 5015" Laptop, 12-core, 32GB / 1TB, gray
QN-4418, setup key LT-01
11015 min from DK-011.9Fri Jun 5 17:00Warehouse stock
715:50Thu Jun 4 16:45WO-10326 op 5014" Laptop, 8-core, 16GB / 512GB
LM-5139, setup key LT-03
4010 min from LT-010.8Tue Jun 9 15:00ACCOUNT 8321
Friday June 5
819:05Fri Jun 5 21:20WO-10117 op 5014" Laptop, 8-core, 16GB / 512GB, gray
KL-9462, setup key LT-03
1005 min2.2Tue Jun 9 17:00Warehouse stock
Monday June 8
906:05Mon Jun 8 15:00WO-10136 op 5014" Laptop, 8-core, 16GB / 512GB
LM-5139, setup key LT-03
4705 min8.3Mon Jun 8 17:00Warehouse stock
1015:00Mon Jun 8 17:50WO-10150 op 502TB Portable SSD
LM-7276, setup key ST-04
38015 min from LT-032.6Wed Jun 10 17:00Warehouse stock
1117:50Mon Jun 8 22:15WO-10279 op 50Ergonomic Mouse, wireless
VW-4001, setup key PR-01
50015 min from ST-043.7Wed Jun 10 17:00Warehouse stock
1222:15Tue Jun 9 08:25WO-10083 op 50Chromebook 11", 4GB / 64GB, refresh
KL-1625, setup key LT-02
15515 min from PR-012.9Thu Jun 11 17:00Warehouse stock
Tuesday June 9
1308:25Tue Jun 9 17:20WO-10156 op 5027" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
39015 min from LT-028.2Thu Jun 11 17:00Warehouse stock
1417:20Tue Jun 9 18:10WO-10341 op 5015" Laptop, 12-core, 32GB / 1TB
BP-4957, setup key LT-01
3015 min from MN-030.6Fri Jun 12 12:00ENGINEERING
1518:10Tue Jun 9 20:50WO-10064 op 501TB NVMe SSD, refresh
BP-7490, setup key ST-02
23015 min from LT-011.9Fri Jun 12 17:00Warehouse stock
1621:50Wed Jun 10 15:00WO-10203 op 5014" Rugged Laptop, 16GB / 256GB
NB-7498, setup key LT-04
47515 min from ST-029.4Wed Jun 10 17:00Warehouse stock
Wednesday June 10
1722:20Thu Jun 11 10:40WO-10344 op 5014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
24010 min from LT-044.7Fri Jun 12 15:00ACCOUNT 4340
Friday June 12
1819:35Mon Jun 15 09:35WO-10255 op 50
Late order
13" Ultralight Laptop, 16GB / 512GB
QN-7885, setup key LT-05
35010 min from LT-036.8Fri Jun 12 17:00Warehouse stock

122 more jobs after Sat Jun 13.

PK-02 Pack-out line 2

Work center PKCalendar C2X5Stations 4Load, next 14 days 93%As of Wed Jun 3 06:00
#StartEndOrderProductQtyChangeoverRun hOrder dueFor
Wednesday June 3
106:00Wed Jun 3 11:20WO-10259 op 50
Running
22" Touch Monitor, gray
VW-1017, setup key MN-05
1834.8Wed Jun 3 17:00Warehouse stock
211:50Wed Jun 3 13:40WO-10315 op 50
Frozen
22" Touch Monitor
VW-1888, setup key MN-05
805 min1.8Fri Jun 5 15:00ACCOUNT 1466
313:50Wed Jun 3 22:35WO-10044 op 50
Frozen
24" FHD Monitor, IPS
BP-5281, setup key MN-01
37010 min from MN-058.1Fri Jun 5 17:00Warehouse stock
422:35Thu Jun 4 09:00WO-10001 op 50
Frozen
Ergonomic Mouse, wireless, gray
AF-4219, setup key PR-01
39015 min from MN-013.2Mon Jun 8 17:00Warehouse stock
Thursday June 4
509:00Thu Jun 4 13:55WO-10049 op 5027" 4K Monitor, USB-C, refresh
BP-5748, setup key MN-02
19015 min from PR-014.2Mon Jun 8 17:00Warehouse stock
613:55Thu Jun 4 15:50WO-10193 op 5010" Tablet, 64GB
NB-7024, setup key TB-03
12015 min from MN-021.7Mon Jun 8 17:00Warehouse stock
715:50Thu Jun 4 20:00WO-10208 op 504-Bay NAS Enclosure, refresh
QN-2129, setup key ST-01
48515 min from TB-033.4Mon Jun 8 17:00Warehouse stock
820:00Thu Jun 4 21:05WO-10235 op 50Tower Workstation, 32GB / 1TB
QN-4437, setup key DT-04
3015 min from ST-010.8Mon Jun 8 17:00Warehouse stock
921:05Thu Jun 4 22:10WO-10269 op 50Thin Client, 4GB / 32GB
VW-2014, setup key DT-01
3010 min from DT-040.9Mon Jun 8 17:00Warehouse stock
1022:10Fri Jun 5 07:25WO-10310 op 50Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key DT-03
8010 min from DT-012.1Tue Jun 9 15:00ACCOUNT 8733
Friday June 5
1109:05Fri Jun 5 13:00WO-10330 op 5027" QHD Monitor, 165Hz, refresh
LM-8095, setup key MN-03
15015 min from DT-033.2Tue Jun 9 15:00ACCOUNT 8733
1213:00Fri Jun 5 16:50WO-10030 op 50Mesh Wi-Fi Kit, 3-pack, refresh
AF-9913, setup key NW-01
24515 min from MN-033.6Tue Jun 9 17:00Warehouse stock
1316:50Fri Jun 5 20:10WO-10073 op 504-Bay NAS Enclosure
BP-8568, setup key ST-01
41515 min from NW-012.6Tue Jun 9 17:00Warehouse stock
1420:10Mon Jun 8 06:35WO-10141 op 504K Conference Camera
LM-5365, setup key PR-03
43015 min from ST-013.2Tue Jun 9 17:00Warehouse stock
Monday June 8
1506:35Mon Jun 8 08:10WO-10174 op 508" Rugged Tablet, 64GB
NB-1986, setup key TB-02
8515 min from PR-031.3Tue Jun 9 17:00Warehouse stock
1608:10Mon Jun 8 11:25WO-10216 op 50USB-C Travel Hub, 7-in-1, gray
QN-2461, setup key DK-03
23015 min from TB-022.5Tue Jun 9 17:00Warehouse stock
1711:25Mon Jun 8 12:55WO-10298 op 50USB-C Dock, 100W, dual display
VW-7925, setup key DK-02
14010 min from DK-031.3Tue Jun 9 17:00Warehouse stock
1812:55Mon Jun 8 14:40WO-10011 op 50All-in-One 24", 16GB / 512GB
AF-4434, setup key DT-02
4515 min from DK-021.5Wed Jun 10 17:00Warehouse stock
1914:40Mon Jun 8 15:55WO-10054 op 50128GB USB Flash Drive, 10-pack, refresh
BP-7381, setup key ST-03
13015 min from DT-021.0Wed Jun 10 17:00Warehouse stock
2015:55Mon Jun 8 16:30WO-10098 op 50Wi-Fi 6E Router
KL-3459, setup key NW-02
2015 min from ST-030.3Wed Jun 10 17:00Warehouse stock
2116:30Mon Jun 8 21:50WO-10245 op 50Thunderbolt Dock, 4 ports
QN-5393, setup key DK-04
41515 min from NW-024.6Wed Jun 10 17:00Warehouse stock
2221:50Tue Jun 9 10:40WO-10040 op 50KVM Switch, 2-port 4K
BP-5055, setup key DK-01
54010 min from DK-045.2Thu Jun 11 17:00Warehouse stock
Tuesday June 9
2310:40Tue Jun 9 13:30WO-10127 op 5024-Port PoE Switch, managed, refresh
LM-3668, setup key NW-04
15515 min from DK-012.6Thu Jun 11 17:00Warehouse stock
2413:30Tue Jun 9 16:10WO-10226 op 50Mini PC, 8-core, 16GB / 512GB, refresh
QN-4241, setup key DT-03
9515 min from NW-042.4Thu Jun 11 17:00Warehouse stock
2516:10Tue Jun 9 18:25WO-10265 op 5024-Port PoE Switch, managed
VW-1670, setup key NW-04
12515 min from DT-032.0Thu Jun 11 17:00Warehouse stock
2618:25Tue Jun 9 22:00WO-10021 op 50Mini PC, 8-core, 16GB / 512GB
AF-7495, setup key DT-03
8515 min from NW-042.8Fri Jun 12 17:00Warehouse stock
Wednesday June 10
2706:00Wed Jun 10 06:40WO-10184 op 508" Rugged Tablet, 64GB, gray
NB-5680, setup key TB-02
2515 min from DT-030.4Thu Jun 11 17:00Warehouse stock
2806:40Wed Jun 10 08:10WO-10108 op 50Wi-Fi 6 Access Point, ceiling
KL-5384, setup key NW-03
10015 min from TB-021.2Fri Jun 12 17:00Warehouse stock
2908:10Wed Jun 10 11:15WO-10165 op 5034" Ultrawide Monitor, curved, gray
LM-9032, setup key MN-04
8015 min from NW-032.3Fri Jun 12 17:00Warehouse stock
3012:35Wed Jun 10 20:40WO-10289 op 5027" 4K Monitor, USB-C
VW-6003, setup key MN-02
35510 min from MN-047.4Fri Jun 12 17:00Warehouse stock
3120:40Thu Jun 11 06:45WO-10026 op 501TB NVMe SSD
AF-7757, setup key ST-02
45015 min from MN-022.8Mon Jun 15 17:00Warehouse stock
Thursday June 11
3206:45Thu Jun 11 13:20WO-10069 op 50Mesh Wi-Fi Kit, 3-pack
BP-8055, setup key NW-01
36515 min from ST-025.8Mon Jun 15 17:00Warehouse stock
3313:20Thu Jun 11 17:45WO-10113 op 50Mini PC, 8-core, 16GB / 512GB, gray
KL-9030, setup key DT-03
14015 min from NW-014.2Mon Jun 15 17:00Warehouse stock
Friday June 12
3406:00Fri Jun 12 08:35WO-10170 op 50Tower Workstation, 32GB / 1TB, refresh
LM-9819, setup key DT-04
9010 min from DT-032.4Mon Jun 15 17:00Warehouse stock
3508:35Fri Jun 12 12:25WO-10209 op 504-Bay NAS Enclosure, refresh
QN-2129, setup key ST-01
43515 min from DT-043.1Mon Jun 15 17:00Warehouse stock
3612:25Fri Jun 12 19:45WO-10294 op 5034" Ultrawide Monitor, curved
VW-6938, setup key MN-04
26515 min from ST-016.6Mon Jun 15 17:00Warehouse stock
3720:30Fri Jun 12 22:30WO-10093 op 5014" Laptop, 8-core, 16GB / 512GB, refresh
KL-2645, setup key LT-03
9015 min from MN-041.8Tue Jun 16 17:00Warehouse stock

121 more jobs after Sat Jun 13.

Exceptions

Everything the schedule could not make work, with the likely cause and a next step. Red is high, amber medium, grey low.

Scenario: Saturday overtime on SMT and PK

Adds 144 open hours over the next two weeks and cuts late orders from 41 to 25 and weighted lateness by 43%. To adopt it, set allow_overtime to Y and list SMT, PK in overtime_work_centers.

Late orders 41

Capacity: Queues 327 working hours at SMT
SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 112 working hours at SMT
SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 178 working hours at SMT
Split op 10 across SMT-05 and SMT-01: SMT-01 has 71 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 276 working hours at SMT
SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 229 working hours at SMT
Split op 10 across SMT-03 and SMT-01: SMT-01 has 32 idle hours while this order waits, in gaps too short for the whole job.
Material: SoC module from Kestrel Silicon arrives Sun Jun 7 06:00
Expedite the SoC module to arrive by Thu Jun 4 13:25. Everything else fits before the due date.
Capacity: Queues 126 working hours at SMT
Split op 10 across SMT-04 and SMT-06: SMT-06 has 41 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 219 working hours at SMT
Split op 10 across SMT-03 and SMT-01: SMT-01 has 71 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 258 working hours at SMT
Split op 10 across SMT-02 and SMT-01: SMT-01 has 25 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 206 working hours at SMT
Split op 10 across SMT-05 and SMT-07: SMT-07 has 83 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 154 working hours at SMT
Split op 10 across SMT-01 and SMT-07: SMT-07 has 60 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 85 working hours at SMT
SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 89 working hours at SMT
Split op 10 across SMT-07 and SMT-05: SMT-05 has 18 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 68 working hours at SMT
Split op 10 across SMT-02 and SMT-05: SMT-05 has 18 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 56 working hours at SMT
SMT-06 has a 15 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 82 working hours at TB
TB-04 has a 22 h opening before this order starts but no test technicians free then. Add crew to that shift.
Capacity: Queues 110 working hours at SMT
Split op 10 across SMT-02 and SMT-07: SMT-07 has 38 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 53 working hours at SMT
Split op 10 across SMT-06 and SMT-01: SMT-01 has 23 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 133 working hours at SMT
SMT-07 has a 18 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 120 working hours at SMT
SMT-01 has a 39 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 142 working hours at SMT
Split op 10 across SMT-05 and SMT-07: SMT-07 has 80 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 65 working hours at SMT
SMT-02 has a 10 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 74 working hours at SMT
Split op 10 across SMT-04 and SMT-02: SMT-02 has 11 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 82 working hours at SMT
Split op 10 across SMT-04 and SMT-07: SMT-07 has 28 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 101 working hours at SMT
Split op 10 across SMT-04 and SMT-02: SMT-02 has 19 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 105 working hours at SMT
Split op 10 across SMT-03 and SMT-01: SMT-01 has 14 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 124 working hours at SMT
SMT-02 has a 20 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 166 working hours at SMT
Split op 10 across SMT-02 and SMT-07: SMT-07 has 98 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 135 working hours at SMT
Split op 10 across SMT-03 and SMT-04: SMT-04 has 28 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 91 working hours at SMT
Split op 10 across SMT-06 and SMT-07: SMT-07 has 30 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 227 working hours at SMT
SMT-07 has a 40 h opening before this order starts but no smt operators free then. Add crew to that shift.
Capacity: Queues 81 working hours at SMT
Split op 10 across SMT-04 and SMT-07: SMT-07 has 36 idle hours while this order waits, in gaps too short for the whole job.
Labor: Waits 64 working hours for test technicians at TB
Add test technicians to the shifts before Thu Jul 2; the TB stations are free but not staffed.
Capacity: Queues 109 working hours at SMT
Split op 10 across SMT-06 and SMT-07: SMT-07 has 39 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 69 working hours at SMT
Split op 10 across SMT-07 and SMT-02: SMT-02 has 17 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 140 working hours at TB
Review the TB sequence on the dispatch list; a lower-weight order may be able to wait.
Capacity: Queues 99 working hours at SMT
Split op 10 across SMT-04 and SMT-07: SMT-07 has 30 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 144 working hours at SMT
Split op 10 across SMT-04 and SMT-07: SMT-07 has 87 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 74 working hours at SMT
Split op 10 across SMT-05 and SMT-06: SMT-06 has 28 idle hours while this order waits, in gaps too short for the whole job.
Capacity: Queues 25 working hours at PK
Run Saturday overtime on PK (set allow_overtime to Y and list PK in overtime_work_centers).
Capacity: Queues 264 working hours at SMT
Split op 10 across SMT-04 and SMT-01: SMT-01 has 63 idle hours while this order waits, in gaps too short for the whole job.

Waiting for material 30

Kestrel Silicon delivers Sun Jun 7 06:00; order is late
Expedite with the supplier.
Tidewell Plastics delivers Sun Jun 14 14:00; order is late
Expedite with the supplier.
Norra Circuits delivers Thu Jul 2 06:00; order is late
Expedite with the supplier.
Tidewell Plastics delivers Mon Jun 15 10:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Wed Jun 17 10:00; order still makes its date
Watch the delivery.
Kestrel Silicon delivers Mon Jun 15 10:00; order still makes its date
Watch the delivery.
Aster Power delivers Tue Jun 23 14:00; order still makes its date
Watch the delivery.
Aster Power delivers Mon Jun 22 14:00; order still makes its date
Watch the delivery.
Aster Power delivers Wed Jun 24 14:00; order still makes its date
Watch the delivery.
Aster Power delivers Fri Jun 26 10:00; order still makes its date
Watch the delivery.
Aster Power delivers Thu Jun 25 10:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Mon Jun 29 06:00; order still makes its date
Watch the delivery.
Aster Power delivers Mon Jun 29 06:00; order still makes its date
Watch the delivery.
Aster Power delivers Sat Jun 27 10:00; order still makes its date
Watch the delivery.
Aster Power delivers Sat Jul 4 10:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Tue Jul 7 06:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Sun Jul 5 10:00; order still makes its date
Watch the delivery.
Tidewell Plastics delivers Wed Jul 8 14:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Fri Jul 10 06:00; order still makes its date
Watch the delivery.
Tidewell Plastics delivers Mon Jul 13 06:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Fri Jul 10 14:00; order still makes its date
Watch the delivery.
Tidewell Plastics delivers Sun Jul 12 06:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Fri Jul 10 06:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Tue Jul 14 10:00; order still makes its date
Watch the delivery.
Kestrel Silicon delivers Thu Jul 16 06:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Wed Jul 15 06:00; order still makes its date
Watch the delivery.
Aster Power delivers Tue Jul 14 10:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Sat Jul 18 14:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Wed Jul 22 14:00; order still makes its date
Watch the delivery.
Norra Circuits delivers Fri Jul 24 10:00; order still makes its date
Watch the delivery.

Crew limits 3

SMT operators leave free resources idle for 49 hours in the next week
Tightest: night shift on Thu Jun 4, 7.0 h with a free resource and nobody to run it
Cross-train or add headcount on that shift.
Test technicians leave free resources idle for 81 hours in the next week
Tightest: day shift on Sat Jun 6, 8.5 h with a free resource and nobody to run it
Cross-train or add headcount on that shift.
Imaging engineers leave free resources idle for 8 hours in the next week
Tightest: swing shift on Thu Jun 4, 8.0 h with a free resource and nobody to run it
Cross-train or add headcount on that shift.

Downtime 2

Placement head failure, awaiting spare
Work is already scheduled around it.
Preventive maintenance: reflow oven
Work is already scheduled around it.

Frozen window 1

4 operations in the frozen window had to move
A running job overran, material slipped or a machine went down.
Tell the affected supervisors before the shift starts.

Changes since the last run

Compared with the schedule published as of Tue Jun 2 06:00. Orders whose on-time status flipped are listed first.

57%
Near-term stability
113 of 198 operations due to start in the next 7 days held within 4 h. Across the full horizon, 30%.
142
Orders moved
24 crossed their due date
1
New orders
Not in the last schedule
7
Finished
Completed since the last run

Headline measures

1412 open operations compared. In the next 7 days, 85 moved more than 4 h (77 of them later) and 46 changed resource. Further out, work reshuffles more freely because nothing there has been released to the floor.

MeasureNowLast runChange
On-time orders86.2%91.8%−5.5%
Weighted on-time85.4%89.3%−3.8%
Late orders4125+16
Order-days late31.211.9+19.2
Open orders298304−6
Utilization77.4%78.0%−0.6%

New and finished orders

New

OrderProductQtyCustomerDueStatus
WO-1034414" Laptop, 8-core, 16GB / 512GB, refresh240ACCOUNT 4340Fri Jun 12 15:00On time

Finished

OrderProductQtyFinishedDue
WO-1032914" Laptop, 8-core, 16GB / 512GB, refresh400Tue Jun 2 06:55Mon Jun 1 15:00
WO-10317All-in-One 24", 16GB / 512GB, gray150Tue Jun 2 14:20Tue Jun 2 15:00
WO-1012127" QHD Monitor, 165Hz355Tue Jun 2 08:35Wed Jun 3 17:00
WO-102208-Port Gigabit Switch160Tue Jun 2 13:00Wed Jun 3 17:00
WO-10302Mechanical Keyboard, TKL330Tue Jun 2 16:55Wed Jun 3 17:00
WO-100154-Bay NAS Enclosure, gray150Tue Jun 2 09:10Thu Jun 4 17:00
WO-101021080p Webcam with mic310Tue Jun 2 19:55Thu Jun 4 17:00

Orders whose finish moved

Moves of more than 8 hours. A plus sign means later.

OrderProductWasNowMovedDue
WO-1025813" Ultralight Laptop, 16GB / 512GBTue Jul 21 15:55Mon Jul 27 12:40+5.9 dFri Jul 24 17:00Now late
WO-1025713" Ultralight Laptop, 16GB / 512GBThu Jul 9 16:05Mon Jul 13 13:25+3.9 dFri Jul 10 17:00Now late
WO-1025513" Ultralight Laptop, 16GB / 512GBThu Jun 11 21:10Mon Jun 15 09:35+3.5 dFri Jun 12 17:00Now late
WO-10191KVM Switch, 2-port 4K, grayTue Jul 14 07:50Fri Jul 17 19:30+3.5 dFri Jul 17 17:00Now late
WO-1020514" Rugged Laptop, 16GB / 256GBTue Jul 7 10:45Fri Jul 10 11:00+3.0 dWed Jul 8 17:00Now late
WO-10023Mini PC, 8-core, 16GB / 512GBWed Jul 8 07:30Fri Jul 10 20:00+2.5 dFri Jul 10 17:00Now late
WO-1026724-Port PoE Switch, managedTue Jul 7 19:50Thu Jul 9 18:25+47 hThu Jul 9 17:00Now late
WO-10228Mini PC, 8-core, 16GB / 512GB, refreshWed Jul 8 21:55Fri Jul 10 16:30+43 hThu Jul 9 17:00Now late
WO-1012924-Port PoE Switch, managed, refreshThu Jul 9 08:25Fri Jul 10 13:55+30 hThu Jul 9 17:00Now late
WO-101878" Rugged Tablet, 64GB, grayWed Jul 22 14:45Thu Jul 23 19:15+28 hThu Jul 23 17:00Now late
WO-1011914" Laptop, 8-core, 16GB / 512GB, grayTue Jul 7 17:10Mon Jul 6 15:55−25 hTue Jul 7 17:00Back on time
WO-101868" Rugged Tablet, 64GB, grayWed Jul 8 22:30Thu Jul 9 22:40+24 hThu Jul 9 17:00Now late
WO-10042KVM Switch, 2-port 4KFri Jul 10 13:45Thu Jul 9 16:05−22 hThu Jul 9 17:00Back on time
WO-10281Ergonomic Mouse, wirelessWed Jul 8 13:30Thu Jul 9 10:35+21 hWed Jul 8 17:00Now late
WO-1029634" Ultrawide Monitor, curvedMon Jul 13 12:45Tue Jul 14 09:05+20 hMon Jul 13 17:00Now late
WO-101348" Rugged Tablet, 64GB, grayFri Jul 17 08:25Fri Jul 17 21:25+13 hFri Jul 17 17:00Now late
WO-10116Mini PC, 8-core, 16GB / 512GB, grayMon Jul 27 10:55Mon Jul 27 23:00+12 hMon Jul 27 17:00Now late
WO-10308All-in-One 24", 16GB / 512GB, grayTue Jun 30 06:50Tue Jun 30 18:00+11 hTue Jun 30 15:00Now late
WO-1023315" Laptop, 12-core, 32GB / 1TB, grayFri Jul 17 10:45Fri Jul 17 21:20+11 hFri Jul 17 17:00Now late
WO-101768" Rugged Tablet, 64GBTue Jul 7 20:20Tue Jul 7 09:50−10 hTue Jul 7 17:00Back on time
WO-102134-Bay NAS Enclosure, refreshMon Jul 13 09:30Mon Jul 13 19:45+10 hMon Jul 13 17:00Now late
WO-10218USB-C Travel Hub, 7-in-1, grayTue Jul 7 22:55Tue Jul 7 12:55−10 hTue Jul 7 17:00Back on time
WO-10201Chromebook 11", 4GB / 64GBTue Jul 28 11:05Tue Jul 28 20:55+9.8 hTue Jul 28 17:00Now late
WO-1031834" Ultrawide Monitor, curved, grayThu Jul 2 08:20Thu Jul 2 17:50+9.5 hThu Jul 2 15:00Now late
WO-10172Tower Workstation, 32GB / 1TB, refreshWed Jul 8 16:25Mon Jul 13 15:45+5.0 dMon Jul 13 17:00
WO-10237Tower Workstation, 32GB / 1TBThu Jul 2 18:25Mon Jul 6 12:25+3.8 dMon Jul 6 17:00
WO-101758" Rugged Tablet, 64GBThu Jun 18 15:05Mon Jun 22 07:55+3.7 dTue Jun 23 17:00
WO-10301USB-C Dock, 100W, dual displayFri Jul 17 17:25Tue Jul 21 10:00+3.7 dTue Jul 21 17:00
WO-10271Thin Client, 4GB / 32GBThu Jul 2 22:25Mon Jul 6 13:40+3.6 dMon Jul 6 17:00
WO-1005127" 4K Monitor, USB-C, refreshThu Jul 2 17:20Mon Jul 6 07:35+3.6 dMon Jul 6 17:00
WO-1019510" Tablet, 64GBThu Jul 2 20:00Mon Jul 6 07:20+3.5 dMon Jul 6 17:00
WO-102144-Bay NAS Enclosure, refreshFri Jul 17 16:00Mon Jul 20 12:55+2.9 dMon Jul 20 17:00
WO-10238Tower Workstation, 32GB / 1TBFri Jul 17 17:05Mon Jul 20 14:00+2.9 dMon Jul 20 17:00
WO-10272Thin Client, 4GB / 32GBFri Jul 17 18:30Mon Jul 20 15:25+2.9 dMon Jul 20 17:00
WO-102154-Bay NAS Enclosure, refreshMon Jul 27 16:50Fri Jul 24 19:55−2.9 dMon Jul 27 17:00
WO-101444K Conference CameraFri Jun 26 16:25Mon Jun 29 12:25+2.8 dTue Jun 30 17:00
WO-10006Thin Client, 4GB / 32GB, grayFri Jun 12 15:00Mon Jun 15 10:35+2.8 dTue Jun 16 17:00
WO-101424K Conference CameraFri Jun 12 18:10Mon Jun 15 13:45+2.8 dTue Jun 16 17:00
WO-10004Ergonomic Mouse, wireless, grayFri Jul 17 13:00Mon Jul 20 08:30+2.8 dMon Jul 20 17:00
WO-102401TB NVMe SSD, grayFri Jun 12 21:20Mon Jun 15 16:25+2.8 dTue Jun 16 17:00
WO-1029534" Ultrawide Monitor, curvedFri Jun 26 12:35Mon Jun 29 07:05+2.8 dMon Jun 29 17:00
WO-1013714" Laptop, 8-core, 16GB / 512GBFri Jun 19 21:30Mon Jun 22 15:45+2.8 dMon Jun 22 17:00
WO-1005227" 4K Monitor, USB-C, refreshFri Jul 17 15:45Mon Jul 20 09:25+2.7 dMon Jul 20 17:00
WO-10274Wi-Fi 6E Router, grayFri Jun 12 22:25Mon Jun 15 15:25+2.7 dTue Jun 16 17:00
WO-100291TB NVMe SSDFri Jul 24 22:35Mon Jul 27 13:00+2.6 dMon Jul 27 17:00
WO-1029734" Ultrawide Monitor, curvedFri Jul 24 21:20Mon Jul 27 09:30+2.5 dMon Jul 27 17:00
WO-1029127" 4K Monitor, USB-CFri Jul 10 15:40Wed Jul 8 11:35−2.2 dFri Jul 10 17:00
WO-1031634" Ultrawide Monitor, curvedFri Jul 24 12:35Wed Jul 22 09:30−2.1 dFri Jul 24 15:00
WO-100271TB NVMe SSDWed Jun 24 22:35Fri Jun 26 09:35+35 hMon Jun 29 17:00
WO-1020614" Rugged Laptop, 16GB / 256GBWed Jul 22 21:35Fri Jul 24 08:35+35 hWed Jul 22 17:00
WO-10342Chromebook 11", 4GB / 64GB, refreshMon Jun 15 23:00Wed Jun 17 09:50+35 hFri Jun 19 12:00
WO-102504K Conference Camera, grayMon Jun 15 22:10Wed Jun 17 09:00+35 hThu Jun 18 17:00
WO-102114-Bay NAS Enclosure, refreshThu Jun 25 15:05Fri Jun 26 20:25+29 hMon Jun 29 17:00
WO-10070Mesh Wi-Fi Kit, 3-packThu Jun 25 11:50Fri Jun 26 15:25+28 hMon Jun 29 17:00
WO-10111Wi-Fi 6 Access Point, ceilingThu Jul 23 17:50Wed Jul 22 14:30−27 hFri Jul 24 17:00
WO-1016734" Ultrawide Monitor, curved, grayThu Jul 9 21:25Wed Jul 8 18:25−27 hFri Jul 10 17:00
WO-1034314" Laptop, 8-core, 16GB / 512GB, refreshMon Jun 22 10:00Tue Jun 23 11:45+26 hFri Jun 26 12:00
WO-1012427" QHD Monitor, 165HzTue Jul 14 15:30Wed Jul 15 16:25+25 hWed Jul 15 17:00
WO-1015827" QHD Monitor, 165Hz, refreshWed Jun 24 16:40Tue Jun 23 15:50−25 hThu Jun 25 17:00
WO-100194-Bay NAS Enclosure, grayTue Jul 28 17:05Wed Jul 29 17:55+25 hThu Jul 30 17:00
WO-1020414" Rugged Laptop, 16GB / 256GBTue Jun 23 16:05Wed Jun 24 16:45+25 hWed Jun 24 17:00
WO-101858" Rugged Tablet, 64GB, grayTue Jun 23 08:35Wed Jun 24 09:00+24 hThu Jun 25 17:00
WO-1033122" Touch MonitorWed Jul 8 16:15Thu Jul 9 16:15+24 hWed Jul 8 15:00
WO-1026222" Touch Monitor, grayWed Jul 15 21:05Thu Jul 16 21:00+24 hWed Jul 15 17:00
WO-10100Wi-Fi 6E RouterWed Jul 8 14:05Tue Jul 7 14:30−24 hWed Jul 8 17:00
WO-10305Mechanical Keyboard, TKLWed Jul 15 14:50Tue Jul 14 15:20−24 hWed Jul 15 17:00
WO-1016327" QHD Monitor, 165Hz, refreshWed Jul 29 17:25Thu Jul 30 16:05+23 hThu Jul 30 17:00
WO-102248-Port Gigabit SwitchTue Jul 28 15:50Wed Jul 29 14:25+23 hWed Jul 29 17:00
WO-102534K Conference Camera, grayWed Jul 29 19:05Tue Jul 28 21:00−22 hThu Jul 30 17:00
WO-101358" Rugged Tablet, 64GB, grayThu Jul 30 09:00Fri Jul 31 06:55+22 hFri Jul 31 17:00
WO-10062128GB USB Flash Drive, 10-packTue Jul 28 21:30Wed Jul 29 19:25+22 hThu Jul 30 17:00
WO-1033615" Laptop, 12-core, 32GB / 1TBTue Jul 21 09:00Wed Jul 22 06:50+22 hThu Jul 23 15:00
WO-1004724" FHD Monitor, IPSThu Jul 16 13:40Fri Jul 17 10:45+21 hFri Jul 17 17:00
WO-1009012" Pro Tablet, 256GBThu Jul 16 16:45Fri Jul 17 13:50+21 hFri Jul 17 17:00
WO-1032212" Pro Tablet, 256GBThu Jul 16 18:00Fri Jul 17 15:05+21 hMon Jul 20 15:00
WO-10303Mechanical Keyboard, TKLMon Jun 15 14:10Tue Jun 16 11:10+21 hWed Jun 17 17:00
WO-1019610" Tablet, 64GBThu Jul 16 20:55Fri Jul 17 17:55+21 hMon Jul 20 17:00
WO-10306Mechanical Keyboard, TKLTue Jul 28 20:25Wed Jul 29 16:40+20 hWed Jul 29 17:00
WO-10081Thin Client, 4GB / 32GB, grayTue Jul 28 12:20Mon Jul 27 16:15−20 hWed Jul 29 17:00
WO-1009614" Laptop, 8-core, 16GB / 512GB, refreshMon Jul 27 14:10Tue Jul 28 09:55+20 hTue Jul 28 17:00

Showing 80 of 142. The full list is in schedule_changes.csv.

Inputs and method

What this schedule was built from, how it was built, and how to refresh it.

Refreshing the schedule

The page is static. New data reaches it when the scheduler runs again and rewrites this file in place.

  1. Drop updated exports into the input folder. Open work orders, material arrivals and shop-floor actuals change most often. Column layouts are listed at the bottom of this page.
  2. Run python schedule.py, or leave python schedule.py --watch running and it reschedules within seconds of any file changing.
  3. Browsers showing this page pick up the new schedule on their next reload, every 5 minutes. No scripts are involved; the page uses an HTML refresh tag.
  4. The schedule it replaces is archived in output/history. Operations inside the frozen window keep the slot the floor was given.
python schedule.py                 # schedule once
python schedule.py --watch         # reschedule when inputs change
python schedule.py --passes 0      # skip the improvement passes
python tools/roll_forward.py --to "2026-06-04 06:00"   # sample data: advance a day

Integrity checks

Every run re-checks the finished schedule against the raw calendars and rules, separately from the engine.

✓
No overlapping operations on any resource
✓
Every operation fits its working time exactly
✓
Changeover time matches the preceding job on every resource
✓
Routing order, move times and transfer batches respected
✓
No order starts before release or before its materials arrive
✓
Nothing is planned in the past
✓
Labor pools never exceed headcount
✓
Every open operation is scheduled or listed as an exception
✓
Every operation runs on a resource with the required capability

Built in 24.1 s. 20 of 24 operations in the frozen window held in place.

Sequencing

Orders are ranked by earliest due date, then scheduled one at a time on whichever eligible resource finishes each step first. 30 improvement passes tried moving late orders earlier in the sequence and kept 8 of 54 changes, cutting weighted lateness by 24%.

Rule, before improvement passesOn timeLateLate, weight 2+Weighted days late
Earliest due date83.6%49761
Least slack45.0%16415336
Priority, then due date32.9%200121,200
Customer tier, then due date29.5%21091,637
Least slack, weighted by tier25.5%22201,743
Critical ratio34.2%196132,767
Shortest work first46.0%161155,035

Every rule was run on the same data. The highlighted row is the rule in use; change it with sequencing_rule in parameters.csv.

How the engine works

Time is a grid of 5-minute slots. Each resource gets a working mask from its shift calendar, breaks, plant holidays, optional overtime and planned downtime. An operation uses working slots only, so it pauses overnight and picks up on the next shift.

Run time is quantity times minutes per unit, divided by the resource's stations, efficiency and speed. Changeovers depend on what ran before, from the setup rules and changeover matrix. A job can slot into an earlier gap when it fits and the job after it still has room for its own changeover.

Steps overlap in transfer batches: the next step may start once the first batch is done, but may not finish before the last batch reaches it. Move times, order release and material arrival all hold work back. Shared crews limit how many lines or banks run at once on each shift.

Shop-floor actuals remove finished steps and lock running ones in place. Operations due to start inside the frozen window keep the slot they had in the last published schedule.

For each late order the engine also schedules it alone on an empty plant. If it is still late, the cause is lead time or material; if not, the cause is the queue where it waited longest.

Input files

Read from the input folder for this run. The fingerprint changes whenever a file's contents change.

FileRowsLast changedFingerprint
parameters.csvRequired202026-09-29 12:599f08416002
resources.csvRequired242026-09-29 12:5846b0179e1e
calendars.csvRequired612026-09-29 12:58b36599059a
products.csvRequired682026-09-29 12:5809ec4dd3b8
routings.csvRequired4082026-09-29 12:587e4366388a
work_orders.csvRequired3442026-09-29 12:59f7740bfca4
holidays.csvOptional32026-09-29 12:585bda2b142d
downtime.csvOptional62026-09-29 12:595519661f69
labor_pools.csvOptional492026-09-29 12:58d5ff899bf8
setup_rules.csvOptional62026-09-29 12:580b4fb8e13a
changeover_matrix.csvOptional32026-09-29 12:5832f948baa9
materials.csvOptional1,3412026-09-29 12:59aa0eefd11f
actuals.csvOptional2032026-09-29 12:5905db1a1286
customer_tiers.csvOptional62026-09-29 12:58c86b44ba09

Parameters

From parameters.csv, with defaults for anything left out.

site_nameReno Integration Center
schedule_start2026-06-03 06:00
calendar_origin2026-05-11
calendar_weeks22
sequencing_ruledue_date
optimize_passes30
allow_overtimeN
overtime_work_centersFA,PK
frozen_hours24
transfer_batch_qty50
release_policyasap
jit_buffer_days3
at_risk_hours8
stability_threshold_hours4
utilization_window_days14
display_days_before2
display_days_after40
html_refresh_seconds300
resource_stickiness_hours2
stability_horizon_days7

Data validation

All input files loaded without errors or warnings.

Input layouts

CSV with a header row. Dates as YYYY-MM-DD HH:MM. Column order does not matter.

FileColumnsNotes
work_orders.csvwo_id, sku, qty, release, due, priority, customer, tier, order_type, reference, special_requirements, statusOpen orders from ERP. special_requirements such as 10:npi forces a capability on one step. Status Closed drops the order.
actuals.csvwo_id, op_seq, resource_id, status, qty_done, actual_start, actual_endShop-floor feedback. complete removes the step; started locks it on its resource with the quantity left.
materials.csvwo_id, component, supplier, qty_required, eta, statusAnything not On hand holds the first step until its ETA.
routings.csvsku, op_seq, work_center, description, run_min_per_unit, setup_min, required_capability, allow_overlap, move_min_after, order_typesMinutes per unit at one station. order_types limits a step to some order types.
resources.csvresource_id, name, work_center, stations, efficiency, speed_factor, calendar_id, capabilities, labor_pool, crew_per_run, initial_setup_key, cost_per_hour, preferenceCapabilities are separated by semicolons.
calendars.csvcalendar_id, day, start, end, kind, shift_namekind is shift, break or overtime. An end before the start crosses midnight.
labor_pools.csvpool_id, name, day, start, end, headcountCrew available by shift. Fractions are allowed.
setup_rules.csvwork_center, key_attribute, group_attribute, same_key_min, same_group_min, different_group_minKeys can be family, category, customer, sku or brand.
changeover_matrix.csvwork_center, from_key, to_key, minutesOverrides the rules for specific pairs.
downtime.csvresource_id, start, end, reasonPlanned maintenance and breakdowns.
holidays.csvdate, name, applies_toapplies_to lists calendar IDs, or all.
products.csvsku, description, category, family, brand, price, case_pack
customer_tiers.csvtier, weight, otd_target_pct, descriptionWeight sets how much lateness costs in the improvement passes.
parameters.csvparameter, value, descriptionListed in full above.