298 open orders are scheduled to finish by Jul 31. 41 will finish late and 51 more finish inside one shift of their due date.
257 of 298 open orders
Orders weighted by customer tier
31 order-days late in total
Surface mount, where late orders wait longest
All resources, next 14 days
Of busy time spent on changeovers
30 open orders still waiting on material
Next 7 days' operations held within 4 h of the last run
Needs attention
The most urgent exceptions, worst first. Each links to the order or resource.
Adds 144 open hours over the next two weeks and cuts late orders from 41 to 25 and weighted lateness by 43%. To adopt it, set allow_overtime to Y and list SMT, PK in overtime_work_centers.
- 36 late orders queue at SMT surface mount9 are customer orders. Worst is WO-10332 (Silver), 4.8 d late.26 of them could finish sooner by splitting the job across lines with idle gaps; see each order.
- WO-10255 is 2.7 d late waiting for materialSoC module from Kestrel Silicon arrives Sun Jun 7 06:00.Expedite the SoC module to arrive by Thu Jun 4 13:25. Everything else fits before the due date.
- 2 late orders queue at TB burn-in and testAll are stock replenishment. Worst is WO-10281 (Stock), 18 h late.See each order for the fix; the scenario above shows what overtime buys.
- 1 late order queues at PK pack-outAll are stock replenishment. Worst is WO-10152 (Stock), 0.9 h late.See each order for the fix; the scenario above shows what overtime buys.
- SMT-05 is down until Thu Jun 4 12:00Placement head failure, awaiting spareWork is already scheduled around it.
- SMT operators leave free resources idle for 49 hours in the next weekTightest: night shift on Thu Jun 4, 7.0 h with a free resource and nobody to run itCross-train or add headcount on that shift.
- Test technicians leave free resources idle for 81 hours in the next weekTightest: day shift on Sat Jun 6, 8.5 h with a free resource and nobody to run itCross-train or add headcount on that shift.
On-time by customer tier
Share of open orders projected to finish by their due date. The black tick is the service target.
Work center load by week
Booked hours as a share of open hours, after shifts, holidays and planned downtime. This week counts from the as-of time. Amber is above 90%, red is over capacity.
| Work center | This week | Week of Jun 8 | Week of Jun 15 | Week of Jun 22 | Week of Jun 29 | Week of Jul 6 | Resources |
|---|---|---|---|---|---|---|---|
| SMT Surface mount | 83% | 80% | 81% | 79% | 86% | 83% | 7 |
| SUB Sub-assembly | 72% | 85% | 78% | 88% | 76% | 92% | 3 |
| FA Final assembly | 61% | 91% | 80% | 88% | 93% | 94% | 6 |
| TB Burn-in and test | 85% | 86% | 87% | 85% | 79% | 84% | 4 |
| CFG Imaging and configuration | 19% | 10% | 16% | 37% | 47% | 53% | 2 |
| PK Pack-out | 70% | 75% | 84% | 80% | 88% | 88% | 2 |
Orders due and finishing each week
Grey is what falls due that week; teal finishes on time and red finishes late.
How close to the due date orders finish
Open orders by projected finish against their due date.
Schedule board
Every operation on every resource. Hatching at the start of a bar is changeover; grey is closed time and red hatching is planned downtime. Hover a bar for detail and click it to open the order.
Tracing WO-10329400 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Mon Jun 1 15:00, finishes Tue Jun 2 06:55CompleteOrder detailsClear
Tracing WO-10259490 × 22" Touch Monitor, grayDue Wed Jun 3 17:00, finishes Wed Jun 3 11:20At riskOrder detailsClear
Tracing WO-10136470 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jun 8 17:00, finishes Mon Jun 8 15:00At riskOrder detailsClear
Tracing WO-10197245 × Chromebook 11", 4GB / 64GBDue Tue Jun 2 17:00, finishes Mon Jun 1 14:10CompleteOrder detailsClear
Tracing WO-10203475 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jun 10 17:00, finishes Wed Jun 10 15:00At riskOrder detailsClear
Tracing WO-10317150 × All-in-One 24", 16GB / 512GB, grayDue Tue Jun 2 15:00, finishes Tue Jun 2 14:20CompleteOrder detailsClear
Tracing WO-10005120 × Thin Client, 4GB / 32GB, grayDue Tue Jun 2 17:00, finishes Mon Jun 1 09:15CompleteOrder detailsClear
Tracing WO-1009295 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jun 2 17:00, finishes Mon Jun 1 06:15CompleteOrder detailsClear
Tracing WO-10121355 × 27" QHD Monitor, 165HzDue Wed Jun 3 17:00, finishes Tue Jun 2 08:35CompleteOrder detailsClear
Tracing WO-10155445 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 4 17:00, finishes Wed Jun 3 10:45On timeOrder detailsClear
Tracing WO-10239320 × 1TB NVMe SSD, grayDue Tue Jun 2 17:00, finishes Mon Jun 1 10:50CompleteOrder detailsClear
Tracing WO-10034170 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jun 3 17:00, finishes Mon Jun 1 17:20CompleteOrder detailsClear
Tracing WO-1032360 × Mini PC, 8-core, 16GB / 512GBDue Wed Jun 3 15:00, finishes Mon Jun 1 13:10CompleteOrder detailsClear
Tracing WO-10044370 × 24" FHD Monitor, IPSDue Fri Jun 5 17:00, finishes Wed Jun 3 22:35On timeOrder detailsClear
Tracing WO-1007720 × Thin Client, 4GB / 32GB, grayDue Wed Jun 3 17:00, finishes Mon Jun 1 13:55CompleteOrder detailsClear
Tracing WO-10087200 × 12" Pro Tablet, 256GBDue Fri Jun 5 17:00, finishes Wed Jun 3 16:05On timeOrder detailsClear
Tracing WO-10131160 × 8" Rugged Tablet, 64GB, grayDue Fri Jun 5 17:00, finishes Wed Jun 3 19:25On timeOrder detailsClear
Tracing WO-10188340 × KVM Switch, 2-port 4K, grayDue Fri Jun 5 17:00, finishes Thu Jun 4 06:30On timeOrder detailsClear
Tracing WO-10220160 × 8-Port Gigabit SwitchDue Wed Jun 3 17:00, finishes Tue Jun 2 13:00CompleteOrder detailsClear
Tracing WO-10230110 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jun 5 17:00, finishes Thu Jun 4 08:40On timeOrder detailsClear
Tracing WO-10283130 × USB-C Travel Hub, 7-in-1Due Thu Jun 4 17:00, finishes Wed Jun 3 12:25On timeOrder detailsClear
Tracing WO-10058100 × 128GB USB Flash Drive, 10-packDue Thu Jun 4 17:00, finishes Mon Jun 1 16:10CompleteOrder detailsClear
Tracing WO-1017870 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jun 3 17:00, finishes Mon Jun 1 15:10CompleteOrder detailsClear
Tracing WO-10302330 × Mechanical Keyboard, TKLDue Wed Jun 3 17:00, finishes Tue Jun 2 16:55CompleteOrder detailsClear
Tracing WO-10015150 × 4-Bay NAS Enclosure, grayDue Thu Jun 4 17:00, finishes Tue Jun 2 09:10CompleteOrder detailsClear
Tracing WO-10102310 × 1080p Webcam with micDue Thu Jun 4 17:00, finishes Tue Jun 2 19:55CompleteOrder detailsClear
Tracing WO-10156390 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 17:20On timeOrder detailsClear
Tracing WO-10255350 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jun 12 17:00, finishes Mon Jun 15 09:35LateOrder detailsClear
Tracing WO-1031580 × 22" Touch MonitorDue Fri Jun 5 15:00, finishes Wed Jun 3 13:40On timeOrder detailsClear
Tracing WO-10049190 × 27" 4K Monitor, USB-C, refreshDue Mon Jun 8 17:00, finishes Thu Jun 4 13:55On timeOrder detailsClear
Tracing WO-10073415 × 4-Bay NAS EnclosureDue Tue Jun 9 17:00, finishes Fri Jun 5 20:10On timeOrder detailsClear
Tracing WO-10083155 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 08:25On timeOrder detailsClear
Tracing WO-10208485 × 4-Bay NAS Enclosure, refreshDue Mon Jun 8 17:00, finishes Thu Jun 4 20:00On timeOrder detailsClear
Tracing WO-10245415 × Thunderbolt Dock, 4 portsDue Wed Jun 10 17:00, finishes Mon Jun 8 21:50On timeOrder detailsClear
Tracing WO-1031080 × Mini PC, 8-core, 16GB / 512GB, refreshDue Tue Jun 9 15:00, finishes Fri Jun 5 07:25On timeOrder detailsClear
Tracing WO-10001390 × Ergonomic Mouse, wireless, grayDue Mon Jun 8 17:00, finishes Thu Jun 4 09:00On timeOrder detailsClear
Tracing WO-10030245 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jun 9 17:00, finishes Fri Jun 5 16:50On timeOrder detailsClear
Tracing WO-10040540 × KVM Switch, 2-port 4KDue Thu Jun 11 17:00, finishes Tue Jun 9 10:40On timeOrder detailsClear
Tracing WO-10117100 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jun 9 17:00, finishes Fri Jun 5 21:20On timeOrder detailsClear
Tracing WO-1017485 × 8" Rugged Tablet, 64GBDue Tue Jun 9 17:00, finishes Mon Jun 8 08:10On timeOrder detailsClear
Tracing WO-10193120 × 10" Tablet, 64GBDue Mon Jun 8 17:00, finishes Thu Jun 4 15:50On timeOrder detailsClear
Tracing WO-10216230 × USB-C Travel Hub, 7-in-1, grayDue Tue Jun 9 17:00, finishes Mon Jun 8 11:25On timeOrder detailsClear
Tracing WO-1023530 × Tower Workstation, 32GB / 1TBDue Mon Jun 8 17:00, finishes Thu Jun 4 21:05On timeOrder detailsClear
Tracing WO-1026930 × Thin Client, 4GB / 32GBDue Mon Jun 8 17:00, finishes Thu Jun 4 22:10On timeOrder detailsClear
Tracing WO-1032640 × 14" Laptop, 8-core, 16GB / 512GBDue Tue Jun 9 15:00, finishes Thu Jun 4 16:45On timeOrder detailsClear
Tracing WO-10330150 × 27" QHD Monitor, 165Hz, refreshDue Tue Jun 9 15:00, finishes Fri Jun 5 13:00On timeOrder detailsClear
Tracing WO-1002185 × Mini PC, 8-core, 16GB / 512GBDue Fri Jun 12 17:00, finishes Tue Jun 9 22:00On timeOrder detailsClear
Tracing WO-10069365 × Mesh Wi-Fi Kit, 3-packDue Mon Jun 15 17:00, finishes Thu Jun 11 13:20On timeOrder detailsClear
Tracing WO-10141430 × 4K Conference CameraDue Tue Jun 9 17:00, finishes Mon Jun 8 06:35On timeOrder detailsClear
Tracing WO-1022695 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 16:10On timeOrder detailsClear
Tracing WO-10279500 × Ergonomic Mouse, wirelessDue Wed Jun 10 17:00, finishes Mon Jun 8 22:15On timeOrder detailsClear
Tracing WO-10289355 × 27" 4K Monitor, USB-CDue Fri Jun 12 17:00, finishes Wed Jun 10 20:40On timeOrder detailsClear
Tracing WO-1001145 × All-in-One 24", 16GB / 512GBDue Wed Jun 10 17:00, finishes Mon Jun 8 14:40On timeOrder detailsClear
Tracing WO-10054130 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jun 10 17:00, finishes Mon Jun 8 15:55On timeOrder detailsClear
Tracing WO-10150380 × 2TB Portable SSDDue Wed Jun 10 17:00, finishes Mon Jun 8 17:50On timeOrder detailsClear
Tracing WO-10260540 × 22" Touch Monitor, grayDue Wed Jun 17 17:00, finishes Wed Jun 17 08:55On timeOrder detailsClear
Tracing WO-10298140 × USB-C Dock, 100W, dual displayDue Tue Jun 9 17:00, finishes Mon Jun 8 12:55On timeOrder detailsClear
Tracing WO-1034130 × 15" Laptop, 12-core, 32GB / 1TBDue Fri Jun 12 12:00, finishes Tue Jun 9 18:10On timeOrder detailsClear
Tracing WO-10113140 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jun 15 17:00, finishes Thu Jun 11 17:45On timeOrder detailsClear
Tracing WO-10127155 × 24-Port PoE Switch, managed, refreshDue Thu Jun 11 17:00, finishes Tue Jun 9 13:30On timeOrder detailsClear
Tracing WO-10198240 × Chromebook 11", 4GB / 64GBDue Tue Jun 16 17:00, finishes Mon Jun 15 14:20On timeOrder detailsClear
Tracing WO-10265125 × 24-Port PoE Switch, managedDue Thu Jun 11 17:00, finishes Tue Jun 9 18:25On timeOrder detailsClear
Tracing WO-10006155 × Thin Client, 4GB / 32GB, grayDue Tue Jun 16 17:00, finishes Mon Jun 15 10:35On timeOrder detailsClear
Tracing WO-10064230 × 1TB NVMe SSD, refreshDue Fri Jun 12 17:00, finishes Tue Jun 9 20:50On timeOrder detailsClear
Tracing WO-1009820 × Wi-Fi 6E RouterDue Wed Jun 10 17:00, finishes Mon Jun 8 16:30On timeOrder detailsClear
Tracing WO-10108100 × Wi-Fi 6 Access Point, ceilingDue Fri Jun 12 17:00, finishes Wed Jun 10 08:10On timeOrder detailsClear
Tracing WO-10122340 × 27" QHD Monitor, 165HzDue Wed Jun 17 17:00, finishes Tue Jun 16 11:00On timeOrder detailsClear
Tracing WO-10137505 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jun 22 17:00, finishes Mon Jun 22 15:45At riskOrder detailsClear
Tracing WO-1018425 × 8" Rugged Tablet, 64GB, grayDue Thu Jun 11 17:00, finishes Wed Jun 10 06:40On timeOrder detailsClear
Tracing WO-10204475 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jun 24 17:00, finishes Wed Jun 24 16:45At riskOrder detailsClear
Tracing WO-10294265 × 34" Ultrawide Monitor, curvedDue Mon Jun 15 17:00, finishes Fri Jun 12 19:45On timeOrder detailsClear
Tracing WO-10339120 × Thin Client, 4GB / 32GB, grayDue Wed Jun 17 15:00, finishes Mon Jun 15 19:10On timeOrder detailsClear
Tracing WO-1016580 × 34" Ultrawide Monitor, curved, grayDue Fri Jun 12 17:00, finishes Wed Jun 10 11:15On timeOrder detailsClear
Tracing WO-10209435 × 4-Bay NAS Enclosure, refreshDue Mon Jun 15 17:00, finishes Fri Jun 12 12:25On timeOrder detailsClear
Tracing WO-10026450 × 1TB NVMe SSDDue Mon Jun 15 17:00, finishes Thu Jun 11 06:45On timeOrder detailsClear
Tracing WO-10240300 × 1TB NVMe SSD, grayDue Tue Jun 16 17:00, finishes Mon Jun 15 16:25On timeOrder detailsClear
Tracing WO-10035195 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jun 17 17:00, finishes Mon Jun 15 20:35On timeOrder detailsClear
Tracing WO-10142400 × 4K Conference CameraDue Tue Jun 16 17:00, finishes Mon Jun 15 13:45On timeOrder detailsClear
Tracing WO-10157380 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 18 17:00, finishes Wed Jun 17 07:45On timeOrder detailsClear
Tracing WO-1017090 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jun 15 17:00, finishes Fri Jun 12 08:35On timeOrder detailsClear
Tracing WO-10256345 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jun 26 17:00, finishes Fri Jun 26 12:45At riskOrder detailsClear
Tracing WO-10324400 × 22" Touch Monitor, grayDue Fri Jun 26 15:00, finishes Fri Jun 26 06:45On timeOrder detailsClear
Tracing WO-10088190 × 12" Pro Tablet, 256GBDue Fri Jun 19 17:00, finishes Wed Jun 17 13:50On timeOrder detailsClear
Tracing WO-1009390 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jun 16 17:00, finishes Fri Jun 12 22:30On timeOrder detailsClear
Tracing WO-1027450 × Wi-Fi 6E Router, grayDue Tue Jun 16 17:00, finishes Mon Jun 15 15:25On timeOrder detailsClear
Tracing WO-10045280 × 24" FHD Monitor, IPSDue Fri Jun 19 17:00, finishes Wed Jun 17 16:40On timeOrder detailsClear
Tracing WO-10103350 × 1080p Webcam with micDue Thu Jun 18 17:00, finishes Tue Jun 16 16:05On timeOrder detailsClear
Tracing WO-10132140 × 8" Rugged Tablet, 64GB, grayDue Fri Jun 19 17:00, finishes Wed Jun 17 16:20On timeOrder detailsClear
Tracing WO-10189340 × KVM Switch, 2-port 4K, grayDue Fri Jun 19 17:00, finishes Wed Jun 17 20:55On timeOrder detailsClear
Tracing WO-10221160 × 8-Port Gigabit SwitchDue Wed Jun 17 17:00, finishes Tue Jun 16 08:35On timeOrder detailsClear
Tracing WO-10231110 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jun 19 17:00, finishes Wed Jun 17 19:20On timeOrder detailsClear
Tracing WO-10311400 × 27" 4K Monitor, USB-C, refreshDue Thu Jun 25 15:00, finishes Wed Jun 24 08:25On timeOrder detailsClear
Tracing WO-1034230 × Chromebook 11", 4GB / 64GB, refreshDue Fri Jun 19 12:00, finishes Wed Jun 17 09:50On timeOrder detailsClear
Tracing WO-10059110 × 128GB USB Flash Drive, 10-packDue Thu Jun 18 17:00, finishes Tue Jun 16 13:15On timeOrder detailsClear
Tracing WO-1007820 × Thin Client, 4GB / 32GB, grayDue Wed Jun 17 17:00, finishes Mon Jun 15 21:25On timeOrder detailsClear
Tracing WO-1017975 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jun 17 17:00, finishes Mon Jun 15 22:45On timeOrder detailsClear
Tracing WO-10303260 × Mechanical Keyboard, TKLDue Wed Jun 17 17:00, finishes Tue Jun 16 11:10On timeOrder detailsClear
Tracing WO-10308300 × All-in-One 24", 16GB / 512GB, grayDue Tue Jun 30 15:00, finishes Tue Jun 30 18:00LateOrder detailsClear
Tracing WO-10016120 × 4-Bay NAS Enclosure, grayDue Thu Jun 18 17:00, finishes Tue Jun 16 12:15On timeOrder detailsClear
Tracing WO-10284100 × USB-C Travel Hub, 7-in-1Due Thu Jun 18 17:00, finishes Wed Jun 17 10:45On timeOrder detailsClear
Tracing WO-10041630 × KVM Switch, 2-port 4KDue Thu Jun 25 17:00, finishes Mon Jun 22 22:30On timeOrder detailsClear
Tracing WO-10158365 × 27" QHD Monitor, 165Hz, refreshDue Thu Jun 25 17:00, finishes Tue Jun 23 15:50On timeOrder detailsClear
Tracing WO-10246410 × Thunderbolt Dock, 4 portsDue Wed Jun 24 17:00, finishes Mon Jun 22 13:10On timeOrder detailsClear
Tracing WO-10250125 × 4K Conference Camera, grayDue Thu Jun 18 17:00, finishes Wed Jun 17 09:00On timeOrder detailsClear
Tracing WO-10318400 × 34" Ultrawide Monitor, curved, grayDue Thu Jul 2 15:00, finishes Thu Jul 2 17:50LateOrder detailsClear
Tracing WO-10319120 × All-in-One 24", 16GB / 512GB, grayDue Mon Jun 22 15:00, finishes Thu Jun 18 07:25On timeOrder detailsClear
Tracing WO-10050215 × 27" 4K Monitor, USB-C, refreshDue Mon Jun 22 17:00, finishes Thu Jun 18 11:05On timeOrder detailsClear
Tracing WO-10194125 × 10" Tablet, 64GBDue Mon Jun 22 17:00, finishes Thu Jun 18 09:25On timeOrder detailsClear
Tracing WO-10210485 × 4-Bay NAS Enclosure, refreshDue Mon Jun 22 17:00, finishes Fri Jun 19 09:40On timeOrder detailsClear
Tracing WO-1027040 × Thin Client, 4GB / 32GBDue Mon Jun 22 17:00, finishes Thu Jun 18 12:30On timeOrder detailsClear
Tracing WO-10002370 × Ergonomic Mouse, wireless, grayDue Mon Jun 22 17:00, finishes Wed Jun 17 22:35On timeOrder detailsClear
Tracing WO-10031200 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jun 23 17:00, finishes Thu Jun 18 15:40On timeOrder detailsClear
Tracing WO-10084165 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jun 25 17:00, finishes Mon Jun 22 21:35On timeOrder detailsClear
Tracing WO-1011890 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jun 23 17:00, finishes Fri Jun 19 07:05On timeOrder detailsClear
Tracing WO-10143410 × 4K Conference CameraDue Tue Jun 23 17:00, finishes Thu Jun 18 19:25On timeOrder detailsClear
Tracing WO-10199305 × Chromebook 11", 4GB / 64GBDue Tue Jun 30 17:00, finishes Mon Jun 29 14:50On timeOrder detailsClear
Tracing WO-10217180 × USB-C Travel Hub, 7-in-1, grayDue Tue Jun 23 17:00, finishes Fri Jun 19 09:20On timeOrder detailsClear
Tracing WO-10280590 × Ergonomic Mouse, wirelessDue Wed Jun 24 17:00, finishes Mon Jun 22 17:45On timeOrder detailsClear
Tracing WO-10307150 × 27" QHD Monitor, 165HzDue Wed Jun 24 15:00, finishes Fri Jun 19 20:55On timeOrder detailsClear
Tracing WO-1001240 × All-in-One 24", 16GB / 512GBDue Wed Jun 24 17:00, finishes Fri Jun 19 14:25On timeOrder detailsClear
Tracing WO-10074430 × 4-Bay NAS EnclosureDue Tue Jun 23 17:00, finishes Thu Jun 18 14:05On timeOrder detailsClear
Tracing WO-10175110 × 8" Rugged Tablet, 64GBDue Tue Jun 23 17:00, finishes Mon Jun 22 07:55On timeOrder detailsClear
Tracing WO-1023635 × Tower Workstation, 32GB / 1TBDue Mon Jun 22 17:00, finishes Thu Jun 18 11:05On timeOrder detailsClear
Tracing WO-10290385 × 27" 4K Monitor, USB-CDue Fri Jun 26 17:00, finishes Thu Jun 25 11:50On timeOrder detailsClear
Tracing WO-10055140 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jun 24 17:00, finishes Fri Jun 19 13:15On timeOrder detailsClear
Tracing WO-10070320 × Mesh Wi-Fi Kit, 3-packDue Mon Jun 29 17:00, finishes Fri Jun 26 15:25On timeOrder detailsClear
Tracing WO-10151330 × 2TB Portable SSDDue Wed Jun 24 17:00, finishes Fri Jun 19 21:30On timeOrder detailsClear
Tracing WO-1022795 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jun 25 17:00, finishes Tue Jun 23 08:10On timeOrder detailsClear
Tracing WO-10266125 × 24-Port PoE Switch, managedDue Thu Jun 25 17:00, finishes Tue Jun 23 10:55On timeOrder detailsClear
Tracing WO-10332400 × Thin Client, 4GB / 32GB, grayDue Fri Jul 10 15:00, finishes Wed Jul 15 09:30LateOrder detailsClear
Tracing WO-1034330 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Fri Jun 26 12:00, finishes Tue Jun 23 11:45On timeOrder detailsClear
Tracing WO-10065300 × 1TB NVMe SSD, refreshDue Fri Jun 26 17:00, finishes Tue Jun 23 18:30On timeOrder detailsClear
Tracing WO-10128160 × 24-Port PoE Switch, managed, refreshDue Thu Jun 25 17:00, finishes Tue Jun 23 07:30On timeOrder detailsClear
Tracing WO-10299110 × USB-C Dock, 100W, dual displayDue Tue Jun 23 17:00, finishes Thu Jun 18 17:00On timeOrder detailsClear
Tracing WO-1002275 × Mini PC, 8-core, 16GB / 512GBDue Fri Jun 26 17:00, finishes Tue Jun 23 15:45On timeOrder detailsClear
Tracing WO-10036195 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jul 1 17:00, finishes Mon Jun 29 18:25On timeOrder detailsClear
Tracing WO-1009920 × Wi-Fi 6E RouterDue Wed Jun 24 17:00, finishes Wed Jun 24 06:35On timeOrder detailsClear
Tracing WO-1018520 × 8" Rugged Tablet, 64GB, grayDue Thu Jun 25 17:00, finishes Wed Jun 24 09:00On timeOrder detailsClear
Tracing WO-10261465 × 22" Touch Monitor, grayDue Wed Jul 1 17:00, finishes Wed Jul 1 06:55On timeOrder detailsClear
Tracing WO-10325250 × Mini PC, 8-core, 16GB / 512GBDue Mon Jul 6 15:00, finishes Wed Jul 8 07:45LateOrder detailsClear
Tracing WO-10027410 × 1TB NVMe SSDDue Mon Jun 29 17:00, finishes Fri Jun 26 09:35On timeOrder detailsClear
Tracing WO-10114125 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jun 29 17:00, finishes Fri Jun 26 16:40On timeOrder detailsClear
Tracing WO-10138450 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jul 6 17:00, finishes Mon Jul 6 16:20At riskOrder detailsClear
Tracing WO-10159415 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 2 17:00, finishes Thu Jul 2 09:30At riskOrder detailsClear
Tracing WO-1016680 × 34" Ultrawide Monitor, curved, grayDue Fri Jun 26 17:00, finishes Tue Jun 23 23:00On timeOrder detailsClear
Tracing WO-10295235 × 34" Ultrawide Monitor, curvedDue Mon Jun 29 17:00, finishes Mon Jun 29 07:05On timeOrder detailsClear
Tracing WO-1010990 × Wi-Fi 6 Access Point, ceilingDue Fri Jun 26 17:00, finishes Tue Jun 23 20:25On timeOrder detailsClear
Tracing WO-10123350 × 27" QHD Monitor, 165HzDue Wed Jul 1 17:00, finishes Tue Jun 30 11:00On timeOrder detailsClear
Tracing WO-10190360 × KVM Switch, 2-port 4K, grayDue Thu Jul 2 17:00, finishes Thu Jul 2 14:20At riskOrder detailsClear
Tracing WO-10205415 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jul 8 17:00, finishes Fri Jul 10 11:00LateOrder detailsClear
Tracing WO-10211420 × 4-Bay NAS Enclosure, refreshDue Mon Jun 29 17:00, finishes Fri Jun 26 20:25On timeOrder detailsClear
Tracing WO-10257340 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jul 10 17:00, finishes Mon Jul 13 13:25LateOrder detailsClear
Tracing WO-10314400 × 22" Touch MonitorDue Mon Jul 6 15:00, finishes Tue Jul 7 08:05LateOrder detailsClear
Tracing WO-10007120 × Thin Client, 4GB / 32GB, grayDue Tue Jun 30 17:00, finishes Mon Jun 29 08:10On timeOrder detailsClear
Tracing WO-10046290 × 24" FHD Monitor, IPSDue Thu Jul 2 17:00, finishes Wed Jul 1 08:05On timeOrder detailsClear
Tracing WO-10089190 × 12" Pro Tablet, 256GBDue Thu Jul 2 17:00, finishes Wed Jul 1 11:40On timeOrder detailsClear
Tracing WO-1017170 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jun 29 17:00, finishes Fri Jun 26 17:30On timeOrder detailsClear
Tracing WO-10241280 × 1TB NVMe SSD, grayDue Tue Jun 30 17:00, finishes Mon Jun 29 14:55On timeOrder detailsClear
Tracing WO-1033540 × Tower Workstation, 32GB / 1TBDue Mon Jun 29 15:00, finishes Wed Jun 24 11:00On timeOrder detailsClear
Tracing WO-1009485 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jun 30 17:00, finishes Mon Jun 29 09:00On timeOrder detailsClear
Tracing WO-10222150 × 8-Port Gigabit SwitchDue Wed Jul 1 17:00, finishes Mon Jun 29 20:15On timeOrder detailsClear
Tracing WO-1027560 × Wi-Fi 6E Router, grayDue Tue Jun 30 17:00, finishes Mon Jun 29 16:10On timeOrder detailsClear
Tracing WO-10133145 × 8" Rugged Tablet, 64GB, grayDue Thu Jul 2 17:00, finishes Wed Jul 1 17:05On timeOrder detailsClear
Tracing WO-10144480 × 4K Conference CameraDue Tue Jun 30 17:00, finishes Mon Jun 29 12:25On timeOrder detailsClear
Tracing WO-10232100 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Thu Jul 2 17:00, finishes Thu Jul 2 16:20At riskOrder detailsClear
Tracing WO-10304320 × Mechanical Keyboard, TKLDue Wed Jul 1 17:00, finishes Mon Jun 29 22:45On timeOrder detailsClear
Tracing WO-1033740 × 24" FHD Monitor, IPSDue Tue Jun 30 15:00, finishes Fri Jun 26 21:35On timeOrder detailsClear
Tracing WO-10060110 × 128GB USB Flash Drive, 10-packDue Thu Jul 2 17:00, finishes Tue Jun 30 09:10On timeOrder detailsClear
Tracing WO-1007920 × Thin Client, 4GB / 32GB, grayDue Wed Jul 1 17:00, finishes Mon Jun 29 17:00On timeOrder detailsClear
Tracing WO-10285120 × USB-C Travel Hub, 7-in-1Due Thu Jul 2 17:00, finishes Thu Jul 2 17:55LateOrder detailsClear
Tracing WO-10338150 × All-in-One 24", 16GB / 512GB, grayDue Wed Jul 8 15:00, finishes Wed Jul 8 13:45At riskOrder detailsClear
Tracing WO-10017135 × 4-Bay NAS Enclosure, grayDue Thu Jul 2 17:00, finishes Tue Jun 30 08:10On timeOrder detailsClear
Tracing WO-10104340 × 1080p Webcam with micDue Thu Jul 2 17:00, finishes Wed Jul 1 14:25On timeOrder detailsClear
Tracing WO-1018065 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jul 1 17:00, finishes Tue Jun 30 07:00On timeOrder detailsClear
Tracing WO-10212460 × 4-Bay NAS Enclosure, refreshDue Mon Jul 6 17:00, finishes Mon Jul 6 11:20At riskOrder detailsClear
Tracing WO-10032245 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jul 7 17:00, finishes Tue Jul 7 06:05On timeOrder detailsClear
Tracing WO-10051220 × 27" 4K Monitor, USB-C, refreshDue Mon Jul 6 17:00, finishes Mon Jul 6 07:35On timeOrder detailsClear
Tracing WO-10075530 × 4-Bay NAS EnclosureDue Tue Jul 7 17:00, finishes Tue Jul 7 09:35At riskOrder detailsClear
Tracing WO-10160380 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 9 17:00, finishes Fri Jul 10 19:30LateOrder detailsClear
Tracing WO-10251105 × 4K Conference Camera, grayDue Thu Jul 2 17:00, finishes Thu Jul 2 19:30LateOrder detailsClear
Tracing WO-10333150 × 10" Tablet, 64GBDue Wed Jul 8 15:00, finishes Thu Jul 9 18:30LateOrder detailsClear
Tracing WO-10003480 × Ergonomic Mouse, wireless, grayDue Mon Jul 6 17:00, finishes Thu Jul 2 22:30On timeOrder detailsClear
Tracing WO-10139470 × 14" Laptop, 8-core, 16GB / 512GBDue Mon Jul 20 17:00, finishes Mon Jul 20 17:35LateOrder detailsClear
Tracing WO-10195115 × 10" Tablet, 64GBDue Mon Jul 6 17:00, finishes Mon Jul 6 07:20On timeOrder detailsClear
Tracing WO-10262525 × 22" Touch Monitor, grayDue Wed Jul 15 17:00, finishes Thu Jul 16 21:00LateOrder detailsClear
Tracing WO-1031380 × 22" Touch Monitor, grayDue Tue Jul 7 15:00, finishes Mon Jul 6 19:15On timeOrder detailsClear
Tracing WO-10331300 × 22" Touch MonitorDue Wed Jul 8 15:00, finishes Thu Jul 9 16:15LateOrder detailsClear
Tracing WO-10042550 × KVM Switch, 2-port 4KDue Thu Jul 9 17:00, finishes Thu Jul 9 16:05At riskOrder detailsClear
Tracing WO-1017695 × 8" Rugged Tablet, 64GBDue Tue Jul 7 17:00, finishes Tue Jul 7 09:50At riskOrder detailsClear
Tracing WO-10247415 × Thunderbolt Dock, 4 portsDue Wed Jul 8 17:00, finishes Thu Jul 9 06:15LateOrder detailsClear
Tracing WO-10291365 × 27" 4K Monitor, USB-CDue Fri Jul 10 17:00, finishes Wed Jul 8 11:35On timeOrder detailsClear
Tracing WO-1002390 × Mini PC, 8-core, 16GB / 512GBDue Fri Jul 10 17:00, finishes Fri Jul 10 20:00LateOrder detailsClear
Tracing WO-1011990 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jul 7 17:00, finishes Mon Jul 6 15:55On timeOrder detailsClear
Tracing WO-10145490 × 4K Conference CameraDue Tue Jul 7 17:00, finishes Tue Jul 7 13:55At riskOrder detailsClear
Tracing WO-10206495 × 14" Rugged Laptop, 16GB / 256GBDue Wed Jul 22 17:00, finishes Fri Jul 24 08:35LateOrder detailsClear
Tracing WO-10218210 × USB-C Travel Hub, 7-in-1, grayDue Tue Jul 7 17:00, finishes Tue Jul 7 12:55At riskOrder detailsClear
Tracing WO-1023730 × Tower Workstation, 32GB / 1TBDue Mon Jul 6 17:00, finishes Mon Jul 6 12:25At riskOrder detailsClear
Tracing WO-1027135 × Thin Client, 4GB / 32GBDue Mon Jul 6 17:00, finishes Mon Jul 6 13:40At riskOrder detailsClear
Tracing WO-10309120 × 27" 4K Monitor, USB-C, refreshDue Wed Jul 8 15:00, finishes Tue Jul 7 17:30On timeOrder detailsClear
Tracing WO-10312120 × 27" 4K Monitor, USB-C, refreshDue Thu Jul 9 15:00, finishes Fri Jul 10 10:55LateOrder detailsClear
Tracing WO-10085150 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jul 9 17:00, finishes Thu Jul 9 22:05LateOrder detailsClear
Tracing WO-10152350 × 2TB Portable SSDDue Wed Jul 8 17:00, finishes Wed Jul 8 17:55LateOrder detailsClear
Tracing WO-10267115 × 24-Port PoE Switch, managedDue Thu Jul 9 17:00, finishes Thu Jul 9 18:25LateOrder detailsClear
Tracing WO-10281490 × Ergonomic Mouse, wirelessDue Wed Jul 8 17:00, finishes Thu Jul 9 10:35LateOrder detailsClear
Tracing WO-10300130 × USB-C Dock, 100W, dual displayDue Tue Jul 7 17:00, finishes Tue Jul 7 14:20At riskOrder detailsClear
Tracing WO-1001345 × All-in-One 24", 16GB / 512GBDue Wed Jul 8 17:00, finishes Wed Jul 8 15:20At riskOrder detailsClear
Tracing WO-10056130 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jul 8 17:00, finishes Tue Jul 7 15:35On timeOrder detailsClear
Tracing WO-1010020 × Wi-Fi 6E RouterDue Wed Jul 8 17:00, finishes Tue Jul 7 14:30On timeOrder detailsClear
Tracing WO-10129160 × 24-Port PoE Switch, managed, refreshDue Thu Jul 9 17:00, finishes Fri Jul 10 13:55LateOrder detailsClear
Tracing WO-1022890 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jul 9 17:00, finishes Fri Jul 10 16:30LateOrder detailsClear
Tracing WO-10028530 × 1TB NVMe SSDDue Mon Jul 13 17:00, finishes Mon Jul 13 08:40On timeOrder detailsClear
Tracing WO-10037170 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jul 15 17:00, finishes Wed Jul 15 08:10On timeOrder detailsClear
Tracing WO-10066270 × 1TB NVMe SSD, refreshDue Fri Jul 10 17:00, finishes Fri Jul 10 22:00LateOrder detailsClear
Tracing WO-10110100 × Wi-Fi 6 Access Point, ceilingDue Fri Jul 10 17:00, finishes Fri Jul 10 07:10On timeOrder detailsClear
Tracing WO-1016780 × 34" Ultrawide Monitor, curved, grayDue Fri Jul 10 17:00, finishes Wed Jul 8 18:25On timeOrder detailsClear
Tracing WO-1018620 × 8" Rugged Tablet, 64GB, grayDue Thu Jul 9 17:00, finishes Thu Jul 9 22:40LateOrder detailsClear
Tracing WO-10296265 × 34" Ultrawide Monitor, curvedDue Mon Jul 13 17:00, finishes Tue Jul 14 09:05LateOrder detailsClear
Tracing WO-10071320 × Mesh Wi-Fi Kit, 3-packDue Mon Jul 13 17:00, finishes Mon Jul 13 14:30At riskOrder detailsClear
Tracing WO-10115135 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jul 13 17:00, finishes Mon Jul 13 19:15LateOrder detailsClear
Tracing WO-10200235 × Chromebook 11", 4GB / 64GBDue Tue Jul 14 17:00, finishes Tue Jul 14 21:25LateOrder detailsClear
Tracing WO-10213460 × 4-Bay NAS Enclosure, refreshDue Mon Jul 13 17:00, finishes Mon Jul 13 19:45LateOrder detailsClear
Tracing WO-1009585 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jul 14 17:00, finishes Tue Jul 14 08:30On timeOrder detailsClear
Tracing WO-10124315 × 27" QHD Monitor, 165HzDue Wed Jul 15 17:00, finishes Wed Jul 15 16:25At riskOrder detailsClear
Tracing WO-10161425 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 16 17:00, finishes Thu Jul 16 15:35At riskOrder detailsClear
Tracing WO-10340300 × 27" QHD Monitor, 165Hz, refreshDue Fri Jul 17 15:00, finishes Fri Jul 17 14:50At riskOrder detailsClear
Tracing WO-10008120 × Thin Client, 4GB / 32GB, grayDue Tue Jul 14 17:00, finishes Tue Jul 14 06:35On timeOrder detailsClear
Tracing WO-10047280 × 24" FHD Monitor, IPSDue Fri Jul 17 17:00, finishes Fri Jul 17 10:45At riskOrder detailsClear
Tracing WO-10090190 × 12" Pro Tablet, 256GBDue Fri Jul 17 17:00, finishes Fri Jul 17 13:50At riskOrder detailsClear
Tracing WO-1017280 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jul 13 17:00, finishes Mon Jul 13 15:45At riskOrder detailsClear
Tracing WO-10191350 × KVM Switch, 2-port 4K, grayDue Fri Jul 17 17:00, finishes Fri Jul 17 19:30LateOrder detailsClear
Tracing WO-10223150 × 8-Port Gigabit SwitchDue Wed Jul 15 17:00, finishes Wed Jul 15 12:45At riskOrder detailsClear
Tracing WO-10242270 × 1TB NVMe SSD, grayDue Tue Jul 14 17:00, finishes Tue Jul 14 12:00At riskOrder detailsClear
Tracing WO-1027650 × Wi-Fi 6E Router, grayDue Tue Jul 14 17:00, finishes Tue Jul 14 13:05At riskOrder detailsClear
Tracing WO-10146380 × 4K Conference CameraDue Tue Jul 14 17:00, finishes Tue Jul 14 12:00At riskOrder detailsClear
Tracing WO-1023390 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jul 17 17:00, finishes Fri Jul 17 21:20LateOrder detailsClear
Tracing WO-10018140 × 4-Bay NAS Enclosure, grayDue Thu Jul 16 17:00, finishes Wed Jul 15 14:00On timeOrder detailsClear
Tracing WO-1008020 × Thin Client, 4GB / 32GB, grayDue Wed Jul 15 17:00, finishes Tue Jul 14 13:55On timeOrder detailsClear
Tracing WO-10134135 × 8" Rugged Tablet, 64GB, grayDue Fri Jul 17 17:00, finishes Fri Jul 17 21:25LateOrder detailsClear
Tracing WO-1018170 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jul 15 17:00, finishes Tue Jul 14 13:15On timeOrder detailsClear
Tracing WO-10258305 × 13" Ultralight Laptop, 16GB / 512GBDue Fri Jul 24 17:00, finishes Mon Jul 27 12:40LateOrder detailsClear
Tracing WO-10286120 × USB-C Travel Hub, 7-in-1Due Thu Jul 16 17:00, finishes Wed Jul 15 20:55On timeOrder detailsClear
Tracing WO-10305260 × Mechanical Keyboard, TKLDue Wed Jul 15 17:00, finishes Tue Jul 14 15:20On timeOrder detailsClear
Tracing WO-10316400 × 34" Ultrawide Monitor, curvedDue Fri Jul 24 15:00, finishes Wed Jul 22 09:30On timeOrder detailsClear
Tracing WO-10043600 × KVM Switch, 2-port 4KDue Thu Jul 23 17:00, finishes Wed Jul 22 13:20On timeOrder detailsClear
Tracing WO-10052215 × 27" 4K Monitor, USB-C, refreshDue Mon Jul 20 17:00, finishes Mon Jul 20 09:25At riskOrder detailsClear
Tracing WO-10061100 × 128GB USB Flash Drive, 10-packDue Thu Jul 16 17:00, finishes Wed Jul 15 14:55On timeOrder detailsClear
Tracing WO-10105350 × 1080p Webcam with micDue Thu Jul 16 17:00, finishes Wed Jul 15 17:45On timeOrder detailsClear
Tracing WO-10162395 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 23 17:00, finishes Thu Jul 23 13:00At riskOrder detailsClear
Tracing WO-10248485 × Thunderbolt Dock, 4 portsDue Wed Jul 22 17:00, finishes Tue Jul 21 21:20On timeOrder detailsClear
Tracing WO-10252115 × 4K Conference Camera, grayDue Thu Jul 16 17:00, finishes Wed Jul 15 19:20On timeOrder detailsClear
Tracing WO-1012090 × 14" Laptop, 8-core, 16GB / 512GB, grayDue Tue Jul 21 17:00, finishes Tue Jul 21 06:40On timeOrder detailsClear
Tracing WO-10004490 × Ergonomic Mouse, wireless, grayDue Mon Jul 20 17:00, finishes Mon Jul 20 08:30On timeOrder detailsClear
Tracing WO-10033245 × Mesh Wi-Fi Kit, 3-pack, refreshDue Tue Jul 21 17:00, finishes Mon Jul 20 21:25On timeOrder detailsClear
Tracing WO-10076445 × 4-Bay NAS EnclosureDue Tue Jul 21 17:00, finishes Mon Jul 20 21:05On timeOrder detailsClear
Tracing WO-10214395 × 4-Bay NAS Enclosure, refreshDue Mon Jul 20 17:00, finishes Mon Jul 20 12:55At riskOrder detailsClear
Tracing WO-10292350 × 27" 4K Monitor, USB-CDue Fri Jul 24 17:00, finishes Fri Jul 24 14:00At riskOrder detailsClear
Tracing WO-10196105 × 10" Tablet, 64GBDue Mon Jul 20 17:00, finishes Fri Jul 17 17:55On timeOrder detailsClear
Tracing WO-10219180 × USB-C Travel Hub, 7-in-1, grayDue Tue Jul 21 17:00, finishes Tue Jul 21 09:50At riskOrder detailsClear
Tracing WO-1032280 × 12" Pro Tablet, 256GBDue Mon Jul 20 15:00, finishes Fri Jul 17 15:05On timeOrder detailsClear
Tracing WO-1002480 × Mini PC, 8-core, 16GB / 512GBDue Fri Jul 24 17:00, finishes Thu Jul 23 15:35On timeOrder detailsClear
Tracing WO-10147450 × 4K Conference CameraDue Tue Jul 21 17:00, finishes Tue Jul 21 07:35On timeOrder detailsClear
Tracing WO-10153370 × 2TB Portable SSDDue Wed Jul 22 17:00, finishes Tue Jul 21 15:15On timeOrder detailsClear
Tracing WO-1017790 × 8" Rugged Tablet, 64GBDue Tue Jul 21 17:00, finishes Tue Jul 21 08:20On timeOrder detailsClear
Tracing WO-1023830 × Tower Workstation, 32GB / 1TBDue Mon Jul 20 17:00, finishes Mon Jul 20 14:00At riskOrder detailsClear
Tracing WO-10263595 × 22" Touch Monitor, grayDue Wed Jul 29 17:00, finishes Wed Jul 29 20:55LateOrder detailsClear
Tracing WO-1027240 × Thin Client, 4GB / 32GBDue Mon Jul 20 17:00, finishes Mon Jul 20 15:25At riskOrder detailsClear
Tracing WO-10301150 × USB-C Dock, 100W, dual displayDue Tue Jul 21 17:00, finishes Tue Jul 21 10:00At riskOrder detailsClear
Tracing WO-10321150 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jul 27 15:00, finishes Mon Jul 27 21:10LateOrder detailsClear
Tracing WO-1032780 × 15" Laptop, 12-core, 32GB / 1TBDue Tue Jul 21 15:00, finishes Mon Jul 20 17:05On timeOrder detailsClear
Tracing WO-1001435 × All-in-One 24", 16GB / 512GBDue Wed Jul 22 17:00, finishes Tue Jul 21 11:45On timeOrder detailsClear
Tracing WO-10057150 × 128GB USB Flash Drive, 10-pack, refreshDue Wed Jul 22 17:00, finishes Tue Jul 21 11:55On timeOrder detailsClear
Tracing WO-10072325 × Mesh Wi-Fi Kit, 3-packDue Mon Jul 27 17:00, finishes Mon Jul 27 18:05LateOrder detailsClear
Tracing WO-10086145 × Chromebook 11", 4GB / 64GB, refreshDue Thu Jul 23 17:00, finishes Wed Jul 22 13:00On timeOrder detailsClear
Tracing WO-10130185 × 24-Port PoE Switch, managed, refreshDue Thu Jul 23 17:00, finishes Wed Jul 22 16:40On timeOrder detailsClear
Tracing WO-1022990 × Mini PC, 8-core, 16GB / 512GB, refreshDue Thu Jul 23 17:00, finishes Thu Jul 23 08:35On timeOrder detailsClear
Tracing WO-10268130 × 24-Port PoE Switch, managedDue Thu Jul 23 17:00, finishes Wed Jul 22 19:55On timeOrder detailsClear
Tracing WO-10282500 × Ergonomic Mouse, wirelessDue Wed Jul 22 17:00, finishes Tue Jul 21 15:40On timeOrder detailsClear
Tracing WO-1033640 × 15" Laptop, 12-core, 32GB / 1TBDue Thu Jul 23 15:00, finishes Wed Jul 22 06:50On timeOrder detailsClear
Tracing WO-1010120 × Wi-Fi 6E RouterDue Wed Jul 22 17:00, finishes Tue Jul 21 12:30On timeOrder detailsClear
Tracing WO-10116140 × Mini PC, 8-core, 16GB / 512GB, grayDue Mon Jul 27 17:00, finishes Mon Jul 27 23:00LateOrder detailsClear
Tracing WO-10163450 × 27" QHD Monitor, 165Hz, refreshDue Thu Jul 30 17:00, finishes Thu Jul 30 16:05At riskOrder detailsClear
Tracing WO-10297255 × 34" Ultrawide Monitor, curvedDue Mon Jul 27 17:00, finishes Mon Jul 27 09:30At riskOrder detailsClear
Tracing WO-1033440 × Mini PC, 8-core, 16GB / 512GB, grayDue Thu Jul 23 15:00, finishes Tue Jul 21 22:50On timeOrder detailsClear
Tracing WO-10201285 × Chromebook 11", 4GB / 64GBDue Tue Jul 28 17:00, finishes Tue Jul 28 20:55LateOrder detailsClear
Tracing WO-10029440 × 1TB NVMe SSDDue Mon Jul 27 17:00, finishes Mon Jul 27 13:00At riskOrder detailsClear
Tracing WO-10038195 × 15" Laptop, 12-core, 32GB / 1TBDue Wed Jul 29 17:00, finishes Tue Jul 28 19:50On timeOrder detailsClear
Tracing WO-10067260 × 1TB NVMe SSD, refreshDue Fri Jul 24 17:00, finishes Thu Jul 23 18:00On timeOrder detailsClear
Tracing WO-10111100 × Wi-Fi 6 Access Point, ceilingDue Fri Jul 24 17:00, finishes Wed Jul 22 14:30On timeOrder detailsClear
Tracing WO-10125265 × 27" QHD Monitor, 165HzDue Wed Jul 29 17:00, finishes Wed Jul 29 12:00At riskOrder detailsClear
Tracing WO-1016865 × 34" Ultrawide Monitor, curved, grayDue Fri Jul 24 17:00, finishes Thu Jul 23 21:25On timeOrder detailsClear
Tracing WO-1017385 × Tower Workstation, 32GB / 1TB, refreshDue Mon Jul 27 17:00, finishes Mon Jul 27 15:30At riskOrder detailsClear
Tracing WO-1018720 × 8" Rugged Tablet, 64GB, grayDue Thu Jul 23 17:00, finishes Thu Jul 23 19:15LateOrder detailsClear
Tracing WO-10215460 × 4-Bay NAS Enclosure, refreshDue Mon Jul 27 17:00, finishes Fri Jul 24 19:55On timeOrder detailsClear
Tracing WO-10096100 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Tue Jul 28 17:00, finishes Tue Jul 28 09:55At riskOrder detailsClear
Tracing WO-1032060 × 34" Ultrawide Monitor, curved, grayDue Mon Jul 27 15:00, finishes Fri Jul 24 15:55On timeOrder detailsClear
Tracing WO-10009135 × Thin Client, 4GB / 32GB, grayDue Tue Jul 28 17:00, finishes Tue Jul 28 07:40On timeOrder detailsClear
Tracing WO-10135160 × 8" Rugged Tablet, 64GB, grayDue Fri Jul 31 17:00, finishes Fri Jul 31 06:55On timeOrder detailsClear
Tracing WO-10243290 × 1TB NVMe SSD, grayDue Tue Jul 28 17:00, finishes Tue Jul 28 12:15At riskOrder detailsClear
Tracing WO-10148405 × 4K Conference CameraDue Tue Jul 28 17:00, finishes Tue Jul 28 09:10At riskOrder detailsClear
Tracing WO-10048330 × 24" FHD Monitor, IPSDue Fri Jul 31 17:00, finishes Thu Jul 30 13:20On timeOrder detailsClear
Tracing WO-10106350 × 1080p Webcam with micDue Thu Jul 30 17:00, finishes Wed Jul 29 22:15On timeOrder detailsClear
Tracing WO-1018265 × Wi-Fi 6 Access Point, ceiling, refreshDue Wed Jul 29 17:00, finishes Tue Jul 28 14:35On timeOrder detailsClear
Tracing WO-10224130 × 8-Port Gigabit SwitchDue Wed Jul 29 17:00, finishes Wed Jul 29 14:25At riskOrder detailsClear
Tracing WO-1027760 × Wi-Fi 6E Router, grayDue Tue Jul 28 17:00, finishes Tue Jul 28 13:30At riskOrder detailsClear
Tracing WO-10306280 × Mechanical Keyboard, TKLDue Wed Jul 29 17:00, finishes Wed Jul 29 16:40At riskOrder detailsClear
Tracing WO-1008120 × Thin Client, 4GB / 32GB, grayDue Wed Jul 29 17:00, finishes Mon Jul 27 16:15On timeOrder detailsClear
Tracing WO-10091160 × 12" Pro Tablet, 256GBDue Fri Jul 31 17:00, finishes Thu Jul 30 15:55On timeOrder detailsClear
Tracing WO-10192290 × KVM Switch, 2-port 4K, grayDue Fri Jul 31 17:00, finishes Thu Jul 30 19:55On timeOrder detailsClear
Tracing WO-10019140 × 4-Bay NAS Enclosure, grayDue Thu Jul 30 17:00, finishes Wed Jul 29 17:55On timeOrder detailsClear
Tracing WO-10062110 × 128GB USB Flash Drive, 10-packDue Thu Jul 30 17:00, finishes Wed Jul 29 19:25On timeOrder detailsClear
Tracing WO-10234100 × 15" Laptop, 12-core, 32GB / 1TB, grayDue Fri Jul 31 17:00, finishes Thu Jul 30 18:05On timeOrder detailsClear
Tracing WO-10253115 × 4K Conference Camera, grayDue Thu Jul 30 17:00, finishes Tue Jul 28 21:00On timeOrder detailsClear
Tracing WO-10287110 × USB-C Travel Hub, 7-in-1Due Thu Jul 30 17:00, finishes Wed Jul 29 22:25On timeOrder detailsClear
Tracing WO-10344240 × 14" Laptop, 8-core, 16GB / 512GB, refreshDue Fri Jun 12 15:00, finishes Thu Jun 11 10:40On timeOrder detailsClear
4K Conference Camera
- State
- Finished
- Quantity
- 430
- Start
- Mon Jun 1 05:00
- End
- Mon Jun 1 20:20
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 34 h to spare
8" Rugged Tablet, 64GB
- State
- Finished
- Quantity
- 85
- Start
- Mon Jun 1 20:20
- End
- Tue Jun 2 09:50
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 33 h to spare
Ergonomic Mouse, wireless
- State
- Finished
- Quantity
- 500
- Start
- Tue Jun 2 09:50
- End
- Wed Jun 3 05:05
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Running now
- Quantity
- 149 left of 155
- Start
- Wed Jun 3 05:05
- End
- Thu Jun 4 01:50
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.4 d to spare
24-Port PoE Switch, managed
- State
- Held in the frozen window
- Quantity
- 125
- Start
- Thu Jun 4 03:25
- End
- Thu Jun 4 17:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 47 h to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 365
- Start
- Fri Jun 5 06:00
- End
- Mon Jun 8 19:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.2 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 8 19:50
- End
- Tue Jun 9 08:40
- Changeover
- 90 min
- For
- ACCOUNT 3915, Standard
- Order due
- Wed Jun 17 15:00
- Order
- On time, 44 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 260
- Start
- Tue Jun 9 08:40
- End
- Tue Jun 9 19:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 540
- Start
- Wed Jun 10 00:15
- End
- Thu Jun 11 18:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 8.1 h to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 370
- Start
- Fri Jun 12 06:00
- End
- Fri Jun 12 21:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.8 d to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 15 01:55
- End
- Mon Jun 15 08:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.1 d to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 15 10:30
- End
- Mon Jun 15 16:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 485
- Start
- Wed Jun 17 10:30
- End
- Thu Jun 18 07:50
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 3.3 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Thu Jun 18 07:50
- End
- Thu Jun 18 12:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 32 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 75
- Start
- Thu Jun 18 12:15
- End
- Thu Jun 18 23:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 3.1 d to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 345
- Start
- Fri Jun 19 03:05
- End
- Tue Jun 23 04:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- At risk, 4.2 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 60
- Start
- Tue Jun 23 06:00
- End
- Tue Jun 23 14:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 25 h to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Tue Jun 23 15:20
- End
- Tue Jun 23 17:25
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 10 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Wed Jun 24 14:00
- End
- Thu Jun 25 06:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 45 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 65
- Start
- Mon Jun 29 06:00
- End
- Mon Jun 29 12:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 34 h to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 245
- Start
- Mon Jun 29 12:45
- End
- Tue Jun 30 12:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 11 h to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 210
- Start
- Tue Jun 30 12:05
- End
- Wed Jul 1 11:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 4.1 h to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 490
- Start
- Wed Jul 1 11:25
- End
- Thu Jul 2 05:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 18 h late
2TB Portable SSD
- State
- Planned
- Quantity
- 350
- Start
- Thu Jul 2 06:00
- End
- Thu Jul 2 22:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 0.9 h late
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Sun Jul 5 23:25
- End
- Mon Jul 6 23:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 26 h late
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 100
- Start
- Mon Jul 6 23:35
- End
- Tue Jul 7 08:40
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 9.8 h to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 80
- Start
- Tue Jul 7 08:40
- End
- Tue Jul 7 18:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 1.2 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Wed Jul 8 02:20
- End
- Wed Jul 8 14:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 10 h to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Wed Jul 8 14:55
- End
- Thu Jul 9 04:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 8.5 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Thu Jul 9 06:00
- End
- Thu Jul 9 20:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 23 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 115
- Start
- Thu Jul 9 20:10
- End
- Fri Jul 10 01:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 22 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 270
- Start
- Fri Jul 10 06:00
- End
- Fri Jul 10 21:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 5.0 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 260
- Start
- Sun Jul 12 23:00
- End
- Mon Jul 13 08:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 26 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Finished
- Quantity
- 470
- Start
- Thu May 28 18:05
- End
- Tue Jun 2 01:15
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- At risk, 2.0 h to spare
Wi-Fi 6E Router
- State
- Finished
- Quantity
- 20
- Start
- Tue Jun 2 06:00
- End
- Tue Jun 2 09:25
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Running now
- Quantity
- 371 left of 475
- Start
- Tue Jun 2 09:25
- End
- Fri Jun 5 10:00
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- At risk, 2.0 h to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 350
- Start
- Sun Jun 7 23:00
- End
- Wed Jun 10 00:15
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- Late, 2.7 d late
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Wed Jun 10 02:20
- End
- Wed Jun 10 09:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 100
- Start
- Wed Jun 10 09:00
- End
- Wed Jun 10 21:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 30 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Wed Jun 10 21:10
- End
- Thu Jun 11 16:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 215
- Start
- Thu Jun 11 16:35
- End
- Fri Jun 12 07:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 12 07:20
- End
- Fri Jun 12 22:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.4 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 35
- Start
- Sun Jun 14 23:00
- End
- Mon Jun 15 04:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 15 10:30
- End
- Mon Jun 15 15:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Mon Jun 15 16:50
- End
- Thu Jun 18 13:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- At risk, 0.2 h to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 300
- Start
- Thu Jun 18 13:45
- End
- Fri Jun 19 06:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Fri Jun 19 06:35
- End
- Mon Jun 22 16:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.1 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 480
- Start
- Mon Jun 22 20:30
- End
- Tue Jun 23 14:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 29 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 320
- Start
- Tue Jun 23 17:25
- End
- Wed Jun 24 04:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 42 h to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 400
- Start
- Wed Jun 24 04:55
- End
- Thu Jun 25 14:50
- Changeover
- 90 min
- For
- ACCOUNT 3915, Standard
- Order due
- Thu Jul 2 15:00
- Order
- Late, 2.8 h late
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 100
- Start
- Thu Jun 25 14:50
- End
- Fri Jun 26 04:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 0.7 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 145
- Start
- Fri Jun 26 10:30
- End
- Mon Jun 29 06:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 24 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Mon Jun 29 06:30
- End
- Tue Jun 30 04:40
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 5.7 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 150
- Start
- Tue Jun 30 06:00
- End
- Tue Jun 30 23:35
- Changeover
- 90 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- At risk, 1.2 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 300
- Start
- Tue Jun 30 23:35
- End
- Wed Jul 1 19:20
- Changeover
- 90 min
- For
- ACCOUNT 6021, Standard
- Order due
- Wed Jul 8 15:00
- Order
- Late, 25 h late
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Thu Jul 2 05:50
- End
- Sun Jul 5 23:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 21 h late
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 400
- Start
- Mon Jul 6 06:00
- End
- Tue Jul 7 22:35
- Changeover
- 90 min
- For
- ACCOUNT 5190, Silver
- Order due
- Fri Jul 10 15:00
- Order
- Late, 4.8 d late
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Wed Jul 8 00:40
- End
- Wed Jul 8 21:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 16 h late
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 170
- Start
- Wed Jul 8 21:05
- End
- Thu Jul 9 19:40
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 8.8 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 120
- Start
- Thu Jul 9 19:40
- End
- Fri Jul 10 08:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 20 h to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Finished
- Quantity
- 245
- Start
- Fri May 29 19:55
- End
- Mon Jun 1 14:50
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 4.0 d to spare
All-in-One 24", 16GB / 512GB
- State
- Finished
- Quantity
- 45
- Start
- Mon Jun 1 20:00
- End
- Tue Jun 2 03:10
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.1 d to spare
2TB Portable SSD
- State
- Finished
- Quantity
- 380
- Start
- Tue Jun 2 03:10
- End
- Tue Jun 2 20:15
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 47 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Finished
- Quantity
- 25
- Start
- Tue Jun 2 20:15
- End
- Wed Jun 3 00:45
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 34 h to spare
24-Port PoE Switch, managed, refresh
- State
- Running now
- Quantity
- 123 left of 155
- Start
- Wed Jun 3 02:20
- End
- Wed Jun 3 19:25
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.1 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Held in the frozen window
- Quantity
- 95
- Start
- Wed Jun 3 23:10
- End
- Thu Jun 4 09:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.0 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 355
- Start
- Thu Jun 4 15:15
- End
- Fri Jun 5 13:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 44 h to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Fri Jun 5 13:45
- End
- Mon Jun 8 08:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 2.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Mon Jun 8 08:55
- End
- Mon Jun 8 23:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 3.8 d to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Mon Jun 8 23:15
- End
- Wed Jun 10 08:15
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 280
- Start
- Wed Jun 10 08:15
- End
- Thu Jun 11 03:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 110
- Start
- Thu Jun 11 05:30
- End
- Thu Jun 11 20:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 46 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 125
- Start
- Thu Jun 11 20:45
- End
- Fri Jun 12 11:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.3 d to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 430
- Start
- Sun Jun 14 23:00
- End
- Mon Jun 15 17:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 110
- Start
- Mon Jun 15 17:05
- End
- Tue Jun 16 07:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 33 h to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 590
- Start
- Tue Jun 16 07:55
- End
- Wed Jun 17 06:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 47 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 165
- Start
- Wed Jun 17 06:05
- End
- Thu Jun 18 05:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 365
- Start
- Thu Jun 18 05:45
- End
- Fri Jun 19 04:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.0 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 40
- Start
- Fri Jun 19 06:00
- End
- Fri Jun 19 11:55
- Changeover
- 90 min
- For
- ACCOUNT 2800, Silver
- Order due
- Mon Jun 29 15:00
- Order
- On time, 5.2 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 420
- Start
- Mon Jun 22 00:00
- End
- Mon Jun 22 20:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 2.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Mon Jun 22 20:30
- End
- Tue Jun 23 09:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 32 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Tue Jun 23 09:25
- End
- Wed Jun 24 10:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 47 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 290
- Start
- Wed Jun 24 10:40
- End
- Thu Jun 25 06:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 33 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 415
- Start
- Thu Jun 25 06:00
- End
- Fri Jun 26 07:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 7.5 h to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 480
- Start
- Fri Jun 26 07:05
- End
- Mon Jun 29 03:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 3.8 d to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 115
- Start
- Mon Jun 29 03:00
- End
- Mon Jun 29 16:40
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.7 h to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Mon Jun 29 16:40
- End
- Tue Jun 30 08:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 25 h to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 95
- Start
- Tue Jun 30 08:00
- End
- Tue Jun 30 21:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.2 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 150
- Start
- Wed Jul 1 03:55
- End
- Wed Jul 1 20:50
- Changeover
- 45 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- Late, 28 h late
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 415
- Start
- Wed Jul 1 20:50
- End
- Tue Jul 7 07:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 42 h late
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 340
- Start
- Tue Jul 7 07:45
- End
- Thu Jul 9 07:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 2.9 d late
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Thu Jul 9 07:45
- End
- Fri Jul 10 01:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- At risk, 4.2 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 300
- Start
- Fri Jul 10 01:10
- End
- Fri Jul 10 20:35
- Changeover
- 90 min
- For
- ACCOUNT 7463, Gold
- Order due
- Fri Jul 17 15:00
- Order
- At risk, 0.2 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 135
- Start
- Fri Jul 10 20:35
- End
- Mon Jul 13 15:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 17 17:00
- Order
- Late, 4.4 h late
14" Laptop, 8-core, 16GB / 512GB
- State
- Finished
- Quantity
- 40
- Start
- Fri May 29 19:45
- End
- Mon Jun 1 02:05
- For
- ACCOUNT 8321, Platinum
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Finished
- Quantity
- 100
- Start
- Mon Jun 1 02:05
- End
- Mon Jun 1 18:15
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.8 d to spare
KVM Switch, 2-port 4K
- State
- Running now
- Quantity
- 276 left of 540
- Start
- Tue Jun 2 05:30
- End
- Thu Jun 4 07:00
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.3 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 240
- Start
- Thu Jun 4 07:00
- End
- Fri Jun 5 17:30
- Changeover
- 90 min
- For
- ACCOUNT 4340, Platinum
- Order due
- Fri Jun 12 15:00
- Order
- On time, 28 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 155
- Start
- Mon Jun 8 03:25
- End
- Mon Jun 8 20:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 30 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 240
- Start
- Mon Jun 8 20:10
- End
- Wed Jun 10 02:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Wed Jun 10 02:25
- End
- Wed Jun 10 16:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.0 d to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Wed Jun 10 16:20
- End
- Thu Jun 11 15:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.1 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 505
- Start
- Thu Jun 11 15:50
- End
- Tue Jun 16 08:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- At risk, 1.2 h to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 630
- Start
- Tue Jun 16 08:50
- End
- Thu Jun 18 20:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 410
- Start
- Fri Jun 19 06:00
- End
- Mon Jun 22 00:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.3 d to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 22 06:00
- End
- Mon Jun 22 09:55
- Changeover
- 90 min
- For
- ACCOUNT 2800, Silver
- Order due
- Tue Jun 30 15:00
- Order
- On time, 3.7 d to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 70
- Start
- Mon Jun 22 14:00
- End
- Mon Jun 22 22:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 305
- Start
- Tue Jun 23 04:30
- End
- Wed Jun 24 19:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Wed Jun 24 19:05
- End
- Thu Jun 25 18:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 29 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 400
- Start
- Thu Jun 25 18:05
- End
- Fri Jun 26 19:45
- Changeover
- 90 min
- For
- ACCOUNT 3327, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 17 h late
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 450
- Start
- Fri Jun 26 19:45
- End
- Wed Jul 1 05:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 0.7 h to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 365
- Start
- Wed Jul 1 05:55
- End
- Thu Jul 2 05:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 2.2 d to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 150
- Start
- Thu Jul 2 05:15
- End
- Mon Jul 6 01:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.1 h late
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Mon Jul 6 01:45
- End
- Mon Jul 6 05:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.7 h late
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 115
- Start
- Mon Jul 6 05:55
- End
- Mon Jul 6 19:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 1.4 h late
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 270
- Start
- Mon Jul 6 19:30
- End
- Tue Jul 7 11:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 5.0 h late
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Tue Jul 7 19:00
- End
- Wed Jul 8 15:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.8 h late
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 235
- Start
- Wed Jul 8 15:55
- End
- Thu Jul 9 22:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- Late, 4.4 h late
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 280
- Start
- Fri Jul 10 01:05
- End
- Fri Jul 10 20:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 17 17:00
- Order
- At risk, 6.2 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Fri Jul 10 20:05
- End
- Mon Jul 13 19:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 17 17:00
- Order
- At risk, 3.2 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Finished
- Quantity
- 150
- Start
- Fri May 29 18:15
- End
- Mon Jun 1 05:00
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.1 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Finished
- Quantity
- 230
- Start
- Mon Jun 1 06:00
- End
- Tue Jun 2 13:35
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 30 h to spare
Wi-Fi 6 Access Point, ceiling
- State
- Finished
- Quantity
- 100
- Start
- Tue Jun 2 13:35
- End
- Tue Jun 2 22:55
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.4 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Held in the frozen window
- Quantity
- 390
- Start
- Thu Jun 4 12:00
- End
- Fri Jun 5 12:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 48 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 435
- Start
- Fri Jun 5 12:25
- End
- Mon Jun 8 09:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.2 d to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 300
- Start
- Mon Jun 8 09:00
- End
- Tue Jun 9 00:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 25 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Tue Jun 9 00:55
- End
- Tue Jun 9 04:40
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 75
- Start
- Tue Jun 9 06:00
- End
- Tue Jun 9 14:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 42 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Wed Jun 10 05:20
- End
- Thu Jun 11 05:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 33 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Thu Jun 11 06:00
- End
- Thu Jun 11 20:35
- Changeover
- 90 min
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 22 15:00
- Order
- On time, 4.3 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 200
- Start
- Fri Jun 12 06:00
- End
- Mon Jun 15 01:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 110
- Start
- Mon Jun 15 06:00
- End
- Mon Jun 15 17:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.0 d to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 330
- Start
- Mon Jun 15 17:05
- End
- Tue Jun 16 08:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 4.8 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 400
- Start
- Tue Jun 16 08:30
- End
- Wed Jun 17 11:25
- Changeover
- 90 min
- For
- ACCOUNT 7463, Gold
- Order due
- Thu Jun 25 15:00
- Order
- On time, 31 h to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Thu Jun 18 00:55
- End
- Thu Jun 18 19:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 90
- Start
- Thu Jun 18 19:45
- End
- Fri Jun 19 03:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 385
- Start
- Fri Jun 19 04:50
- End
- Mon Jun 22 05:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 29 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 300
- Start
- Mon Jun 22 05:15
- End
- Tue Jun 23 14:35
- Changeover
- 90 min
- For
- ACCOUNT 5190, Silver
- Order due
- Tue Jun 30 15:00
- Order
- Late, 3.0 h late
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 465
- Start
- Tue Jun 23 14:35
- End
- Thu Jun 25 03:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 10 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 105
- Start
- Thu Jun 25 06:00
- End
- Thu Jun 25 11:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 2.5 h late
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 120
- Start
- Thu Jun 25 11:50
- End
- Fri Jun 26 01:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 0.9 h late
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 250
- Start
- Fri Jun 26 01:25
- End
- Mon Jun 29 11:10
- Changeover
- 90 min
- For
- ACCOUNT 7702, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 41 h late
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 35
- Start
- Mon Jun 29 11:10
- End
- Mon Jun 29 15:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 3.3 h to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 45
- Start
- Mon Jun 29 15:50
- End
- Mon Jun 29 22:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- At risk, 1.7 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 490
- Start
- Tue Jun 30 04:40
- End
- Tue Jun 30 23:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 3.1 h to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 130
- Start
- Wed Jul 1 06:00
- End
- Wed Jul 1 13:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 25 h to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 550
- Start
- Wed Jul 1 19:20
- End
- Mon Jul 6 21:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- At risk, 0.9 h to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 530
- Start
- Tue Jul 7 03:50
- End
- Wed Jul 8 02:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- On time, 8.3 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 380
- Start
- Wed Jul 8 06:00
- End
- Wed Jul 8 20:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 5.0 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 525
- Start
- Thu Jul 9 06:00
- End
- Fri Jul 10 22:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- Late, 28 h late
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 490
- Start
- Fri Jul 10 22:55
- End
- Mon Jul 13 19:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 20 17:00
- Order
- On time, 8.5 h to spare
4-Bay NAS Enclosure
- State
- Finished
- Quantity
- 415
- Start
- Fri May 29 20:10
- End
- Mon Jun 1 08:30
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.9 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Finished
- Quantity
- 130
- Start
- Mon Jun 1 20:45
- End
- Tue Jun 2 03:30
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
Thunderbolt Dock, 4 ports
- State
- Running now
- Quantity
- 191 left of 415
- Start
- Tue Jun 2 03:30
- End
- Thu Jun 4 01:55
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 230
- Start
- Thu Jun 4 01:55
- End
- Thu Jun 4 15:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 450
- Start
- Thu Jun 4 15:35
- End
- Fri Jun 5 09:15
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.4 d to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Fri Jun 5 09:15
- End
- Mon Jun 8 03:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.0 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 400
- Start
- Mon Jun 8 06:00
- End
- Mon Jun 8 21:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 340
- Start
- Tue Jun 9 04:40
- End
- Wed Jun 10 05:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 125
- Start
- Wed Jun 10 06:00
- End
- Wed Jun 10 12:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 32 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 340
- Start
- Thu Jun 11 03:30
- End
- Fri Jun 12 16:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 44 h to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 180
- Start
- Mon Jun 15 00:10
- End
- Mon Jun 15 19:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.3 d to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 410
- Start
- Tue Jun 16 05:25
- End
- Thu Jun 18 00:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 2.2 d to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 400
- Start
- Thu Jun 18 06:00
- End
- Fri Jun 19 13:30
- Changeover
- 90 min
- For
- ACCOUNT 6021, Standard
- Order due
- Fri Jun 26 15:00
- Order
- On time, 8.2 h to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 235
- Start
- Mon Jun 22 03:05
- End
- Mon Jun 22 20:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 9.9 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 280
- Start
- Tue Jun 23 06:00
- End
- Tue Jun 23 21:40
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 135
- Start
- Wed Jun 24 06:00
- End
- Wed Jun 24 12:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.4 d to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Wed Jun 24 12:45
- End
- Wed Jun 24 18:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.3 d to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 360
- Start
- Thu Jun 25 06:00
- End
- Fri Jun 26 21:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 2.7 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 220
- Start
- Sun Jun 28 23:00
- End
- Mon Jun 29 14:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.4 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Tue Jun 30 23:05
- End
- Wed Jul 1 06:35
- Changeover
- 10 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jul 8 15:00
- Order
- On time, 22 h to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 415
- Start
- Wed Jul 1 06:35
- End
- Mon Jul 6 02:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 13 h late
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Mon Jul 6 06:00
- End
- Mon Jul 6 13:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 3.9 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 90
- Start
- Mon Jul 6 14:35
- End
- Tue Jul 7 03:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 3.0 h late
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Tue Jul 7 06:00
- End
- Wed Jul 8 15:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 2.5 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 315
- Start
- Wed Jul 8 15:45
- End
- Thu Jul 9 14:50
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- At risk, 0.6 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Fri Jul 10 14:00
- End
- Fri Jul 10 17:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 27 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 350
- Start
- Fri Jul 10 17:30
- End
- Tue Jul 14 08:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jul 17 17:00
- Order
- Late, 2.5 h late
USB-C Dock, 100W, dual display
- State
- Finished
- Quantity
- 140
- Start
- Mon Jun 1 06:00
- End
- Mon Jun 1 22:05
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 28 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Finished
- Quantity
- 30
- Start
- Tue Jun 2 06:00
- End
- Tue Jun 2 12:10
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 12 12:00
- Order
- On time, 2.7 d to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 85
- Start
- Wed Jun 3 06:00
- End
- Wed Jun 3 20:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Thu Jun 4 06:00
- End
- Thu Jun 4 15:15
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.2 d to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 5 06:00
- End
- Fri Jun 5 18:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.4 d to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Mon Jun 8 06:00
- End
- Mon Jun 8 13:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 26 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 160
- Start
- Tue Jun 9 06:00
- End
- Wed Jun 10 02:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 32 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Wed Jun 10 06:00
- End
- Wed Jun 10 12:30
- Changeover
- 90 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 19 12:00
- Order
- On time, 2.1 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 410
- Start
- Fri Jun 12 06:00
- End
- Mon Jun 15 00:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.9 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 140
- Start
- Mon Jun 15 04:10
- End
- Mon Jun 15 13:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.2 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 150
- Start
- Mon Jun 15 15:45
- End
- Tue Jun 16 05:25
- Changeover
- 90 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jun 24 15:00
- Order
- On time, 4.8 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Tue Jun 16 06:00
- End
- Tue Jun 16 19:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Wed Jun 17 06:00
- End
- Wed Jun 17 22:40
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.3 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Thu Jun 18 06:00
- End
- Thu Jun 18 12:40
- Changeover
- 90 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 26 12:00
- Order
- On time, 3.0 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Thu Jun 18 23:25
- End
- Fri Jun 19 08:10
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.8 d to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 125
- Start
- Fri Jun 19 08:10
- End
- Mon Jun 22 03:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Mon Jun 22 06:00
- End
- Mon Jun 22 09:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 2.0 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 22 16:55
- End
- Tue Jun 23 06:50
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 33 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 350
- Start
- Tue Jun 23 06:50
- End
- Wed Jun 24 12:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 30 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 340
- Start
- Thu Jun 25 03:15
- End
- Thu Jun 25 18:30
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 27 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 80
- Start
- Fri Jun 26 04:25
- End
- Fri Jun 26 13:10
- Changeover
- 90 min
- For
- ACCOUNT 3327, Gold
- Order due
- Tue Jul 7 15:00
- Order
- On time, 20 h to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Mon Jun 29 06:00
- End
- Mon Jun 29 11:25
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 4.6 h to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 530
- Start
- Mon Jun 29 11:25
- End
- Tue Jun 30 13:05
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.4 h to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 130
- Start
- Tue Jun 30 13:05
- End
- Wed Jul 1 03:55
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 2.7 h to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Wed Jul 1 06:00
- End
- Wed Jul 1 09:45
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 26 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Wed Jul 1 09:45
- End
- Wed Jul 1 20:35
- Changeover
- 90 min
- For
- ACCOUNT 9148, Standard
- Order due
- Thu Jul 9 15:00
- Order
- Late, 20 h late
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Thu Jul 2 06:00
- End
- Thu Jul 2 14:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 47 h to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Mon Jul 6 02:20
- End
- Mon Jul 6 14:35
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 24 h late
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 135
- Start
- Tue Jul 7 06:00
- End
- Wed Jul 8 00:40
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.2 h late
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 100
- Start
- Wed Jul 8 06:00
- End
- Wed Jul 8 13:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 26 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 70
- Start
- Thu Jul 9 04:20
- End
- Thu Jul 9 13:20
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 28 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 425
- Start
- Thu Jul 9 14:50
- End
- Fri Jul 10 22:00
- Changeover
- 90 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- At risk, 1.4 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Finished
- Quantity
- 40
- Start
- Mon Jun 1 06:00
- End
- Mon Jun 1 08:20
- For
- ACCOUNT 8321, Platinum
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.9 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Finished
- Quantity
- 470
- Start
- Mon Jun 1 13:30
- End
- Tue Jun 2 14:35
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- At risk, 2.0 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Finished
- Quantity
- 30
- Start
- Tue Jun 2 15:10
- End
- Tue Jun 2 16:55
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 12 12:00
- Order
- On time, 2.7 d to spare
2TB Portable SSD
- State
- Finished
- Quantity
- 380
- Start
- Tue Jun 2 19:00
- End
- Tue Jun 2 22:10
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 47 h to spare
Ergonomic Mouse, wireless
- State
- Running now
- Quantity
- 146 left of 500
- Start
- Tue Jun 2 22:10
- End
- Wed Jun 3 07:00
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Thu Jun 4 08:15
- End
- Fri Jun 5 13:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- At risk, 2.0 h to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 230
- Start
- Fri Jun 5 13:05
- End
- Fri Jun 5 15:40
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 355
- Start
- Fri Jun 5 15:40
- End
- Mon Jun 8 08:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 44 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 435
- Start
- Mon Jun 8 08:10
- End
- Mon Jun 8 12:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.2 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Mon Jun 8 12:20
- End
- Mon Jun 8 20:55
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 2.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Mon Jun 8 20:55
- End
- Tue Jun 9 08:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 3.8 d to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Tue Jun 9 08:25
- End
- Tue Jun 9 10:55
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 26 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 260
- Start
- Tue Jun 9 17:40
- End
- Tue Jun 9 20:40
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 240
- Start
- Tue Jun 9 22:00
- End
- Wed Jun 10 14:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 160
- Start
- Wed Jun 10 14:45
- End
- Wed Jun 10 19:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 32 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Wed Jun 10 19:45
- End
- Wed Jun 10 23:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.0 d to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 100
- Start
- Thu Jun 11 06:00
- End
- Thu Jun 11 08:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 30 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Thu Jun 11 08:20
- End
- Thu Jun 11 10:50
- Changeover
- 50 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 19 12:00
- Order
- On time, 2.1 d to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 280
- Start
- Thu Jun 11 10:50
- End
- Thu Jun 11 18:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 110
- Start
- Thu Jun 11 18:25
- End
- Fri Jun 12 06:40
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 46 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 340
- Start
- Fri Jun 12 12:00
- End
- Fri Jun 12 18:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 44 h to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 370
- Start
- Fri Jun 12 19:05
- End
- Fri Jun 12 22:40
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.8 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 35
- Start
- Mon Jun 15 06:00
- End
- Mon Jun 15 08:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Mon Jun 15 08:25
- End
- Mon Jun 15 13:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.4 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 140
- Start
- Mon Jun 15 13:45
- End
- Mon Jun 15 15:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.2 d to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 15 16:15
- End
- Mon Jun 15 17:40
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 430
- Start
- Mon Jun 15 17:40
- End
- Mon Jun 15 21:05
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 110
- Start
- Tue Jun 16 06:00
- End
- Tue Jun 16 11:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 33 h to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 330
- Start
- Tue Jun 16 11:15
- End
- Tue Jun 16 14:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 4.8 d to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 590
- Start
- Wed Jun 17 06:00
- End
- Wed Jun 17 11:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 47 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 485
- Start
- Wed Jun 17 22:35
- End
- Thu Jun 18 09:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 3.3 d to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 630
- Start
- Thu Jun 18 11:30
- End
- Thu Jun 18 21:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Thu Jun 18 21:10
- End
- Thu Jun 18 22:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 32 h to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Thu Jun 18 22:45
- End
- Fri Jun 19 09:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.3 d to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 75
- Start
- Fri Jun 19 09:25
- End
- Fri Jun 19 15:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 3.1 d to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 19 15:00
- End
- Fri Jun 19 17:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 385
- Start
- Fri Jun 19 17:25
- End
- Mon Jun 22 11:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 29 h to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Mon Jun 22 11:05
- End
- Mon Jun 22 19:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.1 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 420
- Start
- Mon Jun 22 19:25
- End
- Mon Jun 22 23:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 2.9 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 235
- Start
- Tue Jun 23 06:00
- End
- Tue Jun 23 13:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 9.9 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 480
- Start
- Tue Jun 23 13:45
- End
- Tue Jun 23 17:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 29 h to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Tue Jun 23 17:55
- End
- Tue Jun 23 19:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 10 h to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Tue Jun 23 19:45
- End
- Wed Jun 24 07:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 32 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Wed Jun 24 07:00
- End
- Wed Jun 24 15:10
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 47 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 320
- Start
- Wed Jun 24 15:10
- End
- Wed Jun 24 18:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 42 h to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 135
- Start
- Wed Jun 24 18:05
- End
- Wed Jun 24 20:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.4 d to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Wed Jun 24 20:50
- End
- Thu Jun 25 08:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 45 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 290
- Start
- Thu Jun 25 08:05
- End
- Thu Jun 25 16:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 33 h to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Thu Jun 25 16:25
- End
- Thu Jun 25 18:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.3 d to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Thu Jun 25 18:05
- End
- Fri Jun 26 08:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 29 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 105
- Start
- Fri Jun 26 08:50
- End
- Fri Jun 26 11:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 2.5 h late
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 145
- Start
- Fri Jun 26 19:35
- End
- Mon Jun 29 08:55
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 24 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 65
- Start
- Mon Jun 29 12:05
- End
- Mon Jun 29 14:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 34 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 220
- Start
- Mon Jun 29 14:15
- End
- Mon Jun 29 20:55
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.4 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Mon Jun 29 20:55
- End
- Tue Jun 30 07:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 5.7 h to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 530
- Start
- Tue Jun 30 10:30
- End
- Tue Jun 30 13:55
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.4 h to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Tue Jun 30 13:55
- End
- Tue Jun 30 19:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 25 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 490
- Start
- Tue Jun 30 19:15
- End
- Wed Jul 1 06:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 3.1 h to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 95
- Start
- Wed Jul 1 06:25
- End
- Wed Jul 1 11:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.2 h to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 130
- Start
- Wed Jul 1 11:05
- End
- Wed Jul 1 13:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 2.7 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 300
- Start
- Wed Jul 1 13:35
- End
- Wed Jul 1 21:55
- Changeover
- 50 min
- For
- ACCOUNT 6021, Standard
- Order due
- Wed Jul 8 15:00
- Order
- Late, 25 h late
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Wed Jul 1 21:55
- End
- Thu Jul 2 08:30
- Changeover
- 40 min
- For
- ACCOUNT 9148, Standard
- Order due
- Thu Jul 9 15:00
- Order
- Late, 20 h late
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 415
- Start
- Mon Jul 6 06:00
- End
- Mon Jul 6 13:40
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 13 h late
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Mon Jul 6 13:40
- End
- Mon Jul 6 18:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 21 h late
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Mon Jul 6 18:15
- End
- Tue Jul 7 11:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 26 h late
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 115
- Start
- Tue Jul 7 11:50
- End
- Tue Jul 7 15:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 1.4 h late
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 270
- Start
- Tue Jul 7 15:15
- End
- Tue Jul 7 18:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 5.0 h late
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 135
- Start
- Tue Jul 7 18:10
- End
- Wed Jul 8 09:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.2 h late
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Wed Jul 8 09:20
- End
- Wed Jul 8 11:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 3.9 h to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 340
- Start
- Wed Jul 8 12:20
- End
- Thu Jul 9 10:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 2.9 d late
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Thu Jul 9 10:50
- End
- Thu Jul 9 14:55
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 8.5 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 235
- Start
- Thu Jul 9 14:55
- End
- Fri Jul 10 07:20
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- Late, 4.4 h late
4K Conference Camera, gray
- State
- Planned
- Quantity
- 115
- Start
- Fri Jul 10 07:20
- End
- Fri Jul 10 09:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 22 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 270
- Start
- Fri Jul 10 19:20
- End
- Fri Jul 10 22:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 5.0 h to spare
Ergonomic Mouse, wireless, gray
- State
- Finished
- Quantity
- 390
- Start
- Fri May 29 19:50
- End
- Mon Jun 1 06:45
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.3 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Finished
- Quantity
- 150
- Start
- Mon Jun 1 08:55
- End
- Mon Jun 1 13:45
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.1 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Finished
- Quantity
- 100
- Start
- Mon Jun 1 15:25
- End
- Mon Jun 1 21:15
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.8 d to spare
USB-C Dock, 100W, dual display
- State
- Finished
- Quantity
- 140
- Start
- Tue Jun 2 11:05
- End
- Tue Jun 2 13:45
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 28 h to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Finished
- Quantity
- 130
- Start
- Tue Jun 2 13:45
- End
- Tue Jun 2 15:30
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
Wi-Fi 6E Router
- State
- Finished
- Quantity
- 20
- Start
- Tue Jun 2 15:30
- End
- Tue Jun 2 16:50
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
8" Rugged Tablet, 64GB
- State
- Finished
- Quantity
- 85
- Start
- Tue Jun 2 16:50
- End
- Tue Jun 2 21:10
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 33 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Held in the frozen window
- Quantity
- 25
- Start
- Wed Jun 3 06:00
- End
- Wed Jun 3 07:20
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 34 h to spare
Thunderbolt Dock, 4 ports
- State
- Held in the frozen window
- Quantity
- 415
- Start
- Wed Jun 3 16:10
- End
- Thu Jun 4 06:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 155
- Start
- Thu Jun 4 06:50
- End
- Thu Jun 4 14:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.4 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Thu Jun 4 14:10
- End
- Thu Jun 4 19:40
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.0 d to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 85
- Start
- Thu Jun 4 19:40
- End
- Fri Jun 5 07:50
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 240
- Start
- Fri Jun 5 09:35
- End
- Fri Jun 5 21:05
- Changeover
- 50 min
- For
- ACCOUNT 4340, Platinum
- Order due
- Fri Jun 12 15:00
- Order
- On time, 28 h to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Fri Jun 5 21:05
- End
- Mon Jun 8 12:30
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.0 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 155
- Start
- Mon Jun 8 15:05
- End
- Mon Jun 8 22:50
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 30 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 400
- Start
- Mon Jun 8 22:50
- End
- Tue Jun 9 09:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Tue Jun 9 09:20
- End
- Tue Jun 9 11:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 75
- Start
- Tue Jun 9 13:30
- End
- Tue Jun 9 15:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 42 h to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 350
- Start
- Tue Jun 9 16:10
- End
- Wed Jun 10 15:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- Late, 2.7 d late
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Wed Jun 10 15:05
- End
- Wed Jun 10 16:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 125
- Start
- Wed Jun 10 16:45
- End
- Wed Jun 10 18:30
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 32 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 540
- Start
- Wed Jun 10 19:55
- End
- Thu Jun 11 20:30
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 8.1 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Thu Jun 11 20:30
- End
- Fri Jun 12 09:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 125
- Start
- Fri Jun 12 09:35
- End
- Fri Jun 12 14:40
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.3 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 505
- Start
- Mon Jun 15 08:15
- End
- Tue Jun 16 12:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- At risk, 1.2 h to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Tue Jun 16 16:15
- End
- Tue Jun 16 21:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Wed Jun 17 12:00
- End
- Thu Jun 18 16:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- At risk, 0.2 h to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Thu Jun 18 16:20
- End
- Thu Jun 18 21:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Thu Jun 18 21:25
- End
- Fri Jun 19 06:30
- Changeover
- 50 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 26 12:00
- Order
- On time, 3.0 d to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 400
- Start
- Fri Jun 19 06:30
- End
- Fri Jun 19 20:00
- Changeover
- 50 min
- For
- ACCOUNT 6021, Standard
- Order due
- Fri Jun 26 15:00
- Order
- On time, 8.2 h to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 40
- Start
- Fri Jun 19 20:00
- End
- Fri Jun 19 22:40
- Changeover
- 50 min
- For
- ACCOUNT 2800, Silver
- Order due
- Mon Jun 29 15:00
- Order
- On time, 5.2 d to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 410
- Start
- Fri Jun 19 22:40
- End
- Mon Jun 22 08:55
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.3 d to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 22 10:30
- End
- Mon Jun 22 12:20
- Changeover
- 50 min
- For
- ACCOUNT 2800, Silver
- Order due
- Tue Jun 30 15:00
- Order
- On time, 3.7 d to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 345
- Start
- Mon Jun 22 16:20
- End
- Tue Jun 23 15:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- At risk, 4.2 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Tue Jun 23 15:05
- End
- Tue Jun 23 21:30
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 33 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 280
- Start
- Tue Jun 23 21:30
- End
- Wed Jun 24 07:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 305
- Start
- Wed Jun 24 09:20
- End
- Wed Jun 24 21:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 400
- Start
- Wed Jun 24 21:50
- End
- Thu Jun 25 19:10
- Changeover
- 50 min
- For
- ACCOUNT 3915, Standard
- Order due
- Thu Jul 2 15:00
- Order
- Late, 2.8 h late
1080p Webcam with mic
- State
- Planned
- Quantity
- 340
- Start
- Thu Jun 25 19:10
- End
- Thu Jun 25 22:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 27 h to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 100
- Start
- Fri Jun 26 06:00
- End
- Fri Jun 26 10:55
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 0.7 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 120
- Start
- Fri Jun 26 10:55
- End
- Fri Jun 26 13:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 0.9 h late
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 80
- Start
- Fri Jun 26 13:35
- End
- Fri Jun 26 16:45
- Changeover
- 50 min
- For
- ACCOUNT 3327, Gold
- Order due
- Tue Jul 7 15:00
- Order
- On time, 20 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 360
- Start
- Mon Jun 29 06:00
- End
- Mon Jun 29 12:55
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 2.7 h to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 480
- Start
- Mon Jun 29 12:55
- End
- Mon Jun 29 17:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 3.8 d to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 115
- Start
- Mon Jun 29 17:15
- End
- Mon Jun 29 22:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.7 h to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 35
- Start
- Mon Jun 29 22:10
- End
- Tue Jun 30 07:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 3.3 h to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 245
- Start
- Tue Jun 30 07:50
- End
- Tue Jun 30 14:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 11 h to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 45
- Start
- Tue Jun 30 14:05
- End
- Tue Jun 30 17:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- At risk, 1.7 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 150
- Start
- Wed Jul 1 06:25
- End
- Wed Jul 1 14:15
- Changeover
- 25 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- At risk, 1.2 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Wed Jul 1 14:15
- End
- Wed Jul 1 18:00
- Changeover
- 50 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jul 8 15:00
- Order
- On time, 22 h to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 365
- Start
- Wed Jul 1 18:00
- End
- Thu Jul 2 10:50
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 2.2 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Thu Jul 2 13:25
- End
- Thu Jul 2 16:35
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 47 h to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 350
- Start
- Mon Jul 6 06:00
- End
- Mon Jul 6 09:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 0.9 h late
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 415
- Start
- Mon Jul 6 09:00
- End
- Tue Jul 7 11:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 42 h late
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 400
- Start
- Tue Jul 7 11:25
- End
- Wed Jul 8 13:10
- Changeover
- 50 min
- For
- ACCOUNT 5190, Silver
- Order due
- Fri Jul 10 15:00
- Order
- Late, 4.8 d late
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 80
- Start
- Wed Jul 8 13:10
- End
- Wed Jul 8 17:30
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 1.2 h to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Wed Jul 8 17:30
- End
- Thu Jul 9 09:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 16 h late
4K Conference Camera
- State
- Planned
- Quantity
- 380
- Start
- Thu Jul 9 09:05
- End
- Thu Jul 9 13:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 5.0 h to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 100
- Start
- Thu Jul 9 13:00
- End
- Thu Jul 9 14:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 26 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 170
- Start
- Thu Jul 9 14:35
- End
- Thu Jul 9 22:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 8.8 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Thu Jul 9 22:00
- End
- Fri Jul 10 08:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 23 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 120
- Start
- Fri Jul 10 08:15
- End
- Fri Jul 10 11:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 20 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Fri Jul 10 18:00
- End
- Fri Jul 10 20:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 27 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 425
- Start
- Fri Jul 10 20:15
- End
- Mon Jul 13 14:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- At risk, 1.4 h to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Finished
- Quantity
- 80
- Start
- Fri May 29 21:30
- End
- Mon Jun 1 06:35
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.3 d to spare
4-Bay NAS Enclosure
- State
- Finished
- Quantity
- 415
- Start
- Mon Jun 1 09:35
- End
- Mon Jun 1 13:15
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.9 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Finished
- Quantity
- 245
- Start
- Mon Jun 1 15:15
- End
- Mon Jun 1 21:30
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 4.0 d to spare
4K Conference Camera
- State
- Finished
- Quantity
- 430
- Start
- Mon Jun 1 21:30
- End
- Tue Jun 2 07:10
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 34 h to spare
All-in-One 24", 16GB / 512GB
- State
- Finished
- Quantity
- 45
- Start
- Tue Jun 2 13:05
- End
- Tue Jun 2 16:25
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.1 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Finished
- Quantity
- 230
- Start
- Tue Jun 2 16:25
- End
- Tue Jun 2 21:15
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 30 h to spare
Wi-Fi 6 Access Point, ceiling
- State
- Running now
- Quantity
- 9 left of 100
- Start
- Tue Jun 2 21:20
- End
- Wed Jun 3 06:10
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.4 d to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 155
- Start
- Wed Jun 3 16:50
- End
- Wed Jun 3 21:35
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.1 d to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 540
- Start
- Thu Jun 4 06:00
- End
- Thu Jun 4 14:30
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.3 d to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Thu Jun 4 15:55
- End
- Thu Jun 4 20:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 47 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 390
- Start
- Thu Jun 4 20:45
- End
- Fri Jun 5 14:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 48 h to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Fri Jun 5 14:05
- End
- Fri Jun 5 17:15
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.2 d to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 450
- Start
- Fri Jun 5 17:15
- End
- Fri Jun 5 21:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.4 d to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 5 21:15
- End
- Mon Jun 8 09:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.4 d to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 365
- Start
- Mon Jun 8 12:10
- End
- Mon Jun 8 21:30
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.2 d to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 300
- Start
- Mon Jun 8 21:30
- End
- Tue Jun 9 07:30
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 25 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Tue Jun 9 07:30
- End
- Tue Jun 9 13:55
- Changeover
- 50 min
- For
- ACCOUNT 3915, Standard
- Order due
- Wed Jun 17 15:00
- Order
- On time, 44 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Tue Jun 9 19:45
- End
- Wed Jun 10 11:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 340
- Start
- Wed Jun 10 11:05
- End
- Wed Jun 10 21:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Wed Jun 10 21:20
- End
- Thu Jun 11 14:00
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 33 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Thu Jun 11 14:00
- End
- Thu Jun 11 21:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.1 d to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Thu Jun 11 21:45
- End
- Fri Jun 12 11:40
- Changeover
- 50 min
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 22 15:00
- Order
- On time, 4.3 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 215
- Start
- Fri Jun 12 11:40
- End
- Fri Jun 12 17:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 200
- Start
- Fri Jun 12 19:10
- End
- Mon Jun 15 07:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 410
- Start
- Mon Jun 15 07:00
- End
- Mon Jun 15 11:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.9 d to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 15 11:05
- End
- Mon Jun 15 14:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.1 d to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 15 16:25
- End
- Mon Jun 15 19:40
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 180
- Start
- Mon Jun 15 19:40
- End
- Tue Jun 16 06:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.3 d to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 110
- Start
- Tue Jun 16 06:15
- End
- Tue Jun 16 08:20
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.0 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 150
- Start
- Tue Jun 16 08:20
- End
- Tue Jun 16 13:40
- Changeover
- 50 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jun 24 15:00
- Order
- On time, 4.8 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 400
- Start
- Tue Jun 16 19:20
- End
- Wed Jun 17 13:10
- Changeover
- 40 min
- For
- ACCOUNT 7463, Gold
- Order due
- Thu Jun 25 15:00
- Order
- On time, 31 h to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 410
- Start
- Thu Jun 18 06:00
- End
- Thu Jun 18 13:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 2.2 d to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 165
- Start
- Thu Jun 18 13:35
- End
- Thu Jun 18 21:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 365
- Start
- Thu Jun 18 21:20
- End
- Fri Jun 19 14:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.0 d to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 300
- Start
- Fri Jun 19 14:05
- End
- Fri Jun 19 17:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Fri Jun 19 17:15
- End
- Fri Jun 19 21:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.8 d to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 125
- Start
- Fri Jun 19 21:05
- End
- Mon Jun 22 11:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Mon Jun 22 11:45
- End
- Mon Jun 22 13:20
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 2.0 d to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 70
- Start
- Mon Jun 22 21:30
- End
- Tue Jun 23 08:20
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 300
- Start
- Tue Jun 23 08:20
- End
- Wed Jun 24 06:50
- Changeover
- 40 min
- For
- ACCOUNT 5190, Silver
- Order due
- Tue Jun 30 15:00
- Order
- Late, 3.0 h late
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 60
- Start
- Wed Jun 24 06:50
- End
- Wed Jun 24 09:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 25 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 350
- Start
- Wed Jun 24 09:05
- End
- Wed Jun 24 20:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 30 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 465
- Start
- Wed Jun 24 20:10
- End
- Thu Jun 25 17:50
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 10 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 415
- Start
- Thu Jun 25 17:50
- End
- Fri Jun 26 12:05
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 7.5 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 400
- Start
- Fri Jun 26 12:05
- End
- Fri Jun 26 22:30
- Changeover
- 40 min
- For
- ACCOUNT 3327, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 17 h late
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 250
- Start
- Fri Jun 26 22:30
- End
- Mon Jun 29 21:20
- Changeover
- 50 min
- For
- ACCOUNT 7702, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 41 h late
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Mon Jun 29 21:20
- End
- Tue Jun 30 06:20
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 4.6 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 450
- Start
- Tue Jun 30 06:55
- End
- Wed Jul 1 08:15
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 0.7 h to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 210
- Start
- Wed Jul 1 08:15
- End
- Wed Jul 1 12:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 4.1 h to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 130
- Start
- Wed Jul 1 12:55
- End
- Wed Jul 1 14:40
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 25 h to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Wed Jul 1 14:40
- End
- Wed Jul 1 16:00
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 26 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 150
- Start
- Wed Jul 1 17:25
- End
- Thu Jul 2 06:25
- Changeover
- 50 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- Late, 28 h late
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 490
- Start
- Thu Jul 2 06:25
- End
- Thu Jul 2 11:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 18 h late
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 150
- Start
- Mon Jul 6 06:00
- End
- Mon Jul 6 13:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.1 h late
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 550
- Start
- Mon Jul 6 14:10
- End
- Mon Jul 6 22:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- At risk, 0.9 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Mon Jul 6 22:45
- End
- Tue Jul 7 07:20
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.7 h late
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Tue Jul 7 07:20
- End
- Tue Jul 7 12:35
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 24 h late
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 90
- Start
- Tue Jul 7 12:35
- End
- Tue Jul 7 18:05
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 3.0 h late
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 100
- Start
- Tue Jul 7 18:05
- End
- Tue Jul 7 21:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 9.8 h to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 530
- Start
- Tue Jul 7 21:10
- End
- Wed Jul 8 08:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- On time, 8.3 h to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Wed Jul 8 09:05
- End
- Wed Jul 8 17:25
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 2.5 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Wed Jul 8 17:25
- End
- Wed Jul 8 21:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.8 h late
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Wed Jul 8 21:45
- End
- Thu Jul 9 11:10
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 10 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 315
- Start
- Thu Jul 9 11:10
- End
- Thu Jul 9 20:50
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- At risk, 0.6 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 70
- Start
- Thu Jul 9 20:50
- End
- Fri Jul 10 06:05
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 28 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Fri Jul 10 06:05
- End
- Fri Jul 10 10:40
- Changeover
- 40 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- At risk, 4.2 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 525
- Start
- Fri Jul 10 10:40
- End
- Mon Jul 13 10:45
- Changeover
- 50 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- Late, 28 h late
Ergonomic Mouse, wireless, gray
- State
- Finished
- Quantity
- 390
- Start
- Fri May 29 21:20
- End
- Mon Jun 1 07:45
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.3 d to spare
4-Bay NAS Enclosure, refresh
- State
- Finished
- Quantity
- 485
- Start
- Mon Jun 1 12:25
- End
- Mon Jun 1 21:10
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.9 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Finished
- Quantity
- 245
- Start
- Mon Jun 1 21:10
- End
- Tue Jun 2 12:20
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 4.0 d to spare
USB-C Dock, 100W, dual display
- State
- Finished
- Quantity
- 140
- Start
- Tue Jun 2 15:15
- End
- Tue Jun 2 19:45
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 28 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Finished
- Quantity
- 30
- Start
- Tue Jun 2 19:45
- End
- Tue Jun 2 22:55
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 12 12:00
- Order
- On time, 2.7 d to spare
Ergonomic Mouse, wireless
- State
- Held in the frozen window
- Quantity
- 500
- Start
- Wed Jun 3 06:40
- End
- Wed Jun 3 16:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 540
- Start
- Thu Jun 4 07:45
- End
- Thu Jun 4 22:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.3 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 435
- Start
- Mon Jun 8 09:35
- End
- Mon Jun 8 17:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.2 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 400
- Start
- Tue Jun 9 07:15
- End
- Tue Jun 9 14:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Tue Jun 9 14:55
- End
- Tue Jun 9 18:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 26 h to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 350
- Start
- Tue Jun 9 19:50
- End
- Thu Jun 11 19:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- Late, 2.7 d late
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Fri Jun 12 06:30
- End
- Fri Jun 12 19:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 370
- Start
- Fri Jun 12 20:35
- End
- Mon Jun 15 11:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.8 d to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 15 17:30
- End
- Mon Jun 15 20:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 430
- Start
- Mon Jun 15 20:35
- End
- Tue Jun 16 09:30
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 485
- Start
- Thu Jun 18 07:00
- End
- Thu Jun 18 15:05
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 3.3 d to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Thu Jun 18 19:00
- End
- Fri Jun 19 10:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Fri Jun 19 10:40
- End
- Fri Jun 19 14:05
- Changeover
- 45 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 26 12:00
- Order
- On time, 3.0 d to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 19 17:00
- End
- Fri Jun 19 21:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 410
- Start
- Mon Jun 22 07:05
- End
- Mon Jun 22 14:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.3 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 420
- Start
- Mon Jun 22 20:50
- End
- Tue Jun 23 11:15
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 2.9 d to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Tue Jun 23 20:00
- End
- Tue Jun 23 21:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 10 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 480
- Start
- Tue Jun 23 21:40
- End
- Wed Jun 24 13:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 29 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 305
- Start
- Wed Jun 24 13:35
- End
- Thu Jun 25 22:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 340
- Start
- Thu Jun 25 22:20
- End
- Fri Jun 26 12:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 27 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 105
- Start
- Fri Jun 26 12:10
- End
- Fri Jun 26 14:30
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 2.5 h late
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 120
- Start
- Fri Jun 26 14:30
- End
- Fri Jun 26 18:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 0.9 h late
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 65
- Start
- Mon Jun 29 14:15
- End
- Mon Jun 29 17:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 34 h to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 480
- Start
- Mon Jun 29 17:35
- End
- Tue Jun 30 10:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 3.8 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 245
- Start
- Tue Jun 30 10:45
- End
- Tue Jun 30 21:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 11 h to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Tue Jun 30 21:50
- End
- Wed Jul 1 14:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 25 h to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 95
- Start
- Wed Jul 1 14:55
- End
- Thu Jul 2 06:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.2 h to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 130
- Start
- Thu Jul 2 06:20
- End
- Thu Jul 2 10:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 2.7 h to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 130
- Start
- Thu Jul 2 10:35
- End
- Thu Jul 2 13:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 25 h to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Thu Jul 2 13:30
- End
- Thu Jul 2 15:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 26 h to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 490
- Start
- Thu Jul 2 15:10
- End
- Mon Jul 6 07:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 18 h late
2TB Portable SSD
- State
- Planned
- Quantity
- 350
- Start
- Mon Jul 6 07:25
- End
- Mon Jul 6 13:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 0.9 h late
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 550
- Start
- Mon Jul 6 15:55
- End
- Tue Jul 7 13:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- At risk, 0.9 h to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 115
- Start
- Tue Jul 7 14:05
- End
- Tue Jul 7 20:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 1.4 h late
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 100
- Start
- Tue Jul 7 20:35
- End
- Wed Jul 8 07:25
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 9.8 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Wed Jul 8 12:05
- End
- Wed Jul 8 14:50
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 3.9 h to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 340
- Start
- Wed Jul 8 15:30
- End
- Fri Jul 10 14:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 2.9 d late
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 70
- Start
- Fri Jul 10 14:20
- End
- Fri Jul 10 17:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 28 h to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 100
- Start
- Fri Jul 10 17:50
- End
- Fri Jul 10 20:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 26 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 270
- Start
- Fri Jul 10 21:10
- End
- Mon Jul 13 09:15
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 5.0 h to spare
KVM Switch, 2-port 4K, gray
- State
- Finished
- Quantity
- 340
- Start
- Fri May 29 15:10
- End
- Mon Jun 1 06:25
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 34 h to spare
10" Tablet, 64GB
- State
- Finished
- Quantity
- 120
- Start
- Mon Jun 1 08:55
- End
- Mon Jun 1 18:15
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.0 d to spare
4-Bay NAS Enclosure
- State
- Finished
- Quantity
- 415
- Start
- Mon Jun 1 22:45
- End
- Tue Jun 2 09:15
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.9 d to spare
4K Conference Camera
- State
- Finished
- Quantity
- 430
- Start
- Tue Jun 2 12:40
- End
- Tue Jun 2 20:50
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 34 h to spare
Wi-Fi 6E Router
- State
- Finished
- Quantity
- 20
- Start
- Tue Jun 2 20:50
- End
- Tue Jun 2 22:30
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Running now
- Quantity
- 111 left of 230
- Start
- Tue Jun 2 22:30
- End
- Wed Jun 3 09:00
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 30 h to spare
Thunderbolt Dock, 4 ports
- State
- Held in the frozen window
- Quantity
- 415
- Start
- Wed Jun 3 18:05
- End
- Thu Jun 4 13:50
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Thu Jun 4 18:10
- End
- Fri Jun 5 08:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 47 h to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 230
- Start
- Fri Jun 5 14:35
- End
- Fri Jun 5 20:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 450
- Start
- Fri Jun 5 20:05
- End
- Mon Jun 8 09:25
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.4 d to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 365
- Start
- Mon Jun 8 14:25
- End
- Tue Jun 9 15:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.2 d to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 300
- Start
- Tue Jun 9 15:10
- End
- Tue Jun 9 21:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 25 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Tue Jun 9 22:40
- End
- Wed Jun 10 22:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 260
- Start
- Wed Jun 10 22:45
- End
- Thu Jun 11 11:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Thu Jun 11 11:00
- End
- Thu Jun 11 13:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Thu Jun 11 13:35
- End
- Thu Jun 11 16:55
- Changeover
- 45 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 19 12:00
- Order
- On time, 2.1 d to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Thu Jun 11 16:55
- End
- Fri Jun 12 15:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.1 d to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 110
- Start
- Fri Jun 12 15:25
- End
- Mon Jun 15 08:15
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 46 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 125
- Start
- Mon Jun 15 08:15
- End
- Mon Jun 15 17:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.3 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 200
- Start
- Mon Jun 15 17:55
- End
- Tue Jun 16 14:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 180
- Start
- Tue Jun 16 14:40
- End
- Tue Jun 16 20:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.3 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 140
- Start
- Tue Jun 16 20:50
- End
- Wed Jun 17 06:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.2 d to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 410
- Start
- Thu Jun 18 07:55
- End
- Thu Jun 18 20:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 2.2 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Fri Jun 19 06:00
- End
- Fri Jun 19 08:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 32 h to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Fri Jun 19 08:20
- End
- Fri Jun 19 15:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.3 d to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 345
- Start
- Mon Jun 22 20:00
- End
- Wed Jun 24 19:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- At risk, 4.2 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 60
- Start
- Wed Jun 24 19:20
- End
- Wed Jun 24 22:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 25 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Thu Jun 25 06:00
- End
- Thu Jun 25 13:45
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 45 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 320
- Start
- Thu Jun 25 13:45
- End
- Thu Jun 25 19:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 42 h to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 135
- Start
- Thu Jun 25 19:55
- End
- Thu Jun 25 22:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.4 d to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Thu Jun 25 22:40
- End
- Fri Jun 26 07:55
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.3 d to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 100
- Start
- Fri Jun 26 08:55
- End
- Fri Jun 26 18:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 0.7 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 360
- Start
- Mon Jun 29 07:55
- End
- Mon Jun 29 19:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 2.7 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 450
- Start
- Tue Jun 30 09:50
- End
- Thu Jul 2 15:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 0.7 h to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 415
- Start
- Mon Jul 6 07:55
- End
- Mon Jul 6 21:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 13 h late
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Mon Jul 6 21:00
- End
- Tue Jul 7 12:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 21 h late
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Tue Jul 7 12:40
- End
- Tue Jul 7 15:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.7 h late
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 270
- Start
- Tue Jul 7 16:45
- End
- Tue Jul 7 22:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 5.0 h late
1TB NVMe SSD
- State
- Planned
- Quantity
- 530
- Start
- Tue Jul 7 22:55
- End
- Wed Jul 8 13:50
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- On time, 8.3 h to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Wed Jul 8 13:50
- End
- Thu Jul 9 12:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 2.5 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 380
- Start
- Thu Jul 9 12:35
- End
- Thu Jul 9 19:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- At risk, 5.0 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 235
- Start
- Thu Jul 9 19:55
- End
- Fri Jul 10 22:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- Late, 4.4 h late
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Fri Jul 10 22:45
- End
- Mon Jul 13 12:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 23 h to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Finished
- Quantity
- 110
- Start
- Fri May 29 19:10
- End
- Mon Jun 1 08:05
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 32 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Finished
- Quantity
- 40
- Start
- Mon Jun 1 08:35
- End
- Mon Jun 1 12:45
- For
- ACCOUNT 8321, Platinum
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.9 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Running now
- Quantity
- 191 left of 470
- Start
- Mon Jun 1 16:25
- End
- Wed Jun 3 22:25
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- At risk, 2.0 h to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Thu Jun 4 11:55
- End
- Tue Jun 9 06:40
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- At risk, 2.0 h to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Tue Jun 9 07:05
- End
- Tue Jun 9 16:00
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 3.8 d to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 240
- Start
- Wed Jun 10 07:55
- End
- Thu Jun 11 11:20
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 125
- Start
- Thu Jun 11 11:20
- End
- Thu Jun 11 14:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 32 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 100
- Start
- Thu Jun 11 14:20
- End
- Thu Jun 11 17:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 30 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 340
- Start
- Fri Jun 12 13:55
- End
- Mon Jun 15 07:20
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 44 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 505
- Start
- Mon Jun 15 11:45
- End
- Wed Jun 17 21:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- At risk, 1.2 h to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 630
- Start
- Thu Jun 18 13:15
- End
- Fri Jun 19 13:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 300
- Start
- Fri Jun 19 15:35
- End
- Fri Jun 19 22:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Mon Jun 22 13:20
- End
- Tue Jun 23 12:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.1 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Tue Jun 23 22:55
- End
- Wed Jun 24 14:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 32 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 280
- Start
- Wed Jun 24 14:40
- End
- Wed Jun 24 20:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Wed Jun 24 20:45
- End
- Thu Jun 25 20:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 47 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Thu Jun 25 21:25
- End
- Fri Jun 26 19:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 29 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 145
- Start
- Fri Jun 26 22:35
- End
- Mon Jun 29 18:15
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 24 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 115
- Start
- Mon Jun 29 20:25
- End
- Tue Jun 30 12:05
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.7 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Tue Jun 30 12:05
- End
- Tue Jun 30 20:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 5.7 h to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 530
- Start
- Tue Jun 30 20:30
- End
- Wed Jul 1 11:15
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.4 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 490
- Start
- Wed Jul 1 11:15
- End
- Wed Jul 1 20:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 3.1 h to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 210
- Start
- Wed Jul 1 20:20
- End
- Thu Jul 2 09:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 4.1 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 150
- Start
- Thu Jul 2 09:45
- End
- Thu Jul 2 21:35
- Changeover
- 45 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- Late, 28 h late
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 415
- Start
- Mon Jul 6 12:40
- End
- Wed Jul 8 19:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 42 h late
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Wed Jul 8 19:20
- End
- Thu Jul 9 10:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.8 h late
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Thu Jul 9 13:50
- End
- Thu Jul 9 22:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 8.5 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 170
- Start
- Thu Jul 9 22:35
- End
- Fri Jul 10 20:20
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 8.8 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 115
- Start
- Fri Jul 10 20:20
- End
- Mon Jul 13 06:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 16 17:00
- Order
- On time, 22 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Finished
- Quantity
- 445
- Start
- Thu May 28 14:00
- End
- Mon Jun 1 07:30
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- On time, 30 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Finished
- Quantity
- 190
- Start
- Mon Jun 1 09:50
- End
- Tue Jun 2 06:20
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.1 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Finished
- Quantity
- 100
- Start
- Tue Jun 2 06:40
- End
- Tue Jun 2 17:40
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.8 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Finished
- Quantity
- 130
- Start
- Tue Jun 2 17:40
- End
- Tue Jun 2 21:05
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
2TB Portable SSD
- State
- Running now
- Quantity
- 200 left of 380
- Start
- Tue Jun 2 21:05
- End
- Wed Jun 3 09:00
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 47 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Held in the frozen window
- Quantity
- 25
- Start
- Wed Jun 3 10:35
- End
- Wed Jun 3 13:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 34 h to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 155
- Start
- Wed Jun 3 19:25
- End
- Thu Jun 4 10:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.1 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Thu Jun 4 17:30
- End
- Fri Jun 5 11:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.0 d to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 85
- Start
- Fri Jun 5 11:30
- End
- Fri Jun 5 22:45
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Fri Jun 5 22:45
- End
- Mon Jun 8 13:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.2 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 355
- Start
- Mon Jun 8 13:45
- End
- Tue Jun 9 20:40
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 44 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Tue Jun 9 20:40
- End
- Wed Jun 10 16:15
- Changeover
- 45 min
- For
- ACCOUNT 3915, Standard
- Order due
- Wed Jun 17 15:00
- Order
- On time, 44 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 75
- Start
- Wed Jun 10 16:15
- End
- Wed Jun 10 20:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 42 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 540
- Start
- Wed Jun 10 22:30
- End
- Mon Jun 15 17:05
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 8.1 h to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 35
- Start
- Mon Jun 15 17:05
- End
- Mon Jun 15 21:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Mon Jun 15 21:50
- End
- Tue Jun 16 14:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.4 d to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 110
- Start
- Tue Jun 16 14:55
- End
- Tue Jun 16 18:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.0 d to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 40
- Start
- Tue Jun 16 18:10
- End
- Wed Jun 17 07:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.1 d to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 590
- Start
- Wed Jun 17 07:30
- End
- Wed Jun 17 18:15
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 47 h to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Wed Jun 17 18:15
- End
- Thu Jun 18 12:15
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 165
- Start
- Thu Jun 18 16:40
- End
- Fri Jun 19 15:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 400
- Start
- Fri Jun 19 15:30
- End
- Tue Jun 23 15:40
- Changeover
- 45 min
- For
- ACCOUNT 6021, Standard
- Order due
- Fri Jun 26 15:00
- Order
- On time, 8.2 h to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 70
- Start
- Tue Jun 23 15:40
- End
- Wed Jun 24 07:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 300
- Start
- Wed Jun 24 07:00
- End
- Fri Jun 26 06:20
- Changeover
- 25 min
- For
- ACCOUNT 5190, Silver
- Order due
- Tue Jun 30 15:00
- Order
- Late, 3.0 h late
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 400
- Start
- Fri Jun 26 06:20
- End
- Tue Jun 30 08:50
- Changeover
- 45 min
- For
- ACCOUNT 3915, Standard
- Order due
- Thu Jul 2 15:00
- Order
- Late, 2.8 h late
22" Touch Monitor
- State
- Planned
- Quantity
- 400
- Start
- Tue Jun 30 08:50
- End
- Wed Jul 1 19:05
- Changeover
- 15 min
- For
- ACCOUNT 3327, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 17 h late
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Wed Jul 1 19:05
- End
- Wed Jul 1 22:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 4.6 h to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 35
- Start
- Wed Jul 1 22:50
- End
- Thu Jul 2 10:45
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 3.3 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Thu Jul 2 10:45
- End
- Thu Jul 2 19:50
- Changeover
- 45 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jul 8 15:00
- Order
- On time, 22 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 300
- Start
- Thu Jul 2 19:50
- End
- Mon Jul 6 23:00
- Changeover
- 25 min
- For
- ACCOUNT 6021, Standard
- Order due
- Wed Jul 8 15:00
- Order
- Late, 25 h late
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Tue Jul 7 06:00
- End
- Wed Jul 8 14:30
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 26 h late
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 135
- Start
- Wed Jul 8 14:30
- End
- Thu Jul 9 14:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.2 h late
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Thu Jul 9 14:30
- End
- Fri Jul 10 19:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 16 h late
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Fri Jul 10 19:10
- End
- Mon Jul 13 09:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- At risk, 4.2 h to spare
22" Touch Monitor, gray
- State
- Finished
- Quantity
- 490
- Start
- Wed May 27 22:20
- End
- Mon Jun 1 07:45
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- At risk, 5.7 h to spare
Tower Workstation, 32GB / 1TB
- State
- Finished
- Quantity
- 30
- Start
- Mon Jun 1 13:00
- End
- Mon Jun 1 16:45
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.8 d to spare
Thin Client, 4GB / 32GB
- State
- Finished
- Quantity
- 30
- Start
- Mon Jun 1 16:45
- End
- Mon Jun 1 21:05
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.8 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Finished
- Quantity
- 80
- Start
- Mon Jun 1 21:05
- End
- Tue Jun 2 11:10
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.3 d to spare
8" Rugged Tablet, 64GB
- State
- Running now
- Quantity
- 33 left of 85
- Start
- Tue Jun 2 20:15
- End
- Wed Jun 3 08:30
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 33 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 155
- Start
- Thu Jun 4 09:55
- End
- Fri Jun 5 07:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.4 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 240
- Start
- Fri Jun 5 13:15
- End
- Mon Jun 8 19:20
- Changeover
- 25 min
- For
- ACCOUNT 4340, Platinum
- Order due
- Fri Jun 12 15:00
- Order
- On time, 28 h to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Mon Jun 8 19:20
- End
- Tue Jun 9 12:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.4 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Tue Jun 9 12:40
- End
- Wed Jun 10 16:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 2.9 d to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 160
- Start
- Wed Jun 10 17:00
- End
- Thu Jun 11 08:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 32 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Thu Jun 11 08:35
- End
- Thu Jun 11 15:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.0 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Thu Jun 11 15:35
- End
- Mon Jun 15 07:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 33 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 15 07:25
- End
- Mon Jun 15 21:35
- Changeover
- 45 min
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 22 15:00
- Order
- On time, 4.3 d to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 15 21:35
- End
- Tue Jun 16 09:35
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 410
- Start
- Tue Jun 16 09:35
- End
- Tue Jun 16 17:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.9 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 150
- Start
- Tue Jun 16 17:25
- End
- Wed Jun 17 12:50
- Changeover
- 45 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jun 24 15:00
- Order
- On time, 4.8 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 400
- Start
- Wed Jun 17 12:50
- End
- Fri Jun 19 06:45
- Changeover
- 25 min
- For
- ACCOUNT 7463, Gold
- Order due
- Thu Jun 25 15:00
- Order
- On time, 31 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 365
- Start
- Fri Jun 19 06:45
- End
- Mon Jun 22 14:20
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.0 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Mon Jun 22 14:20
- End
- Mon Jun 22 22:00
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.8 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 385
- Start
- Mon Jun 22 22:00
- End
- Wed Jun 24 13:50
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 29 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 40
- Start
- Wed Jun 24 13:50
- End
- Wed Jun 24 16:55
- Changeover
- 25 min
- For
- ACCOUNT 2800, Silver
- Order due
- Tue Jun 30 15:00
- Order
- On time, 3.7 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Wed Jun 24 16:55
- End
- Thu Jun 25 13:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 33 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 465
- Start
- Thu Jun 25 13:00
- End
- Mon Jun 29 18:15
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 10 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 415
- Start
- Mon Jun 29 18:15
- End
- Wed Jul 1 12:25
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 7.5 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 220
- Start
- Wed Jul 1 12:25
- End
- Thu Jul 2 11:10
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.4 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 80
- Start
- Thu Jul 2 11:10
- End
- Thu Jul 2 17:55
- Changeover
- 25 min
- For
- ACCOUNT 3327, Gold
- Order due
- Tue Jul 7 15:00
- Order
- On time, 20 h to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 45
- Start
- Thu Jul 2 17:55
- End
- Mon Jul 6 07:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- At risk, 1.7 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Mon Jul 6 07:45
- End
- Mon Jul 6 16:50
- Changeover
- 45 min
- For
- ACCOUNT 9148, Standard
- Order due
- Thu Jul 9 15:00
- Order
- Late, 20 h late
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 150
- Start
- Mon Jul 6 16:50
- End
- Tue Jul 7 14:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.1 h late
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Tue Jul 7 14:20
- End
- Tue Jul 7 22:20
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 47 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 400
- Start
- Tue Jul 7 22:20
- End
- Fri Jul 10 12:25
- Changeover
- 45 min
- For
- ACCOUNT 5190, Silver
- Order due
- Fri Jul 10 15:00
- Order
- Late, 4.8 d late
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 315
- Start
- Fri Jul 10 12:25
- End
- Mon Jul 13 20:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- At risk, 0.6 h to spare
24" FHD Monitor, IPS
- State
- Finished
- Quantity
- 370
- Start
- Fri May 29 15:35
- End
- Mon Jun 1 17:25
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 42 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Finished
- Quantity
- 150
- Start
- Mon Jun 1 17:25
- End
- Tue Jun 2 10:50
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.1 d to spare
All-in-One 24", 16GB / 512GB
- State
- Running now
- Quantity
- 6 left of 45
- Start
- Tue Jun 2 18:20
- End
- Wed Jun 3 06:45
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.1 d to spare
Wi-Fi 6 Access Point, ceiling
- State
- Held in the frozen window
- Quantity
- 100
- Start
- Wed Jun 3 08:10
- End
- Wed Jun 3 12:50
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.4 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 390
- Start
- Fri Jun 5 06:00
- End
- Mon Jun 8 15:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 48 h to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Mon Jun 8 15:25
- End
- Tue Jun 9 16:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.0 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 155
- Start
- Tue Jun 9 16:00
- End
- Wed Jun 10 15:05
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 30 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Wed Jun 10 15:05
- End
- Wed Jun 10 17:10
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 340
- Start
- Wed Jun 10 17:10
- End
- Fri Jun 12 09:30
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 280
- Start
- Fri Jun 12 09:30
- End
- Mon Jun 15 12:35
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 215
- Start
- Mon Jun 15 12:35
- End
- Tue Jun 16 11:00
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 110
- Start
- Tue Jun 16 11:00
- End
- Tue Jun 16 20:35
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 33 h to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 330
- Start
- Tue Jun 16 20:35
- End
- Wed Jun 17 09:10
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 4.8 d to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Wed Jun 17 15:10
- End
- Mon Jun 22 10:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- At risk, 0.2 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 75
- Start
- Mon Jun 22 10:45
- End
- Mon Jun 22 21:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 3.1 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 40
- Start
- Mon Jun 22 21:25
- End
- Tue Jun 23 08:50
- Changeover
- 25 min
- For
- ACCOUNT 2800, Silver
- Order due
- Mon Jun 29 15:00
- Order
- On time, 5.2 d to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 125
- Start
- Tue Jun 23 08:50
- End
- Wed Jun 24 07:25
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 235
- Start
- Wed Jun 24 07:25
- End
- Thu Jun 25 09:25
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 9.9 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Thu Jun 25 09:25
- End
- Thu Jun 25 12:40
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 2.0 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 350
- Start
- Thu Jun 25 12:40
- End
- Fri Jun 26 22:45
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 30 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 290
- Start
- Fri Jun 26 22:45
- End
- Tue Jun 30 09:00
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 33 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 250
- Start
- Tue Jun 30 09:00
- End
- Thu Jul 2 09:05
- Changeover
- 45 min
- For
- ACCOUNT 7702, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 41 h late
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 150
- Start
- Thu Jul 2 09:05
- End
- Mon Jul 6 09:00
- Changeover
- 25 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- At risk, 1.2 h to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 365
- Start
- Mon Jul 6 09:00
- End
- Tue Jul 7 16:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 2.2 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Tue Jul 7 16:55
- End
- Wed Jul 8 09:55
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 24 h late
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 90
- Start
- Wed Jul 8 09:55
- End
- Wed Jul 8 22:20
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 3.0 h late
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 80
- Start
- Wed Jul 8 22:20
- End
- Thu Jul 9 14:20
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 1.2 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Thu Jul 9 14:20
- End
- Fri Jul 10 09:35
- Changeover
- 25 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 10 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Fri Jul 10 20:30
- End
- Fri Jul 10 22:35
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- On time, 27 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 525
- Start
- Fri Jul 10 22:35
- End
- Wed Jul 15 16:00
- Changeover
- 45 min
- For
- Warehouse stock
- Order due
- Wed Jul 15 17:00
- Order
- Late, 28 h late
22" Touch Monitor, gray
- State
- Finished
- Quantity
- 490
- Start
- Sun May 31 19:20
- End
- Tue Jun 2 04:20
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- At risk, 5.7 h to spare
12" Pro Tablet, 256GB
- State
- Finished
- Quantity
- 200
- Start
- Tue Jun 2 04:20
- End
- Wed Jun 3 04:20
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 2.0 d to spare
KVM Switch, 2-port 4K, gray
- State
- Held in the frozen window
- Quantity
- 340
- Start
- Wed Jun 3 06:00
- End
- Wed Jun 3 15:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 34 h to spare
4-Bay NAS Enclosure, refresh
- State
- Held in the frozen window
- Quantity
- 485
- Start
- Wed Jun 3 15:55
- End
- Thu Jun 4 10:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.9 d to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 415
- Start
- Thu Jun 4 10:10
- End
- Thu Jun 4 23:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 100
- Start
- Thu Jun 4 23:40
- End
- Fri Jun 5 18:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.8 d to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Fri Jun 5 18:35
- End
- Fri Jun 5 20:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 415
- Start
- Fri Jun 5 20:45
- End
- Sat Jun 6 08:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 155
- Start
- Sat Jun 6 08:30
- End
- Sun Jun 7 09:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.4 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Sun Jun 7 09:50
- End
- Mon Jun 8 03:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.0 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 240
- Start
- Mon Jun 8 06:00
- End
- Tue Jun 9 22:20
- Changeover
- 35 min
- For
- ACCOUNT 4340, Platinum
- Order due
- Fri Jun 12 15:00
- Order
- On time, 28 h to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Wed Jun 10 06:00
- End
- Thu Jun 11 12:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.0 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Thu Jun 11 12:35
- End
- Fri Jun 12 04:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 2.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 12 04:30
- End
- Fri Jun 12 20:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 3.8 d to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 300
- Start
- Fri Jun 12 20:00
- End
- Sat Jun 13 08:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 25 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Sat Jun 13 17:15
- End
- Sat Jun 13 21:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 340
- Start
- Sat Jun 13 21:40
- End
- Sun Jun 14 17:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Sun Jun 14 20:15
- End
- Mon Jun 15 01:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 100
- Start
- Mon Jun 15 02:45
- End
- Mon Jun 15 06:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 30 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Mon Jun 15 06:00
- End
- Mon Jun 15 11:25
- Changeover
- 35 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 19 12:00
- Order
- On time, 2.1 d to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 370
- Start
- Mon Jun 15 11:25
- End
- Mon Jun 15 15:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.8 d to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 15 19:50
- End
- Tue Jun 16 00:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 340
- Start
- Tue Jun 16 00:40
- End
- Tue Jun 16 10:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 44 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Tue Jun 16 10:35
- End
- Wed Jun 17 10:40
- Changeover
- 35 min
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 22 15:00
- Order
- On time, 4.3 d to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 40
- Start
- Wed Jun 17 10:40
- End
- Wed Jun 17 19:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 110
- Start
- Wed Jun 17 19:35
- End
- Wed Jun 17 22:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.0 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 485
- Start
- Thu Jun 18 08:10
- End
- Fri Jun 19 02:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 3.3 d to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 40
- Start
- Fri Jun 19 02:25
- End
- Fri Jun 19 12:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.1 d to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 590
- Start
- Fri Jun 19 12:20
- End
- Fri Jun 19 18:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 47 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 400
- Start
- Fri Jun 19 18:35
- End
- Sat Jun 20 15:40
- Changeover
- 35 min
- For
- ACCOUNT 7463, Gold
- Order due
- Thu Jun 25 15:00
- Order
- On time, 31 h to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Sat Jun 20 15:40
- End
- Sun Jun 21 05:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 365
- Start
- Sun Jun 21 22:40
- End
- Mon Jun 22 17:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.0 d to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 400
- Start
- Mon Jun 22 18:05
- End
- Tue Jun 23 19:00
- Changeover
- 15 min
- For
- ACCOUNT 6021, Standard
- Order due
- Fri Jun 26 15:00
- Order
- On time, 8.2 h to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Tue Jun 23 21:55
- End
- Wed Jun 24 00:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 10 h to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 410
- Start
- Wed Jun 24 02:30
- End
- Wed Jun 24 16:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.3 d to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 125
- Start
- Wed Jun 24 16:30
- End
- Thu Jun 25 19:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 235
- Start
- Thu Jun 25 19:55
- End
- Fri Jun 26 10:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 9.9 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 480
- Start
- Fri Jun 26 10:05
- End
- Fri Jun 26 15:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 29 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 305
- Start
- Fri Jun 26 15:15
- End
- Sun Jun 28 11:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Sun Jun 28 11:50
- End
- Mon Jun 29 00:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 45 h to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 135
- Start
- Mon Jun 29 04:00
- End
- Mon Jun 29 09:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.4 d to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Mon Jun 29 09:20
- End
- Mon Jun 29 13:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.3 d to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 65
- Start
- Mon Jun 29 17:15
- End
- Mon Jun 29 22:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 34 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 360
- Start
- Tue Jun 30 06:00
- End
- Tue Jun 30 16:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 2.7 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 415
- Start
- Tue Jun 30 18:20
- End
- Wed Jul 1 15:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 7.5 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 220
- Start
- Thu Jul 2 02:30
- End
- Thu Jul 2 14:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.4 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Thu Jul 2 14:00
- End
- Fri Jul 3 07:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 5.7 h to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 35
- Start
- Fri Jul 3 07:20
- End
- Fri Jul 3 15:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 3.3 h to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 245
- Start
- Fri Jul 3 15:30
- End
- Sat Jul 4 09:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 11 h to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Sat Jul 4 09:25
- End
- Sun Jul 5 02:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 25 h to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 130
- Start
- Sun Jul 5 02:30
- End
- Sun Jul 5 08:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 25 h to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 490
- Start
- Mon Jul 6 02:50
- End
- Mon Jul 6 08:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 18 h late
22" Touch Monitor
- State
- Planned
- Quantity
- 300
- Start
- Mon Jul 6 10:25
- End
- Tue Jul 7 01:45
- Changeover
- 35 min
- For
- ACCOUNT 6021, Standard
- Order due
- Wed Jul 8 15:00
- Order
- Late, 25 h late
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 365
- Start
- Tue Jul 7 01:45
- End
- Tue Jul 7 19:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 2.2 d to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Tue Jul 7 19:50
- End
- Wed Jul 8 09:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 21 h late
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Wed Jul 8 09:30
- End
- Wed Jul 8 15:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 47 h to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 100
- Start
- Wed Jul 8 15:25
- End
- Wed Jul 8 22:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 9.8 h to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 115
- Start
- Thu Jul 9 01:30
- End
- Thu Jul 9 10:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 1.4 h late
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 270
- Start
- Thu Jul 9 10:45
- End
- Thu Jul 9 22:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 5.0 h late
1TB NVMe SSD
- State
- Planned
- Quantity
- 530
- Start
- Fri Jul 10 04:10
- End
- Fri Jul 10 21:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- On time, 8.3 h to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 135
- Start
- Sat Jul 11 07:25
- End
- Sun Jul 12 12:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.2 h late
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Sun Jul 12 12:55
- End
- Mon Jul 13 04:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 16 h late
Mechanical Keyboard, TKL
- State
- Finished
- Quantity
- 330
- Start
- Mon Jun 1 00:00
- End
- Mon Jun 1 03:35
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
128GB USB Flash Drive, 10-pack
- State
- Finished
- Quantity
- 100
- Start
- Mon Jun 1 03:35
- End
- Mon Jun 1 07:55
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- Complete
27" QHD Monitor, 165Hz, refresh
- State
- Finished
- Quantity
- 445
- Start
- Mon Jun 1 08:05
- End
- Tue Jun 2 06:30
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- On time, 30 h to spare
Thin Client, 4GB / 32GB
- State
- Finished
- Quantity
- 30
- Start
- Tue Jun 2 06:30
- End
- Tue Jun 2 13:35
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.8 d to spare
Tower Workstation, 32GB / 1TB
- State
- Finished
- Quantity
- 30
- Start
- Tue Jun 2 16:40
- End
- Tue Jun 2 22:35
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.8 d to spare
10" Tablet, 64GB
- State
- Running now
- Quantity
- 109 left of 120
- Start
- Wed Jun 3 04:35
- End
- Wed Jun 3 18:00
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.0 d to spare
4K Conference Camera
- State
- Held in the frozen window
- Quantity
- 430
- Start
- Wed Jun 3 18:20
- End
- Wed Jun 3 23:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 34 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 150
- Start
- Thu Jun 4 06:00
- End
- Thu Jun 4 13:55
- Changeover
- 35 min
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.1 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 230
- Start
- Thu Jun 4 13:55
- End
- Thu Jun 4 20:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 30 h to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 140
- Start
- Fri Jun 5 06:00
- End
- Fri Jun 5 09:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 28 h to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 45
- Start
- Fri Jun 5 09:25
- End
- Fri Jun 5 20:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.1 d to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 500
- Start
- Sat Jun 6 02:55
- End
- Sat Jun 6 08:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 540
- Start
- Sat Jun 6 08:15
- End
- Sat Jun 6 21:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.3 d to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 155
- Start
- Sat Jun 6 21:25
- End
- Sun Jun 7 10:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.1 d to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Sun Jun 7 10:40
- End
- Sun Jun 7 20:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 47 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 390
- Start
- Sun Jun 7 22:35
- End
- Mon Jun 8 18:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 48 h to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 100
- Start
- Tue Jun 9 06:00
- End
- Tue Jun 9 12:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.4 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Tue Jun 9 12:35
- End
- Tue Jun 9 18:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.2 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 355
- Start
- Tue Jun 9 18:30
- End
- Wed Jun 10 12:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 44 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 400
- Start
- Wed Jun 10 12:05
- End
- Wed Jun 10 16:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Wed Jun 10 16:30
- End
- Wed Jun 10 21:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 26 h to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Thu Jun 11 06:00
- End
- Thu Jun 11 23:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.4 d to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 240
- Start
- Fri Jun 12 06:00
- End
- Sat Jun 13 17:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 75
- Start
- Sun Jun 14 01:55
- End
- Sun Jun 14 07:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 42 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 160
- Start
- Sun Jun 14 07:40
- End
- Sun Jun 14 20:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 32 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Mon Jun 15 00:30
- End
- Mon Jun 15 19:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 33 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Mon Jun 15 19:40
- End
- Tue Jun 16 18:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.1 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 215
- Start
- Tue Jun 16 18:45
- End
- Wed Jun 17 06:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 35
- Start
- Wed Jun 17 06:20
- End
- Wed Jun 17 13:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 200
- Start
- Wed Jun 17 13:30
- End
- Thu Jun 18 04:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Thu Jun 18 04:15
- End
- Thu Jun 18 21:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.4 d to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 330
- Start
- Fri Jun 19 06:00
- End
- Fri Jun 19 18:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 4.8 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Sun Jun 21 05:20
- End
- Sun Jun 21 23:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Sun Jun 21 23:25
- End
- Mon Jun 22 09:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.3 d to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 90
- Start
- Mon Jun 22 09:45
- End
- Mon Jun 22 15:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 75
- Start
- Mon Jun 22 18:05
- End
- Tue Jun 23 12:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 3.1 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 40
- Start
- Tue Jun 23 12:30
- End
- Tue Jun 23 20:20
- Changeover
- 15 min
- For
- ACCOUNT 2800, Silver
- Order due
- Mon Jun 29 15:00
- Order
- On time, 5.2 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 385
- Start
- Wed Jun 24 00:05
- End
- Wed Jun 24 19:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 29 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 40
- Start
- Wed Jun 24 19:30
- End
- Wed Jun 24 21:50
- Changeover
- 15 min
- For
- ACCOUNT 2800, Silver
- Order due
- Tue Jun 30 15:00
- Order
- On time, 3.7 d to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 70
- Start
- Thu Jun 25 06:00
- End
- Thu Jun 25 19:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 300
- Start
- Thu Jun 25 19:55
- End
- Sun Jun 28 06:50
- Changeover
- 15 min
- For
- ACCOUNT 5190, Silver
- Order due
- Tue Jun 30 15:00
- Order
- Late, 3.0 h late
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Sun Jun 28 06:50
- End
- Sun Jun 28 10:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 2.0 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 350
- Start
- Sun Jun 28 10:55
- End
- Mon Jun 29 07:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 30 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 340
- Start
- Mon Jun 29 07:05
- End
- Mon Jun 29 11:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 27 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 29 11:00
- End
- Mon Jun 29 14:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 0.9 h late
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 290
- Start
- Mon Jun 29 20:25
- End
- Tue Jun 30 11:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 33 h to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 480
- Start
- Tue Jun 30 11:50
- End
- Tue Jun 30 17:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 3.8 d to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 100
- Start
- Tue Jun 30 23:55
- End
- Wed Jul 1 15:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 0.7 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 450
- Start
- Wed Jul 1 15:10
- End
- Sat Jul 4 11:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 0.7 h to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 210
- Start
- Sat Jul 4 11:35
- End
- Sat Jul 4 17:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 4.1 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Sat Jul 4 17:45
- End
- Sun Jul 5 00:30
- Changeover
- 35 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jul 8 15:00
- Order
- On time, 22 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 150
- Start
- Sun Jul 5 00:30
- End
- Sun Jul 5 17:35
- Changeover
- 35 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- Late, 28 h late
2TB Portable SSD
- State
- Planned
- Quantity
- 350
- Start
- Mon Jul 6 09:10
- End
- Mon Jul 6 21:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 0.9 h late
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Tue Jul 7 06:00
- End
- Tue Jul 7 12:45
- Changeover
- 35 min
- For
- ACCOUNT 9148, Standard
- Order due
- Thu Jul 9 15:00
- Order
- Late, 20 h late
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 150
- Start
- Tue Jul 7 12:45
- End
- Wed Jul 8 13:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.1 h late
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Wed Jul 8 13:20
- End
- Thu Jul 9 06:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 24 h late
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 90
- Start
- Thu Jul 9 06:30
- End
- Fri Jul 10 04:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 3.0 h late
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Fri Jul 10 06:00
- End
- Sat Jul 11 07:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 2.5 h to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 80
- Start
- Sun Jul 12 06:15
- End
- Sun Jul 12 22:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- At risk, 1.2 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Sun Jul 12 22:05
- End
- Mon Jul 13 19:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 10 h to spare
27" QHD Monitor, 165Hz
- State
- Finished
- Quantity
- 355
- Start
- Sun May 31 04:00
- End
- Mon Jun 1 00:25
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
4-Bay NAS Enclosure, gray
- State
- Finished
- Quantity
- 150
- Start
- Mon Jun 1 00:25
- End
- Mon Jun 1 06:55
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- Complete
USB-C Travel Hub, 7-in-1
- State
- Finished
- Quantity
- 130
- Start
- Mon Jun 1 06:55
- End
- Mon Jun 1 10:55
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- On time, 29 h to spare
24" FHD Monitor, IPS
- State
- Finished
- Quantity
- 370
- Start
- Mon Jun 1 14:50
- End
- Tue Jun 2 10:20
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 42 h to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Finished
- Quantity
- 110
- Start
- Tue Jun 2 10:20
- End
- Wed Jun 3 03:00
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 32 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Running now
- Quantity
- 455 left of 470
- Start
- Wed Jun 3 03:00
- End
- Sat Jun 6 02:55
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- At risk, 2.0 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Mon Jun 8 03:55
- End
- Mon Jun 8 08:35
- Changeover
- 15 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 12 12:00
- Order
- On time, 2.7 d to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 85
- Start
- Mon Jun 8 08:35
- End
- Tue Jun 9 05:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 230
- Start
- Tue Jun 9 05:25
- End
- Tue Jun 9 15:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 450
- Start
- Tue Jun 9 15:50
- End
- Wed Jun 10 06:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.4 d to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 350
- Start
- Wed Jun 10 08:20
- End
- Fri Jun 12 19:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- Late, 2.7 d late
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Sat Jun 13 08:50
- End
- Sun Jun 14 13:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 540
- Start
- Sun Jun 14 13:50
- End
- Mon Jun 15 23:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 8.1 h to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 110
- Start
- Tue Jun 16 06:00
- End
- Tue Jun 16 22:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 46 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 125
- Start
- Wed Jun 17 06:00
- End
- Wed Jun 17 20:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.3 d to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 430
- Start
- Wed Jun 17 20:20
- End
- Thu Jun 18 10:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 410
- Start
- Thu Jun 18 10:40
- End
- Thu Jun 18 15:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.9 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 180
- Start
- Thu Jun 18 15:10
- End
- Thu Jun 18 20:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.3 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 150
- Start
- Thu Jun 18 20:35
- End
- Fri Jun 19 05:35
- Changeover
- 35 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jun 24 15:00
- Order
- On time, 4.8 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 140
- Start
- Fri Jun 19 05:35
- End
- Fri Jun 19 11:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.2 d to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 410
- Start
- Fri Jun 19 11:30
- End
- Fri Jun 19 23:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 2.2 d to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 630
- Start
- Fri Jun 19 23:05
- End
- Sat Jun 20 14:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 165
- Start
- Sat Jun 20 14:05
- End
- Sun Jun 21 17:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Sun Jun 21 17:05
- End
- Sun Jun 21 22:20
- Changeover
- 15 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 26 12:00
- Order
- On time, 3.0 d to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 300
- Start
- Mon Jun 22 06:00
- End
- Mon Jun 22 19:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Tue Jun 23 06:00
- End
- Tue Jun 23 11:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.8 d to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 345
- Start
- Tue Jun 23 11:55
- End
- Thu Jun 25 21:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- At risk, 4.2 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Thu Jun 25 23:20
- End
- Fri Jun 26 21:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 33 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 60
- Start
- Sat Jun 27 08:40
- End
- Sat Jun 27 14:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 25 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Sat Jun 27 14:10
- End
- Sun Jun 28 19:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 47 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 465
- Start
- Sun Jun 28 19:30
- End
- Tue Jun 30 00:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 10 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Tue Jun 30 00:50
- End
- Tue Jun 30 23:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 29 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 400
- Start
- Wed Jul 1 06:00
- End
- Thu Jul 2 02:15
- Changeover
- 35 min
- For
- ACCOUNT 3327, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 17 h late
10" Tablet, 64GB
- State
- Planned
- Quantity
- 115
- Start
- Thu Jul 2 06:00
- End
- Thu Jul 2 19:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.7 h to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 130
- Start
- Thu Jul 2 19:15
- End
- Thu Jul 2 22:45
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 2.7 h to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Fri Jul 3 06:00
- End
- Fri Jul 3 12:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 4.6 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 80
- Start
- Fri Jul 3 12:15
- End
- Fri Jul 3 17:50
- Changeover
- 35 min
- For
- ACCOUNT 3327, Gold
- Order due
- Tue Jul 7 15:00
- Order
- On time, 20 h to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 530
- Start
- Fri Jul 3 17:50
- End
- Sat Jul 4 11:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.4 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 150
- Start
- Sun Jul 5 13:10
- End
- Mon Jul 6 19:05
- Changeover
- 35 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- At risk, 1.2 h to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 415
- Start
- Mon Jul 6 19:05
- End
- Tue Jul 7 06:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 13 h late
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 550
- Start
- Tue Jul 7 06:50
- End
- Tue Jul 7 19:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- At risk, 0.9 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Wed Jul 8 06:00
- End
- Thu Jul 9 01:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 26 h late
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 400
- Start
- Thu Jul 9 06:00
- End
- Sun Jul 12 06:15
- Changeover
- 35 min
- For
- ACCOUNT 5190, Silver
- Order due
- Fri Jul 10 15:00
- Order
- Late, 4.8 d late
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Sun Jul 12 06:15
- End
- Sun Jul 12 23:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- Late, 2.8 h late
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Sun Jul 12 23:35
- End
- Mon Jul 13 14:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 14 17:00
- Order
- On time, 8.5 h to spare
1080p Webcam with mic
- State
- Finished
- Quantity
- 310
- Start
- Mon Jun 1 06:00
- End
- Mon Jun 1 09:35
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- Complete
22" Touch Monitor
- State
- Finished
- Quantity
- 80
- Start
- Mon Jun 1 09:35
- End
- Mon Jun 1 14:10
- For
- ACCOUNT 1466, Gold
- Order due
- Fri Jun 5 15:00
- Order
- On time, 2.1 d to spare
Ergonomic Mouse, wireless, gray
- State
- Finished
- Quantity
- 390
- Start
- Mon Jun 1 14:10
- End
- Mon Jun 1 18:50
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.3 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Finished
- Quantity
- 160
- Start
- Tue Jun 2 06:00
- End
- Wed Jun 3 03:50
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 46 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Running now
- Quantity
- 151 left of 190
- Start
- Wed Jun 3 03:50
- End
- Wed Jun 3 13:45
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.1 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Held in the frozen window
- Quantity
- 80
- Start
- Wed Jun 3 14:10
- End
- Thu Jun 4 05:30
- Changeover
- 35 min
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.3 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Held in the frozen window
- Quantity
- 40
- Start
- Thu Jun 4 05:30
- End
- Thu Jun 4 12:10
- Changeover
- 35 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.9 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 245
- Start
- Thu Jun 4 12:10
- End
- Fri Jun 5 06:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 4.0 d to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 85
- Start
- Fri Jun 5 06:05
- End
- Fri Jun 5 17:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 33 h to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 130
- Start
- Fri Jun 5 17:15
- End
- Fri Jun 5 22:50
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 380
- Start
- Fri Jun 5 22:50
- End
- Sat Jun 6 12:15
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 47 h to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Sat Jun 6 12:15
- End
- Tue Jun 9 21:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- At risk, 2.0 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 25
- Start
- Tue Jun 9 21:20
- End
- Wed Jun 10 01:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 34 h to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 365
- Start
- Wed Jun 10 01:10
- End
- Thu Jun 11 06:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.2 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 435
- Start
- Thu Jun 11 06:05
- End
- Thu Jun 11 22:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.2 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 155
- Start
- Thu Jun 11 23:45
- End
- Sat Jun 13 04:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 30 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Sat Jun 13 04:10
- End
- Sun Jun 14 01:55
- Changeover
- 15 min
- For
- ACCOUNT 3915, Standard
- Order due
- Wed Jun 17 15:00
- Order
- On time, 44 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 260
- Start
- Sun Jun 14 17:15
- End
- Sun Jun 14 20:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Sun Jun 14 20:50
- End
- Mon Jun 15 00:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.0 d to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 125
- Start
- Mon Jun 15 01:10
- End
- Mon Jun 15 02:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 32 h to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 280
- Start
- Mon Jun 15 06:00
- End
- Mon Jun 15 20:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Mon Jun 15 23:45
- End
- Tue Jun 16 18:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 505
- Start
- Tue Jun 16 18:55
- End
- Sat Jun 20 00:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- At risk, 1.2 h to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 110
- Start
- Sat Jun 20 00:00
- End
- Sat Jun 20 14:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 33 h to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Sat Jun 20 14:15
- End
- Tue Jun 23 23:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- At risk, 0.2 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Tue Jun 23 23:20
- End
- Wed Jun 24 02:30
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 32 h to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Wed Jun 24 06:00
- End
- Thu Jun 25 07:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.1 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 420
- Start
- Thu Jun 25 07:25
- End
- Thu Jun 25 23:20
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 2.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Fri Jun 26 06:00
- End
- Fri Jun 26 20:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 32 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 280
- Start
- Fri Jun 26 20:40
- End
- Sat Jun 27 08:40
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 320
- Start
- Mon Jun 29 00:30
- End
- Mon Jun 29 04:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 42 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 105
- Start
- Mon Jun 29 06:00
- End
- Mon Jun 29 07:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 2.5 h late
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 400
- Start
- Mon Jun 29 09:15
- End
- Tue Jun 30 12:25
- Changeover
- 35 min
- For
- ACCOUNT 3915, Standard
- Order due
- Thu Jul 2 15:00
- Order
- Late, 2.8 h late
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 145
- Start
- Tue Jun 30 12:25
- End
- Wed Jul 1 08:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 24 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 250
- Start
- Wed Jul 1 08:15
- End
- Fri Jul 3 20:15
- Changeover
- 35 min
- For
- ACCOUNT 7702, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 41 h late
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Fri Jul 3 20:15
- End
- Fri Jul 3 22:25
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 26 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 490
- Start
- Sat Jul 4 11:20
- End
- Sat Jul 4 16:35
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 3.1 h to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 95
- Start
- Sat Jul 4 16:35
- End
- Sun Jul 5 04:55
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.2 h to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 45
- Start
- Mon Jul 6 08:00
- End
- Mon Jul 6 19:05
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- At risk, 1.7 h to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 415
- Start
- Mon Jul 6 19:05
- End
- Thu Jul 9 18:00
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 42 h late
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Thu Jul 9 18:00
- End
- Thu Jul 9 21:10
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.7 h late
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 340
- Start
- Thu Jul 9 21:10
- End
- Sun Jul 12 06:15
- Changeover
- 35 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 2.9 d late
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Finished
- Quantity
- 400
- Start
- Fri May 29 06:25
- End
- Mon Jun 1 09:00
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 1 15:00
- Order
- Complete
All-in-One 24", 16GB / 512GB, gray
- State
- Finished
- Quantity
- 150
- Start
- Mon Jun 1 16:05
- End
- Tue Jun 2 09:05
- For
- ACCOUNT 1466, Gold
- Order due
- Tue Jun 2 15:00
- Order
- Complete
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 80
- Start
- Thu Jun 4 06:00
- End
- Thu Jun 4 11:55
- Changeover
- 25 min
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.3 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 240
- Start
- Tue Jun 9 22:50
- End
- Wed Jun 10 22:05
- Changeover
- 25 min
- For
- ACCOUNT 4340, Platinum
- Order due
- Fri Jun 12 15:00
- Order
- On time, 28 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 15 06:00
- End
- Mon Jun 15 14:20
- Changeover
- 25 min
- For
- ACCOUNT 3915, Standard
- Order due
- Wed Jun 17 15:00
- Order
- On time, 44 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Wed Jun 17 11:10
- End
- Wed Jun 17 19:30
- Changeover
- 25 min
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 22 15:00
- Order
- On time, 4.3 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 150
- Start
- Fri Jun 19 06:05
- End
- Fri Jun 19 16:20
- Changeover
- 25 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jun 24 15:00
- Order
- On time, 4.8 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 400
- Start
- Mon Jun 22 06:00
- End
- Tue Jun 23 15:40
- Changeover
- 25 min
- For
- ACCOUNT 7463, Gold
- Order due
- Thu Jun 25 15:00
- Order
- On time, 31 h to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 40
- Start
- Wed Jun 24 06:00
- End
- Wed Jun 24 08:55
- Changeover
- 25 min
- For
- ACCOUNT 2800, Silver
- Order due
- Mon Jun 29 15:00
- Order
- On time, 5.2 d to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 40
- Start
- Thu Jun 25 06:00
- End
- Thu Jun 25 08:35
- Changeover
- 5 min
- For
- ACCOUNT 2800, Silver
- Order due
- Tue Jun 30 15:00
- Order
- On time, 3.7 d to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 300
- Start
- Mon Jun 29 06:00
- End
- Tue Jun 30 09:00
- Changeover
- 25 min
- For
- ACCOUNT 5190, Silver
- Order due
- Tue Jun 30 15:00
- Order
- Late, 3.0 h late
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 400
- Start
- Tue Jun 30 12:55
- End
- Wed Jul 1 22:35
- Changeover
- 25 min
- For
- ACCOUNT 3915, Standard
- Order due
- Thu Jul 2 15:00
- Order
- Late, 2.8 h late
22" Touch Monitor
- State
- Planned
- Quantity
- 400
- Start
- Thu Jul 2 06:00
- End
- Mon Jul 6 15:40
- Changeover
- 25 min
- For
- ACCOUNT 3327, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 17 h late
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Tue Jul 7 06:00
- End
- Tue Jul 7 14:20
- Changeover
- 25 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jul 8 15:00
- Order
- On time, 22 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 300
- Start
- Wed Jul 8 06:00
- End
- Thu Jul 9 09:00
- Changeover
- 25 min
- For
- ACCOUNT 6021, Standard
- Order due
- Wed Jul 8 15:00
- Order
- Late, 25 h late
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Thu Jul 9 15:55
- End
- Fri Jul 10 07:15
- Changeover
- 25 min
- For
- ACCOUNT 9148, Standard
- Order due
- Thu Jul 9 15:00
- Order
- Late, 20 h late
Mini PC, 8-core, 16GB / 512GB
- State
- Finished
- Quantity
- 60
- Start
- Mon Jun 1 06:00
- End
- Mon Jun 1 10:40
- For
- ACCOUNT 9148, Standard
- Order due
- Wed Jun 3 15:00
- Order
- Complete
22" Touch Monitor
- State
- Finished
- Quantity
- 80
- Start
- Tue Jun 2 06:00
- End
- Tue Jun 2 11:55
- For
- ACCOUNT 1466, Gold
- Order due
- Fri Jun 5 15:00
- Order
- On time, 2.1 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 40
- Start
- Thu Jun 4 12:40
- End
- Thu Jun 4 15:35
- Changeover
- 25 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.9 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 150
- Start
- Thu Jun 4 15:35
- End
- Fri Jun 5 08:50
- Changeover
- 25 min
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.1 d to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 400
- Start
- Tue Jun 23 19:30
- End
- Thu Jun 25 12:10
- Changeover
- 25 min
- For
- ACCOUNT 6021, Standard
- Order due
- Fri Jun 26 15:00
- Order
- On time, 8.2 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 80
- Start
- Mon Jul 6 06:00
- End
- Mon Jul 6 11:55
- Changeover
- 25 min
- For
- ACCOUNT 3327, Gold
- Order due
- Tue Jul 7 15:00
- Order
- On time, 20 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 250
- Start
- Mon Jul 6 15:40
- End
- Tue Jul 7 15:35
- Changeover
- 25 min
- For
- ACCOUNT 7702, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 41 h late
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 150
- Start
- Tue Jul 7 15:35
- End
- Wed Jul 8 08:50
- Changeover
- 25 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- At risk, 1.2 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 150
- Start
- Thu Jul 9 06:00
- End
- Thu Jul 9 15:55
- Changeover
- 5 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- Late, 28 h late
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Finished
- Quantity
- 95
- Start
- Fri May 29 22:30
- End
- Mon Jun 1 06:15
- For
- Warehouse stock
- Order due
- Tue Jun 2 17:00
- Order
- Complete
1TB NVMe SSD, gray
- State
- Finished
- Quantity
- 320
- Start
- Mon Jun 1 07:35
- End
- Mon Jun 1 10:50
- For
- Warehouse stock
- Order due
- Tue Jun 2 17:00
- Order
- Complete
Mini PC, 8-core, 16GB / 512GB
- State
- Finished
- Quantity
- 60
- Start
- Mon Jun 1 10:55
- End
- Mon Jun 1 13:10
- For
- ACCOUNT 9148, Standard
- Order due
- Wed Jun 3 15:00
- Order
- Complete
Thin Client, 4GB / 32GB, gray
- State
- Finished
- Quantity
- 20
- Start
- Mon Jun 1 13:10
- End
- Mon Jun 1 13:55
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Finished
- Quantity
- 70
- Start
- Mon Jun 1 13:55
- End
- Mon Jun 1 15:10
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
128GB USB Flash Drive, 10-pack
- State
- Finished
- Quantity
- 100
- Start
- Mon Jun 1 15:10
- End
- Mon Jun 1 16:10
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- Complete
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Finished
- Quantity
- 400
- Start
- Mon Jun 1 16:20
- End
- Tue Jun 2 06:55
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 1 15:00
- Order
- Complete
4-Bay NAS Enclosure, gray
- State
- Finished
- Quantity
- 150
- Start
- Tue Jun 2 07:50
- End
- Tue Jun 2 09:10
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- Complete
All-in-One 24", 16GB / 512GB, gray
- State
- Finished
- Quantity
- 150
- Start
- Tue Jun 2 09:35
- End
- Tue Jun 2 14:20
- For
- ACCOUNT 1466, Gold
- Order due
- Tue Jun 2 15:00
- Order
- Complete
Mechanical Keyboard, TKL
- State
- Finished
- Quantity
- 330
- Start
- Tue Jun 2 14:20
- End
- Tue Jun 2 16:55
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
1080p Webcam with mic
- State
- Finished
- Quantity
- 310
- Start
- Tue Jun 2 16:55
- End
- Tue Jun 2 19:55
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- Complete
27" QHD Monitor, 165Hz, refresh
- State
- Running now
- Quantity
- 203 left of 445
- Start
- Tue Jun 2 19:55
- End
- Wed Jun 3 10:45
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- On time, 30 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 130
- Start
- Wed Jun 3 10:45
- End
- Wed Jun 3 12:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 4 17:00
- Order
- On time, 29 h to spare
12" Pro Tablet, 256GB
- State
- Held in the frozen window
- Quantity
- 200
- Start
- Wed Jun 3 12:55
- End
- Wed Jun 3 16:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 2.0 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Held in the frozen window
- Quantity
- 160
- Start
- Wed Jun 3 16:05
- End
- Wed Jun 3 19:25
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 46 h to spare
KVM Switch, 2-port 4K, gray
- State
- Held in the frozen window
- Quantity
- 340
- Start
- Wed Jun 3 19:25
- End
- Thu Jun 4 06:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 34 h to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 110
- Start
- Thu Jun 4 06:30
- End
- Thu Jun 4 08:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 32 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 40
- Start
- Thu Jun 4 15:50
- End
- Thu Jun 4 16:45
- Changeover
- 10 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 100
- Start
- Fri Jun 5 19:05
- End
- Fri Jun 5 21:20
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.8 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 470
- Start
- Mon Jun 8 06:05
- End
- Mon Jun 8 15:00
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- At risk, 2.0 h to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 380
- Start
- Mon Jun 8 15:00
- End
- Mon Jun 8 17:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 47 h to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 500
- Start
- Mon Jun 8 17:50
- End
- Mon Jun 8 22:15
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 155
- Start
- Mon Jun 8 22:15
- End
- Tue Jun 9 08:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.4 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 390
- Start
- Tue Jun 9 08:25
- End
- Tue Jun 9 17:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 48 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Tue Jun 9 17:20
- End
- Tue Jun 9 18:10
- Changeover
- 15 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 12 12:00
- Order
- On time, 2.7 d to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 230
- Start
- Tue Jun 9 18:10
- End
- Tue Jun 9 20:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Tue Jun 9 21:50
- End
- Wed Jun 10 15:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- At risk, 2.0 h to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 240
- Start
- Wed Jun 10 22:20
- End
- Thu Jun 11 10:40
- Changeover
- 10 min
- For
- ACCOUNT 4340, Platinum
- Order due
- Fri Jun 12 15:00
- Order
- On time, 28 h to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 350
- Start
- Fri Jun 12 19:35
- End
- Mon Jun 15 09:35
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- Late, 2.7 d late
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 240
- Start
- Mon Jun 15 09:35
- End
- Mon Jun 15 14:20
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 50
- Start
- Mon Jun 15 14:20
- End
- Mon Jun 15 15:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 26 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Mon Jun 15 15:25
- End
- Mon Jun 15 19:10
- Changeover
- 15 min
- For
- ACCOUNT 3915, Standard
- Order due
- Wed Jun 17 15:00
- Order
- On time, 44 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 340
- Start
- Mon Jun 15 19:10
- End
- Tue Jun 16 11:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 540
- Start
- Tue Jun 16 11:00
- End
- Wed Jun 17 08:55
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 8.1 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 100
- Start
- Wed Jun 17 08:55
- End
- Wed Jun 17 10:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 30 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Wed Jun 17 10:45
- End
- Wed Jun 17 13:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.1 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Wed Jun 17 13:50
- End
- Wed Jun 17 16:20
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 340
- Start
- Wed Jun 17 16:20
- End
- Wed Jun 17 20:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 44 h to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Wed Jun 17 20:55
- End
- Thu Jun 18 07:25
- Changeover
- 15 min
- For
- ACCOUNT 9148, Standard
- Order due
- Mon Jun 22 15:00
- Order
- On time, 4.3 d to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 125
- Start
- Thu Jun 18 07:25
- End
- Thu Jun 18 09:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.3 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 35
- Start
- Thu Jun 18 09:25
- End
- Thu Jun 18 11:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 40
- Start
- Thu Jun 18 11:05
- End
- Thu Jun 18 12:30
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 200
- Start
- Thu Jun 18 12:30
- End
- Thu Jun 18 15:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 110
- Start
- Thu Jun 18 15:40
- End
- Thu Jun 18 17:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.0 d to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Thu Jun 18 21:50
- End
- Fri Jun 19 07:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.4 d to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 180
- Start
- Fri Jun 19 07:05
- End
- Fri Jun 19 09:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.3 d to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 40
- Start
- Fri Jun 19 12:50
- End
- Fri Jun 19 14:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.1 d to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 330
- Start
- Fri Jun 19 19:00
- End
- Fri Jun 19 21:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 4.8 d to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 505
- Start
- Mon Jun 22 06:00
- End
- Mon Jun 22 15:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- At risk, 1.2 h to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 630
- Start
- Mon Jun 22 15:45
- End
- Mon Jun 22 22:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Mon Jun 22 22:30
- End
- Tue Jun 23 08:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Tue Jun 23 08:10
- End
- Tue Jun 23 10:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.3 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Tue Jun 23 10:55
- End
- Tue Jun 23 11:45
- Changeover
- 15 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 26 12:00
- Order
- On time, 3.0 d to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 75
- Start
- Tue Jun 23 13:00
- End
- Tue Jun 23 15:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 3.1 d to spare
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 300
- Start
- Tue Jun 23 15:45
- End
- Tue Jun 23 18:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 90
- Start
- Tue Jun 23 19:00
- End
- Tue Jun 23 20:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.9 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Tue Jun 23 20:25
- End
- Tue Jun 23 23:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 2.8 d to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Wed Jun 24 06:00
- End
- Wed Jun 24 06:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 10 h to spare
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 475
- Start
- Wed Jun 24 06:35
- End
- Wed Jun 24 16:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- At risk, 0.2 h to spare
13" Ultralight Laptop, 16GB / 512GB
- State
- Planned
- Quantity
- 345
- Start
- Thu Jun 25 22:20
- End
- Fri Jun 26 12:45
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- At risk, 4.2 h to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 125
- Start
- Fri Jun 26 12:45
- End
- Fri Jun 26 16:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 420
- Start
- Fri Jun 26 16:40
- End
- Fri Jun 26 20:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 2.9 d to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 40
- Start
- Fri Jun 26 20:25
- End
- Fri Jun 26 21:35
- Changeover
- 15 min
- For
- ACCOUNT 2800, Silver
- Order due
- Tue Jun 30 15:00
- Order
- On time, 3.7 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 120
- Start
- Fri Jun 26 21:55
- End
- Mon Jun 29 08:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 33 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 480
- Start
- Mon Jun 29 08:10
- End
- Mon Jun 29 12:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 29 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 280
- Start
- Mon Jun 29 12:25
- End
- Mon Jun 29 14:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
Wi-Fi 6E Router, gray
- State
- Planned
- Quantity
- 60
- Start
- Mon Jun 29 14:55
- End
- Mon Jun 29 16:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 25 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Mon Jun 29 16:10
- End
- Mon Jun 29 17:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 2.0 d to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 150
- Start
- Mon Jun 29 17:00
- End
- Mon Jun 29 20:15
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 45 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 320
- Start
- Mon Jun 29 20:15
- End
- Mon Jun 29 22:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 42 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 65
- Start
- Mon Jun 29 22:50
- End
- Tue Jun 30 07:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 34 h to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 135
- Start
- Tue Jun 30 07:00
- End
- Tue Jun 30 08:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.4 d to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Tue Jun 30 08:10
- End
- Tue Jun 30 09:10
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 2.3 d to spare
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 300
- Start
- Tue Jun 30 09:15
- End
- Tue Jun 30 18:00
- Changeover
- 15 min
- For
- ACCOUNT 5190, Silver
- Order due
- Tue Jun 30 15:00
- Order
- Late, 3.0 h late
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 290
- Start
- Tue Jun 30 18:00
- End
- Wed Jul 1 08:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 33 h to spare
12" Pro Tablet, 256GB
- State
- Planned
- Quantity
- 190
- Start
- Wed Jul 1 08:05
- End
- Wed Jul 1 11:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 29 h to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 340
- Start
- Wed Jul 1 11:40
- End
- Wed Jul 1 14:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 27 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 145
- Start
- Wed Jul 1 14:25
- End
- Wed Jul 1 17:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- On time, 24 h to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 415
- Start
- Wed Jul 1 17:05
- End
- Thu Jul 2 09:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 7.5 h to spare
KVM Switch, 2-port 4K, gray
- State
- Planned
- Quantity
- 360
- Start
- Thu Jul 2 09:30
- End
- Thu Jul 2 14:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 2.7 h to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 100
- Start
- Thu Jul 2 14:20
- End
- Thu Jul 2 16:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- At risk, 0.7 h to spare
USB-C Travel Hub, 7-in-1
- State
- Planned
- Quantity
- 120
- Start
- Thu Jul 2 16:20
- End
- Thu Jul 2 17:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 0.9 h late
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 480
- Start
- Thu Jul 2 17:55
- End
- Thu Jul 2 22:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 3.8 d to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 115
- Start
- Thu Jul 2 22:30
- End
- Mon Jul 6 07:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.7 h to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 460
- Start
- Mon Jul 6 07:20
- End
- Mon Jul 6 11:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 5.7 h to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Mon Jul 6 11:20
- End
- Mon Jul 6 12:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 4.6 h to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 35
- Start
- Mon Jul 6 12:25
- End
- Mon Jul 6 13:40
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 3.3 h to spare
14" Laptop, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 90
- Start
- Mon Jul 6 13:40
- End
- Mon Jul 6 15:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 25 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 400
- Start
- Mon Jul 6 15:55
- End
- Tue Jul 7 08:05
- Changeover
- 15 min
- For
- ACCOUNT 3327, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 17 h late
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 95
- Start
- Tue Jul 7 08:05
- End
- Tue Jul 7 09:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.2 h to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 210
- Start
- Tue Jul 7 09:50
- End
- Tue Jul 7 12:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 4.1 h to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 130
- Start
- Tue Jul 7 12:55
- End
- Tue Jul 7 14:20
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 2.7 h to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 130
- Start
- Tue Jul 7 14:20
- End
- Tue Jul 7 15:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 25 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 250
- Start
- Tue Jul 7 15:50
- End
- Wed Jul 8 07:45
- Changeover
- 15 min
- For
- ACCOUNT 7702, Gold
- Order due
- Mon Jul 6 15:00
- Order
- Late, 41 h late
All-in-One 24", 16GB / 512GB, gray
- State
- Planned
- Quantity
- 150
- Start
- Wed Jul 8 09:05
- End
- Wed Jul 8 13:45
- Changeover
- 10 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- At risk, 1.2 h to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 45
- Start
- Wed Jul 8 13:45
- End
- Wed Jul 8 15:20
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- At risk, 1.7 h to spare
2TB Portable SSD
- State
- Planned
- Quantity
- 350
- Start
- Wed Jul 8 15:20
- End
- Wed Jul 8 17:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 0.9 h late
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 415
- Start
- Wed Jul 8 17:55
- End
- Thu Jul 9 06:15
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 13 h late
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 490
- Start
- Thu Jul 9 06:15
- End
- Thu Jul 9 10:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 18 h late
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 550
- Start
- Thu Jul 9 10:35
- End
- Thu Jul 9 16:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- At risk, 0.9 h to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 150
- Start
- Thu Jul 9 16:10
- End
- Thu Jul 9 18:30
- Changeover
- 15 min
- For
- ACCOUNT 8321, Platinum
- Order due
- Wed Jul 8 15:00
- Order
- Late, 28 h late
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 150
- Start
- Thu Jul 9 19:00
- End
- Thu Jul 9 22:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.1 h late
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Thu Jul 9 22:05
- End
- Thu Jul 9 22:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 5.7 h late
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 100
- Start
- Thu Jul 9 22:40
- End
- Fri Jul 10 07:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 9.8 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Fri Jul 10 07:30
- End
- Fri Jul 10 10:55
- Changeover
- 15 min
- For
- ACCOUNT 9148, Standard
- Order due
- Thu Jul 9 15:00
- Order
- Late, 20 h late
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Fri Jul 10 10:55
- End
- Fri Jul 10 19:30
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 26 h late
1TB NVMe SSD, refresh
- State
- Planned
- Quantity
- 270
- Start
- Fri Jul 10 19:30
- End
- Fri Jul 10 22:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 5.0 h late
1TB NVMe SSD
- State
- Planned
- Quantity
- 530
- Start
- Fri Jul 10 22:15
- End
- Mon Jul 13 08:40
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Mon Jul 13 17:00
- Order
- On time, 8.3 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Finished
- Quantity
- 120
- Start
- Mon Jun 1 06:00
- End
- Mon Jun 1 09:15
- For
- Warehouse stock
- Order due
- Tue Jun 2 17:00
- Order
- Complete
Chromebook 11", 4GB / 64GB
- State
- Finished
- Quantity
- 245
- Start
- Mon Jun 1 09:15
- End
- Mon Jun 1 14:10
- For
- Warehouse stock
- Order due
- Tue Jun 2 17:00
- Order
- Complete
15" Laptop, 12-core, 32GB / 1TB
- State
- Finished
- Quantity
- 170
- Start
- Mon Jun 1 14:10
- End
- Mon Jun 1 17:20
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
27" QHD Monitor, 165Hz
- State
- Finished
- Quantity
- 355
- Start
- Mon Jun 1 17:20
- End
- Tue Jun 2 08:35
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
8-Port Gigabit Switch
- State
- Finished
- Quantity
- 160
- Start
- Tue Jun 2 09:35
- End
- Tue Jun 2 13:00
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- Complete
22" Touch Monitor, gray
- State
- Running now
- Quantity
- 183 left of 490
- Start
- Tue Jun 2 13:00
- End
- Wed Jun 3 11:20
- For
- Warehouse stock
- Order due
- Wed Jun 3 17:00
- Order
- At risk, 5.7 h to spare
22" Touch Monitor
- State
- Held in the frozen window
- Quantity
- 80
- Start
- Wed Jun 3 11:50
- End
- Wed Jun 3 13:40
- Changeover
- 5 min
- For
- ACCOUNT 1466, Gold
- Order due
- Fri Jun 5 15:00
- Order
- On time, 2.1 d to spare
24" FHD Monitor, IPS
- State
- Held in the frozen window
- Quantity
- 370
- Start
- Wed Jun 3 13:50
- End
- Wed Jun 3 22:35
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Fri Jun 5 17:00
- Order
- On time, 42 h to spare
Ergonomic Mouse, wireless, gray
- State
- Held in the frozen window
- Quantity
- 390
- Start
- Wed Jun 3 22:35
- End
- Thu Jun 4 09:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.3 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 190
- Start
- Thu Jun 4 09:00
- End
- Thu Jun 4 13:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.1 d to spare
10" Tablet, 64GB
- State
- Planned
- Quantity
- 120
- Start
- Thu Jun 4 13:55
- End
- Thu Jun 4 15:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 4.0 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 485
- Start
- Thu Jun 4 15:50
- End
- Thu Jun 4 20:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.9 d to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 30
- Start
- Thu Jun 4 20:00
- End
- Thu Jun 4 21:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.8 d to spare
Thin Client, 4GB / 32GB
- State
- Planned
- Quantity
- 30
- Start
- Thu Jun 4 21:05
- End
- Thu Jun 4 22:10
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Mon Jun 8 17:00
- Order
- On time, 3.8 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 80
- Start
- Thu Jun 4 22:10
- End
- Fri Jun 5 07:25
- Changeover
- 10 min
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.3 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 150
- Start
- Fri Jun 5 09:05
- End
- Fri Jun 5 13:00
- Changeover
- 15 min
- For
- ACCOUNT 8733, Silver
- Order due
- Tue Jun 9 15:00
- Order
- On time, 4.1 d to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 245
- Start
- Fri Jun 5 13:00
- End
- Fri Jun 5 16:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 4.0 d to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 415
- Start
- Fri Jun 5 16:50
- End
- Fri Jun 5 20:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 3.9 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 430
- Start
- Fri Jun 5 20:10
- End
- Mon Jun 8 06:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 34 h to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 85
- Start
- Mon Jun 8 06:35
- End
- Mon Jun 8 08:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 33 h to spare
USB-C Travel Hub, 7-in-1, gray
- State
- Planned
- Quantity
- 230
- Start
- Mon Jun 8 08:10
- End
- Mon Jun 8 11:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 30 h to spare
USB-C Dock, 100W, dual display
- State
- Planned
- Quantity
- 140
- Start
- Mon Jun 8 11:25
- End
- Mon Jun 8 12:55
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Tue Jun 9 17:00
- Order
- On time, 28 h to spare
All-in-One 24", 16GB / 512GB
- State
- Planned
- Quantity
- 45
- Start
- Mon Jun 8 12:55
- End
- Mon Jun 8 14:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.1 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 130
- Start
- Mon Jun 8 14:40
- End
- Mon Jun 8 15:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Mon Jun 8 15:55
- End
- Mon Jun 8 16:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 2.0 d to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 415
- Start
- Mon Jun 8 16:30
- End
- Mon Jun 8 21:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 10 17:00
- Order
- On time, 43 h to spare
KVM Switch, 2-port 4K
- State
- Planned
- Quantity
- 540
- Start
- Mon Jun 8 21:50
- End
- Tue Jun 9 10:40
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.3 d to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 155
- Start
- Tue Jun 9 10:40
- End
- Tue Jun 9 13:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.1 d to spare
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 95
- Start
- Tue Jun 9 13:30
- End
- Tue Jun 9 16:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 2.0 d to spare
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 125
- Start
- Tue Jun 9 16:10
- End
- Tue Jun 9 18:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 47 h to spare
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 85
- Start
- Tue Jun 9 18:25
- End
- Tue Jun 9 22:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.8 d to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 25
- Start
- Wed Jun 10 06:00
- End
- Wed Jun 10 06:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 11 17:00
- Order
- On time, 34 h to spare
Wi-Fi 6 Access Point, ceiling
- State
- Planned
- Quantity
- 100
- Start
- Wed Jun 10 06:40
- End
- Wed Jun 10 08:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.4 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Wed Jun 10 08:10
- End
- Wed Jun 10 11:15
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 2.2 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 355
- Start
- Wed Jun 10 12:35
- End
- Wed Jun 10 20:40
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Fri Jun 12 17:00
- Order
- On time, 44 h to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 450
- Start
- Wed Jun 10 20:40
- End
- Thu Jun 11 06:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.4 d to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 365
- Start
- Thu Jun 11 06:45
- End
- Thu Jun 11 13:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.2 d to spare
Mini PC, 8-core, 16GB / 512GB, gray
- State
- Planned
- Quantity
- 140
- Start
- Thu Jun 11 13:20
- End
- Thu Jun 11 17:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 4.0 d to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 12 06:00
- End
- Fri Jun 12 08:35
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.4 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 435
- Start
- Fri Jun 12 08:35
- End
- Fri Jun 12 12:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 3.2 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 265
- Start
- Fri Jun 12 12:25
- End
- Fri Jun 12 19:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 15 17:00
- Order
- On time, 2.9 d to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Fri Jun 12 20:30
- End
- Fri Jun 12 22:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 3.8 d to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 155
- Start
- Mon Jun 15 06:00
- End
- Mon Jun 15 10:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 30 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 400
- Start
- Mon Jun 15 10:35
- End
- Mon Jun 15 13:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 27 h to spare
1TB NVMe SSD, gray
- State
- Planned
- Quantity
- 300
- Start
- Mon Jun 15 13:45
- End
- Mon Jun 15 16:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 16 17:00
- Order
- On time, 25 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Mon Jun 15 16:25
- End
- Mon Jun 15 20:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
Thin Client, 4GB / 32GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Mon Jun 15 20:35
- End
- Mon Jun 15 21:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 44 h to spare
Wi-Fi 6 Access Point, ceiling, refresh
- State
- Planned
- Quantity
- 75
- Start
- Mon Jun 15 21:25
- End
- Mon Jun 15 22:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 42 h to spare
8-Port Gigabit Switch
- State
- Planned
- Quantity
- 160
- Start
- Mon Jun 15 22:45
- End
- Tue Jun 16 08:35
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 32 h to spare
Mechanical Keyboard, TKL
- State
- Planned
- Quantity
- 260
- Start
- Tue Jun 16 08:35
- End
- Tue Jun 16 11:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 17 17:00
- Order
- On time, 30 h to spare
4-Bay NAS Enclosure, gray
- State
- Planned
- Quantity
- 120
- Start
- Tue Jun 16 11:10
- End
- Tue Jun 16 12:15
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
128GB USB Flash Drive, 10-pack
- State
- Planned
- Quantity
- 110
- Start
- Tue Jun 16 12:15
- End
- Tue Jun 16 13:15
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.2 d to spare
1080p Webcam with mic
- State
- Planned
- Quantity
- 350
- Start
- Tue Jun 16 13:15
- End
- Tue Jun 16 16:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 2.0 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 380
- Start
- Tue Jun 16 16:05
- End
- Wed Jun 17 07:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 33 h to spare
4K Conference Camera, gray
- State
- Planned
- Quantity
- 125
- Start
- Wed Jun 17 07:45
- End
- Wed Jun 17 09:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 18 17:00
- Order
- On time, 32 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 30
- Start
- Wed Jun 17 09:00
- End
- Wed Jun 17 09:50
- Changeover
- 15 min
- For
- ENGINEERING, Internal
- Order due
- Fri Jun 19 12:00
- Order
- On time, 2.1 d to spare
24" FHD Monitor, IPS
- State
- Planned
- Quantity
- 280
- Start
- Wed Jun 17 09:50
- End
- Wed Jun 17 16:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 2.0 d to spare
15" Laptop, 12-core, 32GB / 1TB, gray
- State
- Planned
- Quantity
- 110
- Start
- Wed Jun 17 16:40
- End
- Wed Jun 17 19:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 19 17:00
- Order
- On time, 46 h to spare
Ergonomic Mouse, wireless, gray
- State
- Planned
- Quantity
- 370
- Start
- Wed Jun 17 19:20
- End
- Wed Jun 17 22:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.8 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 215
- Start
- Wed Jun 17 22:35
- End
- Thu Jun 18 11:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 4.2 d to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 430
- Start
- Thu Jun 18 11:10
- End
- Thu Jun 18 14:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 5.1 d to spare
4K Conference Camera
- State
- Planned
- Quantity
- 410
- Start
- Thu Jun 18 15:40
- End
- Thu Jun 18 19:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 4.9 d to spare
4-Bay NAS Enclosure, refresh
- State
- Planned
- Quantity
- 485
- Start
- Fri Jun 19 06:00
- End
- Fri Jun 19 09:40
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 22 17:00
- Order
- On time, 3.3 d to spare
128GB USB Flash Drive, 10-pack, refresh
- State
- Planned
- Quantity
- 140
- Start
- Fri Jun 19 12:00
- End
- Fri Jun 19 13:15
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 5.2 d to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 150
- Start
- Fri Jun 19 16:35
- End
- Fri Jun 19 20:55
- Changeover
- 15 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jun 24 15:00
- Order
- On time, 4.8 d to spare
8" Rugged Tablet, 64GB
- State
- Planned
- Quantity
- 110
- Start
- Mon Jun 22 06:00
- End
- Mon Jun 22 07:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 23 17:00
- Order
- On time, 33 h to spare
Thunderbolt Dock, 4 ports
- State
- Planned
- Quantity
- 410
- Start
- Mon Jun 22 07:55
- End
- Mon Jun 22 13:10
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 2.2 d to spare
Ergonomic Mouse, wireless
- State
- Planned
- Quantity
- 590
- Start
- Mon Jun 22 13:10
- End
- Mon Jun 22 17:45
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jun 24 17:00
- Order
- On time, 47 h to spare
Chromebook 11", 4GB / 64GB, refresh
- State
- Planned
- Quantity
- 165
- Start
- Mon Jun 22 17:45
- End
- Mon Jun 22 21:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.8 d to spare
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Mon Jun 22 21:35
- End
- Tue Jun 23 07:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.4 d to spare
27" QHD Monitor, 165Hz, refresh
- State
- Planned
- Quantity
- 365
- Start
- Tue Jun 23 07:30
- End
- Tue Jun 23 15:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 2.0 d to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 400
- Start
- Tue Jun 23 16:00
- End
- Wed Jun 24 08:25
- Changeover
- 10 min
- For
- ACCOUNT 7463, Gold
- Order due
- Thu Jun 25 15:00
- Order
- On time, 31 h to spare
8" Rugged Tablet, 64GB, gray
- State
- Planned
- Quantity
- 20
- Start
- Wed Jun 24 08:25
- End
- Wed Jun 24 09:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jun 25 17:00
- Order
- On time, 32 h to spare
Tower Workstation, 32GB / 1TB
- State
- Planned
- Quantity
- 40
- Start
- Wed Jun 24 09:10
- End
- Wed Jun 24 11:00
- Changeover
- 15 min
- For
- ACCOUNT 2800, Silver
- Order due
- Mon Jun 29 15:00
- Order
- On time, 5.2 d to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 385
- Start
- Wed Jun 24 20:00
- End
- Thu Jun 25 11:50
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Fri Jun 26 17:00
- Order
- On time, 29 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 400
- Start
- Thu Jun 25 12:30
- End
- Fri Jun 26 06:45
- Changeover
- 10 min
- For
- ACCOUNT 6021, Standard
- Order due
- Fri Jun 26 15:00
- Order
- On time, 8.2 h to spare
1TB NVMe SSD
- State
- Planned
- Quantity
- 410
- Start
- Fri Jun 26 06:45
- End
- Fri Jun 26 09:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.3 d to spare
Mesh Wi-Fi Kit, 3-pack
- State
- Planned
- Quantity
- 320
- Start
- Fri Jun 26 09:35
- End
- Fri Jun 26 15:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.1 d to spare
Tower Workstation, 32GB / 1TB, refresh
- State
- Planned
- Quantity
- 70
- Start
- Fri Jun 26 15:25
- End
- Fri Jun 26 17:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 3.0 d to spare
34" Ultrawide Monitor, curved
- State
- Planned
- Quantity
- 235
- Start
- Fri Jun 26 17:30
- End
- Mon Jun 29 07:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jun 29 17:00
- Order
- On time, 9.9 h to spare
14" Laptop, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 85
- Start
- Mon Jun 29 07:05
- End
- Mon Jun 29 09:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 32 h to spare
Chromebook 11", 4GB / 64GB
- State
- Planned
- Quantity
- 305
- Start
- Mon Jun 29 09:00
- End
- Mon Jun 29 14:50
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Tue Jun 30 17:00
- Order
- On time, 26 h to spare
15" Laptop, 12-core, 32GB / 1TB
- State
- Planned
- Quantity
- 195
- Start
- Mon Jun 29 14:50
- End
- Mon Jun 29 18:25
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 47 h to spare
27" QHD Monitor, 165Hz
- State
- Planned
- Quantity
- 350
- Start
- Mon Jun 29 18:25
- End
- Tue Jun 30 11:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 30 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 465
- Start
- Tue Jun 30 11:00
- End
- Wed Jul 1 06:55
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Wed Jul 1 17:00
- Order
- On time, 10 h to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 400
- Start
- Wed Jul 1 22:50
- End
- Thu Jul 2 17:50
- Changeover
- 10 min
- For
- ACCOUNT 3915, Standard
- Order due
- Thu Jul 2 15:00
- Order
- Late, 2.8 h late
4K Conference Camera, gray
- State
- Planned
- Quantity
- 105
- Start
- Thu Jul 2 17:50
- End
- Thu Jul 2 19:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 2 17:00
- Order
- Late, 2.5 h late
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 220
- Start
- Thu Jul 2 19:30
- End
- Mon Jul 6 07:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- On time, 9.4 h to spare
14" Laptop, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 450
- Start
- Mon Jul 6 07:35
- End
- Mon Jul 6 16:20
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Mon Jul 6 17:00
- Order
- At risk, 0.7 h to spare
22" Touch Monitor, gray
- State
- Planned
- Quantity
- 80
- Start
- Mon Jul 6 16:20
- End
- Mon Jul 6 19:15
- Changeover
- 15 min
- For
- ACCOUNT 3327, Gold
- Order due
- Tue Jul 7 15:00
- Order
- On time, 20 h to spare
Mesh Wi-Fi Kit, 3-pack, refresh
- State
- Planned
- Quantity
- 245
- Start
- Mon Jul 6 19:15
- End
- Tue Jul 7 06:05
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- On time, 11 h to spare
4-Bay NAS Enclosure
- State
- Planned
- Quantity
- 530
- Start
- Tue Jul 7 06:05
- End
- Tue Jul 7 09:35
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 7.4 h to spare
4K Conference Camera
- State
- Planned
- Quantity
- 490
- Start
- Tue Jul 7 09:35
- End
- Tue Jul 7 13:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Tue Jul 7 17:00
- Order
- At risk, 3.1 h to spare
Wi-Fi 6E Router
- State
- Planned
- Quantity
- 20
- Start
- Tue Jul 7 13:55
- End
- Tue Jul 7 14:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- On time, 26 h to spare
27" 4K Monitor, USB-C, refresh
- State
- Planned
- Quantity
- 120
- Start
- Tue Jul 7 14:35
- End
- Tue Jul 7 17:30
- Changeover
- 15 min
- For
- ACCOUNT 7702, Gold
- Order due
- Wed Jul 8 15:00
- Order
- On time, 22 h to spare
27" 4K Monitor, USB-C
- State
- Planned
- Quantity
- 365
- Start
- Tue Jul 7 20:20
- End
- Wed Jul 8 11:35
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 2.2 d to spare
34" Ultrawide Monitor, curved, gray
- State
- Planned
- Quantity
- 80
- Start
- Wed Jul 8 15:55
- End
- Wed Jul 8 18:25
- Changeover
- 10 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- On time, 47 h to spare
22" Touch Monitor
- State
- Planned
- Quantity
- 300
- Start
- Thu Jul 9 09:15
- End
- Thu Jul 9 16:15
- Changeover
- 10 min
- For
- ACCOUNT 6021, Standard
- Order due
- Wed Jul 8 15:00
- Order
- Late, 25 h late
24-Port PoE Switch, managed
- State
- Planned
- Quantity
- 115
- Start
- Thu Jul 9 16:15
- End
- Thu Jul 9 18:25
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 1.4 h late
14" Rugged Laptop, 16GB / 256GB
- State
- Planned
- Quantity
- 415
- Start
- Thu Jul 9 19:00
- End
- Fri Jul 10 11:00
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Wed Jul 8 17:00
- Order
- Late, 42 h late
24-Port PoE Switch, managed, refresh
- State
- Planned
- Quantity
- 160
- Start
- Fri Jul 10 11:00
- End
- Fri Jul 10 13:55
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 21 h late
Mini PC, 8-core, 16GB / 512GB, refresh
- State
- Planned
- Quantity
- 90
- Start
- Fri Jul 10 13:55
- End
- Fri Jul 10 16:30
- Changeover
- 15 min
- For
- Warehouse stock
- Order due
- Thu Jul 9 17:00
- Order
- Late, 24 h late
Mini PC, 8-core, 16GB / 512GB
- State
- Planned
- Quantity
- 90
- Start
- Fri Jul 10 16:30
- End
- Fri Jul 10 20:00
- Changeover
- 5 min
- For
- Warehouse stock
- Order due
- Fri Jul 10 17:00
- Order
- Late, 3.0 h late
Orders
Projected start and finish for every work order, with the reason and the fix for anything late. Click an order to open its routing, materials and diagnosis.
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | May 20 17:50 | May 26 13:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 22 19:55 | May 26 12:35 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | May 22 22:55 | May 27 11:50 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | May 26 11:10 | May 29 05:55 | 0 | 0.0 | 0.0 | Finished | |
| 45 | CFG | CFG-01 | May 29 06:25 | Jun 1 09:00 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 1 16:20 | Jun 2 06:55 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71286 |
| Released | Sat May 9 06:00 |
| Due | Mon Jun 1 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 1 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 1 06:00 | On hand |
| Power module | Aster Power | Sat May 2 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri May 1 06:00 | On hand |
| Display panel | Brightline Displays | Sun May 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | May 26 14:35 | May 28 05:00 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 27 14:25 | May 28 13:30 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-05 | May 27 22:20 | Jun 1 07:45 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | May 31 19:20 | Jun 2 04:20 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 2 13:00 | Jun 3 11:20 | 0 | 4.8 | 0.0 | Running |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2889 |
| Released | Sat May 16 06:00 |
| Due | Wed Jun 3 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 4.8 h |
| Sequence position | 1 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 13 06:00 | On hand |
| Power module | Aster Power | Wed May 13 06:00 | On hand |
| Display panel | Brightline Displays | Tue May 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | May 28 18:05 | Jun 2 01:15 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | Jun 1 13:30 | Jun 2 14:35 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | Jun 1 16:25 | Jun 3 22:25 | 0 | 15.4 | 0.0 | Running | |
| 40 | TB | TB-03 | Jun 3 03:00 | Jun 6 02:55 | 0 | 68.9 | 0.0 | Running | |
| 50 | PK | PK-01 | Jun 8 06:05 | Jun 8 15:00 | 5 | 8.3 | 0.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2766 |
| Released | Sun May 17 06:00 |
| Due | Mon Jun 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 92.8 h |
| Sequence position | 12 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 14 06:00 | On hand |
| Power module | Aster Power | Thu May 14 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri May 15 06:00 | On hand |
| Display panel | Brightline Displays | Sun May 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | May 26 04:35 | May 27 11:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 26 20:25 | May 27 13:20 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | May 27 10:40 | May 28 13:55 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-03 | May 29 13:05 | May 31 01:00 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 1 09:15 | Jun 1 14:10 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2827 |
| Released | Tue May 19 06:00 |
| Due | Tue Jun 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 16 06:00 | On hand |
| Power module | Aster Power | Tue May 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun May 17 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 2 09:25 | Jun 5 10:00 | 0 | 49.8 | 0.0 | Running | |
| 20 | SUB | SUB-A | Jun 4 08:15 | Jun 5 13:05 | 50 | 19.5 | 11.0 | Planned | |
| 30 | FA | FA-03 | Jun 4 11:55 | Jun 9 06:40 | 25 | 42.8 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 6 12:15 | Jun 9 21:20 | 35 | 80.5 | 43.1 | Planned | |
| 50 | PK | PK-01 | Jun 9 21:50 | Jun 10 15:00 | 15 | 9.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2833 |
| Released | Tue May 19 06:00 |
| Due | Wed Jun 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 204.1 h |
| Sequence position | 31 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 17 06:00 | On hand |
| Power module | Aster Power | Sat May 16 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 12 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | May 22 06:00 | May 22 22:50 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 26 07:00 | May 26 15:15 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-05 | May 26 13:55 | May 27 13:50 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | May 29 07:35 | May 30 13:30 | 0 | 0.0 | 0.0 | Finished | |
| 45 | CFG | CFG-01 | Jun 1 16:05 | Jun 2 09:05 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 2 09:35 | Jun 2 14:20 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71130 |
| Released | Tue May 19 06:00 |
| Due | Tue Jun 2 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 13 06:00 | On hand |
| Power module | Aster Power | Tue May 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat May 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | May 22 16:50 | May 26 04:35 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 26 12:35 | May 26 18:30 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | May 26 18:10 | May 27 14:15 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | May 29 05:55 | May 30 04:00 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 1 06:00 | Jun 1 09:15 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2635 |
| Released | Thu May 21 06:00 |
| Due | Tue Jun 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 19 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 15 06:00 | On hand |
| Power module | Aster Power | Tue May 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun May 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | May 22 17:20 | May 26 04:35 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 26 14:40 | May 26 19:50 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | May 26 17:50 | May 27 10:40 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | May 29 06:00 | May 29 22:00 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | May 29 22:30 | Jun 1 06:15 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2722 |
| Released | Thu May 21 06:00 |
| Due | Tue Jun 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 19 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 14 06:00 | On hand |
| Power module | Aster Power | Tue May 19 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon May 11 06:00 | On hand |
| Display panel | Brightline Displays | Wed May 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | May 26 07:15 | May 27 08:50 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 27 10:30 | May 27 21:10 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-06 | May 27 16:35 | May 29 09:40 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-03 | May 31 04:00 | Jun 1 00:25 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 1 17:20 | Jun 2 08:35 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2751 |
| Released | Thu May 21 06:00 |
| Due | Wed Jun 3 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 19 06:00 | On hand |
| Power module | Aster Power | Mon May 11 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 16 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | May 27 08:50 | May 28 11:50 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 27 22:55 | May 28 17:30 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | May 28 14:00 | Jun 1 07:30 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 1 08:05 | Jun 2 06:30 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 2 19:55 | Jun 3 10:45 | 0 | 4.2 | 0.0 | Running |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2785 |
| Released | Thu May 21 06:00 |
| Due | Thu Jun 4 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 4.2 h |
| Sequence position | 2 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 18 06:00 | On hand |
| Power module | Aster Power | Fri May 15 06:00 | On hand |
| Display panel | Brightline Displays | Sun May 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | May 22 22:15 | May 26 07:15 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 26 19:35 | May 26 22:45 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | May 27 11:50 | May 27 18:10 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | May 30 04:00 | May 30 17:40 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 1 07:35 | Jun 1 10:50 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2869 |
| Released | Thu May 21 06:00 |
| Due | Tue Jun 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 12 06:00 | On hand |
| Power module | Aster Power | Sun May 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | May 26 06:40 | May 27 05:15 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 26 21:45 | May 27 12:10 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | May 27 15:25 | May 28 13:30 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | May 30 17:40 | May 31 19:20 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 1 14:10 | Jun 1 17:20 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2664 |
| Released | Fri May 22 06:00 |
| Due | Wed Jun 3 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 16 06:00 | On hand |
| Power module | Aster Power | Tue May 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 19 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | May 26 06:00 | May 26 14:35 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 26 22:45 | May 27 10:00 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-05 | May 27 13:50 | May 27 22:20 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | May 30 13:30 | May 31 04:00 | 0 | 0.0 | 0.0 | Finished | |
| 45 | CFG | CFG-02 | Jun 1 06:00 | Jun 1 10:40 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 1 10:55 | Jun 1 13:10 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71208 |
| Released | Fri May 22 06:00 |
| Due | Wed Jun 3 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 19 06:00 | On hand |
| Power module | Aster Power | Mon May 18 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | May 27 17:35 | May 28 18:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 28 13:50 | May 29 07:05 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-06 | May 29 15:35 | Jun 1 17:25 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-03 | Jun 1 14:50 | Jun 2 10:20 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 3 13:50 | Jun 3 22:35 | 10 | 8.1 | 7.3 | Frozen |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2674 |
| Released | Sat May 23 06:00 |
| Due | Fri Jun 5 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 8.2 h |
| Sequence position | 5 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 21 06:00 | On hand |
| Power module | Aster Power | Wed May 20 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | May 26 06:00 | May 26 09:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 26 19:00 | May 26 20:20 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | May 27 14:15 | May 27 16:20 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | May 31 01:00 | May 31 05:25 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 1 13:10 | Jun 1 13:55 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2707 |
| Released | Sun May 24 06:00 |
| Due | Wed Jun 3 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 22 06:00 | On hand |
| Power module | Aster Power | Sat May 16 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri May 15 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | May 27 23:20 | May 28 23:55 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 28 16:40 | May 29 07:45 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | May 28 20:00 | May 29 19:10 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | Jun 2 04:20 | Jun 3 04:20 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 3 12:55 | Jun 3 16:05 | 15 | 2.9 | 6.4 | Frozen |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2717 |
| Released | Sun May 24 06:00 |
| Due | Fri Jun 5 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 3.2 h |
| Sequence position | 6 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 15 06:00 | On hand |
| Power module | Aster Power | Mon May 18 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat May 16 06:00 | On hand |
| Display panel | Brightline Displays | Sun May 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | May 28 04:50 | May 29 02:55 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 28 17:35 | May 29 07:55 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | May 28 21:05 | May 29 18:20 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 2 06:00 | Jun 3 03:50 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 3 16:05 | Jun 3 19:25 | 10 | 2.7 | 9.6 | Frozen |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2761 |
| Released | Sun May 24 06:00 |
| Due | Fri Jun 5 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 2.8 h |
| Sequence position | 7 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 17 06:00 | On hand |
| Power module | Aster Power | Thu May 21 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri May 22 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | May 28 05:00 | May 29 18:15 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 29 13:15 | May 29 19:50 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | May 29 15:10 | Jun 1 06:25 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | Jun 3 06:00 | Jun 3 15:55 | 35 | 9.3 | 0.0 | Frozen | |
| 50 | PK | PK-01 | Jun 3 19:25 | Jun 4 06:30 | 15 | 3.8 | 2.5 | Frozen |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2818 |
| Released | Sun May 24 06:00 |
| Due | Fri Jun 5 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 14.0 h |
| Sequence position | 8 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 21 06:00 | On hand |
| Power module | Aster Power | Wed May 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | May 26 09:05 | May 27 06:30 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 27 13:20 | May 27 17:50 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | May 27 20:20 | May 28 11:35 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | May 31 10:50 | Jun 1 00:00 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 2 09:35 | Jun 2 13:00 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2850 |
| Released | Sun May 24 06:00 |
| Due | Wed Jun 3 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 15 06:00 | On hand |
| Power module | Aster Power | Sat May 16 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | May 28 06:00 | May 28 21:15 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 29 07:45 | May 29 13:00 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | May 29 19:10 | Jun 1 08:05 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-03 | Jun 2 10:20 | Jun 3 03:00 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 4 06:30 | Jun 4 08:40 | 15 | 1.9 | 16.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2860 |
| Released | Sun May 24 06:00 |
| Due | Fri Jun 5 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 2.2 h |
| Sequence position | 9 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 19 06:00 | On hand |
| Power module | Aster Power | Sun May 17 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon May 18 06:00 | On hand |
| Display panel | Brightline Displays | Mon May 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | May 27 14:05 | May 28 04:50 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 28 11:05 | May 28 13:50 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | May 28 13:55 | May 28 18:10 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-03 | Jun 1 06:55 | Jun 1 10:55 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 3 10:45 | Jun 3 12:25 | 15 | 1.4 | 4.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2913 |
| Released | Sun May 24 06:00 |
| Due | Thu Jun 4 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 1.7 h |
| Sequence position | 3 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Fri May 15 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | May 27 06:30 | May 27 13:50 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 27 21:20 | May 27 22:55 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | May 28 11:35 | May 28 14:00 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 1 03:35 | Jun 1 07:55 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 1 15:10 | Jun 1 16:10 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2688 |
| Released | Mon May 25 06:00 |
| Due | Thu Jun 4 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 19 06:00 | On hand |
| Power module | Aster Power | Tue May 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | May 26 11:05 | May 26 17:45 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 27 12:10 | May 27 14:25 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | May 27 16:20 | May 27 20:20 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | May 31 05:25 | May 31 10:50 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 1 13:55 | Jun 1 15:10 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2808 |
| Released | Mon May 25 06:00 |
| Due | Wed Jun 3 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Sun May 17 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | May 27 05:15 | May 27 17:35 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 27 17:50 | May 27 21:20 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | May 27 19:45 | May 28 08:35 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 1 00:00 | Jun 1 03:35 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 2 14:20 | Jun 2 16:55 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2932 |
| Released | Mon May 25 06:00 |
| Due | Wed Jun 3 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 18 06:00 | On hand |
| Power module | Aster Power | Fri May 22 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | May 27 06:00 | May 27 14:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 27 21:10 | May 27 23:00 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | May 28 08:35 | May 28 12:05 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-03 | Jun 1 00:25 | Jun 1 06:55 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 2 07:50 | Jun 2 09:10 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2645 |
| Released | Tue May 26 06:00 |
| Due | Thu Jun 4 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 17 06:00 | On hand |
| Power module | Aster Power | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | May 27 06:00 | May 27 18:20 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 28 06:00 | May 28 09:00 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | May 28 13:30 | May 28 19:50 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 1 06:00 | Jun 1 09:35 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-01 | Jun 2 16:55 | Jun 2 19:55 | 0 | 0.0 | 0.0 | Finished |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2732 |
| Released | Tue May 26 06:00 |
| Due | Thu Jun 4 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 0.0 h |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Thu May 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 4 12:00 | Jun 5 12:25 | 90 | 21.9 | 0.0 | Frozen | |
| 20 | SUB | SUB-C | Jun 4 20:45 | Jun 5 14:05 | 50 | 9.0 | 3.4 | Planned | |
| 30 | FA | FA-06 | Jun 5 06:00 | Jun 8 15:25 | 45 | 24.2 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 7 22:35 | Jun 8 18:10 | 35 | 19.0 | 60.4 | Planned | |
| 50 | PK | PK-01 | Jun 9 08:25 | Jun 9 17:20 | 15 | 8.2 | 6.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2786 |
| Released | Tue May 26 06:00 |
| Due | Thu Jun 11 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 86.2 h |
| Sequence position | 37 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 7 23:00 | Jun 10 00:15 | 45 | 46.0 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jun 9 16:10 | Jun 10 15:05 | 50 | 14.1 | 24.6 | Planned | |
| 30 | FA | FA-01 | Jun 9 19:50 | Jun 11 19:35 | 45 | 31.0 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 10 08:20 | Jun 12 19:05 | 35 | 58.2 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 12 19:35 | Jun 15 09:35 | 10 | 6.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Expedite the SoC module to arrive by Thu Jun 4 13:25. Everything else fits before the due date.
Order
| Reference | RP-2885 |
| Released | Tue May 26 06:00 |
| Due | Fri Jun 12 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 159.2 h |
| Sequence position | 47 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Wed May 20 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jun 7 06:00 | In transit |
| Display panel | Brightline Displays | Tue May 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | May 27 16:45 | May 27 23:20 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 28 13:30 | May 28 15:50 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-06 | May 29 09:40 | May 29 15:35 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 1 09:35 | Jun 1 14:10 | 0 | 0.0 | 0.0 | Finished | |
| 45 | CFG | CFG-02 | Jun 2 06:00 | Jun 2 11:55 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 3 11:50 | Jun 3 13:40 | 5 | 1.8 | 5.3 | Frozen |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71104 |
| Released | Wed May 27 06:00 |
| Due | Fri Jun 5 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 1.8 h |
| Sequence position | 4 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 18 06:00 | On hand |
| Power module | Aster Power | Thu May 21 06:00 | On hand |
| Display panel | Brightline Displays | Tue May 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | May 28 06:00 | May 28 21:45 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 29 07:55 | May 29 13:50 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | Jun 1 09:50 | Jun 2 06:20 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 3 03:50 | Jun 3 13:45 | 0 | 7.8 | 0.0 | Running | |
| 50 | PK | PK-02 | Jun 4 09:00 | Jun 4 13:55 | 15 | 4.2 | 11.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2679 |
| Released | Thu May 28 06:00 |
| Due | Mon Jun 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.2 h |
| Sequence position | 11 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 24 06:00 | On hand |
| Power module | Aster Power | Mon May 18 06:00 | On hand |
| Display panel | Brightline Displays | Fri May 22 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | May 29 20:10 | Jun 1 08:30 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | Jun 1 09:35 | Jun 1 13:15 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | Jun 1 22:45 | Jun 2 09:15 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | Jun 4 10:10 | Jun 4 23:40 | 15 | 13.2 | 28.2 | Planned | |
| 50 | PK | PK-02 | Jun 5 16:50 | Jun 5 20:10 | 15 | 2.6 | 10.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2703 |
| Released | Thu May 28 06:00 |
| Due | Tue Jun 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 16.3 h |
| Sequence position | 21 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 25 06:00 | On hand |
| Power module | Aster Power | Tue May 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 3 05:05 | Jun 4 01:50 | 0 | 18.8 | 0.0 | Running | |
| 20 | SUB | SUB-B | Jun 4 06:50 | Jun 4 14:10 | 50 | 6.0 | 10.0 | Planned | |
| 30 | FA | FA-05 | Jun 4 09:55 | Jun 5 07:55 | 45 | 13.2 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 6 08:30 | Jun 7 09:50 | 35 | 24.8 | 40.8 | Planned | |
| 50 | PK | PK-01 | Jun 8 22:15 | Jun 9 08:25 | 15 | 2.9 | 15.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2713 |
| Released | Thu May 28 06:00 |
| Due | Thu Jun 11 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 68.2 h |
| Sequence position | 35 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 18 06:00 | On hand |
| Power module | Aster Power | Fri May 22 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu May 21 06:00 | On hand |
| Display panel | Brightline Displays | Wed May 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | May 28 21:15 | May 29 20:10 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 29 17:00 | May 29 21:30 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | Jun 1 12:25 | Jun 1 21:10 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | Jun 3 15:55 | Jun 4 10:10 | 35 | 17.7 | 9.9 | Frozen | |
| 50 | PK | PK-02 | Jun 4 15:50 | Jun 4 20:00 | 15 | 3.4 | 5.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2838 |
| Released | Thu May 28 06:00 |
| Due | Mon Jun 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 21.9 h |
| Sequence position | 14 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 24 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 19 06:00 | On hand |
| Power module | Aster Power | Mon May 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 2 03:30 | Jun 4 01:55 | 0 | 18.9 | 0.0 | Running | |
| 20 | SUB | SUB-B | Jun 3 16:10 | Jun 4 06:50 | 50 | 6.3 | 4.2 | Frozen | |
| 30 | FA | FA-02 | Jun 3 18:05 | Jun 4 13:50 | 25 | 11.3 | 0.0 | Frozen | |
| 40 | TB | TB-01 | Jun 5 20:45 | Jun 6 08:30 | 35 | 11.2 | 48.1 | Planned | |
| 50 | PK | PK-02 | Jun 8 16:30 | Jun 8 21:50 | 15 | 4.6 | 10.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2875 |
| Released | Thu May 28 06:00 |
| Due | Wed Jun 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 54.4 h |
| Sequence position | 32 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 19 06:00 | On hand |
| Power module | Aster Power | Tue May 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | May 29 10:55 | May 29 19:45 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 29 21:30 | Jun 1 06:35 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-05 | Jun 1 21:05 | Jun 2 11:10 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 3 14:10 | Jun 4 05:30 | 35 | 14.8 | 8.2 | Frozen | |
| 45 | CFG | CFG-01 | Jun 4 06:00 | Jun 4 11:55 | 25 | 5.0 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jun 4 22:10 | Jun 5 07:25 | 10 | 2.1 | 9.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71039 |
| Released | Thu May 28 06:00 |
| Due | Tue Jun 9 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 23.0 h |
| Sequence position | 17 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 25 06:00 | On hand |
| Power module | Aster Power | Thu May 21 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu May 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | May 29 06:00 | May 29 22:25 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | May 29 19:50 | Jun 1 06:45 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | May 29 21:20 | Jun 1 07:45 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 1 14:10 | Jun 1 18:50 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 3 22:35 | Jun 4 09:00 | 15 | 3.2 | 15.6 | Frozen |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2631 |
| Released | Fri May 29 06:00 |
| Due | Mon Jun 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 3.4 h |
| Sequence position | 10 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 21 06:00 | On hand |
| Power module | Aster Power | Thu May 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | May 29 19:55 | Jun 1 14:50 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | Jun 1 15:15 | Jun 1 21:30 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | Jun 1 21:10 | Jun 2 12:20 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 4 12:10 | Jun 5 06:05 | 35 | 17.3 | 30.2 | Planned | |
| 50 | PK | PK-02 | Jun 5 13:00 | Jun 5 16:50 | 15 | 3.6 | 5.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2660 |
| Released | Fri May 29 06:00 |
| Due | Tue Jun 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 21.8 h |
| Sequence position | 20 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 25 06:00 | On hand |
| Power module | Aster Power | Wed May 20 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun May 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 2 05:30 | Jun 4 07:00 | 0 | 23.8 | 0.0 | Running | |
| 20 | SUB | SUB-C | Jun 4 06:00 | Jun 4 14:30 | 50 | 7.2 | 11.2 | Planned | |
| 30 | FA | FA-01 | Jun 4 07:45 | Jun 4 22:20 | 45 | 12.8 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 6 08:15 | Jun 6 21:25 | 35 | 12.6 | 46.2 | Planned | |
| 50 | PK | PK-02 | Jun 8 21:50 | Jun 9 10:40 | 10 | 5.2 | 14.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2670 |
| Released | Fri May 29 06:00 |
| Due | Thu Jun 11 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 63.8 h |
| Sequence position | 34 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 19 06:00 | On hand |
| Power module | Aster Power | Wed May 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 1 02:05 | Jun 1 18:15 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | Jun 1 15:25 | Jun 1 21:15 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | Jun 2 06:40 | Jun 2 17:40 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | Jun 4 23:40 | Jun 5 18:35 | 35 | 18.3 | 41.7 | Planned | |
| 50 | PK | PK-01 | Jun 5 19:05 | Jun 5 21:20 | 5 | 2.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2747 |
| Released | Fri May 29 06:00 |
| Due | Tue Jun 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 21.2 h |
| Sequence position | 22 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 22 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat May 23 06:00 | On hand |
| Display panel | Brightline Displays | Wed May 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 1 20:20 | Jun 2 09:50 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | Jun 2 16:50 | Jun 2 21:10 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-05 | Jun 2 20:15 | Jun 3 08:30 | 0 | 2.5 | 0.0 | Running | |
| 40 | TB | TB-04 | Jun 5 06:05 | Jun 5 17:15 | 35 | 10.6 | 45.3 | Planned | |
| 50 | PK | PK-02 | Jun 8 06:35 | Jun 8 08:10 | 15 | 1.3 | 5.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2804 |
| Released | Fri May 29 06:00 |
| Due | Tue Jun 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 15.2 h |
| Sequence position | 24 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 26 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon May 25 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | May 29 06:00 | May 29 19:55 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 29 17:25 | May 29 22:30 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | Jun 1 08:55 | Jun 1 18:15 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 3 04:35 | Jun 3 18:00 | 0 | 12.0 | 0.0 | Running | |
| 50 | PK | PK-02 | Jun 4 13:55 | Jun 4 15:50 | 15 | 1.7 | 11.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2823 |
| Released | Fri May 29 06:00 |
| Due | Mon Jun 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 13.9 h |
| Sequence position | 13 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 23 06:00 | On hand |
| Power module | Aster Power | Wed May 27 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 27 06:00 | On hand |
| Display panel | Brightline Displays | Mon May 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 1 06:00 | Jun 2 13:35 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | Jun 2 16:25 | Jun 2 21:15 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | Jun 2 22:30 | Jun 3 09:00 | 0 | 3.0 | 0.0 | Running | |
| 40 | TB | TB-02 | Jun 4 13:55 | Jun 4 20:40 | 35 | 6.2 | 30.2 | Planned | |
| 50 | PK | PK-02 | Jun 8 08:10 | Jun 8 11:25 | 15 | 2.5 | 20.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2846 |
| Released | Fri May 29 06:00 |
| Due | Tue Jun 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.5 h |
| Sequence position | 25 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Wed May 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | May 29 06:00 | May 29 10:55 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | May 29 13:00 | May 29 15:10 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-05 | Jun 1 13:00 | Jun 1 16:45 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 2 16:40 | Jun 2 22:35 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 4 20:00 | Jun 4 21:05 | 15 | 0.8 | 29.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2865 |
| Released | Fri May 29 06:00 |
| Due | Mon Jun 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 1.1 h |
| Sequence position | 15 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 24 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | May 29 06:00 | May 29 11:55 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | May 29 13:50 | May 29 16:15 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-05 | Jun 1 16:45 | Jun 1 21:05 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 2 06:30 | Jun 2 13:35 | 0 | 0.0 | 0.0 | Finished | |
| 50 | PK | PK-02 | Jun 4 21:05 | Jun 4 22:10 | 10 | 0.9 | 30.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2899 |
| Released | Fri May 29 06:00 |
| Due | Mon Jun 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 1.1 h |
| Sequence position | 16 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 24 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | May 29 19:45 | Jun 1 02:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | Jun 1 06:00 | Jun 1 08:20 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-03 | Jun 1 08:35 | Jun 1 12:45 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 4 05:30 | Jun 4 12:10 | 35 | 6.1 | 23.5 | Frozen | |
| 45 | CFG | CFG-02 | Jun 4 12:40 | Jun 4 15:35 | 25 | 2.5 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 4 15:50 | Jun 4 16:45 | 10 | 0.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71247 |
| Released | Fri May 29 06:00 |
| Due | Tue Jun 9 15:00 |
| Priority and weight | 1, weight 5 |
| Touch time left | 10.5 h |
| Sequence position | 18 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 21 06:00 | On hand |
| Power module | Aster Power | Wed May 27 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 19 06:00 | On hand |
| Display panel | Brightline Displays | Wed May 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | May 29 18:15 | Jun 1 05:00 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | Jun 1 08:55 | Jun 1 13:45 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-06 | Jun 1 17:25 | Jun 2 10:50 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 4 06:00 | Jun 4 13:55 | 35 | 7.3 | 24.0 | Planned | |
| 45 | CFG | CFG-02 | Jun 4 15:35 | Jun 5 08:50 | 25 | 9.3 | 1.2 | Planned | |
| 50 | PK | PK-02 | Jun 5 09:05 | Jun 5 13:00 | 15 | 3.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71299 |
| Released | Fri May 29 06:00 |
| Due | Tue Jun 9 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 21.1 h |
| Sequence position | 19 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Tue May 19 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 3 06:00 | Jun 3 20:45 | 90 | 12.2 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jun 4 19:40 | Jun 5 07:50 | 25 | 4.8 | 19.4 | Planned | |
| 30 | FA | FA-04 | Jun 5 11:30 | Jun 5 22:45 | 5 | 10.7 | 5.0 | Planned | |
| 40 | TB | TB-03 | Jun 8 08:35 | Jun 9 05:25 | 35 | 20.2 | 62.4 | Planned | |
| 50 | PK | PK-02 | Jun 9 18:25 | Jun 9 22:00 | 15 | 2.8 | 11.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2651 |
| Released | Sat May 30 06:00 |
| Due | Fri Jun 12 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 53.6 h |
| Sequence position | 43 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Thu May 21 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 5 06:00 | Jun 8 19:50 | 45 | 34.8 | 45.8 | Planned | |
| 20 | SUB | SUB-C | Jun 8 12:10 | Jun 8 21:30 | 50 | 8.0 | 15.6 | Planned | |
| 30 | FA | FA-02 | Jun 8 14:25 | Jun 9 15:10 | 45 | 16.0 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 10 01:10 | Jun 11 06:05 | 35 | 28.3 | 31.5 | Planned | |
| 50 | PK | PK-02 | Jun 11 06:45 | Jun 11 13:20 | 15 | 5.8 | 0.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2699 |
| Released | Sat May 30 06:00 |
| Due | Mon Jun 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 96.2 h |
| Sequence position | 50 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 26 06:00 | On hand |
| Power module | Aster Power | Fri May 22 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 1 05:00 | Jun 1 20:20 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | Jun 1 21:30 | Jun 2 07:10 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | Jun 2 12:40 | Jun 2 20:50 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 3 18:20 | Jun 3 23:00 | 35 | 4.1 | 12.3 | Frozen | |
| 50 | PK | PK-02 | Jun 5 20:10 | Jun 8 06:35 | 15 | 3.2 | 29.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2771 |
| Released | Sat May 30 06:00 |
| Due | Tue Jun 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 8.1 h |
| Sequence position | 23 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 20 06:00 | On hand |
| Power module | Aster Power | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 3 23:10 | Jun 4 09:55 | 90 | 9.0 | 16.2 | Frozen | |
| 20 | SUB | SUB-B | Jun 4 14:10 | Jun 4 19:40 | 50 | 4.2 | 7.5 | Planned | |
| 30 | FA | FA-04 | Jun 4 17:30 | Jun 5 11:30 | 45 | 9.2 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 7 09:50 | Jun 8 03:55 | 35 | 17.5 | 50.9 | Planned | |
| 50 | PK | PK-02 | Jun 9 13:30 | Jun 9 16:10 | 15 | 2.4 | 23.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2856 |
| Released | Sat May 30 06:00 |
| Due | Thu Jun 11 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 46.2 h |
| Sequence position | 39 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Thu May 21 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 2 09:50 | Jun 3 05:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | Jun 2 22:10 | Jun 3 07:00 | 0 | 1.0 | 0.0 | Running | |
| 30 | FA | FA-01 | Jun 3 06:40 | Jun 3 16:00 | 45 | 8.1 | 0.0 | Frozen | |
| 40 | TB | TB-02 | Jun 6 02:55 | Jun 6 08:15 | 35 | 4.8 | 66.4 | Planned | |
| 50 | PK | PK-01 | Jun 8 17:50 | Jun 8 22:15 | 15 | 3.7 | 11.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2909 |
| Released | Sat May 30 06:00 |
| Due | Wed Jun 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 19.1 h |
| Sequence position | 33 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue May 26 06:00 | On hand |
| Power module | Aster Power | Wed May 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 4 15:15 | Jun 5 13:45 | 90 | 20.0 | 31.5 | Planned | |
| 20 | SUB | SUB-A | Jun 5 15:40 | Jun 8 08:10 | 50 | 8.2 | 11.6 | Planned | |
| 30 | FA | FA-04 | Jun 8 13:45 | Jun 9 20:40 | 25 | 22.0 | 11.8 | Planned | |
| 40 | TB | TB-02 | Jun 9 18:30 | Jun 10 12:05 | 15 | 17.3 | 24.9 | Planned | |
| 50 | PK | PK-02 | Jun 10 12:35 | Jun 10 20:40 | 10 | 7.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2919 |
| Released | Sat May 30 06:00 |
| Due | Fri Jun 12 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 78.1 h |
| Sequence position | 48 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 21 06:00 | On hand |
| Power module | Aster Power | Sat May 23 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 1 20:00 | Jun 2 03:10 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | Jun 2 13:05 | Jun 2 16:25 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-06 | Jun 2 18:20 | Jun 3 06:45 | 0 | 0.8 | 0.0 | Running | |
| 40 | TB | TB-02 | Jun 5 09:25 | Jun 5 20:30 | 35 | 10.5 | 50.4 | Planned | |
| 50 | PK | PK-02 | Jun 8 12:55 | Jun 8 14:40 | 15 | 1.5 | 8.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2641 |
| Released | Sun May 31 06:00 |
| Due | Wed Jun 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 13.6 h |
| Sequence position | 27 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 25 06:00 | On hand |
| Power module | Aster Power | Mon May 25 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 1 20:45 | Jun 2 03:30 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | Jun 2 13:45 | Jun 2 15:30 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | Jun 2 17:40 | Jun 2 21:05 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-04 | Jun 5 17:15 | Jun 5 22:50 | 35 | 5.0 | 59.2 | Planned | |
| 50 | PK | PK-02 | Jun 8 14:40 | Jun 8 15:55 | 15 | 1.0 | 8.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2684 |
| Released | Sun May 31 06:00 |
| Due | Wed Jun 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 6.8 h |
| Sequence position | 28 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 23 06:00 | On hand |
| Power module | Aster Power | Fri May 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 2 03:10 | Jun 2 20:15 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | Jun 2 19:00 | Jun 2 22:10 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-04 | Jun 2 21:05 | Jun 3 09:00 | 0 | 3.0 | 0.0 | Running | |
| 40 | TB | TB-04 | Jun 5 22:50 | Jun 6 12:15 | 15 | 13.2 | 63.8 | Planned | |
| 50 | PK | PK-01 | Jun 8 15:00 | Jun 8 17:50 | 15 | 2.6 | 8.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2780 |
| Released | Sun May 31 06:00 |
| Due | Wed Jun 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 19.2 h |
| Sequence position | 30 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Mon May 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 10 00:15 | Jun 11 18:15 | 90 | 38.5 | 108.5 | Planned | |
| 20 | SUB | SUB-B | Jun 10 19:55 | Jun 11 20:30 | 50 | 15.8 | 12.8 | Planned | |
| 30 | FA | FA-04 | Jun 10 22:30 | Jun 15 17:05 | 45 | 42.3 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 14 13:50 | Jun 15 23:45 | 35 | 33.3 | 74.8 | Planned | |
| 50 | PK | PK-01 | Jun 16 11:00 | Jun 17 08:55 | 10 | 14.2 | 4.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2890 |
| Released | Sun May 31 06:00 |
| Due | Wed Jun 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 148.0 h |
| Sequence position | 67 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 21 06:00 | On hand |
| Power module | Aster Power | Thu May 28 06:00 | On hand |
| Display panel | Brightline Displays | Fri May 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 1 06:00 | Jun 1 22:05 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | Jun 2 11:05 | Jun 2 13:45 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | Jun 2 15:15 | Jun 2 19:45 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-02 | Jun 5 06:00 | Jun 5 09:25 | 15 | 3.2 | 48.0 | Planned | |
| 50 | PK | PK-02 | Jun 8 11:25 | Jun 8 12:55 | 10 | 1.3 | 17.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2928 |
| Released | Sun May 31 06:00 |
| Due | Tue Jun 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 4.9 h |
| Sequence position | 26 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 2 06:00 | Jun 2 12:10 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-A | Jun 2 15:10 | Jun 2 16:55 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-01 | Jun 2 19:45 | Jun 2 22:55 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-03 | Jun 8 03:55 | Jun 8 08:35 | 15 | 4.4 | 117.9 | Planned | |
| 50 | PK | PK-01 | Jun 9 17:20 | Jun 9 18:10 | 15 | 0.6 | 23.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | NPI-510 |
| Released | Sun May 31 12:00 |
| Due | Fri Jun 12 12:00 |
| Priority and weight | 2, weight 2 |
| Touch time left | 5.5 h |
| Sequence position | 41 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 21 12:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 25 12:00 | On hand |
| Power module | Aster Power | Fri May 29 12:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 27 12:00 | On hand |
| Display panel | Brightline Displays | Thu May 28 12:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 5 09:15 | Jun 8 03:25 | 90 | 15.4 | 49.0 | Planned | |
| 20 | SUB | SUB-B | Jun 5 21:05 | Jun 8 12:30 | 50 | 7.1 | 3.2 | Planned | |
| 30 | FA | FA-06 | Jun 8 15:25 | Jun 9 16:00 | 45 | 15.8 | 7.2 | Planned | |
| 40 | TB | TB-01 | Jun 10 06:00 | Jun 11 12:35 | 35 | 30.0 | 31.4 | Planned | |
| 50 | PK | PK-02 | Jun 11 13:20 | Jun 11 17:45 | 15 | 4.2 | 0.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2743 |
| Released | Mon Jun 1 06:00 |
| Due | Mon Jun 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 76.4 h |
| Sequence position | 51 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 23 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 3 02:20 | Jun 3 19:25 | 0 | 12.4 | 0.0 | Running | |
| 20 | SUB | SUB-C | Jun 3 16:50 | Jun 3 21:35 | 40 | 3.6 | 4.8 | Planned | |
| 30 | FA | FA-04 | Jun 3 19:25 | Jun 4 10:50 | 45 | 7.2 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 6 21:25 | Jun 7 10:40 | 35 | 12.7 | 70.7 | Planned | |
| 50 | PK | PK-02 | Jun 9 10:40 | Jun 9 13:30 | 15 | 2.6 | 20.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2757 |
| Released | Mon Jun 1 06:00 |
| Due | Thu Jun 11 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 40.7 h |
| Sequence position | 36 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri May 29 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Fri May 29 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri May 22 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 8 20:10 | Jun 10 02:20 | 90 | 27.4 | 81.7 | Planned | |
| 20 | SUB | SUB-A | Jun 9 22:00 | Jun 10 14:45 | 50 | 8.4 | 15.0 | Planned | |
| 30 | FA | FA-03 | Jun 10 07:55 | Jun 11 11:20 | 25 | 18.5 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 12 06:00 | Jun 13 17:15 | 35 | 34.7 | 41.0 | Planned | |
| 50 | PK | PK-01 | Jun 15 09:35 | Jun 15 14:20 | 10 | 4.1 | 3.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2828 |
| Released | Mon Jun 1 06:00 |
| Due | Tue Jun 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 96.6 h |
| Sequence position | 58 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 22 06:00 | On hand |
| Power module | Aster Power | Wed May 27 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon May 25 06:00 | On hand |
| Display panel | Brightline Displays | Mon May 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 4 03:25 | Jun 4 17:25 | 90 | 12.0 | 20.2 | Frozen | |
| 20 | SUB | SUB-C | Jun 4 15:55 | Jun 4 20:05 | 50 | 2.8 | 5.4 | Planned | |
| 30 | FA | FA-02 | Jun 4 18:10 | Jun 5 08:00 | 45 | 5.6 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 7 10:40 | Jun 7 20:40 | 15 | 9.8 | 60.8 | Planned | |
| 50 | PK | PK-02 | Jun 9 16:10 | Jun 9 18:25 | 15 | 2.0 | 25.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2895 |
| Released | Mon Jun 1 06:00 |
| Due | Thu Jun 11 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 35.8 h |
| Sequence position | 40 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 23 06:00 | On hand |
| Power module | Aster Power | Fri May 22 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 8 03:25 | Jun 8 20:10 | 90 | 14.2 | 65.9 | Planned | |
| 20 | SUB | SUB-B | Jun 8 15:05 | Jun 8 22:50 | 40 | 6.6 | 4.6 | Planned | |
| 30 | FA | FA-06 | Jun 9 16:00 | Jun 10 15:05 | 25 | 14.7 | 13.8 | Planned | |
| 40 | TB | TB-04 | Jun 11 23:45 | Jun 13 04:10 | 35 | 27.8 | 49.8 | Planned | |
| 50 | PK | PK-02 | Jun 15 06:00 | Jun 15 10:35 | 15 | 3.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2636 |
| Released | Tue Jun 2 06:00 |
| Due | Tue Jun 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 70.6 h |
| Sequence position | 55 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 30 06:00 | On hand |
| Power module | Aster Power | Sun May 31 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun May 31 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 4 01:55 | Jun 4 15:35 | 90 | 11.4 | 18.9 | Planned | |
| 20 | SUB | SUB-A | Jun 5 13:05 | Jun 5 15:40 | 50 | 1.8 | 21.9 | Planned | |
| 30 | FA | FA-02 | Jun 5 14:35 | Jun 5 20:05 | 45 | 4.2 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 9 05:25 | Jun 9 15:50 | 35 | 9.8 | 84.8 | Planned | |
| 50 | PK | PK-01 | Jun 9 18:10 | Jun 9 20:50 | 15 | 1.9 | 1.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2694 |
| Released | Tue Jun 2 06:00 |
| Due | Fri Jun 12 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 33.1 h |
| Sequence position | 44 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 25 06:00 | On hand |
| Power module | Aster Power | Sun May 31 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 2 06:00 | Jun 2 09:25 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | Jun 2 15:30 | Jun 2 16:50 | 0 | 0.0 | 0.0 | Finished | |
| 30 | FA | FA-02 | Jun 2 20:50 | Jun 2 22:30 | 0 | 0.0 | 0.0 | Finished | |
| 40 | TB | TB-01 | Jun 5 18:35 | Jun 5 20:45 | 35 | 1.6 | 60.6 | Planned | |
| 50 | PK | PK-02 | Jun 8 15:55 | Jun 8 16:30 | 15 | 0.3 | 11.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2728 |
| Released | Tue Jun 2 06:00 |
| Due | Wed Jun 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 2.8 h |
| Sequence position | 29 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 24 06:00 | On hand |
| Power module | Aster Power | Mon May 25 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat May 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 2 13:35 | Jun 2 22:55 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-C | Jun 2 21:20 | Jun 3 06:10 | 0 | 0.2 | 0.0 | Running | |
| 30 | FA | FA-06 | Jun 3 08:10 | Jun 3 12:50 | 45 | 3.4 | 1.8 | Frozen | |
| 40 | TB | TB-02 | Jun 9 06:00 | Jun 9 12:35 | 35 | 6.0 | 138.6 | Planned | |
| 50 | PK | PK-02 | Jun 10 06:40 | Jun 10 08:10 | 15 | 1.2 | 10.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2738 |
| Released | Tue Jun 2 06:00 |
| Due | Fri Jun 12 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.4 h |
| Sequence position | 45 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 23 06:00 | On hand |
| Power module | Aster Power | Thu May 28 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 9 04:40 | Jun 10 05:20 | 90 | 21.9 | 89.9 | Planned | |
| 20 | SUB | SUB-C | Jun 10 11:05 | Jun 10 21:20 | 50 | 8.9 | 16.7 | Planned | |
| 30 | FA | FA-06 | Jun 10 17:10 | Jun 12 09:30 | 45 | 24.1 | 3.7 | Planned | |
| 40 | TB | TB-01 | Jun 13 21:40 | Jun 14 17:15 | 35 | 19.0 | 71.4 | Planned | |
| 50 | PK | PK-01 | Jun 15 19:10 | Jun 16 11:00 | 15 | 8.1 | 12.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2752 |
| Released | Tue Jun 2 06:00 |
| Due | Wed Jun 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 85.9 h |
| Sequence position | 64 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Fri May 29 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 11 15:50 | Jun 16 08:50 | 90 | 60.5 | 146.1 | Planned | |
| 20 | SUB | SUB-B | Jun 15 08:15 | Jun 16 12:10 | 50 | 18.6 | 18.2 | Planned | |
| 30 | FA | FA-03 | Jun 15 11:45 | Jun 17 21:45 | 45 | 40.8 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 16 18:55 | Jun 20 00:00 | 35 | 76.5 | 26.1 | Planned | |
| 50 | PK | PK-01 | Jun 22 06:00 | Jun 22 15:45 | 15 | 9.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2767 |
| Released | Tue Jun 2 06:00 |
| Due | Mon Jun 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 209.2 h |
| Sequence position | 84 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 31 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 31 06:00 | On hand |
| Power module | Aster Power | Sat May 30 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri May 29 06:00 | On hand |
| Display panel | Brightline Displays | Tue May 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 2 20:15 | Jun 3 00:45 | 0 | 0.0 | 0.0 | Finished | |
| 20 | SUB | SUB-B | Jun 3 06:00 | Jun 3 07:20 | 25 | 0.9 | 0.0 | Frozen | |
| 30 | FA | FA-04 | Jun 3 10:35 | Jun 3 13:20 | 45 | 2.0 | 2.5 | Frozen | |
| 40 | TB | TB-04 | Jun 9 21:20 | Jun 10 01:10 | 35 | 3.2 | 151.8 | Planned | |
| 50 | PK | PK-02 | Jun 10 06:00 | Jun 10 06:40 | 15 | 0.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2814 |
| Released | Tue Jun 2 06:00 |
| Due | Thu Jun 11 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 8.6 h |
| Sequence position | 38 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 31 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 28 06:00 | On hand |
| Power module | Aster Power | Sat May 30 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun May 24 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 15 16:50 | Jun 18 13:45 | 90 | 63.7 | 192.8 | Planned | |
| 20 | SUB | SUB-B | Jun 17 12:00 | Jun 18 16:20 | 50 | 19.5 | 21.5 | Planned | |
| 30 | FA | FA-06 | Jun 17 15:10 | Jun 22 10:45 | 45 | 42.8 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 20 14:15 | Jun 23 23:20 | 35 | 80.5 | 65.0 | Planned | |
| 50 | PK | PK-01 | Jun 24 06:35 | Jun 24 16:45 | 15 | 9.4 | 0.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2834 |
| Released | Tue Jun 2 06:00 |
| Due | Wed Jun 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 219.8 h |
| Sequence position | 101 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon May 25 06:00 | On hand |
| Power module | Aster Power | Sat May 23 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 27 06:00 | On hand |
| Display panel | Brightline Displays | Mon May 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 5 13:45 | Jun 8 08:55 | 45 | 17.7 | 53.0 | Planned | |
| 20 | SUB | SUB-A | Jun 8 12:20 | Jun 8 20:55 | 50 | 7.2 | 10.0 | Planned | |
| 30 | FA | FA-05 | Jun 9 12:40 | Jun 10 16:50 | 45 | 19.4 | 13.8 | Planned | |
| 40 | TB | TB-01 | Jun 11 12:35 | Jun 12 04:30 | 35 | 15.3 | 43.2 | Planned | |
| 50 | PK | PK-02 | Jun 12 12:25 | Jun 12 19:45 | 15 | 6.6 | 5.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2924 |
| Released | Tue Jun 2 06:00 |
| Due | Mon Jun 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 69.4 h |
| Sequence position | 54 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Wed May 27 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 8 19:50 | Jun 9 08:40 | 90 | 11.1 | 81.3 | Planned | |
| 20 | SUB | SUB-C | Jun 9 07:30 | Jun 9 13:55 | 50 | 5.1 | 1.5 | Planned | |
| 30 | FA | FA-04 | Jun 9 20:40 | Jun 10 16:15 | 45 | 11.3 | 8.9 | Planned | |
| 40 | TB | TB-04 | Jun 13 04:10 | Jun 14 01:55 | 15 | 21.5 | 66.8 | Planned | |
| 45 | CFG | CFG-01 | Jun 15 06:00 | Jun 15 14:20 | 25 | 7.4 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 15 15:25 | Jun 15 19:10 | 15 | 3.0 | 0.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71416 |
| Released | Tue Jun 2 06:00 |
| Due | Wed Jun 17 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 63.4 h |
| Sequence position | 61 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon May 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 24 06:00 | On hand |
| Power module | Aster Power | Thu May 28 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 4 06:00 | Jun 4 15:15 | 90 | 7.2 | 22.8 | Planned | |
| 20 | SUB | SUB-C | Jun 5 14:05 | Jun 5 17:15 | 40 | 2.5 | 17.0 | Planned | |
| 30 | FA | FA-04 | Jun 5 22:45 | Jun 8 13:45 | 45 | 6.8 | 5.7 | Planned | |
| 40 | TB | TB-02 | Jun 9 12:35 | Jun 9 18:30 | 35 | 5.3 | 25.1 | Planned | |
| 50 | PK | PK-02 | Jun 10 08:10 | Jun 10 11:15 | 15 | 2.3 | 6.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2795 |
| Released | Wed Jun 3 06:00 |
| Due | Fri Jun 12 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 27.9 h |
| Sequence position | 46 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 29 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
| Display panel | Brightline Displays | Thu May 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 5 12:25 | Jun 8 09:00 | 90 | 18.3 | 23.4 | Planned | |
| 20 | SUB | SUB-A | Jun 8 08:10 | Jun 8 12:20 | 50 | 2.8 | 8.1 | Planned | |
| 30 | FA | FA-01 | Jun 8 09:35 | Jun 8 17:35 | 45 | 6.8 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 11 06:05 | Jun 11 22:30 | 35 | 15.8 | 66.2 | Planned | |
| 50 | PK | PK-02 | Jun 12 08:35 | Jun 12 12:25 | 15 | 3.1 | 2.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2839 |
| Released | Wed Jun 3 06:00 |
| Due | Mon Jun 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 50.8 h |
| Sequence position | 53 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 24 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Sun May 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 4 15:35 | Jun 5 09:15 | 10 | 17.0 | 9.1 | Planned | |
| 20 | SUB | SUB-C | Jun 5 17:15 | Jun 5 21:15 | 50 | 2.7 | 15.1 | Planned | |
| 30 | FA | FA-02 | Jun 5 20:05 | Jun 8 09:25 | 5 | 6.2 | 1.1 | Planned | |
| 40 | TB | TB-03 | Jun 9 15:50 | Jun 10 06:45 | 15 | 14.7 | 90.7 | Planned | |
| 50 | PK | PK-02 | Jun 10 20:40 | Jun 11 06:45 | 15 | 2.8 | 12.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2656 |
| Released | Thu Jun 4 06:00 |
| Due | Mon Jun 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 45.0 h |
| Sequence position | 49 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Mon May 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 8 09:00 | Jun 9 00:55 | 45 | 14.2 | 43.2 | Planned | |
| 20 | SUB | SUB-C | Jun 8 21:30 | Jun 9 07:30 | 50 | 2.2 | 7.8 | Planned | |
| 30 | FA | FA-02 | Jun 9 15:10 | Jun 9 21:40 | 45 | 5.2 | 8.7 | Planned | |
| 40 | TB | TB-01 | Jun 12 20:00 | Jun 13 08:50 | 35 | 12.2 | 74.9 | Planned | |
| 50 | PK | PK-02 | Jun 15 13:45 | Jun 15 16:25 | 15 | 2.4 | 7.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2870 |
| Released | Thu Jun 4 06:00 |
| Due | Tue Jun 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 39.4 h |
| Sequence position | 59 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 31 06:00 | On hand |
| Power module | Aster Power | Mon May 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 8 23:15 | Jun 10 08:15 | 45 | 22.8 | 39.0 | Planned | |
| 20 | SUB | SUB-C | Jun 9 19:45 | Jun 10 11:05 | 50 | 7.0 | 4.2 | Planned | |
| 30 | FA | FA-02 | Jun 9 22:40 | Jun 10 22:45 | 45 | 15.3 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 13 08:50 | Jun 14 13:50 | 15 | 28.8 | 69.7 | Planned | |
| 50 | PK | PK-02 | Jun 15 16:25 | Jun 15 20:35 | 15 | 3.4 | 9.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2665 |
| Released | Fri Jun 5 06:00 |
| Due | Wed Jun 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 80.1 h |
| Sequence position | 62 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 29 06:00 | On hand |
| Power module | Aster Power | Sun May 31 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue May 26 06:00 | On hand |
| Display panel | Brightline Displays | Sun May 31 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 8 06:00 | Jun 8 21:30 | 90 | 13.0 | 22.8 | Planned | |
| 20 | SUB | SUB-B | Jun 8 22:50 | Jun 9 09:20 | 50 | 2.7 | 12.2 | Planned | |
| 30 | FA | FA-01 | Jun 9 07:15 | Jun 9 14:55 | 45 | 6.4 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 10 12:05 | Jun 10 16:30 | 35 | 3.8 | 27.0 | Planned | |
| 50 | PK | PK-02 | Jun 15 10:35 | Jun 15 13:45 | 15 | 2.9 | 41.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2772 |
| Released | Fri Jun 5 06:00 |
| Due | Tue Jun 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 32.8 h |
| Sequence position | 57 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed May 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 3 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 10 05:20 | Jun 11 05:30 | 90 | 21.4 | 67.6 | Planned | |
| 20 | SUB | SUB-C | Jun 10 21:20 | Jun 11 14:00 | 25 | 8.8 | 10.3 | Planned | |
| 30 | FA | FA-05 | Jun 11 15:35 | Jun 15 07:25 | 45 | 23.6 | 9.1 | Planned | |
| 40 | TB | TB-02 | Jun 15 00:30 | Jun 15 19:40 | 35 | 18.6 | 76.2 | Planned | |
| 50 | PK | PK-02 | Jun 16 16:05 | Jun 17 07:45 | 15 | 7.9 | 12.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2787 |
| Released | Fri Jun 5 06:00 |
| Due | Thu Jun 18 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 83.8 h |
| Sequence position | 72 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 31 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun May 31 06:00 | On hand |
| Power module | Aster Power | Mon Jun 1 06:00 | On hand |
| Display panel | Brightline Displays | Fri May 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 5 06:00 | Jun 5 18:25 | 90 | 10.4 | 0.0 | Planned | |
| 20 | SUB | SUB-C | Jun 5 21:15 | Jun 8 09:10 | 50 | 4.1 | 6.4 | Planned | |
| 30 | FA | FA-05 | Jun 8 19:20 | Jun 9 12:40 | 45 | 9.1 | 10.7 | Planned | |
| 40 | TB | TB-02 | Jun 11 06:00 | Jun 11 23:45 | 35 | 17.2 | 45.6 | Planned | |
| 50 | PK | PK-02 | Jun 12 06:00 | Jun 12 08:35 | 10 | 2.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2800 |
| Released | Fri Jun 5 06:00 |
| Due | Mon Jun 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 47.0 h |
| Sequence position | 52 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 31 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 28 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat May 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 19 03:05 | Jun 23 04:30 | 90 | 45.4 | 225.1 | Planned | |
| 20 | SUB | SUB-B | Jun 22 16:20 | Jun 23 15:05 | 50 | 13.9 | 20.2 | Planned | |
| 30 | FA | FA-02 | Jun 22 20:00 | Jun 24 19:20 | 45 | 30.6 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 23 11:55 | Jun 25 21:50 | 35 | 57.3 | 3.4 | Planned | |
| 50 | PK | PK-01 | Jun 25 22:20 | Jun 26 12:45 | 10 | 6.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2886 |
| Released | Fri Jun 5 06:00 |
| Due | Fri Jun 26 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 157.8 h |
| Sequence position | 118 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed May 27 06:00 | On hand |
| Power module | Aster Power | Tue May 26 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 3 06:00 | On hand |
| Display panel | Brightline Displays | Sun May 31 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 18 06:00 | Jun 19 13:30 | 90 | 28.5 | 205.0 | Planned | |
| 20 | SUB | SUB-B | Jun 19 06:30 | Jun 19 20:00 | 50 | 11.7 | 10.9 | Planned | |
| 30 | FA | FA-04 | Jun 19 15:30 | Jun 23 15:40 | 45 | 31.4 | 5.9 | Planned | |
| 40 | TB | TB-01 | Jun 22 18:05 | Jun 23 19:00 | 15 | 24.7 | 69.1 | Planned | |
| 45 | CFG | CFG-02 | Jun 23 19:30 | Jun 25 12:10 | 25 | 24.8 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jun 25 12:30 | Jun 26 06:45 | 10 | 10.6 | 0.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71221 |
| Released | Fri Jun 5 06:00 |
| Due | Fri Jun 26 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 135.5 h |
| Sequence position | 113 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue May 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu May 28 06:00 | On hand |
| Power module | Aster Power | Mon Jun 1 06:00 | On hand |
| Display panel | Brightline Displays | Tue May 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 10 16:20 | Jun 11 15:50 | 90 | 20.8 | 62.1 | Planned | |
| 20 | SUB | SUB-C | Jun 11 14:00 | Jun 11 21:45 | 50 | 6.4 | 7.5 | Planned | |
| 30 | FA | FA-02 | Jun 11 16:55 | Jun 12 15:25 | 45 | 13.8 | 0.1 | Planned | |
| 40 | TB | TB-02 | Jun 15 19:40 | Jun 16 18:45 | 35 | 22.5 | 93.6 | Planned | |
| 50 | PK | PK-01 | Jun 17 10:45 | Jun 17 13:50 | 15 | 2.8 | 8.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2718 |
| Released | Sat Jun 6 06:00 |
| Due | Fri Jun 19 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 70.2 h |
| Sequence position | 77 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 2 06:00 | On hand |
| Power module | Aster Power | Sat May 30 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun May 31 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 8 08:55 | Jun 8 23:15 | 90 | 11.8 | 9.7 | Planned | |
| 20 | SUB | SUB-A | Jun 8 20:55 | Jun 9 08:25 | 50 | 3.7 | 2.4 | Planned | |
| 30 | FA | FA-03 | Jun 9 07:05 | Jun 9 16:00 | 25 | 8.0 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 12 04:30 | Jun 12 20:00 | 35 | 14.9 | 63.8 | Planned | |
| 50 | PK | PK-02 | Jun 12 20:30 | Jun 12 22:30 | 15 | 1.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2723 |
| Released | Sat Jun 6 06:00 |
| Due | Tue Jun 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 43.8 h |
| Sequence position | 56 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Thu Jun 4 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed May 27 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 8 06:00 | Jun 8 13:55 | 90 | 5.9 | 6.8 | Planned | |
| 20 | SUB | SUB-A | Jun 9 08:25 | Jun 9 10:55 | 50 | 1.2 | 10.5 | Planned | |
| 30 | FA | FA-01 | Jun 9 14:55 | Jun 9 18:00 | 45 | 2.3 | 3.8 | Planned | |
| 40 | TB | TB-02 | Jun 10 16:30 | Jun 10 21:10 | 35 | 4.1 | 22.2 | Planned | |
| 50 | PK | PK-01 | Jun 15 14:20 | Jun 15 15:25 | 15 | 0.8 | 41.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2904 |
| Released | Sat Jun 6 06:00 |
| Due | Tue Jun 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 18.2 h |
| Sequence position | 60 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 1 06:00 | On hand |
| Power module | Aster Power | Thu Jun 4 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 10 08:15 | Jun 11 03:30 | 90 | 16.5 | 46.5 | Planned | |
| 20 | SUB | SUB-A | Jun 11 10:50 | Jun 11 18:25 | 50 | 6.8 | 13.1 | Planned | |
| 30 | FA | FA-06 | Jun 12 09:30 | Jun 15 12:35 | 25 | 18.2 | 12.8 | Planned | |
| 40 | TB | TB-04 | Jun 15 06:00 | Jun 15 20:55 | 35 | 14.3 | 64.1 | Planned | |
| 50 | PK | PK-02 | Jun 17 09:50 | Jun 17 16:40 | 15 | 6.1 | 21.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2675 |
| Released | Sun Jun 7 06:00 |
| Due | Fri Jun 19 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 65.4 h |
| Sequence position | 76 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 3 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
| Display panel | Brightline Displays | Sat May 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 10 02:25 | Jun 10 16:20 | 90 | 11.7 | 48.9 | Planned | |
| 20 | SUB | SUB-A | Jun 10 19:45 | Jun 10 23:00 | 50 | 2.4 | 12.4 | Planned | |
| 30 | FA | FA-05 | Jun 11 08:35 | Jun 11 15:35 | 45 | 5.8 | 4.3 | Planned | |
| 40 | TB | TB-04 | Jun 14 20:50 | Jun 15 00:30 | 15 | 3.4 | 81.9 | Planned | |
| 50 | PK | PK-02 | Jun 16 13:15 | Jun 16 16:05 | 15 | 2.6 | 22.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2733 |
| Released | Sun Jun 7 06:00 |
| Due | Thu Jun 18 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 29.4 h |
| Sequence position | 71 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 3 06:00 | On hand |
| Power module | Aster Power | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 10 21:10 | Jun 11 16:35 | 90 | 17.2 | 66.4 | Planned | |
| 20 | SUB | SUB-B | Jun 11 20:30 | Jun 12 09:35 | 50 | 5.2 | 13.5 | Planned | |
| 30 | FA | FA-01 | Jun 12 06:30 | Jun 12 19:35 | 45 | 11.3 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 15 23:45 | Jun 16 18:55 | 35 | 18.6 | 83.7 | Planned | |
| 50 | PK | PK-01 | Jun 17 13:50 | Jun 17 16:20 | 10 | 2.3 | 10.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2762 |
| Released | Sun Jun 7 06:00 |
| Due | Fri Jun 19 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 58.5 h |
| Sequence position | 78 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri May 29 06:00 | On hand |
| Display panel | Brightline Displays | Sun May 31 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 11 03:30 | Jun 12 16:45 | 90 | 34.2 | 72.5 | Planned | |
| 20 | SUB | SUB-A | Jun 12 12:00 | Jun 12 18:05 | 50 | 5.2 | 16.9 | Planned | |
| 30 | FA | FA-03 | Jun 12 13:55 | Jun 15 07:20 | 25 | 9.5 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 16 00:40 | Jun 16 10:35 | 35 | 9.3 | 80.7 | Planned | |
| 50 | PK | PK-01 | Jun 17 16:20 | Jun 17 20:55 | 15 | 3.8 | 21.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2819 |
| Released | Sun Jun 7 06:00 |
| Due | Fri Jun 19 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 65.8 h |
| Sequence position | 79 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu May 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri May 29 06:00 | On hand |
| Power module | Aster Power | Sat May 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 9 06:00 | Jun 10 02:25 | 45 | 18.7 | 29.5 | Planned | |
| 20 | SUB | SUB-A | Jun 10 14:45 | Jun 10 19:45 | 50 | 3.7 | 17.2 | Planned | |
| 30 | FA | FA-05 | Jun 10 17:00 | Jun 11 08:35 | 45 | 7.3 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 14 07:40 | Jun 14 20:50 | 15 | 12.9 | 82.8 | Planned | |
| 50 | PK | PK-02 | Jun 15 22:45 | Jun 16 08:35 | 10 | 2.7 | 15.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2851 |
| Released | Sun Jun 7 06:00 |
| Due | Wed Jun 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 48.0 h |
| Sequence position | 66 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Thu Jun 4 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 11 05:30 | Jun 11 20:45 | 90 | 12.8 | 66.5 | Planned | |
| 20 | SUB | SUB-A | Jun 11 18:25 | Jun 12 06:40 | 50 | 3.9 | 4.6 | Planned | |
| 30 | FA | FA-02 | Jun 12 15:25 | Jun 15 08:15 | 45 | 8.6 | 10.1 | Planned | |
| 40 | TB | TB-03 | Jun 16 06:00 | Jun 16 22:40 | 35 | 16.1 | 81.2 | Planned | |
| 50 | PK | PK-02 | Jun 17 16:40 | Jun 17 19:20 | 15 | 1.9 | 10.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2861 |
| Released | Sun Jun 7 06:00 |
| Due | Fri Jun 19 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 47.2 h |
| Sequence position | 80 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat May 30 06:00 | On hand |
| Power module | Aster Power | Sun May 31 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu May 28 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 16 08:30 | Jun 17 11:25 | 90 | 23.7 | 146.0 | Planned | |
| 20 | SUB | SUB-C | Jun 16 19:20 | Jun 17 13:10 | 40 | 9.7 | 4.8 | Planned | |
| 30 | FA | FA-05 | Jun 17 12:50 | Jun 19 06:45 | 25 | 26.0 | 7.8 | Planned | |
| 40 | TB | TB-01 | Jun 19 18:35 | Jun 20 15:40 | 35 | 20.5 | 49.8 | Planned | |
| 45 | CFG | CFG-01 | Jun 22 06:00 | Jun 23 15:40 | 25 | 24.8 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jun 23 16:00 | Jun 24 08:25 | 10 | 8.8 | 0.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71052 |
| Released | Sun Jun 7 06:00 |
| Due | Thu Jun 25 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 117.1 h |
| Sequence position | 104 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Thu May 28 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 10 06:00 | Jun 10 12:30 | 90 | 4.5 | 52.2 | Planned | |
| 20 | SUB | SUB-A | Jun 11 08:20 | Jun 11 10:50 | 50 | 1.2 | 11.8 | Planned | |
| 30 | FA | FA-02 | Jun 11 13:35 | Jun 11 16:55 | 45 | 2.6 | 2.5 | Planned | |
| 40 | TB | TB-01 | Jun 15 06:00 | Jun 15 11:25 | 35 | 4.8 | 84.8 | Planned | |
| 50 | PK | PK-02 | Jun 17 09:00 | Jun 17 09:50 | 15 | 0.6 | 29.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | NPI-511 |
| Released | Sun Jun 7 12:00 |
| Due | Fri Jun 19 12:00 |
| Priority and weight | 2, weight 2 |
| Touch time left | 17.6 h |
| Sequence position | 75 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 31 12:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 3 12:00 | On hand |
| Power module | Aster Power | Mon Jun 1 12:00 | On hand |
| SoC module | Kestrel Silicon | Sun May 31 12:00 | On hand |
| Display panel | Brightline Displays | Fri Jun 5 12:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 10 02:20 | Jun 10 09:00 | 90 | 4.9 | 42.1 | Planned | |
| 20 | SUB | SUB-B | Jun 10 15:05 | Jun 10 16:45 | 50 | 0.8 | 7.8 | Planned | |
| 30 | FA | FA-02 | Jun 11 11:00 | Jun 11 13:35 | 45 | 1.8 | 10.4 | Planned | |
| 40 | TB | TB-01 | Jun 14 20:15 | Jun 15 01:10 | 35 | 4.3 | 79.4 | Planned | |
| 50 | PK | PK-02 | Jun 16 12:15 | Jun 16 13:15 | 10 | 0.8 | 21.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2689 |
| Released | Mon Jun 8 06:00 |
| Due | Thu Jun 18 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 16.6 h |
| Sequence position | 70 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 1 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 9 00:55 | Jun 9 04:40 | 90 | 2.0 | 17.9 | Planned | |
| 20 | SUB | SUB-B | Jun 9 09:20 | Jun 9 11:35 | 50 | 0.9 | 3.3 | Planned | |
| 30 | FA | FA-06 | Jun 10 15:05 | Jun 10 17:10 | 5 | 2.0 | 19.2 | Planned | |
| 40 | TB | TB-01 | Jun 13 17:15 | Jun 13 21:40 | 35 | 3.8 | 71.8 | Planned | |
| 50 | PK | PK-02 | Jun 15 20:35 | Jun 15 21:25 | 15 | 0.6 | 13.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2708 |
| Released | Mon Jun 8 06:00 |
| Due | Wed Jun 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.6 h |
| Sequence position | 63 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Fri May 29 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 9 06:00 | Jun 9 14:20 | 90 | 6.3 | 22.8 | Planned | |
| 20 | SUB | SUB-B | Jun 9 13:30 | Jun 9 15:50 | 50 | 1.5 | 0.8 | Planned | |
| 30 | FA | FA-04 | Jun 10 16:15 | Jun 10 20:25 | 45 | 2.9 | 16.7 | Planned | |
| 40 | TB | TB-02 | Jun 14 01:55 | Jun 14 07:40 | 35 | 5.2 | 78.2 | Planned | |
| 50 | PK | PK-02 | Jun 15 21:25 | Jun 15 22:45 | 15 | 1.1 | 14.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2809 |
| Released | Mon Jun 8 06:00 |
| Due | Wed Jun 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 20.9 h |
| Sequence position | 65 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Fri Jun 5 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 9 08:40 | Jun 9 19:20 | 90 | 8.2 | 25.4 | Planned | |
| 20 | SUB | SUB-A | Jun 9 17:40 | Jun 9 20:40 | 50 | 1.7 | 4.9 | Planned | |
| 30 | FA | FA-02 | Jun 10 22:45 | Jun 11 11:00 | 45 | 4.0 | 19.2 | Planned | |
| 40 | TB | TB-04 | Jun 14 17:15 | Jun 14 20:15 | 35 | 2.4 | 81.7 | Planned | |
| 50 | PK | PK-02 | Jun 16 08:35 | Jun 16 11:10 | 15 | 1.8 | 18.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2933 |
| Released | Mon Jun 8 06:00 |
| Due | Wed Jun 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 22.0 h |
| Sequence position | 68 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 22 05:15 | Jun 23 14:35 | 90 | 30.1 | 120.0 | Planned | |
| 20 | SUB | SUB-C | Jun 23 08:20 | Jun 24 06:50 | 40 | 13.8 | 12.0 | Planned | |
| 30 | FA | FA-04 | Jun 24 07:00 | Jun 26 06:20 | 25 | 30.9 | 11.4 | Planned | |
| 40 | TB | TB-02 | Jun 25 19:55 | Jun 28 06:50 | 15 | 58.7 | 30.6 | Planned | |
| 45 | CFG | CFG-01 | Jun 29 06:00 | Jun 30 09:00 | 25 | 18.6 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 30 09:15 | Jun 30 18:00 | 15 | 8.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-01 has a 39 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Mon Jun 22 18:00.
Order
| Reference | SO-71013 |
| Released | Mon Jun 8 06:00 |
| Due | Tue Jun 30 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 163.6 h |
| Sequence position | 127 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat May 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 14 14:00 | In transit |
| Power module | Aster Power | Mon Jun 1 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 15 10:30 | Jun 15 16:50 | 90 | 4.8 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 15 16:15 | Jun 15 17:40 | 40 | 0.8 | 1.7 | Planned | |
| 30 | FA | FA-01 | Jun 15 17:30 | Jun 15 20:35 | 45 | 1.8 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 15 19:50 | Jun 16 00:40 | 35 | 4.2 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jun 16 11:10 | Jun 16 12:15 | 15 | 0.8 | 4.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2646 |
| Released | Tue Jun 9 06:00 |
| Due | Thu Jun 18 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 16.2 h |
| Sequence position | 69 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun May 31 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 15 10:00 | In transit |
| Power module | Aster Power | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 10 09:00 | Jun 10 21:10 | 90 | 9.7 | 25.8 | Planned | |
| 20 | SUB | SUB-A | Jun 11 06:00 | Jun 11 08:20 | 50 | 1.5 | 6.2 | Planned | |
| 30 | FA | FA-03 | Jun 11 14:20 | Jun 11 17:45 | 45 | 2.7 | 6.0 | Planned | |
| 40 | TB | TB-01 | Jun 15 02:45 | Jun 15 06:00 | 35 | 2.7 | 82.1 | Planned | |
| 50 | PK | PK-01 | Jun 17 08:55 | Jun 17 10:45 | 15 | 1.1 | 34.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2914 |
| Released | Tue Jun 9 06:00 |
| Due | Thu Jun 18 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 21.5 h |
| Sequence position | 74 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 1 06:00 | On hand |
| Power module | Aster Power | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 16 08:50 | Jun 18 20:00 | 90 | 54.2 | 94.1 | Planned | |
| 20 | SUB | SUB-A | Jun 18 11:30 | Jun 18 21:10 | 50 | 8.3 | 27.8 | Planned | |
| 30 | FA | FA-03 | Jun 18 13:15 | Jun 19 13:00 | 45 | 15.0 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 19 23:05 | Jun 20 14:05 | 15 | 14.8 | 31.6 | Planned | |
| 50 | PK | PK-01 | Jun 22 15:45 | Jun 22 22:30 | 15 | 6.0 | 9.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2671 |
| Released | Wed Jun 10 06:00 |
| Due | Thu Jun 25 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 101.8 h |
| Sequence position | 105 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 1 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 2 06:00 | On hand |
| Power module | Aster Power | Sat Jun 6 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 18 05:45 | Jun 19 04:50 | 90 | 20.6 | 136.5 | Planned | |
| 20 | SUB | SUB-C | Jun 18 21:20 | Jun 19 14:05 | 50 | 8.4 | 9.8 | Planned | |
| 30 | FA | FA-05 | Jun 19 06:45 | Jun 22 14:20 | 25 | 22.7 | 0.2 | Planned | |
| 40 | TB | TB-01 | Jun 21 22:40 | Jun 22 17:05 | 35 | 17.8 | 59.6 | Planned | |
| 50 | PK | PK-02 | Jun 23 07:30 | Jun 23 15:50 | 15 | 7.6 | 6.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2788 |
| Released | Wed Jun 10 06:00 |
| Due | Thu Jun 25 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 80.7 h |
| Sequence position | 108 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Mon Jun 1 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 16 05:25 | Jun 18 00:55 | 45 | 40.5 | 90.7 | Planned | |
| 20 | SUB | SUB-C | Jun 18 06:00 | Jun 18 13:35 | 50 | 6.2 | 26.3 | Planned | |
| 30 | FA | FA-02 | Jun 18 07:55 | Jun 18 20:50 | 45 | 11.2 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 19 11:30 | Jun 19 23:05 | 35 | 11.0 | 24.7 | Planned | |
| 50 | PK | PK-02 | Jun 22 07:55 | Jun 22 13:10 | 15 | 4.5 | 1.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2876 |
| Released | Wed Jun 10 06:00 |
| Due | Wed Jun 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 76.6 h |
| Sequence position | 102 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Thu Jun 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 10 06:00 | Jun 10 12:30 | 90 | 4.5 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jun 10 16:45 | Jun 10 18:30 | 50 | 0.9 | 6.4 | Planned | |
| 30 | FA | FA-03 | Jun 11 11:20 | Jun 11 14:20 | 45 | 2.2 | 9.1 | Planned | |
| 40 | TB | TB-04 | Jun 15 01:10 | Jun 15 02:45 | 15 | 1.3 | 83.9 | Planned | |
| 50 | PK | PK-02 | Jun 17 07:45 | Jun 17 09:00 | 15 | 1.0 | 33.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2880 |
| Released | Wed Jun 10 06:00 |
| Due | Thu Jun 18 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 13.6 h |
| Sequence position | 73 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 1 06:00 | On hand |
| Power module | Aster Power | Thu Jun 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 24 04:55 | Jun 25 14:50 | 90 | 30.7 | 226.9 | Planned | |
| 20 | SUB | SUB-B | Jun 24 21:50 | Jun 25 19:10 | 50 | 12.5 | 10.1 | Planned | |
| 30 | FA | FA-04 | Jun 26 06:20 | Jun 30 08:50 | 45 | 33.8 | 14.8 | Planned | |
| 40 | TB | TB-04 | Jun 29 09:15 | Jun 30 12:25 | 35 | 26.6 | 69.2 | Planned | |
| 45 | CFG | CFG-01 | Jun 30 12:55 | Jul 1 22:35 | 25 | 24.8 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jul 1 22:50 | Jul 2 17:50 | 10 | 11.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-07 has a 40 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jun 17 18:20.
Order
| Reference | SO-71143 |
| Released | Wed Jun 10 06:00 |
| Due | Thu Jul 2 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 143.8 h |
| Sequence position | 142 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 2 06:00 | On hand |
| Power module | Aster Power | Sun May 31 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 11 06:00 | Jun 11 20:35 | 90 | 12.1 | 22.8 | Planned | |
| 20 | SUB | SUB-C | Jun 11 21:45 | Jun 12 11:40 | 50 | 5.6 | 7.7 | Planned | |
| 30 | FA | FA-05 | Jun 15 07:25 | Jun 15 21:35 | 45 | 12.4 | 15.2 | Planned | |
| 40 | TB | TB-01 | Jun 16 10:35 | Jun 17 10:40 | 35 | 23.5 | 20.4 | Planned | |
| 45 | CFG | CFG-01 | Jun 17 11:10 | Jun 17 19:30 | 25 | 7.4 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 17 20:55 | Jun 18 07:25 | 15 | 3.2 | 1.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71156 |
| Released | Wed Jun 10 06:00 |
| Due | Mon Jun 22 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 68.6 h |
| Sequence position | 81 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 1 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 11 16:35 | Jun 12 07:20 | 90 | 12.8 | 10.1 | Planned | |
| 20 | SUB | SUB-C | Jun 12 11:40 | Jun 12 17:45 | 50 | 5.2 | 6.1 | Planned | |
| 30 | FA | FA-06 | Jun 15 12:35 | Jun 16 11:00 | 25 | 14.0 | 14.6 | Planned | |
| 40 | TB | TB-02 | Jun 16 18:45 | Jun 17 06:20 | 35 | 11.0 | 26.2 | Planned | |
| 50 | PK | PK-02 | Jun 17 22:35 | Jun 18 11:05 | 15 | 4.8 | 14.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2680 |
| Released | Thu Jun 11 06:00 |
| Due | Mon Jun 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 51.3 h |
| Sequence position | 83 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 2 06:00 | On hand |
| Power module | Aster Power | Mon Jun 1 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 11 20:45 | Jun 12 11:25 | 90 | 12.7 | 13.8 | Planned | |
| 20 | SUB | SUB-B | Jun 12 09:35 | Jun 12 14:40 | 40 | 3.9 | 3.6 | Planned | |
| 30 | FA | FA-02 | Jun 15 08:15 | Jun 15 17:55 | 45 | 8.4 | 12.2 | Planned | |
| 40 | TB | TB-03 | Jun 17 06:00 | Jun 17 20:20 | 35 | 13.8 | 40.8 | Planned | |
| 50 | PK | PK-01 | Jun 18 07:25 | Jun 18 09:25 | 15 | 1.8 | 3.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2824 |
| Released | Thu Jun 11 06:00 |
| Due | Mon Jun 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 44.2 h |
| Sequence position | 85 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 2 06:00 | On hand |
| Power module | Aster Power | Fri Jun 5 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 9 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 17 10:30 | Jun 18 07:50 | 10 | 20.4 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 17 22:35 | Jun 18 09:35 | 50 | 3.2 | 8.8 | Planned | |
| 30 | FA | FA-01 | Jun 18 07:00 | Jun 18 15:05 | 5 | 7.5 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 18 08:10 | Jun 19 02:25 | 35 | 17.7 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jun 19 06:00 | Jun 19 09:40 | 15 | 3.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2840 |
| Released | Thu Jun 11 06:00 |
| Due | Mon Jun 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 54.1 h |
| Sequence position | 86 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 17 10:00 | In transit |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 15 10:30 | Jun 15 15:45 | 45 | 4.5 | 0.0 | Planned | |
| 20 | SUB | SUB-C | Jun 15 16:25 | Jun 15 19:40 | 40 | 2.1 | 0.2 | Planned | |
| 30 | FA | FA-05 | Jun 15 21:35 | Jun 16 09:35 | 25 | 4.6 | 1.7 | Planned | |
| 40 | TB | TB-01 | Jun 17 10:40 | Jun 17 19:35 | 15 | 8.7 | 24.8 | Planned | |
| 50 | PK | PK-01 | Jun 18 11:05 | Jun 18 12:30 | 10 | 1.2 | 7.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2900 |
| Released | Thu Jun 11 06:00 |
| Due | Mon Jun 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 23.3 h |
| Sequence position | 88 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 1 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Sat Jun 6 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 15 10:00 | In transit |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 12 06:00 | Jun 12 21:45 | 90 | 13.2 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 12 19:05 | Jun 12 22:40 | 50 | 2.8 | 8.2 | Planned | |
| 30 | FA | FA-01 | Jun 12 20:35 | Jun 15 11:20 | 45 | 6.5 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 15 11:25 | Jun 15 15:50 | 35 | 3.8 | 60.9 | Planned | |
| 50 | PK | PK-02 | Jun 17 19:20 | Jun 17 22:35 | 15 | 3.0 | 34.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2632 |
| Released | Fri Jun 12 06:00 |
| Due | Mon Jun 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 33.2 h |
| Sequence position | 82 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Mon Jun 8 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 12 06:00 | Jun 15 01:55 | 90 | 17.4 | 0.0 | Planned | |
| 20 | SUB | SUB-C | Jun 12 19:10 | Jun 15 07:00 | 50 | 4.0 | 5.8 | Planned | |
| 30 | FA | FA-02 | Jun 15 17:55 | Jun 16 14:40 | 45 | 8.0 | 13.2 | Planned | |
| 40 | TB | TB-02 | Jun 17 13:30 | Jun 18 04:15 | 35 | 14.2 | 40.1 | Planned | |
| 50 | PK | PK-01 | Jun 18 12:30 | Jun 18 15:40 | 15 | 2.9 | 6.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2661 |
| Released | Fri Jun 12 06:00 |
| Due | Tue Jun 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 50.4 h |
| Sequence position | 89 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Thu Jun 4 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 17 06:05 | Jun 18 05:45 | 90 | 20.9 | 68.3 | Planned | |
| 20 | SUB | SUB-C | Jun 18 13:35 | Jun 18 21:20 | 50 | 6.4 | 14.6 | Planned | |
| 30 | FA | FA-04 | Jun 18 16:40 | Jun 19 15:30 | 45 | 14.1 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 20 14:05 | Jun 21 17:05 | 35 | 26.4 | 39.6 | Planned | |
| 50 | PK | PK-02 | Jun 22 17:45 | Jun 22 21:35 | 15 | 3.1 | 11.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2714 |
| Released | Fri Jun 12 06:00 |
| Due | Thu Jun 25 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 74.8 h |
| Sequence position | 106 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 2 06:00 | On hand |
| Power module | Aster Power | Sun Jun 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat Jun 6 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 6 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 12 07:20 | Jun 12 22:55 | 90 | 13.1 | 1.3 | Planned | |
| 20 | SUB | SUB-A | Jun 15 08:25 | Jun 15 13:45 | 50 | 4.0 | 7.8 | Planned | |
| 30 | FA | FA-04 | Jun 15 21:50 | Jun 16 14:55 | 45 | 8.8 | 9.1 | Planned | |
| 40 | TB | TB-02 | Jun 18 04:15 | Jun 18 21:20 | 35 | 16.5 | 41.0 | Planned | |
| 50 | PK | PK-01 | Jun 18 21:50 | Jun 19 07:05 | 15 | 2.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2748 |
| Released | Fri Jun 12 06:00 |
| Due | Tue Jun 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 48.3 h |
| Sequence position | 91 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 7 06:00 | On hand |
| Power module | Aster Power | Wed Jun 3 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 10 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 12 06:00 | Jun 15 00:10 | 90 | 15.7 | 0.0 | Planned | |
| 20 | SUB | SUB-C | Jun 15 07:00 | Jun 15 11:05 | 50 | 2.8 | 13.1 | Planned | |
| 30 | FA | FA-05 | Jun 16 09:35 | Jun 16 17:25 | 45 | 6.6 | 17.1 | Planned | |
| 40 | TB | TB-03 | Jun 18 10:40 | Jun 18 15:10 | 35 | 3.9 | 46.8 | Planned | |
| 50 | PK | PK-02 | Jun 18 15:40 | Jun 18 19:25 | 15 | 3.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2773 |
| Released | Fri Jun 12 06:00 |
| Due | Tue Jun 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 35.8 h |
| Sequence position | 92 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 10 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 23 04:30 | Jun 24 19:05 | 90 | 34.8 | 158.0 | Planned | |
| 20 | SUB | SUB-B | Jun 24 09:20 | Jun 24 21:50 | 50 | 10.7 | 13.1 | Planned | |
| 30 | FA | FA-01 | Jun 24 13:35 | Jun 25 22:20 | 45 | 23.5 | 0.9 | Planned | |
| 40 | TB | TB-01 | Jun 26 15:15 | Jun 28 11:50 | 35 | 44.0 | 44.8 | Planned | |
| 50 | PK | PK-02 | Jun 29 09:00 | Jun 29 14:50 | 10 | 5.2 | 3.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2829 |
| Released | Fri Jun 12 06:00 |
| Due | Tue Jun 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 122.0 h |
| Sequence position | 132 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Sun Jun 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 3 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 15 00:10 | Jun 15 19:50 | 45 | 17.7 | 17.2 | Planned | |
| 20 | SUB | SUB-C | Jun 15 19:40 | Jun 16 06:15 | 50 | 2.8 | 12.1 | Planned | |
| 30 | FA | FA-02 | Jun 16 14:40 | Jun 16 20:50 | 45 | 4.9 | 5.6 | Planned | |
| 40 | TB | TB-03 | Jun 18 15:10 | Jun 18 20:35 | 35 | 4.8 | 46.1 | Planned | |
| 50 | PK | PK-01 | Jun 19 07:05 | Jun 19 09:20 | 15 | 2.0 | 3.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2847 |
| Released | Fri Jun 12 06:00 |
| Due | Tue Jun 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 35.3 h |
| Sequence position | 94 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Wed Jun 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 16 07:55 | Jun 17 06:05 | 90 | 19.4 | 47.4 | Planned | |
| 20 | SUB | SUB-A | Jun 17 06:00 | Jun 17 11:20 | 50 | 4.0 | 10.4 | Planned | |
| 30 | FA | FA-04 | Jun 17 07:30 | Jun 17 18:15 | 45 | 9.5 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 19 12:20 | Jun 19 18:35 | 35 | 5.7 | 51.0 | Planned | |
| 50 | PK | PK-02 | Jun 22 13:10 | Jun 22 17:45 | 15 | 4.3 | 10.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2910 |
| Released | Fri Jun 12 06:00 |
| Due | Wed Jun 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 46.8 h |
| Sequence position | 103 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 7 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 15 15:45 | Jun 16 05:25 | 90 | 11.4 | 32.0 | Planned | |
| 20 | SUB | SUB-C | Jun 16 08:20 | Jun 16 13:40 | 50 | 4.0 | 3.2 | Planned | |
| 30 | FA | FA-05 | Jun 16 17:25 | Jun 17 12:50 | 45 | 10.7 | 6.2 | Planned | |
| 40 | TB | TB-03 | Jun 18 20:35 | Jun 19 05:35 | 35 | 8.4 | 46.1 | Planned | |
| 45 | CFG | CFG-01 | Jun 19 06:05 | Jun 19 16:20 | 25 | 9.3 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jun 19 16:35 | Jun 19 20:55 | 15 | 3.6 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71000 |
| Released | Fri Jun 12 06:00 |
| Due | Wed Jun 24 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 51.8 h |
| Sequence position | 96 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 15 01:55 | Jun 15 08:30 | 90 | 4.8 | 2.9 | Planned | |
| 20 | SUB | SUB-C | Jun 15 11:05 | Jun 15 14:10 | 50 | 2.2 | 1.6 | Planned | |
| 30 | FA | FA-04 | Jun 16 18:10 | Jun 17 07:20 | 45 | 4.9 | 19.8 | Planned | |
| 40 | TB | TB-01 | Jun 19 02:25 | Jun 19 12:20 | 35 | 9.3 | 42.8 | Planned | |
| 50 | PK | PK-01 | Jun 19 12:50 | Jun 19 14:25 | 15 | 1.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2642 |
| Released | Sat Jun 13 06:00 |
| Due | Wed Jun 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 26.6 h |
| Sequence position | 97 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 7 06:00 | On hand |
| Power module | Aster Power | Tue Jun 9 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 14 23:00 | Jun 15 17:05 | 90 | 15.8 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 15 17:40 | Jun 15 21:05 | 25 | 2.5 | 11.2 | Planned | |
| 30 | FA | FA-01 | Jun 15 20:35 | Jun 16 09:30 | 5 | 5.8 | 1.6 | Planned | |
| 40 | TB | TB-03 | Jun 17 20:20 | Jun 18 10:40 | 35 | 13.8 | 46.7 | Planned | |
| 50 | PK | PK-02 | Jun 18 11:10 | Jun 18 14:05 | 15 | 2.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2704 |
| Released | Sat Jun 13 06:00 |
| Due | Tue Jun 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 43.4 h |
| Sequence position | 90 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 11 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 9 06:00 | On hand |
| Power module | Aster Power | Sat Jun 6 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 15 17:05 | Jun 16 07:55 | 90 | 12.6 | 17.3 | Planned | |
| 20 | SUB | SUB-A | Jun 16 06:00 | Jun 16 11:15 | 50 | 3.9 | 0.0 | Planned | |
| 30 | FA | FA-06 | Jun 16 11:00 | Jun 16 20:35 | 45 | 8.3 | 1.6 | Planned | |
| 40 | TB | TB-04 | Jun 20 00:00 | Jun 20 14:15 | 35 | 13.7 | 80.2 | Planned | |
| 50 | PK | PK-02 | Jun 22 06:00 | Jun 22 07:55 | 15 | 1.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2805 |
| Released | Sat Jun 13 06:00 |
| Due | Tue Jun 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 44.1 h |
| Sequence position | 93 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Mon Jun 8 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 5 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 14 23:00 | Jun 15 04:10 | 90 | 3.4 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 15 06:00 | Jun 15 08:25 | 50 | 1.6 | 0.0 | Planned | |
| 30 | FA | FA-04 | Jun 15 17:05 | Jun 15 21:50 | 45 | 3.5 | 7.9 | Planned | |
| 40 | TB | TB-02 | Jun 17 06:20 | Jun 17 13:30 | 35 | 6.6 | 32.2 | Planned | |
| 50 | PK | PK-01 | Jun 18 09:25 | Jun 18 11:05 | 15 | 0.9 | 11.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2866 |
| Released | Sat Jun 13 06:00 |
| Due | Mon Jun 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 19.9 h |
| Sequence position | 87 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 19 04:50 | Jun 22 05:15 | 90 | 21.7 | 96.8 | Planned | |
| 20 | SUB | SUB-A | Jun 19 17:25 | Jun 22 11:05 | 50 | 8.8 | 7.2 | Planned | |
| 30 | FA | FA-05 | Jun 22 22:00 | Jun 24 13:50 | 25 | 23.9 | 17.8 | Planned | |
| 40 | TB | TB-02 | Jun 24 00:05 | Jun 24 19:30 | 35 | 18.8 | 15.2 | Planned | |
| 50 | PK | PK-02 | Jun 24 20:00 | Jun 25 11:50 | 15 | 8.1 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2920 |
| Released | Sat Jun 13 06:00 |
| Due | Fri Jun 26 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 84.9 h |
| Sequence position | 119 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 10 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 6 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 15 04:10 | Jun 15 13:25 | 90 | 7.2 | 4.9 | Planned | |
| 20 | SUB | SUB-A | Jun 15 13:45 | Jun 15 15:35 | 50 | 1.0 | 4.4 | Planned | |
| 30 | FA | FA-02 | Jun 16 20:50 | Jun 17 06:55 | 45 | 2.3 | 17.1 | Planned | |
| 40 | TB | TB-03 | Jun 19 05:35 | Jun 19 11:30 | 35 | 5.3 | 54.9 | Planned | |
| 50 | PK | PK-02 | Jun 19 12:00 | Jun 19 13:15 | 10 | 1.1 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2685 |
| Released | Sun Jun 14 06:00 |
| Due | Wed Jun 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 20.8 h |
| Sequence position | 98 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 10 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 19 06:35 | Jun 22 16:20 | 90 | 30.5 | 98.6 | Planned | |
| 20 | SUB | SUB-A | Jun 22 11:05 | Jun 22 19:25 | 50 | 7.0 | 13.2 | Planned | |
| 30 | FA | FA-03 | Jun 22 13:20 | Jun 23 12:05 | 45 | 14.0 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 24 06:00 | Jun 25 07:25 | 35 | 24.8 | 37.4 | Planned | |
| 50 | PK | PK-02 | Jun 26 09:35 | Jun 26 15:25 | 15 | 5.1 | 17.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2700 |
| Released | Sun Jun 14 06:00 |
| Due | Mon Jun 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 85.3 h |
| Sequence position | 122 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 4 06:00 | On hand |
| Power module | Aster Power | Sun Jun 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jun 7 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 15 17:05 | Jun 16 08:30 | 90 | 13.2 | 17.3 | Planned | |
| 20 | SUB | SUB-A | Jun 16 11:15 | Jun 16 14:10 | 50 | 2.1 | 6.2 | Planned | |
| 30 | FA | FA-06 | Jun 16 20:35 | Jun 17 09:10 | 45 | 4.8 | 7.4 | Planned | |
| 40 | TB | TB-02 | Jun 19 06:00 | Jun 19 18:00 | 35 | 11.4 | 55.7 | Planned | |
| 50 | PK | PK-01 | Jun 19 19:00 | Jun 19 21:30 | 15 | 2.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2781 |
| Released | Sun Jun 14 06:00 |
| Due | Wed Jun 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 37.7 h |
| Sequence position | 100 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 11 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 16 06:00 | Jun 16 19:05 | 90 | 10.6 | 29.5 | Planned | |
| 20 | SUB | SUB-B | Jun 16 16:15 | Jun 16 21:45 | 50 | 4.2 | 2.2 | Planned | |
| 30 | FA | FA-04 | Jun 17 18:15 | Jun 18 12:15 | 45 | 9.2 | 14.7 | Planned | |
| 40 | TB | TB-02 | Jun 21 05:20 | Jun 21 23:25 | 35 | 17.5 | 57.7 | Planned | |
| 50 | PK | PK-01 | Jun 22 22:30 | Jun 23 08:10 | 15 | 2.4 | 15.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2857 |
| Released | Sun Jun 14 06:00 |
| Due | Thu Jun 25 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 47.8 h |
| Sequence position | 110 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Mon Jun 8 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 17 06:00 | Jun 17 22:40 | 90 | 14.2 | 52.2 | Planned | |
| 20 | SUB | SUB-A | Jun 18 22:45 | Jun 19 09:25 | 50 | 2.8 | 24.1 | Planned | |
| 30 | FA | FA-02 | Jun 19 08:20 | Jun 19 15:10 | 45 | 5.6 | 0.3 | Planned | |
| 40 | TB | TB-02 | Jun 21 23:25 | Jun 22 09:45 | 35 | 9.8 | 47.3 | Planned | |
| 50 | PK | PK-01 | Jun 23 08:10 | Jun 23 10:55 | 15 | 2.0 | 14.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2896 |
| Released | Sun Jun 14 06:00 |
| Due | Thu Jun 25 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 38.2 h |
| Sequence position | 111 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 7 06:00 | On hand |
| Power module | Aster Power | Mon Jun 8 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 6 06:00 | Jul 7 22:35 | 90 | 36.8 | 326.8 | Planned | |
| 20 | SUB | SUB-B | Jul 7 11:25 | Jul 8 13:10 | 50 | 16.9 | 14.2 | Planned | |
| 30 | FA | FA-05 | Jul 7 22:20 | Jul 10 12:25 | 45 | 37.8 | 7.2 | Planned | |
| 40 | TB | TB-03 | Jul 9 06:00 | Jul 12 06:15 | 35 | 71.7 | 18.4 | Planned | |
| 45 | CFG | CFG-01 | Jul 13 06:00 | Jul 14 15:40 | 25 | 24.8 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jul 14 16:05 | Jul 15 09:30 | 5 | 9.8 | 0.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jun 23 13:30.
Order
| Reference | SO-71325 |
| Released | Sun Jun 14 06:00 |
| Due | Fri Jul 10 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 202.0 h |
| Sequence position | 192 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 8 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat Jun 6 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 18 06:00 | Jun 18 12:40 | 90 | 4.7 | 75.0 | Planned | |
| 20 | SUB | SUB-B | Jun 18 21:25 | Jun 19 06:30 | 50 | 1.2 | 7.8 | Planned | |
| 30 | FA | FA-01 | Jun 19 10:40 | Jun 19 14:05 | 45 | 2.7 | 3.4 | Planned | |
| 40 | TB | TB-03 | Jun 21 17:05 | Jun 21 22:20 | 15 | 5.0 | 50.8 | Planned | |
| 50 | PK | PK-01 | Jun 23 10:55 | Jun 23 11:45 | 15 | 0.6 | 20.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | NPI-512 |
| Released | Sun Jun 14 12:00 |
| Due | Fri Jun 26 12:00 |
| Priority and weight | 2, weight 2 |
| Touch time left | 17.8 h |
| Sequence position | 112 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 11 12:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 11 12:00 | On hand |
| Power module | Aster Power | Thu Jun 4 12:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 11 12:00 | On hand |
| Display panel | Brightline Displays | Fri Jun 12 12:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 18 13:45 | Jun 19 06:35 | 90 | 14.8 | 75.5 | Planned | |
| 20 | SUB | SUB-C | Jun 19 14:05 | Jun 19 17:15 | 50 | 2.3 | 11.8 | Planned | |
| 30 | FA | FA-03 | Jun 19 15:35 | Jun 19 22:20 | 45 | 5.5 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 22 06:00 | Jun 22 19:25 | 35 | 12.8 | 60.5 | Planned | |
| 50 | PK | PK-01 | Jun 23 15:45 | Jun 23 18:30 | 15 | 2.5 | 12.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2695 |
| Released | Mon Jun 15 06:00 |
| Due | Fri Jun 26 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 41.9 h |
| Sequence position | 115 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 5 06:00 | On hand |
| Power module | Aster Power | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 18 00:55 | Jun 18 19:45 | 90 | 16.1 | 63.4 | Planned | |
| 20 | SUB | SUB-B | Jun 18 16:20 | Jun 18 21:25 | 50 | 3.8 | 7.6 | Planned | |
| 30 | FA | FA-01 | Jun 18 19:00 | Jun 19 10:40 | 45 | 7.4 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 20 15:40 | Jun 21 05:20 | 35 | 13.1 | 41.3 | Planned | |
| 50 | PK | PK-02 | Jun 22 21:35 | Jun 23 07:30 | 15 | 2.7 | 14.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2758 |
| Released | Mon Jun 15 06:00 |
| Due | Thu Jun 25 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 46.9 h |
| Sequence position | 107 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 10 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 15 06:00 | Jun 15 17:05 | 90 | 9.1 | 0.0 | Planned | |
| 20 | SUB | SUB-C | Jun 16 06:15 | Jun 16 08:20 | 40 | 1.4 | 10.1 | Planned | |
| 30 | FA | FA-04 | Jun 16 14:55 | Jun 16 18:10 | 45 | 2.5 | 6.6 | Planned | |
| 40 | TB | TB-01 | Jun 17 19:35 | Jun 17 22:40 | 35 | 2.5 | 26.5 | Planned | |
| 50 | PK | PK-01 | Jun 18 15:40 | Jun 18 17:00 | 15 | 1.1 | 9.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2929 |
| Released | Mon Jun 15 06:00 |
| Due | Tue Jun 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 20.3 h |
| Sequence position | 95 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 8 06:00 | On hand |
| Power module | Aster Power | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 18 12:15 | Jun 18 23:25 | 90 | 9.2 | 51.2 | Planned | |
| 20 | SUB | SUB-A | Jun 19 09:25 | Jun 19 15:00 | 50 | 4.2 | 5.5 | Planned | |
| 30 | FA | FA-06 | Jun 22 10:45 | Jun 22 21:25 | 45 | 9.4 | 12.9 | Planned | |
| 40 | TB | TB-02 | Jun 22 18:05 | Jun 23 12:30 | 35 | 17.8 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 23 13:00 | Jun 23 15:45 | 15 | 2.5 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2652 |
| Released | Tue Jun 16 06:00 |
| Due | Fri Jun 26 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 47.1 h |
| Sequence position | 114 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 11 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 12 06:00 | On hand |
| Power module | Aster Power | Wed Jun 10 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 23 09:25 | Jun 24 10:40 | 45 | 22.8 | 117.4 | Planned | |
| 20 | SUB | SUB-A | Jun 24 07:00 | Jun 24 15:10 | 40 | 7.0 | 6.5 | Planned | |
| 30 | FA | FA-03 | Jun 24 20:45 | Jun 25 20:50 | 45 | 15.3 | 10.0 | Planned | |
| 40 | TB | TB-03 | Jun 27 14:10 | Jun 28 19:30 | 35 | 28.8 | 53.4 | Planned | |
| 50 | PK | PK-02 | Jun 29 14:50 | Jun 29 18:25 | 10 | 3.4 | 8.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2666 |
| Released | Tue Jun 16 06:00 |
| Due | Wed Jul 1 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 80.2 h |
| Sequence position | 135 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 6 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 11 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jun 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 23 15:20 | Jun 23 17:25 | 10 | 1.9 | 1.3 | Planned | |
| 20 | SUB | SUB-A | Jun 23 17:55 | Jun 23 19:45 | 50 | 0.5 | 0.0 | Planned | |
| 30 | FA | FA-01 | Jun 23 20:00 | Jun 23 21:40 | 45 | 0.9 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 23 21:55 | Jun 24 00:05 | 35 | 1.6 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 24 06:00 | Jun 24 06:35 | 15 | 0.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2729 |
| Released | Tue Jun 16 06:00 |
| Due | Wed Jun 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 7.8 h |
| Sequence position | 99 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 9 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 14:00 | In transit |
| SoC module | Kestrel Silicon | Sun Jun 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 18 07:50 | Jun 18 12:15 | 90 | 2.4 | 47.3 | Planned | |
| 20 | SUB | SUB-A | Jun 18 21:10 | Jun 18 22:45 | 50 | 0.8 | 7.9 | Planned | |
| 30 | FA | FA-02 | Jun 19 06:00 | Jun 19 08:20 | 45 | 1.6 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 23 23:20 | Jun 24 02:30 | 35 | 2.6 | 110.8 | Planned | |
| 50 | PK | PK-02 | Jun 24 08:25 | Jun 24 09:00 | 15 | 0.3 | 2.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2815 |
| Released | Tue Jun 16 06:00 |
| Due | Thu Jun 25 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 11.6 h |
| Sequence position | 109 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 13 06:00 | On hand |
| Power module | Aster Power | Sat Jun 6 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat Jun 13 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 23 14:35 | Jun 25 03:15 | 90 | 33.2 | 122.1 | Planned | |
| 20 | SUB | SUB-C | Jun 24 20:10 | Jun 25 17:50 | 40 | 13.5 | 15.5 | Planned | |
| 30 | FA | FA-05 | Jun 25 13:00 | Jun 29 18:15 | 45 | 36.5 | 6.9 | Planned | |
| 40 | TB | TB-03 | Jun 28 19:30 | Jun 30 00:50 | 35 | 28.8 | 73.5 | Planned | |
| 50 | PK | PK-02 | Jun 30 11:00 | Jul 1 06:55 | 10 | 12.2 | 4.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2891 |
| Released | Tue Jun 16 06:00 |
| Due | Wed Jul 1 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 127.8 h |
| Sequence position | 140 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 7 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 26 01:25 | Jun 29 11:10 | 90 | 30.5 | 177.9 | Planned | |
| 20 | SUB | SUB-C | Jun 26 22:30 | Jun 29 21:20 | 50 | 14.0 | 11.9 | Planned | |
| 30 | FA | FA-06 | Jun 30 09:00 | Jul 2 09:05 | 45 | 31.3 | 15.6 | Planned | |
| 40 | TB | TB-04 | Jul 1 08:15 | Jul 3 20:15 | 35 | 59.4 | 15.4 | Planned | |
| 45 | CFG | CFG-02 | Jul 6 15:40 | Jul 7 15:35 | 25 | 15.5 | 9.2 | Planned | |
| 50 | PK | PK-01 | Jul 7 15:50 | Jul 8 07:45 | 15 | 8.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-05 and SMT-01: SMT-01 has 71 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jun 23 14:55.
Order
| Reference | SO-71234 |
| Released | Tue Jun 16 06:00 |
| Due | Mon Jul 6 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 163.2 h |
| Sequence position | 155 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 8 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 19 06:00 | Jun 22 00:00 | 90 | 15.5 | 45.8 | Planned | |
| 20 | SUB | SUB-B | Jun 19 22:40 | Jun 22 08:55 | 50 | 2.4 | 11.8 | Planned | |
| 30 | FA | FA-01 | Jun 22 07:05 | Jun 22 14:00 | 45 | 5.7 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 24 02:30 | Jun 24 16:30 | 35 | 13.4 | 41.7 | Planned | |
| 50 | PK | PK-02 | Jun 26 06:45 | Jun 26 09:35 | 15 | 2.6 | 22.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2657 |
| Released | Wed Jun 17 06:00 |
| Due | Mon Jun 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 43.5 h |
| Sequence position | 121 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 7 06:00 | On hand |
| Power module | Aster Power | Sun Jun 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 19 08:10 | Jun 22 03:05 | 90 | 16.2 | 47.9 | Planned | |
| 20 | SUB | SUB-C | Jun 19 21:05 | Jun 22 11:45 | 50 | 6.3 | 3.4 | Planned | |
| 30 | FA | FA-06 | Jun 23 08:50 | Jun 24 07:25 | 25 | 14.2 | 17.1 | Planned | |
| 40 | TB | TB-01 | Jun 24 16:30 | Jun 25 19:55 | 35 | 26.8 | 24.8 | Planned | |
| 50 | PK | PK-01 | Jun 26 12:45 | Jun 26 16:40 | 15 | 3.7 | 8.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2744 |
| Released | Wed Jun 17 06:00 |
| Due | Mon Jun 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 70.8 h |
| Sequence position | 123 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 13 06:00 | On hand |
| Power module | Aster Power | Mon Jun 8 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jun 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 26 19:45 | Jul 1 05:55 | 90 | 53.9 | 172.5 | Planned | |
| 20 | SUB | SUB-C | Jun 30 06:55 | Jul 1 08:15 | 50 | 16.5 | 16.9 | Planned | |
| 30 | FA | FA-02 | Jun 30 09:50 | Jul 2 15:25 | 45 | 36.3 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 1 15:10 | Jul 4 11:35 | 15 | 68.2 | 23.8 | Planned | |
| 50 | PK | PK-02 | Jul 6 07:35 | Jul 6 16:20 | 15 | 8.0 | 1.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2768 |
| Released | Wed Jun 17 06:00 |
| Due | Mon Jul 6 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 186.5 h |
| Sequence position | 158 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 10 06:00 | On hand |
| Power module | Aster Power | Tue Jun 9 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 12 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 25 06:00 | Jun 26 07:05 | 45 | 23.3 | 136.8 | Planned | |
| 20 | SUB | SUB-C | Jun 25 17:50 | Jun 26 12:05 | 40 | 9.6 | 7.3 | Planned | |
| 30 | FA | FA-05 | Jun 29 18:15 | Jul 1 12:25 | 25 | 25.8 | 30.3 | Planned | |
| 40 | TB | TB-01 | Jun 30 18:20 | Jul 1 15:10 | 35 | 20.2 | 19.8 | Planned | |
| 50 | PK | PK-01 | Jul 1 17:05 | Jul 2 09:30 | 15 | 8.7 | 1.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2789 |
| Released | Wed Jun 17 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 90.2 h |
| Sequence position | 149 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 11 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 8 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 18 23:25 | Jun 19 08:10 | 90 | 7.2 | 39.2 | Planned | |
| 20 | SUB | SUB-C | Jun 19 17:15 | Jun 19 21:05 | 50 | 2.5 | 10.8 | Planned | |
| 30 | FA | FA-05 | Jun 22 14:20 | Jun 22 22:00 | 25 | 6.8 | 10.4 | Planned | |
| 40 | TB | TB-03 | Jun 23 06:00 | Jun 23 11:55 | 35 | 5.3 | 10.2 | Planned | |
| 50 | PK | PK-01 | Jun 23 20:25 | Jun 23 23:00 | 15 | 2.3 | 7.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2796 |
| Released | Wed Jun 17 06:00 |
| Due | Fri Jun 26 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 27.8 h |
| Sequence position | 117 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 12 06:00 | On hand |
| Power module | Aster Power | Sun Jun 7 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 8 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 22 03:05 | Jun 22 20:30 | 45 | 15.7 | 65.6 | Planned | |
| 20 | SUB | SUB-A | Jun 23 06:00 | Jun 23 13:45 | 50 | 6.4 | 14.3 | Planned | |
| 30 | FA | FA-06 | Jun 24 07:25 | Jun 25 09:25 | 45 | 17.2 | 14.9 | Planned | |
| 40 | TB | TB-01 | Jun 25 19:55 | Jun 26 10:05 | 35 | 13.6 | 31.2 | Planned | |
| 50 | PK | PK-02 | Jun 26 17:30 | Jun 29 07:05 | 15 | 5.8 | 6.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2925 |
| Released | Wed Jun 17 06:00 |
| Due | Mon Jun 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 61.9 h |
| Sequence position | 126 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 14 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jun 7 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 18 19:45 | Jun 19 03:05 | 45 | 6.6 | 12.8 | Planned | |
| 20 | SUB | SUB-A | Jun 19 15:00 | Jun 19 17:25 | 50 | 1.6 | 8.5 | Planned | |
| 30 | FA | FA-01 | Jun 19 17:00 | Jun 19 21:20 | 45 | 3.1 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 22 09:45 | Jun 22 15:20 | 15 | 5.3 | 49.5 | Planned | |
| 50 | PK | PK-01 | Jun 23 19:00 | Jun 23 20:25 | 15 | 1.2 | 18.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2739 |
| Released | Thu Jun 18 06:00 |
| Due | Fri Jun 26 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 20.6 h |
| Sequence position | 116 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 12 06:00 | On hand |
| Power module | Aster Power | Sun Jun 14 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 16 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 23 06:50 | Jun 24 12:35 | 90 | 26.5 | 69.3 | Planned | |
| 20 | SUB | SUB-C | Jun 24 09:05 | Jun 24 20:10 | 50 | 9.2 | 12.4 | Planned | |
| 30 | FA | FA-06 | Jun 25 12:40 | Jun 26 22:45 | 45 | 24.8 | 16.7 | Planned | |
| 40 | TB | TB-02 | Jun 28 10:55 | Jun 29 07:05 | 35 | 19.6 | 65.7 | Planned | |
| 50 | PK | PK-02 | Jun 29 18:25 | Jun 30 11:00 | 15 | 8.3 | 10.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2753 |
| Released | Thu Jun 18 06:00 |
| Due | Wed Jul 1 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 92.4 h |
| Sequence position | 137 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 13 06:00 | On hand |
| Power module | Aster Power | Sun Jun 14 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 25 06:00 | Jun 26 21:45 | 90 | 36.2 | 114.0 | Planned | |
| 20 | SUB | SUB-B | Jun 29 06:00 | Jun 29 12:55 | 50 | 5.6 | 24.9 | Planned | |
| 30 | FA | FA-02 | Jun 29 07:55 | Jun 29 19:40 | 45 | 10.0 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 30 06:00 | Jun 30 16:25 | 35 | 9.8 | 19.2 | Planned | |
| 50 | PK | PK-01 | Jul 2 09:30 | Jul 2 14:20 | 15 | 4.1 | 25.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2820 |
| Released | Thu Jun 18 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 69.7 h |
| Sequence position | 150 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 11 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 1 20:50 | Jul 7 07:45 | 90 | 55.7 | 219.1 | Planned | |
| 20 | SUB | SUB-B | Jul 6 09:00 | Jul 7 11:25 | 50 | 17.1 | 19.0 | Planned | |
| 30 | FA | FA-03 | Jul 6 12:40 | Jul 8 19:20 | 45 | 37.4 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 6 19:05 | Jul 9 18:00 | 35 | 70.3 | 0.8 | Planned | |
| 50 | PK | PK-02 | Jul 9 19:00 | Jul 10 11:00 | 15 | 8.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-03 and SMT-01: SMT-01 has 71 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Fri Jun 26 06:20.
Order
| Reference | RP-2835 |
| Released | Thu Jun 18 06:00 |
| Due | Wed Jul 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 192.7 h |
| Sequence position | 180 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 13 06:00 | On hand |
| Power module | Aster Power | Sat Jun 13 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jun 14 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 22 00:00 | Jun 22 20:30 | 90 | 17.8 | 40.0 | Planned | |
| 20 | SUB | SUB-A | Jun 22 19:25 | Jun 22 23:00 | 50 | 2.8 | 12.4 | Planned | |
| 30 | FA | FA-01 | Jun 22 20:50 | Jun 23 11:15 | 25 | 6.5 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 25 07:25 | Jun 25 23:20 | 35 | 15.3 | 57.1 | Planned | |
| 50 | PK | PK-01 | Jun 26 16:40 | Jun 26 20:25 | 15 | 3.0 | 10.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2841 |
| Released | Thu Jun 18 06:00 |
| Due | Mon Jun 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 48.9 h |
| Sequence position | 125 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 14 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 7 07:45 | Jul 9 07:45 | 45 | 44.8 | 276.2 | Planned | |
| 20 | SUB | SUB-A | Jul 8 12:20 | Jul 9 10:50 | 50 | 13.7 | 12.2 | Planned | |
| 30 | FA | FA-01 | Jul 8 15:30 | Jul 10 14:20 | 45 | 30.1 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 9 21:10 | Jul 12 06:15 | 35 | 56.5 | 23.7 | Planned | |
| 50 | PK | PK-02 | Jul 13 06:00 | Jul 13 13:25 | 15 | 6.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Thu Jun 25 13:25.
Order
| Reference | RP-2887 |
| Released | Thu Jun 18 06:00 |
| Due | Fri Jul 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 154.8 h |
| Sequence position | 196 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 11 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 13 06:00 | On hand |
| Power module | Aster Power | Tue Jun 9 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 11 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 25 18:05 | Jun 26 19:45 | 90 | 22.7 | 125.6 | Planned | |
| 20 | SUB | SUB-C | Jun 26 12:05 | Jun 26 22:30 | 40 | 9.2 | 5.6 | Planned | |
| 30 | FA | FA-04 | Jun 30 08:50 | Jul 1 19:05 | 15 | 25.0 | 27.2 | Planned | |
| 40 | TB | TB-03 | Jul 1 06:00 | Jul 2 02:15 | 35 | 19.7 | 17.0 | Planned | |
| 45 | CFG | CFG-01 | Jul 2 06:00 | Jul 6 15:40 | 25 | 24.8 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jul 6 15:55 | Jul 7 08:05 | 15 | 8.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-06: SMT-06 has 41 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jun 24 23:00.
Order
| Reference | SO-71091 |
| Released | Thu Jun 18 06:00 |
| Due | Mon Jul 6 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 113.4 h |
| Sequence position | 154 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 12 06:00 | On hand |
| Power module | Aster Power | Tue Jun 9 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jun 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 22 16:55 | Jun 23 06:50 | 10 | 13.0 | 33.2 | Planned | |
| 20 | SUB | SUB-B | Jun 23 15:05 | Jun 23 21:30 | 50 | 5.1 | 8.6 | Planned | |
| 30 | FA | FA-05 | Jun 24 16:55 | Jun 25 13:00 | 45 | 11.3 | 14.6 | Planned | |
| 40 | TB | TB-03 | Jun 25 23:20 | Jun 26 21:25 | 35 | 21.5 | 24.2 | Planned | |
| 50 | PK | PK-01 | Jun 26 21:55 | Jun 29 08:10 | 15 | 3.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2637 |
| Released | Fri Jun 19 06:00 |
| Due | Tue Jun 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 56.5 h |
| Sequence position | 129 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 14 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat Jun 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 24 10:40 | Jun 25 06:00 | 90 | 17.1 | 72.4 | Planned | |
| 20 | SUB | SUB-A | Jun 25 08:05 | Jun 25 16:25 | 50 | 7.0 | 8.9 | Planned | |
| 30 | FA | FA-06 | Jun 26 22:45 | Jun 30 09:00 | 25 | 18.8 | 27.3 | Planned | |
| 40 | TB | TB-02 | Jun 29 20:25 | Jun 30 11:50 | 35 | 14.8 | 10.8 | Planned | |
| 50 | PK | PK-01 | Jun 30 18:00 | Jul 1 08:05 | 15 | 6.3 | 5.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2676 |
| Released | Fri Jun 19 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 67.7 h |
| Sequence position | 144 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 10 06:00 | On hand |
| Power module | Aster Power | Tue Jun 9 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 24 19:05 | Jun 25 18:05 | 90 | 20.8 | 80.3 | Planned | |
| 20 | SUB | SUB-A | Jun 25 18:05 | Jun 26 08:50 | 50 | 6.4 | 11.6 | Planned | |
| 30 | FA | FA-03 | Jun 25 21:25 | Jun 26 19:55 | 45 | 13.8 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jun 30 00:50 | Jun 30 23:55 | 35 | 22.5 | 87.8 | Planned | |
| 50 | PK | PK-01 | Jul 1 08:05 | Jul 1 11:40 | 15 | 2.8 | 2.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2719 |
| Released | Fri Jun 19 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 70.2 h |
| Sequence position | 146 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 14 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 9 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 22 14:00 | Jun 22 22:55 | 90 | 6.9 | 0.0 | Planned | |
| 20 | SUB | SUB-C | Jun 22 21:30 | Jun 23 08:20 | 40 | 3.2 | 0.0 | Planned | |
| 30 | FA | FA-04 | Jun 23 15:40 | Jun 24 07:00 | 45 | 7.1 | 7.4 | Planned | |
| 40 | TB | TB-02 | Jun 25 06:00 | Jun 25 19:55 | 35 | 13.3 | 31.8 | Planned | |
| 50 | PK | PK-02 | Jun 26 15:25 | Jun 26 17:30 | 15 | 1.8 | 11.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2801 |
| Released | Fri Jun 19 06:00 |
| Due | Mon Jun 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 36.1 h |
| Sequence position | 124 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 12 06:00 | On hand |
| Power module | Aster Power | Mon Jun 22 14:00 | In transit |
| SoC module | Kestrel Silicon | Tue Jun 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 23 06:00 | Jun 23 21:40 | 90 | 13.2 | 45.5 | Planned | |
| 20 | SUB | SUB-B | Jun 23 21:30 | Jun 24 07:25 | 50 | 2.1 | 10.5 | Planned | |
| 30 | FA | FA-03 | Jun 24 14:40 | Jun 24 20:45 | 45 | 4.8 | 8.2 | Planned | |
| 40 | TB | TB-04 | Jun 26 20:40 | Jun 27 08:40 | 35 | 11.4 | 52.1 | Planned | |
| 50 | PK | PK-01 | Jun 29 12:25 | Jun 29 14:55 | 15 | 2.2 | 5.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2871 |
| Released | Fri Jun 19 06:00 |
| Due | Tue Jun 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 37.7 h |
| Sequence position | 133 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 11 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 11 06:00 | On hand |
| Power module | Aster Power | Thu Jun 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 19 06:00 | Jun 19 11:55 | 90 | 3.9 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jun 19 20:00 | Jun 19 22:40 | 50 | 1.8 | 7.1 | Planned | |
| 30 | FA | FA-06 | Jun 22 21:25 | Jun 23 08:50 | 25 | 4.0 | 14.5 | Planned | |
| 40 | TB | TB-02 | Jun 23 12:30 | Jun 23 20:20 | 15 | 7.6 | 3.4 | Planned | |
| 45 | CFG | CFG-01 | Jun 24 06:00 | Jun 24 08:55 | 25 | 2.5 | 2.2 | Planned | |
| 50 | PK | PK-02 | Jun 24 09:10 | Jun 24 11:00 | 15 | 1.1 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71364 |
| Released | Fri Jun 19 06:00 |
| Due | Mon Jun 29 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 24.6 h |
| Sequence position | 120 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 11 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 9 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 22 20:30 | Jun 23 09:25 | 90 | 11.2 | 20.2 | Planned | |
| 20 | SUB | SUB-A | Jun 23 19:45 | Jun 24 07:00 | 50 | 3.4 | 12.8 | Planned | |
| 30 | FA | FA-03 | Jun 23 22:55 | Jun 24 14:40 | 45 | 7.5 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 26 06:00 | Jun 26 20:40 | 35 | 14.1 | 42.2 | Planned | |
| 50 | PK | PK-02 | Jun 29 07:05 | Jun 29 09:00 | 15 | 1.7 | 2.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2724 |
| Released | Sat Jun 20 06:00 |
| Due | Tue Jun 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 41.8 h |
| Sequence position | 130 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 15 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 17 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 24 14:00 | Jun 25 06:25 | 45 | 14.9 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 24 20:50 | Jun 25 08:05 | 50 | 3.4 | 0.1 | Planned | |
| 30 | FA | FA-02 | Jun 25 06:00 | Jun 25 13:45 | 25 | 6.8 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 28 11:50 | Jun 29 00:30 | 35 | 12.1 | 74.8 | Planned | |
| 50 | PK | PK-01 | Jun 29 17:00 | Jun 29 20:15 | 15 | 2.5 | 10.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2852 |
| Released | Sat Jun 20 06:00 |
| Due | Wed Jul 1 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 42.6 h |
| Sequence position | 139 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 12 06:00 | On hand |
| Power module | Aster Power | Wed Jun 24 14:00 | In transit |
| SoC module | Kestrel Silicon | Wed Jun 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 23 06:00 | Jun 23 14:00 | 90 | 6.0 | 29.5 | Planned | |
| 20 | SUB | SUB-C | Jun 24 06:50 | Jun 24 09:05 | 50 | 1.4 | 9.8 | Planned | |
| 30 | FA | FA-02 | Jun 24 19:20 | Jun 24 22:55 | 45 | 2.8 | 9.2 | Planned | |
| 40 | TB | TB-03 | Jun 27 08:40 | Jun 27 14:10 | 35 | 4.9 | 57.9 | Planned | |
| 50 | PK | PK-01 | Jun 29 14:55 | Jun 29 16:10 | 15 | 1.0 | 8.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2905 |
| Released | Sat Jun 20 06:00 |
| Due | Tue Jun 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 20.1 h |
| Sequence position | 134 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 14 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 26 10:30 | Jun 29 06:30 | 90 | 17.8 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 26 19:35 | Jun 29 08:55 | 50 | 5.5 | 0.6 | Planned | |
| 30 | FA | FA-03 | Jun 26 22:35 | Jun 29 18:15 | 25 | 11.8 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jun 30 12:25 | Jul 1 08:15 | 35 | 19.2 | 25.6 | Planned | |
| 50 | PK | PK-01 | Jul 1 14:25 | Jul 1 17:05 | 15 | 2.4 | 5.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2763 |
| Released | Sun Jun 21 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 60.2 h |
| Sequence position | 148 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 12 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 10:00 | In transit |
| SoC module | Kestrel Silicon | Wed Jun 17 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jun 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 22 20:30 | Jun 23 14:25 | 90 | 15.7 | 20.2 | Planned | |
| 20 | SUB | SUB-A | Jun 23 13:45 | Jun 23 17:50 | 50 | 3.2 | 7.2 | Planned | |
| 30 | FA | FA-01 | Jun 23 21:40 | Jun 24 13:35 | 45 | 7.7 | 5.9 | Planned | |
| 40 | TB | TB-01 | Jun 26 10:05 | Jun 26 15:15 | 35 | 4.6 | 51.6 | Planned | |
| 50 | PK | PK-01 | Jun 29 08:10 | Jun 29 12:25 | 15 | 3.5 | 8.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2774 |
| Released | Sun Jun 21 06:00 |
| Due | Tue Jun 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 38.6 h |
| Sequence position | 131 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 17 06:00 | On hand |
| Power module | Aster Power | Fri Jun 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 25 14:50 | Jun 26 04:25 | 90 | 11.6 | 83.3 | Planned | |
| 20 | SUB | SUB-B | Jun 26 06:00 | Jun 26 10:55 | 50 | 3.6 | 0.0 | Planned | |
| 30 | FA | FA-02 | Jun 26 08:55 | Jun 26 18:00 | 45 | 7.8 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jun 30 23:55 | Jul 1 15:10 | 35 | 14.7 | 105.6 | Planned | |
| 50 | PK | PK-01 | Jul 2 14:20 | Jul 2 16:20 | 15 | 1.8 | 14.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2862 |
| Released | Sun Jun 21 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 43.3 h |
| Sequence position | 151 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 11 06:00 | On hand |
| Power module | Aster Power | Mon Jun 15 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 15 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jun 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 23 17:25 | Jun 24 04:55 | 45 | 10.0 | 40.4 | Planned | |
| 20 | SUB | SUB-A | Jun 24 15:10 | Jun 24 18:05 | 50 | 2.1 | 10.9 | Planned | |
| 30 | FA | FA-02 | Jun 25 13:45 | Jun 25 19:55 | 45 | 4.9 | 13.2 | Planned | |
| 40 | TB | TB-04 | Jun 29 00:30 | Jun 29 04:00 | 35 | 2.9 | 80.9 | Planned | |
| 50 | PK | PK-01 | Jun 29 20:15 | Jun 29 22:45 | 15 | 2.2 | 13.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2934 |
| Released | Sun Jun 21 06:00 |
| Due | Wed Jul 1 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 25.3 h |
| Sequence position | 141 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 11 06:00 | On hand |
| Power module | Aster Power | Thu Jun 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 22 06:00 | Jun 22 09:55 | 90 | 2.4 | 6.8 | Planned | |
| 20 | SUB | SUB-B | Jun 22 10:30 | Jun 22 12:20 | 50 | 1.0 | 0.0 | Planned | |
| 30 | FA | FA-05 | Jun 24 13:50 | Jun 24 16:55 | 25 | 2.7 | 33.2 | Planned | |
| 40 | TB | TB-02 | Jun 24 19:30 | Jun 24 21:50 | 15 | 2.1 | 2.3 | Planned | |
| 45 | CFG | CFG-01 | Jun 25 06:00 | Jun 25 08:35 | 5 | 2.5 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 26 20:25 | Jun 26 21:35 | 15 | 0.9 | 26.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71390 |
| Released | Sun Jun 21 06:00 |
| Due | Tue Jun 30 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 14.9 h |
| Sequence position | 128 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 16 06:00 | On hand |
| Power module | Aster Power | Sat Jun 13 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 24 12:45 | Jun 24 18:25 | 45 | 4.9 | 51.8 | Planned | |
| 20 | SUB | SUB-A | Jun 25 16:25 | Jun 25 18:05 | 50 | 0.8 | 16.2 | Planned | |
| 30 | FA | FA-02 | Jun 25 22:40 | Jun 26 07:55 | 25 | 1.8 | 4.2 | Planned | |
| 40 | TB | TB-01 | Jun 29 09:20 | Jun 29 13:55 | 15 | 4.3 | 74.2 | Planned | |
| 50 | PK | PK-01 | Jun 30 08:10 | Jun 30 09:10 | 10 | 0.8 | 10.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2690 |
| Released | Mon Jun 22 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 15.2 h |
| Sequence position | 145 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 15 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 22 06:00 | Jun 22 09:05 | 45 | 2.3 | 0.0 | Planned | |
| 20 | SUB | SUB-C | Jun 22 11:45 | Jun 22 13:20 | 40 | 0.9 | 1.7 | Planned | |
| 30 | FA | FA-06 | Jun 25 09:25 | Jun 25 12:40 | 45 | 2.0 | 44.3 | Planned | |
| 40 | TB | TB-02 | Jun 28 06:50 | Jun 28 10:55 | 15 | 3.8 | 65.9 | Planned | |
| 50 | PK | PK-01 | Jun 29 16:10 | Jun 29 17:00 | 15 | 0.6 | 9.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2709 |
| Released | Mon Jun 22 06:00 |
| Due | Wed Jul 1 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.3 h |
| Sequence position | 136 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 20 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 25 11:50 | Jun 26 01:25 | 90 | 11.6 | 73.6 | Planned | |
| 20 | SUB | SUB-B | Jun 26 10:55 | Jun 26 13:35 | 50 | 1.8 | 8.4 | Planned | |
| 30 | FA | FA-01 | Jun 26 14:30 | Jun 26 18:30 | 45 | 3.2 | 1.7 | Planned | |
| 40 | TB | TB-02 | Jun 29 11:00 | Jun 29 14:45 | 35 | 3.2 | 66.1 | Planned | |
| 50 | PK | PK-01 | Jul 2 16:20 | Jul 2 17:55 | 15 | 1.3 | 49.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-05 and SMT-06: SMT-06 has 28 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jun 23 12:10.
Order
| Reference | RP-2915 |
| Released | Mon Jun 22 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 25.1 h |
| Sequence position | 153 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 19 06:00 | On hand |
| Power module | Aster Power | Tue Jun 16 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 30 06:00 | Jun 30 23:35 | 90 | 15.1 | 64.5 | Planned | |
| 20 | SUB | SUB-B | Jul 1 06:25 | Jul 1 14:15 | 25 | 6.9 | 9.3 | Planned | |
| 30 | FA | FA-06 | Jul 2 09:05 | Jul 6 09:00 | 25 | 15.5 | 15.7 | Planned | |
| 40 | TB | TB-03 | Jul 5 13:10 | Jul 6 19:05 | 35 | 29.3 | 69.8 | Planned | |
| 45 | CFG | CFG-02 | Jul 7 15:35 | Jul 8 08:50 | 25 | 9.3 | 12.5 | Planned | |
| 50 | PK | PK-01 | Jul 8 09:05 | Jul 8 13:45 | 10 | 4.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71403 |
| Released | Mon Jun 22 06:00 |
| Due | Wed Jul 8 15:00 |
| Priority and weight | 1, weight 5 |
| Touch time left | 83.7 h |
| Sequence position | 168 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 19 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 15 06:00 | On hand |
| Power module | Aster Power | Thu Jun 25 10:00 | In transit |
| SoC module | Kestrel Silicon | Fri Jun 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 24 06:00 | Jun 24 12:45 | 45 | 5.5 | 22.8 | Planned | |
| 20 | SUB | SUB-A | Jun 24 18:05 | Jun 24 20:15 | 50 | 0.8 | 8.2 | Planned | |
| 30 | FA | FA-02 | Jun 25 19:55 | Jun 25 22:40 | 45 | 2.0 | 15.9 | Planned | |
| 40 | TB | TB-01 | Jun 29 04:00 | Jun 29 09:20 | 35 | 4.8 | 78.3 | Planned | |
| 50 | PK | PK-01 | Jun 30 07:00 | Jun 30 08:10 | 15 | 0.9 | 13.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2647 |
| Released | Tue Jun 23 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 17.2 h |
| Sequence position | 143 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 19 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 15 06:00 | On hand |
| Power module | Aster Power | Mon Jun 15 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 25 03:15 | Jun 25 18:30 | 90 | 13.2 | 42.8 | Planned | |
| 20 | SUB | SUB-B | Jun 25 19:10 | Jun 25 22:20 | 50 | 2.3 | 10.9 | Planned | |
| 30 | FA | FA-01 | Jun 25 22:20 | Jun 26 12:10 | 45 | 5.6 | 1.7 | Planned | |
| 40 | TB | TB-02 | Jun 29 07:05 | Jun 29 11:00 | 35 | 3.3 | 71.9 | Planned | |
| 50 | PK | PK-01 | Jul 1 11:40 | Jul 1 14:25 | 15 | 2.5 | 32.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2734 |
| Released | Tue Jun 23 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 30.9 h |
| Sequence position | 147 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 17 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 29 06:00 | Jun 29 12:45 | 45 | 5.5 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 29 12:05 | Jun 29 14:15 | 50 | 1.3 | 0.1 | Planned | |
| 30 | FA | FA-01 | Jun 29 14:15 | Jun 29 17:35 | 45 | 2.6 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 29 17:15 | Jun 29 22:20 | 35 | 4.5 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 29 22:50 | Jun 30 07:00 | 15 | 0.9 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2810 |
| Released | Tue Jun 23 06:00 |
| Due | Wed Jul 1 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 18.0 h |
| Sequence position | 138 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 29 06:00 | In transit |
| Enclosure set | Tidewell Plastics | Sat Jun 20 06:00 | On hand |
| Power module | Aster Power | Tue Jun 16 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 15 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 29 06:30 | Jun 30 04:40 | 90 | 19.4 | 91.8 | Planned | |
| 20 | SUB | SUB-A | Jun 29 20:55 | Jun 30 07:45 | 50 | 3.0 | 9.2 | Planned | |
| 30 | FA | FA-03 | Jun 30 12:05 | Jun 30 20:30 | 45 | 7.2 | 6.2 | Planned | |
| 40 | TB | TB-01 | Jul 2 14:00 | Jul 3 07:20 | 35 | 16.8 | 48.1 | Planned | |
| 50 | PK | PK-01 | Jul 6 07:20 | Jul 6 11:20 | 15 | 3.2 | 1.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2842 |
| Released | Tue Jun 23 06:00 |
| Due | Mon Jul 6 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 53.5 h |
| Sequence position | 160 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 18 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 29 12:45 | Jun 30 12:05 | 45 | 21.3 | 6.2 | Planned | |
| 20 | SUB | SUB-B | Jun 30 07:50 | Jun 30 14:05 | 50 | 4.9 | 5.9 | Planned | |
| 30 | FA | FA-01 | Jun 30 10:45 | Jun 30 21:50 | 45 | 9.8 | 0.2 | Planned | |
| 40 | TB | TB-01 | Jul 3 15:30 | Jul 4 09:25 | 35 | 17.3 | 73.7 | Planned | |
| 50 | PK | PK-02 | Jul 6 19:15 | Jul 7 06:05 | 15 | 3.6 | 12.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2662 |
| Released | Wed Jun 24 06:00 |
| Due | Tue Jul 7 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 60.2 h |
| Sequence position | 164 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Mon Jun 29 06:00 | In transit |
| SoC module | Kestrel Silicon | Wed Jun 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 28 23:00 | Jun 29 14:15 | 90 | 13.0 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jun 29 14:15 | Jun 29 20:55 | 50 | 5.3 | 7.8 | Planned | |
| 30 | FA | FA-05 | Jul 1 12:25 | Jul 2 11:10 | 25 | 14.3 | 27.8 | Planned | |
| 40 | TB | TB-01 | Jul 2 02:30 | Jul 2 14:00 | 15 | 11.2 | 10.1 | Planned | |
| 50 | PK | PK-02 | Jul 2 19:30 | Jul 6 07:35 | 15 | 4.8 | 4.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2681 |
| Released | Wed Jun 24 06:00 |
| Due | Mon Jul 6 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 52.0 h |
| Sequence position | 157 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 16 06:00 | On hand |
| Power module | Aster Power | Sat Jun 27 10:00 | In transit |
| Display panel | Brightline Displays | Fri Jun 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 29 11:25 | Jun 30 13:05 | 90 | 22.9 | 73.4 | Planned | |
| 20 | SUB | SUB-A | Jun 30 10:30 | Jun 30 13:55 | 25 | 3.0 | 10.9 | Planned | |
| 30 | FA | FA-03 | Jun 30 20:30 | Jul 1 11:15 | 5 | 7.2 | 8.5 | Planned | |
| 40 | TB | TB-03 | Jul 3 17:50 | Jul 4 11:20 | 35 | 16.9 | 68.2 | Planned | |
| 50 | PK | PK-02 | Jul 7 06:05 | Jul 7 09:35 | 15 | 3.2 | 16.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2705 |
| Released | Wed Jun 24 06:00 |
| Due | Tue Jul 7 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 56.1 h |
| Sequence position | 165 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 20 06:00 | On hand |
| Power module | Aster Power | Fri Jun 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 5 23:25 | Jul 6 23:35 | 90 | 21.4 | 154.2 | Planned | |
| 20 | SUB | SUB-A | Jul 6 18:15 | Jul 7 11:50 | 50 | 8.8 | 11.8 | Planned | |
| 30 | FA | FA-04 | Jul 7 06:00 | Jul 8 14:30 | 25 | 23.6 | 2.0 | Planned | |
| 40 | TB | TB-03 | Jul 8 06:00 | Jul 9 01:10 | 35 | 18.6 | 20.2 | Planned | |
| 50 | PK | PK-01 | Jul 10 10:55 | Jul 10 19:30 | 10 | 7.9 | 20.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-01 and SMT-07: SMT-07 has 60 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Mon Jun 29 10:35.
Order
| Reference | RP-2790 |
| Released | Wed Jun 24 06:00 |
| Due | Thu Jul 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 83.8 h |
| Sequence position | 187 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Tue Jun 16 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 22 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 25 06:00 | Jun 25 11:50 | 90 | 3.8 | 22.8 | Planned | |
| 20 | SUB | SUB-A | Jun 26 08:50 | Jun 26 11:00 | 50 | 0.8 | 15.0 | Planned | |
| 30 | FA | FA-01 | Jun 26 12:10 | Jun 26 14:30 | 25 | 1.9 | 1.3 | Planned | |
| 40 | TB | TB-04 | Jun 29 06:00 | Jun 29 07:25 | 15 | 1.2 | 64.2 | Planned | |
| 50 | PK | PK-02 | Jul 2 17:50 | Jul 2 19:30 | 15 | 0.9 | 57.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Add test technicians to the shifts before Thu Jul 2; the TB stations are free but not staffed.
With every resource to itself it would finish Wed Jun 24 19:05.
Order
| Reference | RP-2881 |
| Released | Wed Jun 24 06:00 |
| Due | Thu Jul 2 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 11.9 h |
| Sequence position | 152 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 18 06:00 | On hand |
| Power module | Aster Power | Mon Jun 22 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 1 03:55 | Jul 1 20:50 | 45 | 15.2 | 111.9 | Planned | |
| 20 | SUB | SUB-C | Jul 1 17:25 | Jul 2 06:25 | 50 | 4.7 | 6.9 | Planned | |
| 30 | FA | FA-03 | Jul 2 09:45 | Jul 2 21:35 | 45 | 10.1 | 6.2 | Planned | |
| 40 | TB | TB-02 | Jul 5 00:30 | Jul 5 17:35 | 35 | 16.5 | 57.8 | Planned | |
| 45 | CFG | CFG-02 | Jul 9 06:00 | Jul 9 15:55 | 5 | 9.3 | 48.0 | Planned | |
| 50 | PK | PK-01 | Jul 9 16:10 | Jul 9 18:30 | 15 | 2.1 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Fri Jun 26 20:30.
Order
| Reference | SO-71338 |
| Released | Wed Jun 24 06:00 |
| Due | Wed Jul 8 15:00 |
| Priority and weight | 1, weight 5 |
| Touch time left | 61.1 h |
| Sequence position | 174 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Sun Jun 21 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 18 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 22 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 26 07:05 | Jun 29 03:00 | 90 | 17.2 | 24.1 | Planned | |
| 20 | SUB | SUB-B | Jun 29 12:55 | Jun 29 17:15 | 50 | 3.5 | 17.5 | Planned | |
| 30 | FA | FA-01 | Jun 29 17:35 | Jun 30 10:45 | 45 | 8.4 | 3.2 | Planned | |
| 40 | TB | TB-02 | Jun 30 11:50 | Jun 30 17:25 | 35 | 5.0 | 15.8 | Planned | |
| 50 | PK | PK-01 | Jul 2 17:55 | Jul 2 22:30 | 15 | 3.8 | 32.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2633 |
| Released | Thu Jun 25 06:00 |
| Due | Mon Jul 6 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 41.8 h |
| Sequence position | 156 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 13 19:35 | Jul 16 08:05 | 90 | 56.2 | 264.3 | Planned | |
| 20 | SUB | SUB-A | Jul 15 08:20 | Jul 16 10:55 | 50 | 17.2 | 18.3 | Planned | |
| 30 | FA | FA-01 | Jul 15 11:50 | Jul 17 18:30 | 45 | 37.9 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 16 15:45 | Jul 19 15:10 | 15 | 71.2 | 22.8 | Planned | |
| 50 | PK | PK-01 | Jul 20 08:30 | Jul 20 17:35 | 15 | 8.3 | 2.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-01: SMT-01 has 63 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Mon Jul 6 06:35.
Order
| Reference | RP-2769 |
| Released | Thu Jun 25 06:00 |
| Due | Mon Jul 20 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 194.5 h |
| Sequence position | 231 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 22 06:00 | On hand |
| Power module | Aster Power | Tue Jun 16 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 15 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 29 03:00 | Jun 29 16:40 | 90 | 11.7 | 42.8 | Planned | |
| 20 | SUB | SUB-B | Jun 29 17:15 | Jun 29 22:10 | 50 | 3.6 | 6.8 | Planned | |
| 30 | FA | FA-03 | Jun 29 20:25 | Jun 30 12:05 | 25 | 7.8 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 2 06:00 | Jul 2 19:15 | 35 | 12.7 | 46.5 | Planned | |
| 50 | PK | PK-01 | Jul 2 22:30 | Jul 6 07:20 | 15 | 1.6 | 2.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2825 |
| Released | Thu Jun 25 06:00 |
| Due | Mon Jul 6 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 40.8 h |
| Sequence position | 159 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 22 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 9 06:00 | Jul 10 22:55 | 90 | 37.4 | 206.0 | Planned | |
| 20 | SUB | SUB-C | Jul 10 10:40 | Jul 13 10:45 | 50 | 15.2 | 14.6 | Planned | |
| 30 | FA | FA-06 | Jul 10 22:35 | Jul 15 16:00 | 45 | 41.2 | 8.8 | Planned | |
| 40 | TB | TB-04 | Jul 14 16:10 | Jul 16 01:10 | 35 | 32.4 | 29.1 | Planned | |
| 50 | PK | PK-02 | Jul 16 06:00 | Jul 16 21:00 | 10 | 13.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-05 and SMT-07: SMT-07 has 83 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Thu Jul 2 20:55.
Order
| Reference | RP-2892 |
| Released | Thu Jun 25 06:00 |
| Due | Wed Jul 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 143.9 h |
| Sequence position | 214 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 20 06:00 | On hand |
| Power module | Aster Power | Tue Jun 16 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 26 04:25 | Jun 26 13:10 | 90 | 6.8 | 21.4 | Planned | |
| 20 | SUB | SUB-B | Jun 26 13:35 | Jun 26 16:45 | 50 | 2.3 | 2.4 | Planned | |
| 30 | FA | FA-05 | Jul 2 11:10 | Jul 2 17:55 | 25 | 6.3 | 59.0 | Planned | |
| 40 | TB | TB-03 | Jul 3 12:15 | Jul 3 17:50 | 35 | 5.0 | 20.4 | Planned | |
| 45 | CFG | CFG-02 | Jul 6 06:00 | Jul 6 11:55 | 25 | 5.0 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jul 6 16:20 | Jul 6 19:15 | 15 | 2.2 | 4.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71078 |
| Released | Thu Jun 25 06:00 |
| Due | Tue Jul 7 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 31.6 h |
| Sequence position | 163 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 17 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jun 30 23:35 | Jul 1 19:20 | 90 | 17.0 | 85.1 | Planned | |
| 20 | SUB | SUB-A | Jul 1 13:35 | Jul 1 21:55 | 50 | 7.0 | 7.1 | Planned | |
| 30 | FA | FA-04 | Jul 2 19:50 | Jul 6 23:00 | 25 | 18.8 | 19.5 | Planned | |
| 40 | TB | TB-01 | Jul 6 10:25 | Jul 7 01:45 | 35 | 14.8 | 3.8 | Planned | |
| 45 | CFG | CFG-01 | Jul 8 06:00 | Jul 9 09:00 | 25 | 18.6 | 16.0 | Planned | |
| 50 | PK | PK-02 | Jul 9 09:15 | Jul 9 16:15 | 10 | 6.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-01 has a 45 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 1 08:25.
Order
| Reference | SO-71312 |
| Released | Thu Jun 25 06:00 |
| Due | Wed Jul 8 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 86.3 h |
| Sequence position | 173 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Mon Jun 22 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 15 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 1 19:20 | Jul 6 21:35 | 90 | 47.2 | 80.6 | Planned | |
| 20 | SUB | SUB-C | Jul 6 14:10 | Jul 6 22:45 | 50 | 7.2 | 23.7 | Planned | |
| 30 | FA | FA-01 | Jul 6 15:55 | Jul 7 13:45 | 45 | 13.1 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 7 06:50 | Jul 7 19:55 | 15 | 12.8 | 12.7 | Planned | |
| 50 | PK | PK-01 | Jul 9 10:35 | Jul 9 16:05 | 15 | 5.2 | 22.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2672 |
| Released | Fri Jun 26 06:00 |
| Due | Thu Jul 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 89.2 h |
| Sequence position | 184 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 19 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 30 08:00 | Jun 30 21:25 | 90 | 10.9 | 47.5 | Planned | |
| 20 | SUB | SUB-A | Jul 1 06:25 | Jul 1 11:05 | 50 | 3.3 | 6.7 | Planned | |
| 30 | FA | FA-01 | Jul 1 14:55 | Jul 2 06:20 | 45 | 7.2 | 5.1 | Planned | |
| 40 | TB | TB-04 | Jul 4 16:35 | Jul 5 04:55 | 35 | 11.8 | 68.3 | Planned | |
| 50 | PK | PK-01 | Jul 7 08:05 | Jul 7 09:50 | 15 | 1.5 | 18.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2806 |
| Released | Fri Jun 26 06:00 |
| Due | Tue Jul 7 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 38.6 h |
| Sequence position | 169 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 18 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 19 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 1 06:35 | Jul 6 02:20 | 90 | 41.0 | 52.8 | Planned | |
| 20 | SUB | SUB-A | Jul 6 06:00 | Jul 6 13:40 | 50 | 6.3 | 24.4 | Planned | |
| 30 | FA | FA-02 | Jul 6 07:55 | Jul 6 21:00 | 45 | 11.3 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 6 19:05 | Jul 7 06:50 | 35 | 11.2 | 8.2 | Planned | |
| 50 | PK | PK-01 | Jul 8 17:55 | Jul 9 06:15 | 15 | 4.6 | 26.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-06 and SMT-01: SMT-01 has 23 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 1 11:10.
Order
| Reference | RP-2877 |
| Released | Fri Jun 26 06:00 |
| Due | Wed Jul 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 78.3 h |
| Sequence position | 181 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 1 05:55 | Jul 2 05:15 | 90 | 20.6 | 68.2 | Planned | |
| 20 | SUB | SUB-B | Jul 1 18:00 | Jul 2 10:50 | 25 | 8.4 | 6.8 | Planned | |
| 30 | FA | FA-06 | Jul 6 09:00 | Jul 7 16:55 | 45 | 22.7 | 21.7 | Planned | |
| 40 | TB | TB-01 | Jul 7 01:45 | Jul 7 19:50 | 15 | 17.8 | 12.1 | Planned | |
| 50 | PK | PK-02 | Jul 7 20:20 | Jul 8 11:35 | 5 | 7.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2921 |
| Released | Fri Jun 26 06:00 |
| Due | Fri Jul 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 80.2 h |
| Sequence position | 176 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 6 14:35 | Jul 7 03:50 | 90 | 11.0 | 90.8 | Planned | |
| 20 | SUB | SUB-C | Jul 7 12:35 | Jul 7 18:05 | 25 | 5.1 | 6.1 | Planned | |
| 30 | FA | FA-06 | Jul 8 09:55 | Jul 8 22:20 | 5 | 11.3 | 10.3 | Planned | |
| 40 | TB | TB-02 | Jul 9 06:30 | Jul 10 04:10 | 15 | 21.4 | 13.4 | Planned | |
| 50 | PK | PK-02 | Jul 10 16:30 | Jul 10 20:00 | 5 | 2.9 | 10.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-06 and SMT-07: SMT-07 has 30 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 1 07:40.
Order
| Reference | RP-2653 |
| Released | Sat Jun 27 06:00 |
| Due | Fri Jul 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 54.1 h |
| Sequence position | 193 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 19 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 22 06:00 | On hand |
| Power module | Aster Power | Fri Jun 19 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jun 29 16:40 | Jun 30 08:00 | 90 | 13.1 | 16.9 | Planned | |
| 20 | SUB | SUB-A | Jun 30 13:55 | Jun 30 19:15 | 50 | 4.0 | 7.4 | Planned | |
| 30 | FA | FA-01 | Jun 30 21:50 | Jul 1 14:55 | 45 | 8.8 | 4.1 | Planned | |
| 40 | TB | TB-01 | Jul 4 09:25 | Jul 5 02:30 | 35 | 16.5 | 70.2 | Planned | |
| 50 | PK | PK-01 | Jul 6 13:40 | Jul 6 15:55 | 15 | 2.0 | 7.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2749 |
| Released | Sat Jun 27 06:00 |
| Due | Tue Jul 7 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 48.3 h |
| Sequence position | 166 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Fri Jun 19 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 23 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jun 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 30 04:40 | Jun 30 23:05 | 90 | 15.9 | 28.2 | Planned | |
| 20 | SUB | SUB-A | Jun 30 19:15 | Jul 1 06:25 | 50 | 3.3 | 9.9 | Planned | |
| 30 | FA | FA-03 | Jul 1 11:15 | Jul 1 20:20 | 45 | 7.8 | 7.0 | Planned | |
| 40 | TB | TB-04 | Jul 4 11:20 | Jul 4 16:35 | 35 | 4.7 | 70.2 | Planned | |
| 50 | PK | PK-02 | Jul 7 09:35 | Jul 7 13:55 | 15 | 3.6 | 19.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2775 |
| Released | Sat Jun 27 06:00 |
| Due | Tue Jul 7 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 39.2 h |
| Sequence position | 167 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 15 06:00 | Jul 20 05:20 | 90 | 66.3 | 258.2 | Planned | |
| 20 | SUB | SUB-C | Jul 16 19:55 | Jul 20 08:05 | 50 | 20.3 | 20.2 | Planned | |
| 30 | FA | FA-02 | Jul 17 06:00 | Jul 21 20:05 | 25 | 44.7 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 20 02:05 | Jul 23 14:30 | 35 | 83.8 | 62.3 | Planned | |
| 50 | PK | PK-01 | Jul 23 15:00 | Jul 24 08:35 | 15 | 9.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-02 and SMT-01: SMT-01 has 25 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 8 09:25.
Order
| Reference | RP-2836 |
| Released | Sat Jun 27 06:00 |
| Due | Wed Jul 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 228.6 h |
| Sequence position | 243 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 18 06:00 | On hand |
| Power module | Aster Power | Thu Jun 25 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 22 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jun 19 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jun 30 12:05 | Jul 1 11:25 | 90 | 20.6 | 35.1 | Planned | |
| 20 | SUB | SUB-C | Jul 1 08:15 | Jul 1 12:45 | 50 | 3.2 | 6.2 | Planned | |
| 30 | FA | FA-03 | Jul 1 20:20 | Jul 2 09:45 | 45 | 5.7 | 9.3 | Planned | |
| 40 | TB | TB-02 | Jul 4 11:35 | Jul 4 17:45 | 35 | 5.6 | 60.8 | Planned | |
| 50 | PK | PK-01 | Jul 7 09:50 | Jul 7 12:55 | 15 | 2.3 | 19.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2848 |
| Released | Sat Jun 27 06:00 |
| Due | Tue Jul 7 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 41.2 h |
| Sequence position | 170 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 17 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 22 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 29 06:00 | Jun 29 11:25 | 90 | 3.4 | 6.8 | Planned | |
| 20 | SUB | SUB-C | Jun 29 21:20 | Jun 30 06:20 | 40 | 1.3 | 8.9 | Planned | |
| 30 | FA | FA-04 | Jul 1 19:05 | Jul 1 22:50 | 45 | 3.0 | 27.5 | Planned | |
| 40 | TB | TB-03 | Jul 3 06:00 | Jul 3 12:15 | 35 | 5.7 | 30.9 | Planned | |
| 50 | PK | PK-01 | Jul 6 11:20 | Jul 6 12:25 | 15 | 0.8 | 4.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2867 |
| Released | Sat Jun 27 06:00 |
| Due | Mon Jul 6 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 18.0 h |
| Sequence position | 161 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 22 06:00 | On hand |
| Power module | Aster Power | Fri Jun 19 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 29 11:10 | Jun 29 15:50 | 45 | 3.9 | 11.4 | Planned | |
| 20 | SUB | SUB-B | Jun 29 22:10 | Jun 30 07:50 | 50 | 1.8 | 5.3 | Planned | |
| 30 | FA | FA-04 | Jul 1 22:50 | Jul 2 10:45 | 25 | 4.0 | 29.8 | Planned | |
| 40 | TB | TB-01 | Jul 3 07:20 | Jul 3 15:30 | 35 | 7.6 | 20.3 | Planned | |
| 50 | PK | PK-01 | Jul 6 12:25 | Jul 6 13:40 | 10 | 1.1 | 5.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2901 |
| Released | Sat Jun 27 06:00 |
| Due | Mon Jul 6 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 21.2 h |
| Sequence position | 162 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 18 06:00 | On hand |
| Power module | Aster Power | Wed Jun 17 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jun 30 23:05 | Jul 1 06:35 | 10 | 7.1 | 29.6 | Planned | |
| 20 | SUB | SUB-B | Jul 1 14:15 | Jul 1 18:00 | 50 | 2.9 | 7.8 | Planned | |
| 30 | FA | FA-04 | Jul 2 10:45 | Jul 2 19:50 | 45 | 7.8 | 10.2 | Planned | |
| 40 | TB | TB-02 | Jul 4 17:45 | Jul 5 00:30 | 35 | 6.2 | 50.7 | Planned | |
| 45 | CFG | CFG-01 | Jul 7 06:00 | Jul 7 14:20 | 25 | 7.4 | 16.0 | Planned | |
| 50 | PK | PK-02 | Jul 7 14:35 | Jul 7 17:30 | 15 | 2.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71026 |
| Released | Sat Jun 27 06:00 |
| Due | Wed Jul 8 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 37.1 h |
| Sequence position | 172 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Thu Jun 18 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 1 09:45 | Jul 1 20:35 | 90 | 8.3 | 56.0 | Planned | |
| 20 | SUB | SUB-A | Jul 1 21:55 | Jul 2 08:30 | 40 | 2.9 | 5.7 | Planned | |
| 30 | FA | FA-05 | Jul 6 07:45 | Jul 6 16:50 | 45 | 7.8 | 16.7 | Planned | |
| 40 | TB | TB-02 | Jul 7 06:00 | Jul 7 12:45 | 35 | 6.2 | 17.4 | Planned | |
| 45 | CFG | CFG-01 | Jul 9 15:55 | Jul 10 07:15 | 25 | 7.4 | 34.7 | Planned | |
| 50 | PK | PK-01 | Jul 10 07:30 | Jul 10 10:55 | 15 | 2.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-06 has a 15 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jun 30 15:10.
Order
| Reference | SO-71065 |
| Released | Sat Jun 27 06:00 |
| Due | Thu Jul 9 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 39.5 h |
| Sequence position | 183 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 18 06:00 | On hand |
| Power module | Aster Power | Sun Jun 21 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 2 05:15 | Jul 6 01:45 | 90 | 19.0 | 74.2 | Planned | |
| 20 | SUB | SUB-C | Jul 6 06:00 | Jul 6 13:10 | 50 | 5.8 | 8.4 | Planned | |
| 30 | FA | FA-05 | Jul 6 16:50 | Jul 7 14:20 | 45 | 12.8 | 7.2 | Planned | |
| 40 | TB | TB-02 | Jul 7 12:45 | Jul 8 13:20 | 35 | 24.0 | 14.2 | Planned | |
| 50 | PK | PK-01 | Jul 9 19:00 | Jul 9 22:05 | 15 | 2.8 | 20.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-02: SMT-02 has 11 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 1 19:10.
Order
| Reference | RP-2715 |
| Released | Sun Jun 28 06:00 |
| Due | Thu Jul 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 68.3 h |
| Sequence position | 185 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 20 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 26 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 2 06:00 | Jul 2 22:25 | 90 | 13.9 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jul 6 06:00 | Jul 6 09:00 | 50 | 2.2 | 12.0 | Planned | |
| 30 | FA | FA-01 | Jul 6 07:25 | Jul 6 13:50 | 45 | 5.2 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 6 09:10 | Jul 6 21:55 | 35 | 12.2 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jul 8 15:20 | Jul 8 17:55 | 15 | 2.3 | 25.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Run Saturday overtime on PK (set allow_overtime to Y and list PK in overtime_work_centers).
With every resource to itself it would finish Tue Jul 7 07:40.
Order
| Reference | RP-2782 |
| Released | Sun Jun 28 06:00 |
| Due | Wed Jul 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 39.7 h |
| Sequence position | 179 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 2 06:00 | In transit |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 6 05:55 | Jul 6 19:30 | 90 | 11.1 | 98.7 | Planned | |
| 20 | SUB | SUB-A | Jul 7 11:50 | Jul 7 15:15 | 50 | 2.6 | 14.6 | Planned | |
| 30 | FA | FA-01 | Jul 7 14:05 | Jul 7 20:25 | 45 | 5.1 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jul 9 01:30 | Jul 9 10:45 | 15 | 9.0 | 32.2 | Planned | |
| 50 | PK | PK-02 | Jul 9 16:15 | Jul 9 18:25 | 15 | 1.9 | 5.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-07: SMT-07 has 30 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jun 30 08:10.
Order
| Reference | RP-2897 |
| Released | Sun Jun 28 06:00 |
| Due | Thu Jul 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 33.2 h |
| Sequence position | 191 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 19 06:00 | On hand |
| Power module | Aster Power | Sun Jun 21 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 1 11:25 | Jul 2 05:50 | 90 | 16.2 | 57.2 | Planned | |
| 20 | SUB | SUB-C | Jul 2 06:25 | Jul 2 11:05 | 50 | 3.3 | 7.8 | Planned | |
| 30 | FA | FA-01 | Jul 2 15:10 | Jul 6 07:20 | 45 | 7.9 | 6.8 | Planned | |
| 40 | TB | TB-01 | Jul 6 02:50 | Jul 6 08:05 | 35 | 4.7 | 81.8 | Planned | |
| 50 | PK | PK-01 | Jul 9 06:15 | Jul 9 10:35 | 15 | 3.6 | 45.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- TB-04 has a 22 h opening before this order starts but no test technicians free then. Add crew to that shift.
With every resource to itself it would finish Tue Jun 30 13:25.
Order
| Reference | RP-2911 |
| Released | Sun Jun 28 06:00 |
| Due | Wed Jul 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 39.6 h |
| Sequence position | 182 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Sun Jun 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jun 30 13:05 | Jul 1 03:55 | 90 | 12.6 | 36.1 | Planned | |
| 20 | SUB | SUB-A | Jul 1 11:05 | Jul 1 13:35 | 50 | 1.7 | 7.1 | Planned | |
| 30 | FA | FA-01 | Jul 2 06:20 | Jul 2 10:35 | 45 | 3.0 | 10.0 | Planned | |
| 40 | TB | TB-03 | Jul 2 19:15 | Jul 2 22:45 | 35 | 2.9 | 10.8 | Planned | |
| 50 | PK | PK-01 | Jul 7 12:55 | Jul 7 14:20 | 10 | 1.2 | 22.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2930 |
| Released | Sun Jun 28 06:00 |
| Due | Tue Jul 7 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 25.2 h |
| Sequence position | 171 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 24 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 25 06:00 | On hand |
| Power module | Aster Power | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jun 29 15:50 | Jun 29 22:30 | 45 | 5.4 | 9.3 | Planned | |
| 20 | SUB | SUB-B | Jun 30 14:05 | Jun 30 17:25 | 50 | 2.5 | 7.6 | Planned | |
| 30 | FA | FA-05 | Jul 2 17:55 | Jul 6 07:45 | 45 | 5.6 | 32.2 | Planned | |
| 40 | TB | TB-04 | Jul 6 08:00 | Jul 6 19:05 | 35 | 10.5 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jul 8 13:45 | Jul 8 15:20 | 5 | 1.5 | 26.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2643 |
| Released | Mon Jun 29 06:00 |
| Due | Wed Jul 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 28.5 h |
| Sequence position | 175 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 24 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 1 06:00 | Jul 1 13:45 | 90 | 5.8 | 45.5 | Planned | |
| 20 | SUB | SUB-C | Jul 1 12:55 | Jul 1 14:40 | 50 | 0.9 | 2.4 | Planned | |
| 30 | FA | FA-01 | Jul 2 10:35 | Jul 2 13:30 | 45 | 2.2 | 12.2 | Planned | |
| 40 | TB | TB-01 | Jul 5 02:30 | Jul 5 08:05 | 35 | 5.0 | 62.1 | Planned | |
| 50 | PK | PK-01 | Jul 7 14:20 | Jul 7 15:35 | 15 | 1.0 | 23.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2686 |
| Released | Mon Jun 29 06:00 |
| Due | Wed Jul 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 18.8 h |
| Sequence position | 177 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 22 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 1 06:00 | Jul 1 09:45 | 90 | 2.2 | 45.5 | Planned | |
| 20 | SUB | SUB-C | Jul 1 14:40 | Jul 1 16:00 | 50 | 0.5 | 4.2 | Planned | |
| 30 | FA | FA-01 | Jul 2 13:30 | Jul 2 15:10 | 45 | 0.9 | 13.2 | Planned | |
| 40 | TB | TB-04 | Jul 3 20:15 | Jul 3 22:25 | 35 | 1.6 | 28.8 | Planned | |
| 50 | PK | PK-02 | Jul 7 13:55 | Jul 7 14:30 | 15 | 0.3 | 23.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2730 |
| Released | Mon Jun 29 06:00 |
| Due | Wed Jul 8 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 9.5 h |
| Sequence position | 178 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 19 06:00 | On hand |
| Power module | Aster Power | Sat Jun 27 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 2 05:50 | Jul 5 23:25 | 90 | 16.1 | 68.1 | Planned | |
| 20 | SUB | SUB-A | Jul 6 13:40 | Jul 6 18:15 | 50 | 3.8 | 16.2 | Planned | |
| 30 | FA | FA-02 | Jul 6 21:00 | Jul 7 12:40 | 45 | 7.4 | 4.5 | Planned | |
| 40 | TB | TB-01 | Jul 7 19:50 | Jul 8 09:30 | 35 | 13.1 | 12.5 | Planned | |
| 50 | PK | PK-02 | Jul 10 11:00 | Jul 10 13:55 | 15 | 2.7 | 32.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-02 and SMT-05: SMT-05 has 18 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 1 08:55.
Order
| Reference | RP-2759 |
| Released | Mon Jun 29 06:00 |
| Due | Thu Jul 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 46.9 h |
| Sequence position | 186 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 24 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Sat Jun 20 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat Jun 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 6 02:20 | Jul 6 14:35 | 90 | 10.0 | 88.6 | Planned | |
| 20 | SUB | SUB-C | Jul 7 07:20 | Jul 7 12:35 | 50 | 3.9 | 13.3 | Planned | |
| 30 | FA | FA-06 | Jul 7 16:55 | Jul 8 09:55 | 45 | 8.8 | 5.8 | Planned | |
| 40 | TB | TB-02 | Jul 8 13:20 | Jul 9 06:30 | 35 | 16.6 | 7.0 | Planned | |
| 50 | PK | PK-02 | Jul 10 13:55 | Jul 10 16:30 | 15 | 2.3 | 22.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-07 and SMT-05: SMT-05 has 18 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 1 08:35.
Order
| Reference | RP-2858 |
| Released | Mon Jun 29 06:00 |
| Due | Thu Jul 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 45.5 h |
| Sequence position | 190 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 26 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jun 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 7 03:50 | Jul 8 02:20 | 90 | 20.0 | 89.8 | Planned | |
| 20 | SUB | SUB-C | Jul 7 21:10 | Jul 8 08:05 | 50 | 3.1 | 12.4 | Planned | |
| 30 | FA | FA-02 | Jul 7 22:55 | Jul 8 13:50 | 5 | 7.3 | 0.3 | Planned | |
| 40 | TB | TB-01 | Jul 10 04:10 | Jul 10 21:45 | 15 | 17.3 | 45.2 | Planned | |
| 50 | PK | PK-01 | Jul 10 22:15 | Jul 13 08:40 | 5 | 3.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2658 |
| Released | Tue Jun 30 06:00 |
| Due | Mon Jul 13 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 53.8 h |
| Sequence position | 197 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jun 25 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Sun Jun 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 8 21:05 | Jul 9 19:40 | 90 | 19.8 | 128.8 | Planned | |
| 20 | SUB | SUB-B | Jul 9 14:35 | Jul 9 22:00 | 50 | 6.1 | 8.1 | Planned | |
| 30 | FA | FA-03 | Jul 9 22:35 | Jul 10 20:20 | 25 | 13.3 | 4.6 | Planned | |
| 40 | TB | TB-02 | Jul 13 19:50 | Jul 14 21:30 | 35 | 25.1 | 81.6 | Planned | |
| 50 | PK | PK-02 | Jul 14 22:00 | Jul 15 08:10 | 10 | 3.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2667 |
| Released | Tue Jun 30 06:00 |
| Due | Wed Jul 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 70.8 h |
| Sequence position | 209 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 26 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 24 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 6 19:30 | Jul 7 11:05 | 90 | 13.3 | 81.8 | Planned | |
| 20 | SUB | SUB-A | Jul 7 15:15 | Jul 7 18:10 | 50 | 2.1 | 8.8 | Planned | |
| 30 | FA | FA-02 | Jul 7 16:45 | Jul 7 22:55 | 45 | 4.9 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jul 9 10:45 | Jul 9 22:55 | 35 | 11.6 | 40.1 | Planned | |
| 50 | PK | PK-01 | Jul 10 19:30 | Jul 10 22:00 | 15 | 2.2 | 12.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-07: SMT-07 has 28 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 1 15:25.
Order
| Reference | RP-2696 |
| Released | Tue Jun 30 06:00 |
| Due | Fri Jul 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 38.1 h |
| Sequence position | 194 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 25 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 6 23:35 | Jul 7 08:40 | 90 | 7.3 | 85.8 | Planned | |
| 20 | SUB | SUB-C | Jul 7 18:05 | Jul 7 21:10 | 50 | 1.8 | 11.6 | Planned | |
| 30 | FA | FA-01 | Jul 7 20:35 | Jul 8 07:25 | 25 | 3.4 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jul 8 15:25 | Jul 8 22:00 | 35 | 6.0 | 16.4 | Planned | |
| 50 | PK | PK-01 | Jul 9 22:40 | Jul 10 07:10 | 15 | 1.2 | 16.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2740 |
| Released | Tue Jun 30 06:00 |
| Due | Fri Jul 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 23.3 h |
| Sequence position | 195 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 28 06:00 | On hand |
| Power module | Aster Power | Mon Jun 22 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 2 06:00 | Jul 2 14:30 | 45 | 7.2 | 45.5 | Planned | |
| 20 | SUB | SUB-B | Jul 2 13:25 | Jul 2 16:35 | 40 | 2.5 | 1.1 | Planned | |
| 30 | FA | FA-05 | Jul 7 14:20 | Jul 7 22:20 | 45 | 6.8 | 30.4 | Planned | |
| 40 | TB | TB-01 | Jul 8 09:30 | Jul 8 15:25 | 35 | 5.3 | 13.4 | Planned | |
| 50 | PK | PK-02 | Jul 8 15:55 | Jul 8 18:25 | 10 | 2.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2797 |
| Released | Tue Jun 30 06:00 |
| Due | Fri Jul 10 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 27.1 h |
| Sequence position | 189 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 22 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 24 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jun 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 6 01:45 | Jul 6 05:55 | 90 | 2.4 | 65.2 | Planned | |
| 20 | SUB | SUB-C | Jul 6 22:45 | Jul 7 07:20 | 50 | 0.8 | 15.3 | Planned | |
| 30 | FA | FA-02 | Jul 7 12:40 | Jul 7 15:00 | 45 | 1.6 | 4.6 | Planned | |
| 40 | TB | TB-04 | Jul 9 18:00 | Jul 9 21:10 | 35 | 2.6 | 50.8 | Planned | |
| 50 | PK | PK-01 | Jul 9 22:05 | Jul 9 22:40 | 15 | 0.3 | 0.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-02 has a 10 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jun 30 18:25.
Order
| Reference | RP-2816 |
| Released | Tue Jun 30 06:00 |
| Due | Thu Jul 9 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 11.6 h |
| Sequence position | 188 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 22 06:00 | On hand |
| Power module | Aster Power | Mon Jun 22 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jun 28 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 8 00:40 | Jul 8 21:05 | 90 | 17.7 | 109.7 | Planned | |
| 20 | SUB | SUB-B | Jul 8 17:30 | Jul 9 09:05 | 50 | 7.2 | 10.8 | Planned | |
| 30 | FA | FA-04 | Jul 9 14:30 | Jul 10 19:10 | 45 | 19.4 | 10.5 | Planned | |
| 40 | TB | TB-01 | Jul 12 12:55 | Jul 13 04:50 | 35 | 15.3 | 65.2 | Planned | |
| 50 | PK | PK-01 | Jul 13 19:15 | Jul 14 09:05 | 15 | 6.6 | 12.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-02 and SMT-07: SMT-07 has 38 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Mon Jul 6 06:55.
Order
| Reference | RP-2926 |
| Released | Tue Jun 30 06:00 |
| Due | Mon Jul 13 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 70.2 h |
| Sequence position | 202 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Mon Jun 22 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 7 06:00 | Jul 8 15:45 | 90 | 30.5 | 69.2 | Planned | |
| 20 | SUB | SUB-C | Jul 8 09:05 | Jul 8 17:25 | 50 | 7.0 | 12.2 | Planned | |
| 30 | FA | FA-02 | Jul 8 13:50 | Jul 9 12:35 | 45 | 14.0 | 2.0 | Planned | |
| 40 | TB | TB-02 | Jul 10 06:00 | Jul 11 07:25 | 35 | 24.8 | 36.9 | Planned | |
| 50 | PK | PK-01 | Jul 13 08:40 | Jul 13 14:30 | 15 | 5.1 | 2.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2701 |
| Released | Wed Jul 1 06:00 |
| Due | Mon Jul 13 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 85.3 h |
| Sequence position | 198 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 21 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 21 06:00 | On hand |
| Power module | Aster Power | Sat Jun 27 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jun 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 7 06:00 | Jul 8 00:40 | 10 | 17.5 | 69.2 | Planned | |
| 20 | SUB | SUB-A | Jul 7 18:10 | Jul 8 09:20 | 50 | 6.8 | 4.5 | Planned | |
| 30 | FA | FA-04 | Jul 8 14:30 | Jul 9 14:30 | 45 | 15.2 | 8.7 | Planned | |
| 40 | TB | TB-01 | Jul 11 07:25 | Jul 12 12:55 | 35 | 28.9 | 57.8 | Planned | |
| 50 | PK | PK-01 | Jul 13 14:30 | Jul 13 19:15 | 15 | 4.0 | 8.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-07 and SMT-02: SMT-02 has 17 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jul 7 08:05.
Order
| Reference | RP-2745 |
| Released | Wed Jul 1 06:00 |
| Due | Mon Jul 13 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 75.1 h |
| Sequence position | 199 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Sun Jun 21 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jun 21 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 8 15:55 | Jul 9 22:00 | 90 | 26.8 | 101.4 | Planned | |
| 20 | SUB | SUB-A | Jul 9 14:55 | Jul 10 07:20 | 40 | 8.2 | 8.4 | Planned | |
| 30 | FA | FA-02 | Jul 9 19:55 | Jul 10 22:45 | 45 | 18.1 | 1.8 | Planned | |
| 40 | TB | TB-04 | Jul 13 06:00 | Jul 14 16:10 | 15 | 33.9 | 70.2 | Planned | |
| 50 | PK | PK-02 | Jul 14 16:40 | Jul 14 21:25 | 15 | 4.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-02: SMT-02 has 19 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jul 7 07:10.
Order
| Reference | RP-2830 |
| Released | Wed Jul 1 06:00 |
| Due | Tue Jul 14 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 94.5 h |
| Sequence position | 206 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 22 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jun 26 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 7 19:00 | Jul 8 15:55 | 45 | 19.4 | 81.2 | Planned | |
| 20 | SUB | SUB-C | Jul 8 17:25 | Jul 8 21:45 | 50 | 3.0 | 11.5 | Planned | |
| 30 | FA | FA-03 | Jul 8 19:20 | Jul 9 10:45 | 45 | 7.2 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 12 06:15 | Jul 12 23:35 | 35 | 16.8 | 81.1 | Planned | |
| 50 | PK | PK-02 | Jul 13 15:45 | Jul 13 19:45 | 15 | 3.2 | 9.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-07: SMT-07 has 36 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Mon Jul 6 09:30.
Order
| Reference | RP-2843 |
| Released | Wed Jul 1 06:00 |
| Due | Mon Jul 13 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 52.8 h |
| Sequence position | 201 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 29 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 8 14:55 | Jul 9 04:20 | 90 | 11.2 | 60.7 | Planned | |
| 20 | SUB | SUB-A | Jul 9 10:50 | Jul 9 14:55 | 40 | 3.4 | 4.3 | Planned | |
| 30 | FA | FA-03 | Jul 9 13:50 | Jul 9 22:35 | 45 | 7.5 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 12 23:35 | Jul 13 14:15 | 35 | 14.1 | 75.8 | Planned | |
| 50 | PK | PK-02 | Jul 14 06:35 | Jul 14 08:30 | 15 | 1.7 | 8.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2725 |
| Released | Thu Jul 2 06:00 |
| Due | Tue Jul 14 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 41.6 h |
| Sequence position | 204 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 25 06:00 | On hand |
| Power module | Aster Power | Sat Jul 4 10:00 | In transit |
| SoC module | Kestrel Silicon | Fri Jun 26 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 8 15:45 | Jul 9 14:50 | 90 | 20.3 | 78.5 | Planned | |
| 20 | SUB | SUB-C | Jul 9 11:10 | Jul 9 20:50 | 50 | 8.3 | 6.2 | Planned | |
| 30 | FA | FA-05 | Jul 10 12:25 | Jul 13 20:00 | 45 | 22.3 | 14.8 | Planned | |
| 40 | TB | TB-03 | Jul 14 01:00 | Jul 14 19:10 | 35 | 17.6 | 80.0 | Planned | |
| 50 | PK | PK-02 | Jul 15 08:10 | Jul 15 16:25 | 15 | 7.5 | 5.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2754 |
| Released | Thu Jul 2 06:00 |
| Due | Wed Jul 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 80.0 h |
| Sequence position | 211 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 24 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 28 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 9 14:50 | Jul 10 22:00 | 90 | 28.2 | 53.8 | Planned | |
| 20 | SUB | SUB-B | Jul 10 20:15 | Jul 13 14:20 | 50 | 9.8 | 15.6 | Planned | |
| 30 | FA | FA-04 | Jul 13 09:45 | Jul 14 21:50 | 45 | 26.3 | 4.2 | Planned | |
| 40 | TB | TB-02 | Jul 15 04:40 | Jul 16 02:00 | 35 | 20.8 | 38.2 | Planned | |
| 50 | PK | PK-01 | Jul 16 06:00 | Jul 16 15:35 | 15 | 8.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2791 |
| Released | Thu Jul 2 06:00 |
| Due | Thu Jul 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 97.8 h |
| Sequence position | 219 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jul 7 06:00 | In transit |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Wed Jun 24 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 10 01:10 | Jul 10 20:35 | 90 | 16.9 | 93.2 | Planned | |
| 20 | SUB | SUB-C | Jul 13 10:45 | Jul 13 18:20 | 40 | 6.9 | 20.2 | Planned | |
| 30 | FA | FA-05 | Jul 13 20:00 | Jul 14 22:40 | 5 | 18.6 | 6.7 | Planned | |
| 40 | TB | TB-03 | Jul 15 06:00 | Jul 15 21:15 | 35 | 14.7 | 23.5 | Planned | |
| 45 | CFG | CFG-01 | Jul 15 21:45 | Jul 17 07:45 | 25 | 18.6 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jul 17 08:00 | Jul 17 14:50 | 5 | 6.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71429 |
| Released | Thu Jul 2 06:00 |
| Due | Fri Jul 17 15:00 |
| Priority and weight | 2, weight 3 |
| Touch time left | 85.2 h |
| Sequence position | 222 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 10:00 | In transit |
| Enclosure set | Tidewell Plastics | Wed Jun 24 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jun 22 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 8 02:20 | Jul 8 14:55 | 45 | 11.1 | 48.8 | Planned | |
| 20 | SUB | SUB-C | Jul 8 21:45 | Jul 9 11:10 | 50 | 5.1 | 12.2 | Planned | |
| 30 | FA | FA-06 | Jul 9 14:20 | Jul 10 09:35 | 25 | 11.3 | 5.8 | Planned | |
| 40 | TB | TB-02 | Jul 12 22:05 | Jul 13 19:50 | 15 | 21.5 | 73.8 | Planned | |
| 50 | PK | PK-02 | Jul 13 20:20 | Jul 14 06:35 | 15 | 3.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2638 |
| Released | Fri Jul 3 06:00 |
| Due | Tue Jul 14 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 54.5 h |
| Sequence position | 203 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 23 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 24 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
| SoC module | Kestrel Silicon | Sat Jun 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 10 01:05 | Jul 10 20:05 | 90 | 16.5 | 33.3 | Planned | |
| 20 | SUB | SUB-B | Jul 13 14:20 | Jul 13 22:15 | 40 | 6.8 | 23.8 | Planned | |
| 30 | FA | FA-04 | Jul 14 21:50 | Jul 16 07:25 | 25 | 18.2 | 20.8 | Planned | |
| 40 | TB | TB-03 | Jul 15 21:15 | Jul 16 11:50 | 15 | 14.3 | 12.5 | Planned | |
| 50 | PK | PK-02 | Jul 16 21:00 | Jul 17 10:45 | 10 | 6.1 | 8.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2677 |
| Released | Fri Jul 3 06:00 |
| Due | Fri Jul 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 64.8 h |
| Sequence position | 223 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 29 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 8 14:00 | In transit |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jun 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 10 20:05 | Jul 13 19:35 | 90 | 20.8 | 111.1 | Planned | |
| 20 | SUB | SUB-A | Jul 13 14:30 | Jul 13 22:15 | 50 | 6.4 | 8.0 | Planned | |
| 30 | FA | FA-02 | Jul 13 17:20 | Jul 14 15:50 | 45 | 13.8 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 16 01:10 | Jul 17 00:15 | 35 | 22.5 | 50.7 | Planned | |
| 50 | PK | PK-02 | Jul 17 10:45 | Jul 17 13:50 | 15 | 2.8 | 4.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2720 |
| Released | Fri Jul 3 06:00 |
| Due | Fri Jul 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 70.2 h |
| Sequence position | 224 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jun 24 06:00 | On hand |
| Power module | Aster Power | Sat Jun 27 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 29 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jun 24 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 7 08:40 | Jul 7 18:30 | 90 | 7.8 | 32.2 | Planned | |
| 20 | SUB | SUB-B | Jul 8 13:10 | Jul 8 17:30 | 40 | 3.7 | 13.1 | Planned | |
| 30 | FA | FA-06 | Jul 8 22:20 | Jul 9 14:20 | 25 | 8.1 | 5.4 | Planned | |
| 40 | TB | TB-02 | Jul 12 06:15 | Jul 12 22:05 | 35 | 15.2 | 66.7 | Planned | |
| 50 | PK | PK-02 | Jul 13 13:25 | Jul 13 15:45 | 15 | 2.1 | 6.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2802 |
| Released | Fri Jul 3 06:00 |
| Due | Mon Jul 13 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 40.3 h |
| Sequence position | 200 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jun 24 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jun 25 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 10 17:30 | Jul 14 08:15 | 90 | 35.2 | 109.0 | Planned | |
| 20 | SUB | SUB-A | Jul 13 22:15 | Jul 14 12:00 | 50 | 5.4 | 15.2 | Planned | |
| 30 | FA | FA-01 | Jul 14 07:10 | Jul 14 18:10 | 45 | 9.8 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jul 15 09:50 | Jul 15 19:40 | 15 | 9.6 | 24.2 | Planned | |
| 50 | PK | PK-01 | Jul 17 14:50 | Jul 17 19:30 | 15 | 3.9 | 27.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-06 and SMT-07: SMT-07 has 39 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 8 09:25.
Order
| Reference | RP-2821 |
| Released | Fri Jul 3 06:00 |
| Due | Fri Jul 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 67.5 h |
| Sequence position | 226 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jun 28 06:00 | On hand |
| Power module | Aster Power | Tue Jun 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 9 07:45 | Jul 10 01:10 | 90 | 14.9 | 76.8 | Planned | |
| 20 | SUB | SUB-C | Jul 10 06:05 | Jul 10 10:40 | 40 | 3.4 | 7.3 | Planned | |
| 30 | FA | FA-04 | Jul 10 19:10 | Jul 13 09:45 | 45 | 6.8 | 10.0 | Planned | |
| 40 | TB | TB-01 | Jul 14 11:25 | Jul 14 23:45 | 15 | 12.1 | 84.9 | Planned | |
| 50 | PK | PK-01 | Jul 15 09:30 | Jul 15 12:45 | 15 | 2.5 | 3.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2853 |
| Released | Fri Jul 3 06:00 |
| Due | Wed Jul 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 43.2 h |
| Sequence position | 213 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 23 06:00 | On hand |
| Power module | Aster Power | Tue Jun 23 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 25 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 10 06:00 | Jul 10 21:15 | 90 | 12.8 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jul 10 19:20 | Jul 10 22:10 | 50 | 2.0 | 8.3 | Planned | |
| 30 | FA | FA-01 | Jul 10 21:10 | Jul 13 09:15 | 25 | 4.7 | 0.3 | Planned | |
| 40 | TB | TB-01 | Jul 13 09:00 | Jul 13 20:35 | 35 | 11.0 | 58.2 | Planned | |
| 50 | PK | PK-01 | Jul 14 09:05 | Jul 14 12:00 | 15 | 2.2 | 5.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2872 |
| Released | Fri Jul 3 06:00 |
| Due | Tue Jul 14 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 36.2 h |
| Sequence position | 207 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 10 06:00 | In transit |
| Enclosure set | Tidewell Plastics | Fri Jun 26 06:00 | On hand |
| Power module | Aster Power | Wed Jul 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 6 06:00 | Jul 6 13:00 | 90 | 5.0 | 6.8 | Planned | |
| 20 | SUB | SUB-A | Jul 8 09:20 | Jul 8 11:50 | 50 | 1.2 | 28.3 | Planned | |
| 30 | FA | FA-01 | Jul 8 12:05 | Jul 8 14:50 | 25 | 2.3 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 13 14:15 | Jul 13 18:55 | 35 | 4.1 | 119.2 | Planned | |
| 50 | PK | PK-01 | Jul 14 12:00 | Jul 14 13:05 | 15 | 0.8 | 9.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2906 |
| Released | Sat Jul 4 06:00 |
| Due | Tue Jul 14 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 17.0 h |
| Sequence position | 208 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jun 26 06:00 | On hand |
| Power module | Aster Power | Sat Jun 27 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 8 06:00 | Jul 8 20:55 | 90 | 12.4 | 52.2 | Planned | |
| 20 | SUB | SUB-B | Jul 9 09:05 | Jul 9 13:00 | 50 | 2.6 | 15.4 | Planned | |
| 30 | FA | FA-02 | Jul 9 12:35 | Jul 9 19:55 | 45 | 6.1 | 1.5 | Planned | |
| 40 | TB | TB-01 | Jul 13 04:50 | Jul 13 09:00 | 35 | 3.6 | 86.4 | Planned | |
| 50 | PK | PK-02 | Jul 14 08:30 | Jul 14 12:00 | 15 | 2.8 | 15.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2776 |
| Released | Sun Jul 5 06:00 |
| Due | Tue Jul 14 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 31.3 h |
| Sequence position | 205 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 13 08:55 | Jul 13 21:50 | 90 | 10.4 | 123.7 | Planned | |
| 20 | SUB | SUB-B | Jul 13 22:15 | Jul 14 09:20 | 50 | 3.2 | 4.5 | Planned | |
| 30 | FA | FA-02 | Jul 14 15:50 | Jul 15 07:05 | 45 | 7.0 | 7.2 | Planned | |
| 40 | TB | TB-02 | Jul 16 02:00 | Jul 16 15:45 | 35 | 13.2 | 28.8 | Planned | |
| 50 | PK | PK-01 | Jul 17 19:30 | Jul 17 21:20 | 15 | 1.6 | 18.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-02 has a 20 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Tue Jul 7 08:25.
Order
| Reference | RP-2863 |
| Released | Sun Jul 5 06:00 |
| Due | Fri Jul 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 39.3 h |
| Sequence position | 227 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jun 26 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Thu Jul 2 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jun 25 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jul 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 13 06:00 | Jul 13 13:40 | 90 | 5.7 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jul 13 12:45 | Jul 13 14:30 | 50 | 0.9 | 2.2 | Planned | |
| 30 | FA | FA-01 | Jul 13 14:10 | Jul 13 16:40 | 25 | 2.1 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 14 19:10 | Jul 15 00:40 | 35 | 4.9 | 27.6 | Planned | |
| 50 | PK | PK-01 | Jul 15 12:45 | Jul 15 14:00 | 15 | 1.0 | 6.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2648 |
| Released | Mon Jul 6 06:00 |
| Due | Thu Jul 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 18.2 h |
| Sequence position | 216 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 13 06:00 | In transit |
| Power module | Aster Power | Mon Jun 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 10 14:00 | Jul 10 17:30 | 90 | 2.0 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jul 10 18:00 | Jul 10 20:15 | 50 | 0.9 | 0.0 | Planned | |
| 30 | FA | FA-06 | Jul 10 20:30 | Jul 10 22:35 | 5 | 2.0 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jul 13 20:35 | Jul 14 01:00 | 35 | 3.8 | 69.8 | Planned | |
| 50 | PK | PK-01 | Jul 14 13:05 | Jul 14 13:55 | 15 | 0.6 | 6.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2710 |
| Released | Mon Jul 6 06:00 |
| Due | Wed Jul 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.6 h |
| Sequence position | 210 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 10 14:00 | In transit |
| Enclosure set | Tidewell Plastics | Tue Jun 30 06:00 | On hand |
| Power module | Aster Power | Thu Jul 9 06:00 | In transit |
| SoC module | Kestrel Silicon | Sat Jul 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 10 20:35 | Jul 13 15:20 | 90 | 16.5 | 104.8 | Planned | |
| 20 | SUB | SUB-C | Jul 13 18:20 | Jul 14 07:45 | 50 | 5.1 | 11.8 | Planned | |
| 30 | FA | FA-03 | Jul 13 21:50 | Jul 14 17:00 | 45 | 10.9 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 17 00:15 | Jul 17 18:25 | 15 | 17.9 | 62.3 | Planned | |
| 50 | PK | PK-02 | Jul 17 19:00 | Jul 17 21:25 | 10 | 2.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-03 and SMT-01: SMT-01 has 14 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 8 12:15.
Order
| Reference | RP-2764 |
| Released | Mon Jul 6 06:00 |
| Due | Fri Jul 17 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 56.2 h |
| Sequence position | 225 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 3 06:00 | On hand |
| Power module | Aster Power | Sun Jun 28 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jul 2 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jul 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 9 04:20 | Jul 9 13:20 | 90 | 7.0 | 66.6 | Planned | |
| 20 | SUB | SUB-C | Jul 9 20:50 | Jul 10 06:05 | 50 | 1.4 | 8.5 | Planned | |
| 30 | FA | FA-01 | Jul 10 14:20 | Jul 10 17:50 | 45 | 2.8 | 7.8 | Planned | |
| 40 | TB | TB-01 | Jul 14 06:00 | Jul 14 11:25 | 35 | 4.8 | 84.7 | Planned | |
| 50 | PK | PK-02 | Jul 14 12:00 | Jul 14 13:15 | 15 | 1.0 | 0.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2811 |
| Released | Mon Jul 6 06:00 |
| Due | Wed Jul 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 20.9 h |
| Sequence position | 212 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 4 06:00 | On hand |
| Power module | Aster Power | Tue Jun 30 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 20 07:00 | Jul 22 03:05 | 90 | 40.1 | 229.0 | Planned | |
| 20 | SUB | SUB-A | Jul 21 11:25 | Jul 22 08:05 | 50 | 12.3 | 11.3 | Planned | |
| 30 | FA | FA-01 | Jul 21 14:35 | Jul 23 09:50 | 45 | 27.0 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 23 08:15 | Jul 25 11:30 | 35 | 50.7 | 35.7 | Planned | |
| 50 | PK | PK-01 | Jul 27 06:00 | Jul 27 12:40 | 10 | 6.0 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-03 and SMT-01: SMT-01 has 32 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Fri Jul 10 12:45.
Order
| Reference | RP-2888 |
| Released | Mon Jul 6 06:00 |
| Due | Fri Jul 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 139.9 h |
| Sequence position | 265 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Wed Jul 1 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 3 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jul 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 9 19:40 | Jul 10 08:45 | 90 | 11.6 | 80.9 | Planned | |
| 20 | SUB | SUB-B | Jul 10 08:15 | Jul 10 11:25 | 50 | 1.8 | 2.2 | Planned | |
| 30 | FA | FA-02 | Jul 13 12:45 | Jul 13 16:45 | 45 | 3.2 | 18.2 | Planned | |
| 40 | TB | TB-01 | Jul 15 06:05 | Jul 15 09:50 | 35 | 3.2 | 38.9 | Planned | |
| 50 | PK | PK-01 | Jul 15 19:20 | Jul 15 20:55 | 15 | 1.3 | 8.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2916 |
| Released | Mon Jul 6 06:00 |
| Due | Thu Jul 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 25.1 h |
| Sequence position | 221 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 4 06:00 | On hand |
| Power module | Aster Power | Fri Jun 26 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 12 23:00 | Jul 13 08:55 | 90 | 8.2 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jul 13 07:15 | Jul 13 09:45 | 50 | 1.7 | 1.2 | Planned | |
| 30 | FA | FA-03 | Jul 13 09:00 | Jul 13 13:55 | 25 | 4.0 | 0.3 | Planned | |
| 40 | TB | TB-03 | Jul 13 18:55 | Jul 13 21:55 | 35 | 2.4 | 7.9 | Planned | |
| 50 | PK | PK-02 | Jul 14 13:15 | Jul 14 15:20 | 15 | 1.8 | 7.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2935 |
| Released | Mon Jul 6 06:00 |
| Due | Wed Jul 15 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 21.7 h |
| Sequence position | 215 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 12 06:00 | In transit |
| Power module | Aster Power | Mon Jun 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 14 17:40 | Jul 15 23:30 | 90 | 26.6 | 147.9 | Planned | |
| 20 | SUB | SUB-C | Jul 15 18:10 | Jul 16 13:55 | 50 | 10.9 | 11.7 | Planned | |
| 30 | FA | FA-04 | Jul 16 07:25 | Jul 17 22:10 | 25 | 29.3 | 3.2 | Planned | |
| 40 | TB | TB-03 | Jul 19 00:10 | Jul 19 23:50 | 35 | 23.1 | 59.9 | Planned | |
| 45 | CFG | CFG-02 | Jul 20 06:00 | Jul 21 15:40 | 25 | 24.8 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jul 21 15:55 | Jul 22 09:30 | 15 | 9.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71117 |
| Released | Mon Jul 6 06:00 |
| Due | Fri Jul 24 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 128.5 h |
| Sequence position | 240 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Sat Jun 27 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jun 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 16 07:25 | Jul 20 15:15 | 90 | 51.6 | 160.9 | Planned | |
| 20 | SUB | SUB-C | Jul 20 08:05 | Jul 20 17:20 | 50 | 7.9 | 26.3 | Planned | |
| 30 | FA | FA-04 | Jul 20 09:50 | Jul 21 08:50 | 45 | 14.2 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 20 23:55 | Jul 21 14:30 | 35 | 14.0 | 11.3 | Planned | |
| 50 | PK | PK-02 | Jul 22 06:50 | Jul 22 13:20 | 15 | 5.8 | 8.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2673 |
| Released | Tue Jul 7 06:00 |
| Due | Thu Jul 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 97.4 h |
| Sequence position | 254 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 3 06:00 | On hand |
| Power module | Aster Power | Sun Jun 28 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 13 15:20 | Jul 14 06:20 | 90 | 12.8 | 100.1 | Planned | |
| 20 | SUB | SUB-A | Jul 14 12:00 | Jul 14 18:05 | 50 | 5.2 | 7.7 | Planned | |
| 30 | FA | FA-05 | Jul 14 22:40 | Jul 15 21:05 | 25 | 14.0 | 7.8 | Planned | |
| 40 | TB | TB-01 | Jul 16 16:05 | Jul 17 03:40 | 35 | 11.0 | 30.4 | Planned | |
| 50 | PK | PK-02 | Jul 17 21:25 | Jul 20 09:25 | 15 | 4.8 | 14.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2682 |
| Released | Tue Jul 7 06:00 |
| Due | Mon Jul 20 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 51.3 h |
| Sequence position | 230 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 30 06:00 | On hand |
| Power module | Aster Power | Tue Jun 30 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jul 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 8 06:00 | Jul 8 13:20 | 90 | 5.3 | 22.8 | Planned | |
| 20 | SUB | SUB-B | Jul 9 13:00 | Jul 9 14:35 | 50 | 0.8 | 17.8 | Planned | |
| 30 | FA | FA-01 | Jul 10 17:50 | Jul 10 20:45 | 45 | 1.7 | 19.3 | Planned | |
| 40 | TB | TB-01 | Jul 14 23:45 | Jul 15 04:15 | 35 | 3.9 | 99.6 | Planned | |
| 50 | PK | PK-01 | Jul 15 14:00 | Jul 15 14:55 | 10 | 0.8 | 7.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2691 |
| Released | Tue Jul 7 06:00 |
| Due | Thu Jul 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 16.2 h |
| Sequence position | 217 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 30 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 29 06:00 | On hand |
| Power module | Aster Power | Fri Jul 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 9 06:00 | Jul 9 20:10 | 90 | 11.7 | 45.5 | Planned | |
| 20 | SUB | SUB-B | Jul 9 22:00 | Jul 10 08:15 | 50 | 2.4 | 11.3 | Planned | |
| 30 | FA | FA-02 | Jul 10 22:45 | Jul 13 12:45 | 45 | 5.8 | 15.2 | Planned | |
| 40 | TB | TB-02 | Jul 15 00:40 | Jul 15 04:40 | 35 | 3.4 | 41.1 | Planned | |
| 50 | PK | PK-01 | Jul 15 14:55 | Jul 15 17:45 | 15 | 2.6 | 8.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2735 |
| Released | Tue Jul 7 06:00 |
| Due | Thu Jul 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 29.8 h |
| Sequence position | 218 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jun 27 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jun 27 06:00 | On hand |
| Power module | Aster Power | Mon Jun 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 17 06:00 | Jul 20 07:00 | 90 | 22.2 | 182.5 | Planned | |
| 20 | SUB | SUB-A | Jul 17 15:15 | Jul 20 08:40 | 50 | 9.1 | 3.9 | Planned | |
| 30 | FA | FA-06 | Jul 20 08:50 | Jul 21 19:05 | 45 | 24.5 | 7.8 | Planned | |
| 40 | TB | TB-02 | Jul 22 00:40 | Jul 22 20:30 | 35 | 19.2 | 35.2 | Planned | |
| 50 | PK | PK-01 | Jul 22 21:00 | Jul 23 13:00 | 15 | 8.2 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2792 |
| Released | Tue Jul 7 06:00 |
| Due | Thu Jul 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 87.2 h |
| Sequence position | 257 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jun 28 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 1 06:00 | On hand |
| Power module | Aster Power | Sat Jun 27 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jun 27 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 16 02:15 | Jul 20 05:25 | 45 | 47.9 | 87.5 | Planned | |
| 20 | SUB | SUB-B | Jul 20 06:00 | Jul 20 14:40 | 50 | 7.3 | 29.2 | Planned | |
| 30 | FA | FA-03 | Jul 20 07:55 | Jul 20 22:55 | 45 | 13.2 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 20 11:00 | Jul 21 00:35 | 35 | 13.0 | 0.2 | Planned | |
| 50 | PK | PK-02 | Jul 21 15:15 | Jul 21 21:20 | 15 | 5.3 | 8.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2878 |
| Released | Tue Jul 7 06:00 |
| Due | Wed Jul 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 90.0 h |
| Sequence position | 250 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 10 06:00 | In transit |
| Enclosure set | Tidewell Plastics | Thu Jul 2 06:00 | On hand |
| Power module | Aster Power | Mon Jun 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 9 20:10 | Jul 10 01:05 | 45 | 4.2 | 58.7 | Planned | |
| 20 | SUB | SUB-A | Jul 10 07:20 | Jul 10 09:05 | 50 | 0.9 | 1.3 | Planned | |
| 30 | FA | FA-03 | Jul 10 20:20 | Jul 13 06:10 | 45 | 2.1 | 10.5 | Planned | |
| 40 | TB | TB-01 | Jul 15 04:15 | Jul 15 06:05 | 35 | 1.2 | 102.0 | Planned | |
| 50 | PK | PK-01 | Jul 15 17:45 | Jul 15 19:20 | 10 | 0.9 | 10.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2882 |
| Released | Tue Jul 7 06:00 |
| Due | Thu Jul 16 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.4 h |
| Sequence position | 220 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jul 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 5 06:00 | On hand |
| Power module | Aster Power | Sat Jul 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 14 10:45 | Jul 15 01:50 | 90 | 13.1 | 95.5 | Planned | |
| 20 | SUB | SUB-C | Jul 15 13:20 | Jul 15 18:10 | 50 | 4.0 | 9.2 | Planned | |
| 30 | FA | FA-02 | Jul 15 22:05 | Jul 16 14:50 | 25 | 8.8 | 4.9 | Planned | |
| 40 | TB | TB-01 | Jul 18 21:35 | Jul 19 14:20 | 15 | 16.5 | 58.4 | Planned | |
| 50 | PK | PK-02 | Jul 20 21:25 | Jul 21 06:40 | 15 | 2.0 | 14.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2750 |
| Released | Wed Jul 8 06:00 |
| Due | Tue Jul 21 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 47.7 h |
| Sequence position | 239 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 1 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 29 06:00 | On hand |
| Power module | Aster Power | Mon Jun 29 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jun 30 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 10 22:55 | Jul 13 19:10 | 90 | 17.5 | 38.9 | Planned | |
| 20 | SUB | SUB-C | Jul 14 07:45 | Jul 14 12:40 | 50 | 3.6 | 17.8 | Planned | |
| 30 | FA | FA-01 | Jul 14 18:10 | Jul 15 11:30 | 45 | 8.6 | 8.4 | Planned | |
| 40 | TB | TB-03 | Jul 16 11:50 | Jul 16 17:30 | 35 | 5.1 | 39.2 | Planned | |
| 50 | PK | PK-01 | Jul 17 21:20 | Jul 20 08:30 | 15 | 3.9 | 18.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2634 |
| Released | Thu Jul 9 06:00 |
| Due | Mon Jul 20 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 42.6 h |
| Sequence position | 229 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 29 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jun 29 06:00 | On hand |
| Power module | Aster Power | Mon Jun 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 14 06:45 | Jul 15 06:05 | 45 | 21.3 | 69.2 | Planned | |
| 20 | SUB | SUB-C | Jul 14 20:40 | Jul 15 09:25 | 50 | 4.9 | 7.2 | Planned | |
| 30 | FA | FA-03 | Jul 15 14:45 | Jul 16 08:50 | 45 | 9.8 | 8.4 | Planned | |
| 40 | TB | TB-04 | Jul 18 03:40 | Jul 18 21:35 | 35 | 17.3 | 57.8 | Planned | |
| 50 | PK | PK-02 | Jul 20 17:05 | Jul 20 21:25 | 15 | 3.6 | 10.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2663 |
| Released | Thu Jul 9 06:00 |
| Due | Tue Jul 21 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 60.2 h |
| Sequence position | 237 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 1 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jun 29 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 14 08:15 | Jul 15 03:25 | 90 | 16.4 | 70.8 | Planned | |
| 20 | SUB | SUB-C | Jul 15 09:25 | Jul 15 13:20 | 50 | 2.6 | 13.2 | Planned | |
| 30 | FA | FA-05 | Jul 15 21:05 | Jul 16 11:25 | 45 | 6.1 | 9.2 | Planned | |
| 40 | TB | TB-03 | Jul 18 09:25 | Jul 19 00:10 | 35 | 14.2 | 58.6 | Planned | |
| 50 | PK | PK-01 | Jul 20 17:35 | Jul 20 21:05 | 15 | 2.8 | 11.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2706 |
| Released | Thu Jul 9 06:00 |
| Due | Tue Jul 21 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 45.9 h |
| Sequence position | 238 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jun 29 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 2 06:00 | On hand |
| Power module | Aster Power | Wed Jul 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 14 00:25 | Jul 14 19:50 | 90 | 16.7 | 63.2 | Planned | |
| 20 | SUB | SUB-C | Jul 14 16:45 | Jul 14 20:40 | 50 | 2.6 | 10.2 | Planned | |
| 30 | FA | FA-02 | Jul 15 07:05 | Jul 15 14:30 | 45 | 6.2 | 5.4 | Planned | |
| 40 | TB | TB-01 | Jul 17 06:00 | Jul 17 21:00 | 35 | 14.4 | 45.1 | Planned | |
| 50 | PK | PK-02 | Jul 20 09:25 | Jul 20 12:55 | 15 | 2.8 | 4.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2844 |
| Released | Thu Jul 9 06:00 |
| Due | Mon Jul 20 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 46.5 h |
| Sequence position | 233 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 3 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 5 06:00 | On hand |
| Power module | Aster Power | Wed Jul 1 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 20 15:15 | Jul 21 13:45 | 90 | 19.8 | 168.5 | Planned | |
| 20 | SUB | SUB-C | Jul 21 07:00 | Jul 21 16:25 | 50 | 8.1 | 3.4 | Planned | |
| 30 | FA | FA-04 | Jul 21 13:30 | Jul 22 20:30 | 45 | 21.8 | 3.8 | Planned | |
| 40 | TB | TB-01 | Jul 23 10:55 | Jul 24 04:15 | 15 | 17.1 | 41.2 | Planned | |
| 50 | PK | PK-02 | Jul 24 06:00 | Jul 24 14:00 | 10 | 7.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2922 |
| Released | Thu Jul 9 06:00 |
| Due | Fri Jul 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 77.5 h |
| Sequence position | 266 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jul 7 06:00 | On hand |
| Power module | Aster Power | Sat Jul 4 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jun 30 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 13 21:50 | Jul 14 10:45 | 90 | 10.7 | 37.6 | Planned | |
| 20 | SUB | SUB-C | Jul 14 12:40 | Jul 14 16:45 | 50 | 3.2 | 6.2 | Planned | |
| 30 | FA | FA-03 | Jul 15 06:45 | Jul 15 14:45 | 25 | 7.1 | 7.9 | Planned | |
| 40 | TB | TB-03 | Jul 17 03:40 | Jul 17 15:50 | 35 | 11.6 | 40.3 | Planned | |
| 50 | PK | PK-02 | Jul 17 16:20 | Jul 17 17:55 | 10 | 1.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2826 |
| Released | Fri Jul 10 06:00 |
| Due | Mon Jul 20 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 37.5 h |
| Sequence position | 232 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 6 06:00 | On hand |
| Power module | Aster Power | Sun Jul 5 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jul 7 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jul 8 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 15 06:05 | Jul 16 02:15 | 90 | 17.7 | 68.3 | Planned | |
| 20 | SUB | SUB-A | Jul 16 14:45 | Jul 16 18:20 | 50 | 2.8 | 17.2 | Planned | |
| 30 | FA | FA-06 | Jul 16 21:30 | Jul 17 10:40 | 45 | 4.9 | 4.3 | Planned | |
| 40 | TB | TB-01 | Jul 19 15:10 | Jul 19 20:35 | 35 | 4.8 | 56.2 | Planned | |
| 50 | PK | PK-01 | Jul 21 07:35 | Jul 21 09:50 | 15 | 2.0 | 17.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2849 |
| Released | Fri Jul 10 06:00 |
| Due | Tue Jul 21 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 36.1 h |
| Sequence position | 244 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jul 7 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 13 13:40 | Jul 14 00:25 | 90 | 8.8 | 29.9 | Planned | |
| 20 | SUB | SUB-B | Jul 14 09:20 | Jul 14 13:25 | 50 | 2.8 | 4.7 | Planned | |
| 30 | FA | FA-03 | Jul 14 17:00 | Jul 15 06:45 | 25 | 5.8 | 4.3 | Planned | |
| 40 | TB | TB-01 | Jul 16 06:00 | Jul 16 16:05 | 35 | 9.5 | 32.2 | Planned | |
| 45 | CFG | CFG-02 | Jul 17 06:00 | Jul 17 11:55 | 25 | 5.0 | 5.9 | Planned | |
| 50 | PK | PK-02 | Jul 17 13:50 | Jul 17 15:05 | 5 | 1.2 | 1.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71195 |
| Released | Fri Jul 10 06:00 |
| Due | Mon Jul 20 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 36.8 h |
| Sequence position | 228 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 5 06:00 | On hand |
| Power module | Aster Power | Tue Jun 30 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jul 2 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jul 8 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 17 08:50 | Jul 17 21:05 | 90 | 9.8 | 67.3 | Planned | |
| 20 | SUB | SUB-B | Jul 20 14:40 | Jul 20 20:30 | 50 | 4.5 | 13.2 | Planned | |
| 30 | FA | FA-05 | Jul 20 21:40 | Jul 21 15:20 | 5 | 10.1 | 2.7 | Planned | |
| 40 | TB | TB-03 | Jul 22 16:45 | Jul 23 12:20 | 35 | 19.0 | 28.9 | Planned | |
| 50 | PK | PK-02 | Jul 23 12:50 | Jul 23 15:35 | 5 | 2.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2654 |
| Released | Sat Jul 11 06:00 |
| Due | Fri Jul 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 49.1 h |
| Sequence position | 261 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jul 14 10:00 | In transit |
| Enclosure set | Tidewell Plastics | Sat Jul 4 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jul 14 10:00 | In transit |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 15 03:25 | Jul 15 20:35 | 90 | 14.7 | 49.7 | Planned | |
| 20 | SUB | SUB-A | Jul 16 10:55 | Jul 16 14:45 | 50 | 3.0 | 19.3 | Planned | |
| 30 | FA | FA-03 | Jul 16 12:20 | Jul 16 20:45 | 45 | 7.2 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 16 17:30 | Jul 16 22:00 | 15 | 4.2 | 3.3 | Planned | |
| 50 | PK | PK-01 | Jul 20 21:05 | Jul 21 07:35 | 15 | 3.2 | 30.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2777 |
| Released | Sat Jul 11 06:00 |
| Due | Tue Jul 21 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 35.9 h |
| Sequence position | 241 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 3 06:00 | On hand |
| Power module | Aster Power | Fri Jul 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 15 23:30 | Jul 16 16:30 | 90 | 14.8 | 68.8 | Planned | |
| 20 | SUB | SUB-B | Jul 16 19:00 | Jul 16 22:05 | 50 | 2.2 | 12.0 | Planned | |
| 30 | FA | FA-05 | Jul 17 07:55 | Jul 17 14:35 | 45 | 5.4 | 4.5 | Planned | |
| 40 | TB | TB-01 | Jul 20 06:35 | Jul 20 19:40 | 15 | 12.8 | 68.9 | Planned | |
| 50 | PK | PK-02 | Jul 21 12:30 | Jul 21 15:15 | 15 | 2.5 | 8.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2783 |
| Released | Sat Jul 11 06:00 |
| Due | Wed Jul 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 41.3 h |
| Sequence position | 249 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 8 06:00 | On hand |
| Power module | Aster Power | Thu Jul 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 15 01:50 | Jul 15 14:25 | 90 | 10.3 | 48.3 | Planned | |
| 20 | SUB | SUB-C | Jul 16 13:55 | Jul 16 17:55 | 50 | 3.2 | 19.6 | Planned | |
| 30 | FA | FA-05 | Jul 16 16:50 | Jul 17 07:55 | 45 | 6.8 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 19 14:20 | Jul 20 02:05 | 35 | 11.2 | 64.2 | Planned | |
| 50 | PK | PK-02 | Jul 21 06:40 | Jul 21 08:20 | 15 | 1.4 | 16.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2807 |
| Released | Sat Jul 11 06:00 |
| Due | Tue Jul 21 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 36.8 h |
| Sequence position | 242 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 1 06:00 | On hand |
| Power module | Aster Power | Thu Jul 9 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jul 5 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jul 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 13 06:00 | Jul 13 11:25 | 90 | 3.4 | 6.8 | Planned | |
| 20 | SUB | SUB-B | Jul 14 13:25 | Jul 14 15:35 | 50 | 1.3 | 17.5 | Planned | |
| 30 | FA | FA-06 | Jul 15 16:00 | Jul 15 20:15 | 45 | 3.0 | 16.2 | Planned | |
| 40 | TB | TB-03 | Jul 17 15:50 | Jul 17 22:05 | 35 | 5.7 | 43.3 | Planned | |
| 50 | PK | PK-02 | Jul 20 12:55 | Jul 20 14:00 | 15 | 0.8 | 6.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2868 |
| Released | Sat Jul 11 06:00 |
| Due | Mon Jul 20 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 18.2 h |
| Sequence position | 234 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jul 7 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 22 05:40 | Jul 24 03:50 | 90 | 42.4 | 165.9 | Planned | |
| 20 | SUB | SUB-B | Jul 22 22:20 | Jul 24 07:30 | 50 | 17.3 | 10.1 | Planned | |
| 30 | FA | FA-05 | Jul 23 17:45 | Jul 28 17:10 | 45 | 46.7 | 9.3 | Planned | |
| 40 | TB | TB-01 | Jul 27 07:10 | Jul 28 20:30 | 35 | 36.8 | 79.9 | Planned | |
| 50 | PK | PK-01 | Jul 28 21:00 | Jul 29 20:55 | 15 | 15.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-02 and SMT-07: SMT-07 has 98 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Mon Jul 20 11:40.
Order
| Reference | RP-2893 |
| Released | Sat Jul 11 06:00 |
| Due | Wed Jul 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 162.8 h |
| Sequence position | 280 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jul 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 6 06:00 | On hand |
| Power module | Aster Power | Sun Jul 5 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jul 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 16 06:00 | Jul 16 12:30 | 90 | 4.5 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jul 16 13:00 | Jul 16 15:45 | 40 | 2.1 | 0.0 | Planned | |
| 30 | FA | FA-06 | Jul 16 16:00 | Jul 16 21:30 | 25 | 4.6 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 17 18:25 | Jul 18 03:40 | 35 | 8.7 | 20.7 | Planned | |
| 50 | PK | PK-02 | Jul 20 14:00 | Jul 20 15:25 | 10 | 1.2 | 7.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2902 |
| Released | Sat Jul 11 06:00 |
| Due | Mon Jul 20 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 24.4 h |
| Sequence position | 235 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 1 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jul 16 06:00 | In transit |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 15 06:00 | Jul 15 23:05 | 90 | 14.6 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jul 16 15:45 | Jul 16 18:30 | 50 | 1.9 | 18.3 | Planned | |
| 30 | FA | FA-03 | Jul 16 20:45 | Jul 17 07:55 | 45 | 3.4 | 2.8 | Planned | |
| 40 | TB | TB-01 | Jul 19 20:35 | Jul 20 00:15 | 15 | 3.4 | 69.7 | Planned | |
| 50 | PK | PK-02 | Jul 21 08:20 | Jul 21 10:00 | 15 | 1.4 | 18.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2931 |
| Released | Sat Jul 11 06:00 |
| Due | Tue Jul 21 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 28.3 h |
| Sequence position | 245 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 15 06:00 | In transit |
| Enclosure set | Tidewell Plastics | Wed Jul 8 06:00 | On hand |
| Power module | Aster Power | Sat Jul 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 20 19:00 | Jul 21 11:55 | 90 | 14.7 | 132.8 | Planned | |
| 20 | SUB | SUB-B | Jul 21 15:25 | Jul 22 06:30 | 50 | 6.8 | 8.9 | Planned | |
| 30 | FA | FA-06 | Jul 22 07:35 | Jul 23 07:25 | 45 | 15.1 | 5.6 | Planned | |
| 40 | TB | TB-01 | Jul 24 06:00 | Jul 25 11:10 | 35 | 28.6 | 39.8 | Planned | |
| 45 | CFG | CFG-01 | Jul 27 06:00 | Jul 27 16:15 | 25 | 9.3 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jul 27 16:35 | Jul 27 21:10 | 10 | 3.9 | 0.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- SMT-07 has a 18 h opening before this order starts but no smt operators free then. Add crew to that shift.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 15 21:10.
Order
| Reference | SO-71182 |
| Released | Sat Jul 11 06:00 |
| Due | Mon Jul 27 15:00 |
| Priority and weight | 4, weight 1 |
| Touch time left | 82.6 h |
| Sequence position | 270 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 6 06:00 | On hand |
| Power module | Aster Power | Sat Jul 4 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jul 7 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 14 06:20 | Jul 14 17:40 | 90 | 9.3 | 29.8 | Planned | |
| 20 | SUB | SUB-A | Jul 14 18:05 | Jul 14 22:20 | 50 | 2.9 | 3.4 | Planned | |
| 30 | FA | FA-02 | Jul 15 14:30 | Jul 15 22:05 | 45 | 6.3 | 9.5 | Planned | |
| 40 | TB | TB-01 | Jul 17 21:00 | Jul 18 09:25 | 35 | 11.8 | 49.0 | Planned | |
| 45 | CFG | CFG-01 | Jul 20 06:00 | Jul 20 11:55 | 25 | 5.0 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jul 20 15:25 | Jul 20 17:05 | 15 | 1.4 | 3.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71260 |
| Released | Sat Jul 11 06:00 |
| Due | Tue Jul 21 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 41.2 h |
| Sequence position | 236 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 8 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jul 5 06:00 | On hand |
| Display panel | Brightline Displays | Thu Jul 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 14 06:00 | Jul 14 12:15 | 45 | 5.0 | 29.5 | Planned | |
| 20 | SUB | SUB-B | Jul 14 15:35 | Jul 14 18:15 | 40 | 2.0 | 2.8 | Planned | |
| 30 | FA | FA-06 | Jul 15 20:15 | Jul 16 08:00 | 25 | 4.3 | 17.2 | Planned | |
| 40 | TB | TB-03 | Jul 19 23:50 | Jul 20 08:35 | 35 | 8.2 | 87.6 | Planned | |
| 50 | PK | PK-01 | Jul 21 09:50 | Jul 21 11:45 | 15 | 1.2 | 16.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2644 |
| Released | Sun Jul 12 06:00 |
| Due | Wed Jul 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 23.3 h |
| Sequence position | 246 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 10 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 15 23:05 | Jul 16 07:25 | 90 | 6.6 | 68.3 | Planned | |
| 20 | SUB | SUB-A | Jul 16 18:20 | Jul 16 20:45 | 50 | 1.1 | 11.8 | Planned | |
| 30 | FA | FA-03 | Jul 17 07:55 | Jul 17 11:40 | 45 | 2.5 | 4.6 | Planned | |
| 40 | TB | TB-01 | Jul 20 00:15 | Jul 20 06:35 | 35 | 5.8 | 62.5 | Planned | |
| 50 | PK | PK-02 | Jul 21 10:30 | Jul 21 11:55 | 15 | 1.2 | 18.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2687 |
| Released | Sun Jul 12 06:00 |
| Due | Wed Jul 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 21.0 h |
| Sequence position | 247 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jul 7 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 6 06:00 | On hand |
| Power module | Aster Power | Thu Jul 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 21 06:00 | Jul 22 15:30 | 45 | 31.0 | 143.5 | Planned | |
| 20 | SUB | SUB-B | Jul 22 08:40 | Jul 22 17:10 | 50 | 7.2 | 12.6 | Planned | |
| 30 | FA | FA-02 | Jul 22 11:25 | Jul 23 09:55 | 45 | 14.2 | 0.0 | Planned | |
| 40 | TB | TB-03 | Jul 25 01:40 | Jul 26 03:30 | 35 | 25.2 | 59.0 | Planned | |
| 50 | PK | PK-01 | Jul 27 12:40 | Jul 27 18:05 | 15 | 5.2 | 6.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-04 and SMT-07: SMT-07 has 87 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Wed Jul 15 20:15.
Order
| Reference | RP-2702 |
| Released | Sun Jul 12 06:00 |
| Due | Mon Jul 27 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 86.0 h |
| Sequence position | 272 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jul 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 9 06:00 | On hand |
| Power module | Aster Power | Sat Jul 4 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 16 12:30 | Jul 17 08:50 | 90 | 18.3 | 81.0 | Planned | |
| 20 | SUB | SUB-A | Jul 17 06:05 | Jul 17 12:55 | 40 | 5.7 | 1.8 | Planned | |
| 30 | FA | FA-05 | Jul 17 14:35 | Jul 20 11:40 | 45 | 12.3 | 5.1 | Planned | |
| 40 | TB | TB-01 | Jul 21 06:00 | Jul 22 05:45 | 35 | 23.2 | 81.6 | Planned | |
| 50 | PK | PK-01 | Jul 22 09:30 | Jul 22 13:00 | 15 | 2.8 | 3.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2716 |
| Released | Sun Jul 12 06:00 |
| Due | Thu Jul 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 66.0 h |
| Sequence position | 255 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 4 06:00 | On hand |
| Power module | Aster Power | Thu Jul 9 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jul 5 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jul 6 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 16 14:00 | Jul 17 11:05 | 90 | 18.6 | 82.5 | Planned | |
| 20 | SUB | SUB-B | Jul 17 08:00 | Jul 17 13:40 | 50 | 4.3 | 3.4 | Planned | |
| 30 | FA | FA-06 | Jul 17 16:00 | Jul 20 08:50 | 45 | 8.6 | 5.2 | Planned | |
| 40 | TB | TB-02 | Jul 21 09:00 | Jul 22 00:40 | 35 | 15.1 | 85.2 | Planned | |
| 50 | PK | PK-02 | Jul 22 13:20 | Jul 22 16:40 | 15 | 3.1 | 6.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2760 |
| Released | Sun Jul 12 06:00 |
| Due | Thu Jul 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 53.6 h |
| Sequence position | 256 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jul 7 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jul 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 17 06:00 | Jul 17 16:40 | 10 | 10.0 | 64.5 | Planned | |
| 20 | SUB | SUB-B | Jul 17 15:05 | Jul 17 20:20 | 50 | 3.9 | 2.3 | Planned | |
| 30 | FA | FA-05 | Jul 20 11:40 | Jul 20 21:40 | 45 | 8.8 | 9.2 | Planned | |
| 40 | TB | TB-01 | Jul 22 05:45 | Jul 22 22:55 | 35 | 16.6 | 36.2 | Planned | |
| 50 | PK | PK-02 | Jul 23 06:00 | Jul 23 08:35 | 15 | 2.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2859 |
| Released | Sun Jul 12 06:00 |
| Due | Thu Jul 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 44.2 h |
| Sequence position | 259 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 9 06:00 | On hand |
| Power module | Aster Power | Tue Jul 14 10:00 | In transit |
| SoC module | Kestrel Silicon | Thu Jul 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 20 05:20 | Jul 20 18:30 | 10 | 12.5 | 120.1 | Planned | |
| 20 | SUB | SUB-C | Jul 20 17:20 | Jul 20 21:35 | 50 | 2.9 | 6.0 | Planned | |
| 30 | FA | FA-03 | Jul 20 22:55 | Jul 21 12:55 | 45 | 5.8 | 2.8 | Planned | |
| 40 | TB | TB-03 | Jul 22 06:20 | Jul 22 16:45 | 15 | 10.2 | 21.2 | Planned | |
| 50 | PK | PK-02 | Jul 22 17:15 | Jul 22 19:55 | 5 | 2.1 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2898 |
| Released | Sun Jul 12 06:00 |
| Due | Thu Jul 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 35.5 h |
| Sequence position | 260 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 4 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jul 2 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 19 23:00 | Jul 20 17:45 | 90 | 16.5 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jul 20 14:25 | Jul 20 19:10 | 50 | 3.4 | 7.9 | Planned | |
| 30 | FA | FA-01 | Jul 20 15:55 | Jul 21 08:15 | 45 | 8.1 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 21 03:40 | Jul 21 09:00 | 35 | 4.8 | 9.9 | Planned | |
| 50 | PK | PK-01 | Jul 21 11:45 | Jul 21 15:40 | 15 | 3.7 | 1.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2912 |
| Released | Sun Jul 12 06:00 |
| Due | Wed Jul 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 40.3 h |
| Sequence position | 251 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jul 18 14:00 | In transit |
| Enclosure set | Tidewell Plastics | Sat Jul 4 06:00 | On hand |
| Power module | Aster Power | Sat Jul 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 16 08:05 | Jul 16 14:00 | 45 | 4.7 | 77.1 | Planned | |
| 20 | SUB | SUB-A | Jul 16 20:45 | Jul 17 06:05 | 50 | 1.5 | 5.8 | Planned | |
| 30 | FA | FA-03 | Jul 17 11:40 | Jul 17 15:35 | 45 | 3.2 | 4.8 | Planned | |
| 40 | TB | TB-03 | Jul 20 17:25 | Jul 20 23:55 | 35 | 5.9 | 73.6 | Planned | |
| 45 | CFG | CFG-01 | Jul 21 08:55 | Jul 21 12:20 | 25 | 2.5 | 2.9 | Planned | |
| 50 | PK | PK-02 | Jul 21 22:50 | Jul 22 06:50 | 15 | 0.8 | 9.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71377 |
| Released | Sun Jul 12 06:00 |
| Due | Thu Jul 23 15:00 |
| Priority and weight | 3, weight 2 |
| Touch time left | 22.1 h |
| Sequence position | 253 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 9 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jul 5 06:00 | On hand |
| Display panel | Brightline Displays | Wed Jul 8 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 13 19:10 | Jul 13 22:35 | 90 | 1.9 | 12.2 | Planned | |
| 20 | SUB | SUB-A | Jul 14 22:20 | Jul 15 06:40 | 50 | 0.5 | 15.3 | Planned | |
| 30 | FA | FA-03 | Jul 16 08:50 | Jul 16 10:40 | 25 | 0.9 | 17.9 | Planned | |
| 40 | TB | TB-02 | Jul 20 06:00 | Jul 20 08:10 | 35 | 1.6 | 91.1 | Planned | |
| 50 | PK | PK-02 | Jul 21 11:55 | Jul 21 12:30 | 15 | 0.3 | 18.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2731 |
| Released | Mon Jul 13 06:00 |
| Due | Wed Jul 22 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 8.8 h |
| Sequence position | 248 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 8 06:00 | On hand |
| Power module | Aster Power | Sat Jul 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 3 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 21 11:55 | Jul 22 04:50 | 45 | 15.4 | 142.2 | Planned | |
| 20 | SUB | SUB-C | Jul 21 20:20 | Jul 22 11:45 | 50 | 7.1 | 1.3 | Planned | |
| 30 | FA | FA-04 | Jul 22 20:30 | Jul 23 21:05 | 45 | 15.8 | 12.5 | Planned | |
| 40 | TB | TB-01 | Jul 25 11:10 | Jul 26 17:25 | 15 | 30.0 | 49.0 | Planned | |
| 50 | PK | PK-01 | Jul 27 18:05 | Jul 27 23:00 | 15 | 4.2 | 11.6 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-05 and SMT-07: SMT-07 has 80 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Thu Jul 16 10:55.
Order
| Reference | RP-2746 |
| Released | Mon Jul 13 06:00 |
| Due | Mon Jul 27 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 75.3 h |
| Sequence position | 273 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 4 06:00 | On hand |
| Power module | Aster Power | Mon Jul 6 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jul 8 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 23 18:00 | Jul 24 21:00 | 10 | 25.3 | 193.8 | Planned | |
| 20 | SUB | SUB-A | Jul 24 11:00 | Jul 24 22:40 | 50 | 10.3 | 5.5 | Planned | |
| 30 | FA | FA-06 | Jul 24 16:40 | Jul 28 13:20 | 45 | 27.9 | 3.4 | Planned | |
| 40 | TB | TB-04 | Jul 29 00:30 | Jul 29 22:40 | 15 | 21.9 | 99.2 | Planned | |
| 50 | PK | PK-02 | Jul 30 06:00 | Jul 30 16:05 | 15 | 9.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2793 |
| Released | Mon Jul 13 06:00 |
| Due | Thu Jul 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 97.1 h |
| Sequence position | 291 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 11 06:00 | On hand |
| Power module | Aster Power | Fri Jul 10 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jul 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 20 17:45 | Jul 21 13:30 | 90 | 17.0 | 125.2 | Planned | |
| 20 | SUB | SUB-B | Jul 21 07:35 | Jul 21 15:25 | 25 | 6.9 | 1.6 | Planned | |
| 30 | FA | FA-05 | Jul 21 22:05 | Jul 23 07:55 | 5 | 18.8 | 11.4 | Planned | |
| 40 | TB | TB-03 | Jul 24 04:15 | Jul 24 19:15 | 15 | 14.8 | 43.1 | Planned | |
| 50 | PK | PK-02 | Jul 24 19:55 | Jul 27 09:30 | 15 | 6.3 | 0.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2927 |
| Released | Mon Jul 13 06:00 |
| Due | Mon Jul 27 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 66.2 h |
| Sequence position | 269 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 8 06:00 | On hand |
| Power module | Aster Power | Fri Jul 10 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jul 4 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 16 06:00 | Jul 16 13:15 | 90 | 5.2 | 68.2 | Planned | |
| 20 | SUB | SUB-B | Jul 16 22:05 | Jul 17 08:00 | 50 | 2.1 | 7.8 | Planned | |
| 30 | FA | FA-06 | Jul 17 10:40 | Jul 17 16:00 | 45 | 4.6 | 1.9 | Planned | |
| 40 | TB | TB-03 | Jul 20 08:35 | Jul 20 17:25 | 15 | 8.6 | 64.3 | Planned | |
| 45 | CFG | CFG-01 | Jul 21 06:00 | Jul 21 08:55 | 25 | 2.5 | 4.6 | Planned | |
| 50 | PK | PK-02 | Jul 21 21:20 | Jul 21 22:50 | 15 | 1.2 | 11.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71351 |
| Released | Mon Jul 13 06:00 |
| Due | Thu Jul 23 15:00 |
| Priority and weight | 1, weight 5 |
| Touch time left | 28.2 h |
| Sequence position | 252 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jul 4 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 9 06:00 | On hand |
| Power module | Aster Power | Sat Jul 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jul 7 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 22 04:10 | Jul 23 15:15 | 45 | 32.6 | 134.9 | Planned | |
| 20 | SUB | SUB-C | Jul 23 06:10 | Jul 23 17:30 | 50 | 10.0 | 11.0 | Planned | |
| 30 | FA | FA-01 | Jul 23 09:50 | Jul 24 16:40 | 25 | 21.9 | 0.8 | Planned | |
| 40 | TB | TB-02 | Jul 26 21:30 | Jul 28 14:55 | 15 | 41.2 | 78.6 | Planned | |
| 50 | PK | PK-02 | Jul 28 15:25 | Jul 28 20:55 | 10 | 4.8 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Split op 10 across SMT-03 and SMT-04: SMT-04 has 28 idle hours while this order waits, in gaps too short for the whole job.
- Run Saturday overtime on SMT (set allow_overtime to Y and list SMT in overtime_work_centers).
With every resource to itself it would finish Fri Jul 17 16:15.
Order
| Reference | RP-2831 |
| Released | Tue Jul 14 06:00 |
| Due | Tue Jul 28 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 112.9 h |
| Sequence position | 278 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 9 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 10 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jul 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 20 20:45 | Jul 21 14:15 | 10 | 16.6 | 82.2 | Planned | |
| 20 | SUB | SUB-C | Jul 21 16:25 | Jul 21 20:20 | 50 | 2.6 | 9.9 | Planned | |
| 30 | FA | FA-03 | Jul 21 17:50 | Jul 22 08:10 | 45 | 6.1 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 24 11:00 | Jul 25 01:40 | 15 | 14.4 | 62.9 | Planned | |
| 50 | PK | PK-02 | Jul 27 09:30 | Jul 27 13:00 | 15 | 2.8 | 3.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2659 |
| Released | Wed Jul 15 06:00 |
| Due | Mon Jul 27 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 44.7 h |
| Sequence position | 271 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 8 06:00 | On hand |
| Power module | Aster Power | Sun Jul 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 22 15:30 | Jul 23 17:00 | 90 | 22.8 | 123.0 | Planned | |
| 20 | SUB | SUB-A | Jul 23 13:00 | Jul 23 21:20 | 50 | 7.0 | 6.5 | Planned | |
| 30 | FA | FA-02 | Jul 23 21:45 | Jul 24 21:50 | 45 | 15.3 | 5.3 | Planned | |
| 40 | TB | TB-03 | Jul 27 09:50 | Jul 28 15:10 | 35 | 28.8 | 72.1 | Planned | |
| 50 | PK | PK-01 | Jul 28 15:40 | Jul 28 19:50 | 15 | 3.4 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2668 |
| Released | Wed Jul 15 06:00 |
| Due | Wed Jul 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 81.2 h |
| Sequence position | 282 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 6 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jul 8 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jul 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 20 05:25 | Jul 20 20:45 | 90 | 12.8 | 67.9 | Planned | |
| 20 | SUB | SUB-A | Jul 20 19:10 | Jul 20 22:00 | 50 | 2.0 | 8.2 | Planned | |
| 30 | FA | FA-01 | Jul 21 08:15 | Jul 21 14:15 | 45 | 4.8 | 4.6 | Planned | |
| 40 | TB | TB-02 | Jul 22 20:30 | Jul 23 08:15 | 35 | 11.2 | 34.3 | Planned | |
| 50 | PK | PK-02 | Jul 23 15:35 | Jul 23 18:00 | 15 | 2.2 | 6.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2697 |
| Released | Wed Jul 15 06:00 |
| Due | Fri Jul 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 36.8 h |
| Sequence position | 262 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 12 06:00 | On hand |
| Power module | Aster Power | Thu Jul 9 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 20 06:00 | Jul 20 15:20 | 90 | 7.3 | 68.5 | Planned | |
| 20 | SUB | SUB-C | Jul 20 21:35 | Jul 21 07:00 | 40 | 1.8 | 8.9 | Planned | |
| 30 | FA | FA-04 | Jul 21 08:50 | Jul 21 13:30 | 45 | 3.4 | 2.4 | Planned | |
| 40 | TB | TB-03 | Jul 21 14:30 | Jul 21 21:05 | 35 | 6.0 | 2.4 | Planned | |
| 50 | PK | PK-01 | Jul 22 13:00 | Jul 22 14:30 | 15 | 1.2 | 7.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2741 |
| Released | Wed Jul 15 06:00 |
| Due | Fri Jul 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 23.5 h |
| Sequence position | 263 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 6 06:00 | On hand |
| Power module | Aster Power | Mon Jul 13 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 22 18:15 | Jul 23 14:05 | 90 | 17.1 | 125.8 | Planned | |
| 20 | SUB | SUB-C | Jul 23 17:30 | Jul 24 08:50 | 50 | 7.0 | 11.0 | Planned | |
| 30 | FA | FA-04 | Jul 23 21:05 | Jul 27 07:40 | 45 | 18.8 | 0.7 | Planned | |
| 40 | TB | TB-04 | Jul 28 06:00 | Jul 28 21:25 | 35 | 14.8 | 93.3 | Planned | |
| 50 | PK | PK-02 | Jul 28 21:55 | Jul 29 12:00 | 15 | 6.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2755 |
| Released | Wed Jul 15 06:00 |
| Due | Wed Jul 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 68.0 h |
| Sequence position | 284 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 5 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 12 06:00 | On hand |
| Power module | Aster Power | Mon Jul 13 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jul 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 20 06:00 | Jul 20 13:55 | 90 | 5.9 | 68.5 | Planned | |
| 20 | SUB | SUB-B | Jul 20 20:30 | Jul 21 06:25 | 50 | 2.1 | 6.9 | Planned | |
| 30 | FA | FA-05 | Jul 21 15:20 | Jul 21 22:05 | 45 | 5.5 | 8.8 | Planned | |
| 40 | TB | TB-01 | Jul 23 06:00 | Jul 23 10:55 | 35 | 4.3 | 32.9 | Planned | |
| 50 | PK | PK-02 | Jul 23 19:15 | Jul 23 21:25 | 15 | 1.9 | 7.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2798 |
| Released | Wed Jul 15 06:00 |
| Due | Fri Jul 24 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 23.7 h |
| Sequence position | 264 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 12 06:00 | On hand |
| Power module | Aster Power | Sun Jul 12 06:00 | On hand |
| Display panel | Brightline Displays | Mon Jul 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 21 06:00 | Jul 21 17:50 | 90 | 9.8 | 91.2 | Planned | |
| 20 | SUB | SUB-A | Jul 22 08:05 | Jul 22 13:15 | 50 | 3.8 | 10.2 | Planned | |
| 30 | FA | FA-05 | Jul 23 07:55 | Jul 23 17:45 | 45 | 8.6 | 12.4 | Planned | |
| 40 | TB | TB-02 | Jul 25 11:30 | Jul 26 04:20 | 35 | 16.2 | 45.0 | Planned | |
| 50 | PK | PK-02 | Jul 27 13:00 | Jul 27 15:30 | 15 | 2.2 | 6.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2803 |
| Released | Wed Jul 15 06:00 |
| Due | Mon Jul 27 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 44.7 h |
| Sequence position | 274 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 10 06:00 | On hand |
| Power module | Aster Power | Mon Jul 6 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jul 5 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 16 16:30 | Jul 16 20:55 | 90 | 2.4 | 32.8 | Planned | |
| 20 | SUB | SUB-A | Jul 17 12:55 | Jul 17 14:30 | 50 | 0.8 | 8.0 | Planned | |
| 30 | FA | FA-03 | Jul 17 15:35 | Jul 17 17:55 | 45 | 1.6 | 0.8 | Planned | |
| 40 | TB | TB-04 | Jul 23 14:30 | Jul 23 17:40 | 35 | 2.6 | 140.3 | Planned | |
| 50 | PK | PK-02 | Jul 23 18:10 | Jul 23 19:15 | 15 | 0.3 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
- Review the TB sequence on the dispatch list; a lower-weight order may be able to wait.
With every resource to itself it would finish Wed Jul 15 18:10.
Order
| Reference | RP-2817 |
| Released | Wed Jul 15 06:00 |
| Due | Thu Jul 23 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 11.6 h |
| Sequence position | 258 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 13 06:00 | On hand |
| Power module | Aster Power | Sun Jul 5 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 10 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jul 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 22 14:00 | Jul 23 12:10 | 90 | 19.4 | 0.0 | Planned | |
| 20 | SUB | SUB-A | Jul 23 08:40 | Jul 23 13:00 | 50 | 3.0 | 7.0 | Planned | |
| 30 | FA | FA-03 | Jul 23 10:30 | Jul 23 18:25 | 45 | 7.2 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 23 17:40 | Jul 24 11:00 | 35 | 16.8 | 5.3 | Planned | |
| 50 | PK | PK-02 | Jul 24 15:55 | Jul 24 19:55 | 15 | 3.2 | 4.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2845 |
| Released | Wed Jul 15 06:00 |
| Due | Mon Jul 27 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 53.5 h |
| Sequence position | 268 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 22 14:00 | In transit |
| Enclosure set | Tidewell Plastics | Fri Jul 10 06:00 | On hand |
| Power module | Aster Power | Mon Jul 6 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 21 14:15 | Jul 22 05:40 | 90 | 13.2 | 76.2 | Planned | |
| 20 | SUB | SUB-C | Jul 22 11:45 | Jul 22 16:40 | 50 | 4.1 | 5.2 | Planned | |
| 30 | FA | FA-03 | Jul 22 14:55 | Jul 23 08:00 | 45 | 8.8 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 26 04:20 | Jul 26 21:30 | 35 | 16.6 | 79.5 | Planned | |
| 50 | PK | PK-02 | Jul 28 07:40 | Jul 28 09:55 | 15 | 2.0 | 17.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2726 |
| Released | Thu Jul 16 06:00 |
| Due | Tue Jul 28 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 48.6 h |
| Sequence position | 276 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 6 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 9 06:00 | On hand |
| Power module | Aster Power | Mon Jul 13 06:00 | On hand |
| SoC module | Kestrel Silicon | Mon Jul 6 06:00 | On hand |
| Display panel | Brightline Displays | Sat Jul 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 20 15:20 | Jul 20 21:25 | 10 | 5.4 | 54.6 | Planned | |
| 20 | SUB | SUB-A | Jul 20 22:00 | Jul 21 07:45 | 50 | 1.9 | 0.9 | Planned | |
| 30 | FA | FA-06 | Jul 21 19:05 | Jul 22 07:35 | 25 | 5.1 | 10.3 | Planned | |
| 40 | TB | TB-03 | Jul 23 12:20 | Jul 23 16:55 | 35 | 4.0 | 29.3 | Planned | |
| 45 | CFG | CFG-02 | Jul 23 17:25 | Jul 23 22:05 | 25 | 3.8 | 0.0 | Planned | |
| 50 | PK | PK-02 | Jul 24 14:00 | Jul 24 15:55 | 10 | 1.8 | 8.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-71169 |
| Released | Thu Jul 16 06:00 |
| Due | Mon Jul 27 15:00 |
| Priority and weight | 1, weight 5 |
| Touch time left | 24.5 h |
| Sequence position | 267 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 10 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 6 06:00 | On hand |
| Power module | Aster Power | Tue Jul 7 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jul 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 21 13:30 | Jul 22 04:10 | 90 | 12.4 | 52.5 | Planned | |
| 20 | SUB | SUB-A | Jul 22 13:15 | Jul 22 20:10 | 40 | 5.8 | 9.1 | Planned | |
| 30 | FA | FA-06 | Jul 23 07:25 | Jul 23 21:35 | 25 | 12.8 | 7.6 | Planned | |
| 40 | TB | TB-03 | Jul 26 03:30 | Jul 27 04:20 | 35 | 24.2 | 62.2 | Planned | |
| 50 | PK | PK-02 | Jul 27 21:10 | Jul 28 07:40 | 10 | 3.3 | 14.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2639 |
| Released | Fri Jul 17 06:00 |
| Due | Tue Jul 28 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 61.8 h |
| Sequence position | 275 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 10 06:00 | On hand |
| Power module | Aster Power | Thu Jul 9 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jul 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 24 03:50 | Jul 27 01:55 | 90 | 19.6 | 111.8 | Planned | |
| 20 | SUB | SUB-A | Jul 24 22:40 | Jul 27 13:00 | 50 | 6.0 | 9.7 | Planned | |
| 30 | FA | FA-01 | Jul 27 08:40 | Jul 28 06:25 | 45 | 13.0 | 0.0 | Planned | |
| 40 | TB | TB-04 | Jul 29 22:40 | Jul 30 20:30 | 35 | 21.2 | 56.4 | Planned | |
| 50 | PK | PK-02 | Jul 30 21:00 | Jul 31 06:55 | 15 | 2.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2765 |
| Released | Fri Jul 17 06:00 |
| Due | Fri Jul 31 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 66.4 h |
| Sequence position | 296 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 11 06:00 | On hand |
| Power module | Aster Power | Sat Jul 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Wed Jul 8 06:00 | On hand |
| Display panel | Brightline Displays | Fri Jul 10 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 22 04:50 | Jul 22 21:00 | 90 | 13.7 | 67.1 | Planned | |
| 20 | SUB | SUB-B | Jul 22 18:25 | Jul 22 21:55 | 50 | 2.2 | 8.7 | Planned | |
| 30 | FA | FA-03 | Jul 23 18:25 | Jul 24 07:25 | 25 | 5.1 | 14.5 | Planned | |
| 40 | TB | TB-04 | Jul 26 21:50 | Jul 27 09:55 | 15 | 11.8 | 73.3 | Planned | |
| 50 | PK | PK-01 | Jul 28 09:10 | Jul 28 12:15 | 15 | 2.3 | 15.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2873 |
| Released | Fri Jul 17 06:00 |
| Due | Tue Jul 28 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 38.3 h |
| Sequence position | 279 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 10 06:00 | On hand |
| Power module | Aster Power | Tue Jul 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 22 03:05 | Jul 22 18:15 | 90 | 13.2 | 49.3 | Planned | |
| 20 | SUB | SUB-C | Jul 22 16:40 | Jul 22 20:45 | 50 | 2.8 | 9.4 | Planned | |
| 30 | FA | FA-02 | Jul 23 09:55 | Jul 23 17:40 | 45 | 6.5 | 8.2 | Planned | |
| 40 | TB | TB-01 | Jul 26 17:25 | Jul 26 21:50 | 35 | 3.8 | 77.2 | Planned | |
| 50 | PK | PK-01 | Jul 28 06:00 | Jul 28 09:10 | 15 | 2.9 | 16.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2778 |
| Released | Sat Jul 18 06:00 |
| Due | Tue Jul 28 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 33.1 h |
| Sequence position | 277 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 8 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jul 14 06:00 | On hand |
| Power module | Aster Power | Mon Jul 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 24 00:30 | Jul 24 22:25 | 90 | 19.4 | 92.5 | Planned | |
| 20 | SUB | SUB-C | Jul 24 14:55 | Jul 27 07:10 | 50 | 7.9 | 8.4 | Planned | |
| 30 | FA | FA-04 | Jul 27 07:40 | Jul 28 14:00 | 25 | 21.4 | 6.9 | Planned | |
| 40 | TB | TB-03 | Jul 29 02:15 | Jul 29 19:40 | 35 | 16.8 | 38.2 | Planned | |
| 50 | PK | PK-01 | Jul 29 22:25 | Jul 30 13:20 | 15 | 7.2 | 2.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2678 |
| Released | Sun Jul 19 06:00 |
| Due | Fri Jul 31 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 76.3 h |
| Sequence position | 294 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 15 06:00 | On hand |
| Power module | Aster Power | Wed Jul 15 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jul 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 23 17:00 | Jul 24 06:40 | 90 | 11.7 | 85.5 | Planned | |
| 20 | SUB | SUB-B | Jul 24 09:15 | Jul 24 13:00 | 50 | 2.4 | 5.1 | Planned | |
| 30 | FA | FA-01 | Jul 24 16:40 | Jul 27 06:40 | 45 | 5.8 | 5.4 | Planned | |
| 40 | TB | TB-01 | Jul 28 20:30 | Jul 29 00:30 | 35 | 3.4 | 98.0 | Planned | |
| 50 | PK | PK-02 | Jul 29 19:25 | Jul 29 22:15 | 15 | 2.6 | 12.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2736 |
| Released | Sun Jul 19 06:00 |
| Due | Thu Jul 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 29.8 h |
| Sequence position | 290 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Mon Jul 13 06:00 | On hand |
| Power module | Aster Power | Sun Jul 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 22 06:00 | Jul 22 14:30 | 90 | 6.5 | 52.2 | Planned | |
| 20 | SUB | SUB-C | Jul 22 20:45 | Jul 22 22:55 | 50 | 1.3 | 6.8 | Planned | |
| 30 | FA | FA-03 | Jul 24 07:25 | Jul 24 11:15 | 45 | 2.6 | 17.5 | Planned | |
| 40 | TB | TB-04 | Jul 27 14:20 | Jul 27 19:25 | 35 | 4.5 | 75.4 | Planned | |
| 50 | PK | PK-01 | Jul 28 13:30 | Jul 28 14:35 | 10 | 0.9 | 10.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2812 |
| Released | Sun Jul 19 06:00 |
| Due | Wed Jul 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 19.7 h |
| Sequence position | 285 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jul 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 9 06:00 | On hand |
| Power module | Aster Power | Wed Jul 15 06:00 | On hand |
| SoC module | Kestrel Silicon | Thu Jul 16 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 23 06:00 | Jul 23 21:25 | 90 | 12.9 | 75.0 | Planned | |
| 20 | SUB | SUB-A | Jul 23 21:20 | Jul 24 08:10 | 50 | 3.0 | 7.3 | Planned | |
| 30 | FA | FA-06 | Jul 24 06:40 | Jul 24 13:50 | 45 | 5.9 | 0.1 | Planned | |
| 40 | TB | TB-03 | Jul 28 15:10 | Jul 29 02:15 | 35 | 10.5 | 101.2 | Planned | |
| 50 | PK | PK-02 | Jul 29 12:00 | Jul 29 14:25 | 15 | 2.2 | 5.5 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2854 |
| Released | Sun Jul 19 06:00 |
| Due | Wed Jul 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 38.4 h |
| Sequence position | 286 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sun Jul 12 06:00 | On hand |
| Power module | Aster Power | Tue Jul 14 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jul 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 22 06:00 | Jul 22 14:00 | 90 | 6.0 | 52.2 | Planned | |
| 20 | SUB | SUB-A | Jul 22 20:10 | Jul 22 22:25 | 50 | 1.4 | 6.2 | Planned | |
| 30 | FA | FA-02 | Jul 23 17:40 | Jul 23 21:45 | 45 | 2.8 | 11.7 | Planned | |
| 40 | TB | TB-03 | Jul 27 04:20 | Jul 27 09:50 | 35 | 4.9 | 78.8 | Planned | |
| 50 | PK | PK-01 | Jul 28 12:15 | Jul 28 13:30 | 15 | 1.0 | 17.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2907 |
| Released | Sun Jul 19 06:00 |
| Due | Tue Jul 28 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 20.1 h |
| Sequence position | 281 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 11 06:00 | On hand |
| Power module | Aster Power | Thu Jul 9 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-07 | Jul 23 06:00 | Jul 23 18:20 | 90 | 10.3 | 75.0 | Planned | |
| 20 | SUB | SUB-C | Jul 24 08:50 | Jul 24 12:00 | 50 | 1.8 | 14.9 | Planned | |
| 30 | FA | FA-03 | Jul 24 11:15 | Jul 24 16:20 | 45 | 4.3 | 0.8 | Planned | |
| 40 | TB | TB-03 | Jul 24 19:15 | Jul 24 22:25 | 35 | 2.6 | 6.2 | Planned | |
| 50 | PK | PK-02 | Jul 29 14:25 | Jul 29 16:40 | 15 | 2.0 | 40.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2936 |
| Released | Sun Jul 19 06:00 |
| Due | Wed Jul 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 25.0 h |
| Sequence position | 287 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 9 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 15 06:00 | On hand |
| Power module | Aster Power | Mon Jul 13 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-06 | Jul 21 17:50 | Jul 21 21:50 | 90 | 2.0 | 34.1 | Planned | |
| 20 | SUB | SUB-B | Jul 22 06:30 | Jul 22 08:05 | 40 | 0.9 | 1.2 | Planned | |
| 30 | FA | FA-06 | Jul 23 21:35 | Jul 24 06:40 | 5 | 2.0 | 28.2 | Planned | |
| 40 | TB | TB-04 | Jul 27 09:55 | Jul 27 14:20 | 35 | 3.8 | 75.0 | Planned | |
| 50 | PK | PK-02 | Jul 27 15:30 | Jul 27 16:15 | 10 | 0.6 | 0.7 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2711 |
| Released | Mon Jul 20 06:00 |
| Due | Wed Jul 29 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 12.3 h |
| Sequence position | 283 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jul 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 10 06:00 | On hand |
| Power module | Aster Power | Sat Jul 11 06:00 | On hand |
| SoC module | Kestrel Silicon | Tue Jul 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-02 | Jul 24 10:30 | Jul 27 06:15 | 90 | 17.5 | 0.0 | Planned | |
| 20 | SUB | SUB-B | Jul 24 19:15 | Jul 27 08:30 | 50 | 5.4 | 0.8 | Planned | |
| 30 | FA | FA-02 | Jul 24 22:05 | Jul 27 17:55 | 45 | 11.6 | 0.0 | Planned | |
| 40 | TB | TB-02 | Jul 29 04:30 | Jul 30 00:00 | 35 | 18.9 | 42.8 | Planned | |
| 50 | PK | PK-01 | Jul 30 13:20 | Jul 30 15:55 | 15 | 2.3 | 6.8 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2721 |
| Released | Mon Jul 20 06:00 |
| Due | Fri Jul 31 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 59.7 h |
| Sequence position | 295 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Fri Jul 24 10:00 | In transit |
| Enclosure set | Tidewell Plastics | Fri Jul 17 06:00 | On hand |
| Power module | Aster Power | Mon Jul 13 06:00 | On hand |
| SoC module | Kestrel Silicon | Fri Jul 17 06:00 | On hand |
| Display panel | Brightline Displays | Tue Jul 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jul 24 06:40 | Jul 27 15:10 | 90 | 29.2 | 91.9 | Planned | |
| 20 | SUB | SUB-B | Jul 27 11:10 | Jul 27 16:30 | 50 | 4.5 | 12.9 | Planned | |
| 30 | FA | FA-03 | Jul 27 13:05 | Jul 27 22:05 | 25 | 8.1 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jul 29 06:00 | Jul 29 14:30 | 35 | 7.9 | 38.8 | Planned | |
| 50 | PK | PK-01 | Jul 30 15:55 | Jul 30 19:55 | 15 | 3.2 | 16.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2822 |
| Released | Mon Jul 20 06:00 |
| Due | Fri Jul 31 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 56.6 h |
| Sequence position | 297 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sat Jul 18 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jul 14 06:00 | On hand |
| Power module | Aster Power | Tue Jul 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 23 12:10 | Jul 23 18:00 | 10 | 5.7 | 51.2 | Planned | |
| 20 | SUB | SUB-B | Jul 24 07:30 | Jul 24 09:15 | 50 | 0.9 | 9.1 | Planned | |
| 30 | FA | FA-06 | Jul 24 13:50 | Jul 24 16:40 | 45 | 2.1 | 4.4 | Planned | |
| 40 | TB | TB-02 | Jul 28 14:55 | Jul 28 20:25 | 35 | 4.9 | 95.3 | Planned | |
| 50 | PK | PK-02 | Jul 29 16:40 | Jul 29 17:55 | 15 | 1.0 | 12.2 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2649 |
| Released | Tue Jul 21 06:00 |
| Due | Thu Jul 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 17.2 h |
| Sequence position | 288 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Thu Jul 16 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 11 06:00 | On hand |
| Power module | Aster Power | Sat Jul 18 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-03 | Jul 23 15:15 | Jul 23 22:10 | 90 | 4.9 | 54.2 | Planned | |
| 20 | SUB | SUB-A | Jul 24 08:10 | Jul 24 09:50 | 50 | 0.8 | 5.2 | Planned | |
| 30 | FA | FA-03 | Jul 24 16:20 | Jul 24 19:25 | 45 | 1.8 | 6.2 | Planned | |
| 40 | TB | TB-02 | Jul 28 20:25 | Jul 29 01:00 | 15 | 4.3 | 98.2 | Planned | |
| 50 | PK | PK-02 | Jul 29 17:55 | Jul 29 19:25 | 10 | 0.8 | 11.4 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2692 |
| Released | Tue Jul 21 06:00 |
| Due | Thu Jul 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 16.2 h |
| Sequence position | 289 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Sun Jul 12 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Wed Jul 15 06:00 | On hand |
| Power module | Aster Power | Fri Jul 17 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 24 22:25 | Jul 27 12:15 | 90 | 11.6 | 83.9 | Planned | |
| 20 | SUB | SUB-C | Jul 27 09:40 | Jul 27 14:35 | 50 | 3.6 | 3.2 | Planned | |
| 30 | FA | FA-02 | Jul 27 17:55 | Jul 28 10:00 | 45 | 7.8 | 4.8 | Planned | |
| 40 | TB | TB-01 | Jul 29 14:30 | Jul 30 05:45 | 35 | 14.7 | 32.2 | Planned | |
| 50 | PK | PK-02 | Jul 30 16:05 | Jul 30 18:05 | 15 | 1.8 | 9.3 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2864 |
| Released | Tue Jul 21 06:00 |
| Due | Fri Jul 31 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 43.3 h |
| Sequence position | 298 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jul 14 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Thu Jul 16 06:00 | On hand |
| Power module | Aster Power | Tue Jul 14 06:00 | On hand |
| SoC module | Kestrel Silicon | Sun Jul 19 06:00 | On hand |
| Display panel | Brightline Displays | Sun Jul 12 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-01 | Jul 23 18:20 | Jul 24 00:30 | 90 | 4.2 | 57.3 | Planned | |
| 20 | SUB | SUB-B | Jul 24 13:00 | Jul 24 14:35 | 40 | 0.9 | 6.8 | Planned | |
| 30 | FA | FA-03 | Jul 24 19:25 | Jul 24 22:15 | 45 | 2.1 | 4.6 | Planned | |
| 40 | TB | TB-04 | Jul 27 19:25 | Jul 27 21:15 | 35 | 1.2 | 70.1 | Planned | |
| 50 | PK | PK-01 | Jul 28 19:50 | Jul 28 21:00 | 15 | 0.9 | 14.1 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2883 |
| Released | Tue Jul 21 06:00 |
| Due | Thu Jul 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 13.1 h |
| Sequence position | 292 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Mon Jul 13 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Fri Jul 17 06:00 | On hand |
| Power module | Aster Power | Sat Jul 11 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-05 | Jul 23 21:25 | Jul 24 09:30 | 90 | 10.6 | 59.9 | Planned | |
| 20 | SUB | SUB-C | Jul 24 12:00 | Jul 24 14:30 | 50 | 1.7 | 5.5 | Planned | |
| 30 | FA | FA-03 | Jul 24 22:15 | Jul 27 08:55 | 45 | 2.9 | 7.8 | Planned | |
| 40 | TB | TB-02 | Jul 29 01:00 | Jul 29 04:30 | 35 | 2.9 | 41.4 | Planned | |
| 50 | PK | PK-01 | Jul 29 20:55 | Jul 29 22:25 | 15 | 1.2 | 13.9 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | RP-2917 |
| Released | Tue Jul 21 06:00 |
| Due | Thu Jul 30 17:00 |
| Priority and weight | 3, weight 1 |
| Touch time left | 23.2 h |
| Sequence position | 293 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Wed Jul 15 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Sat Jul 11 06:00 | On hand |
| Power module | Aster Power | Tue Jul 14 06:00 | On hand |
Routing
| Op | Work center | Resource | Start | End | Setup min | Run h | Waited h | State | Timeline |
|---|---|---|---|---|---|---|---|---|---|
| 10 | SMT | SMT-04 | Jun 4 07:00 | Jun 5 17:30 | 90 | 31.5 | 23.8 | Planned | |
| 20 | SUB | SUB-B | Jun 5 09:35 | Jun 5 21:05 | 50 | 9.7 | 10.0 | Planned | |
| 30 | FA | FA-05 | Jun 5 13:15 | Jun 8 19:20 | 25 | 21.2 | 0.0 | Planned | |
| 40 | TB | TB-01 | Jun 8 06:00 | Jun 9 22:20 | 35 | 39.8 | 59.7 | Planned | |
| 45 | CFG | CFG-01 | Jun 9 22:50 | Jun 10 22:05 | 25 | 14.8 | 0.0 | Planned | |
| 50 | PK | PK-01 | Jun 10 22:20 | Jun 11 10:40 | 10 | 4.7 | 0.0 | Planned |
In the timeline, dotted amber is time spent waiting and the red line is the due date.
Diagnosis
Order
| Reference | SO-79344 |
| Released | Wed Jun 3 06:00 |
| Due | Fri Jun 12 15:00 |
| Priority and weight | 1, weight 5 |
| Touch time left | 125.5 h |
| Sequence position | 42 |
Key materials
| Component | Supplier | Arrives | Status |
|---|---|---|---|
| Bare circuit board | Norra Circuits | Tue Jun 2 06:00 | On hand |
| Enclosure set | Tidewell Plastics | Tue Jun 2 06:00 | On hand |
| Power module | Aster Power | Tue Jun 2 06:00 | On hand |
Resources
Daily load on every resource for the next three weeks, and where the shared crews run out. Hatched cells include planned downtime.
Daily load
Percent of open hours booked for run and changeover. Utilization and changeover share cover the next 14 days.
| Resource | Util. | Changeover | Stations | Wed 3 | Thu 4 | Fri 5 | Sat 6 | Sun 7 | Mon 8 | Tue 9 | Wed 10 | Thu 11 | Fri 12 | Sat 13 | Sun 14 | Mon 15 | Tue 16 | Wed 17 | Thu 18 | Fri 19 | Sat 20 | Sun 21 | Mon 22 | Tue 23 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SMT Surface mount | ||||||||||||||||||||||||
| SMT-01 SMT line 1 | 69% | 7% | 1 | 75 | 67 | 73 | 100 | 100 | 79 | 99 | 77 | 67 | 0 | 56 | 0 | 57 | 97 | 86 | 100 | 100 | 61 | |||
| SMT-02 SMT line 2 | 91% | 6% | 1 | 75 | 100 | 45 | 100 | 100 | 100 | 91 | 100 | 100 | 100 | 70 | 100 | 100 | 100 | 100 | 100 | 84 | 87 | |||
| SMT-03 SMT line 3 | 90% | 8% | 1 | 58 | 79 | 100 | 100 | 100 | 100 | 100 | 91 | 50 | 100 | 100 | 100 | 100 | 100 | 47 | 0 | 100 | 100 | |||
| SMT-04 SMT line 4 | 96% | 5% | 1 | 75 | 100 | 77 | 0 | 86 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 82 | 73 | 100 | 54 | 81 | |||
| SMT-05 SMT line 5 | 85% | 9% | 1 | 0 | 100 | 100 | 100 | 100 | 54 | 78 | 83 | 73 | 100 | 83 | 100 | 47 | 96 | 92 | 100 | 100 | 100 | |||
| SMT-06 SMT line 6 | 82% | 6% | 1 | 75 | 100 | 100 | 100 | 78 | 81 | 49 | 86 | 74 | 0 | 81 | 77 | 100 | 79 | 59 | 0 | 72 | 64 | |||
| SMT-07 SMT line 7 | 52% | 12% | 1 | 60 | 38 | 54 | 0 | 33 | 75 | 37 | 0 | 73 | 100 | 73 | 76 | 69 | 30 | 100 | 100 | 55 | 100 | |||
| SUB Sub-assembly | ||||||||||||||||||||||||
| SUB-A Sub-assembly cell A | 74% | 16% | 6 | 6 | 86 | 100 | 100 | 49 | 100 | 100 | 65 | 84 | 48 | 33 | 91 | 100 | 100 | 99 | ||||||
| SUB-B Sub-assembly cell B | 80% | 11% | 6 | 48 | 100 | 89 | 84 | 86 | 94 | 100 | 51 | 86 | 67 | 66 | 100 | 100 | 68 | 100 | ||||||
| SUB-C Sub-assembly cell C | 81% | 14% | 6 | 28 | 87 | 100 | 84 | 67 | 100 | 100 | 94 | 86 | 68 | 42 | 100 | 100 | 52 | 100 | ||||||
| FA Final assembly | ||||||||||||||||||||||||
| FA-01 Final assembly cell 1 | 62% | 7% | 5 | 55 | 85 | 0 | 47 | 84 | 100 | 79 | 91 | 61 | 22 | 0 | 72 | 71 | 54 | 48 | ||||||
| FA-02 Final assembly cell 2 | 84% | 8% | 5 | 46 | 73 | 62 | 72 | 94 | 100 | 100 | 100 | 100 | 100 | 6 | 74 | 54 | 19 | 100 | ||||||
| FA-03 Final assembly cell 3 | 81% | 3% | 5 | 96 | 66 | 100 | 100 | 57 | 88 | 70 | 54 | 76 | 100 | 92 | 58 | 80 | 57 | 35 | ||||||
| FA-04 Final assembly cell 4 | 90% | 6% | 5 | 58 | 58 | 100 | 100 | 100 | 87 | 100 | 100 | 100 | 100 | 99 | 72 | 100 | 100 | 100 | ||||||
| FA-05 Final assembly cell 5 | 86% | 6% | 5 | 16 | 76 | 70 | 100 | 100 | 99 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | ||||||
| FA-06 Final assembly cell 6 | 83% | 4% | 5 | 31 | 0 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 66 | 100 | 100 | 100 | 100 | ||||||
| TB Burn-in and test | ||||||||||||||||||||||||
| TB-01 Burn-in bank 1 | 92% | 4% | 4 | 75 | 100 | 100 | 100 | 100 | 91 | 93 | 75 | 100 | 100 | 65 | 88 | 77 | 100 | 94 | 66 | 100 | 100 | 28 | 96 | 88 |
| TB-02 Burn-in bank 2 | 81% | 4% | 4 | 69 | 61 | 60 | 88 | 92 | 76 | 75 | 88 | 74 | 75 | 72 | 79 | 98 | 100 | 100 | 89 | 50 | 0 | 78 | 89 | 85 |
| TB-03 Burn-in bank 3 | 77% | 1% | 4 | 75 | 100 | 100 | 12 | 0 | 84 | 100 | 93 | 100 | 80 | 63 | 100 | 99 | 69 | 75 | 100 | 100 | 100 | 93 | 56 | 75 |
| TB-04 Burn-in bank 4 | 93% | 3% | 4 | 73 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 95 | 100 | 100 | 34 | 72 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 |
| CFG Imaging and configuration | ||||||||||||||||||||||||
| CFG-01 Imaging cell 1 | 18% | 4% | 12 | 0 | 34 | 0 | 0 | 1 | 94 | 0 | 0 | 49 | 0 | 49 | 0 | 61 | 100 | 57 | ||||||
| CFG-02 Imaging cell 2 | 8% | 7% | 12 | 0 | 61 | 18 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 22 | ||||||
| PK Pack-out | ||||||||||||||||||||||||
| PK-01 Pack-out line 1 | 63% | 5% | 4 | 97 | 22 | 14 | 99 | 94 | 57 | 26 | 21 | 100 | 100 | 100 | 73 | 46 | 100 | 92 | ||||||
| PK-02 Pack-out line 2 | 93% | 7% | 4 | 96 | 100 | 90 | 100 | 94 | 92 | 70 | 92 | 100 | 100 | 100 | 67 | 55 | 100 | 99 | ||||||
Crew limits
Hours per shift when a line or bank is free but everyone on the shared crew is already assigned. This is time the crew, not the equipment, is the limit. The schedule never books more people than the shift has.
| Crew and shift | Wed 3 | Thu 4 | Fri 5 | Sat 6 | Sun 7 | Mon 8 | Tue 9 | Wed 10 | Thu 11 | Fri 12 | Sat 13 | Sun 14 | Mon 15 | Tue 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| SMT operators day shift | · | · | · | · | · | · | · | · | · | · | · | · | ||
| SMT operators swing shift | · | 2.9 | 3.0 | 6.5 | 4.3 | · | 3.8 | 2.2 | 4.8 | 4.1 | ||||
| SMT operators night shift | 5.2 | 7.0 | 6.8 | 6.8 | 6.8 | 6.8 | · | 6.8 | 6.8 | 6.8 | ||||
| Test technicians day shift | · | · | · | 8.5 | 8.5 | · | · | · | · | · | 8.5 | 8.5 | · | · |
| Test technicians swing shift | · | · | · | 8.5 | 6.6 | · | · | · | · | · | 8.5 | 8.5 | · | · |
| Test technicians night shift | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 |
| Imaging engineers day shift | · | · | · | · | · | · | · | · | · | · | · | · | ||
| Imaging engineers swing shift | · | 8.0 | · | · | · | 7.1 | · | · | · | · |
Resource setup
How each resource is modelled. Run time per unit is divided by stations, efficiency and speed. Hours cover the next 14 days.
| Resource | Name | Work center | Stations | Efficiency | Speed | Calendar | Capabilities | Crew pool | Booked h | Open h |
|---|---|---|---|---|---|---|---|---|---|---|
| SMT-01 | SMT line 1 | SMT | 1 | 78% | 1.00 | C3X5 | fine-pitch | SMT-OPS | 158 | 228 |
| SMT-02 | SMT line 2 | SMT | 1 | 78% | 1.00 | C3X5 | fine-pitch | SMT-OPS | 207 | 228 |
| SMT-03 | SMT line 3 | SMT | 1 | 78% | 1.00 | C3X5 | fine-pitch | SMT-OPS | 198 | 220 |
| SMT-04 | SMT line 4 | SMT | 1 | 78% | 1.00 | C3X5 | fine-pitch | SMT-OPS | 219 | 228 |
| SMT-05 | SMT line 5 | SMT | 1 | 78% | 1.00 | C3X5 | standard | SMT-OPS | 170 | 200 |
| SMT-06 | SMT line 6 | SMT | 1 | 78% | 1.00 | C3X5 | standard | SMT-OPS | 187 | 228 |
| SMT-07 | SMT line 7 | SMT | 1 | 78% | 0.85 | C3X5 | npi | SMT-OPS | 118 | 228 |
| SUB-A | Sub-assembly cell A | SUB | 6 | 85% | 1.00 | C2X5 | standard | none | 118 | 160 |
| SUB-B | Sub-assembly cell B | SUB | 6 | 85% | 1.00 | C2X5 | standard | none | 129 | 160 |
| SUB-C | Sub-assembly cell C | SUB | 6 | 85% | 1.00 | C2X5 | standard | none | 130 | 160 |
| FA-01 | Final assembly cell 1 | FA | 5 | 85% | 1.00 | C2X5 | standard | none | 100 | 160 |
| FA-02 | Final assembly cell 2 | FA | 5 | 85% | 1.00 | C2X5 | standard | none | 132 | 156 |
| FA-03 | Final assembly cell 3 | FA | 5 | 85% | 1.00 | C2X5 | standard | none | 129 | 160 |
| FA-04 | Final assembly cell 4 | FA | 5 | 85% | 1.00 | C2X5 | large-format | none | 145 | 160 |
| FA-05 | Final assembly cell 5 | FA | 5 | 85% | 1.00 | C2X5 | large-format | none | 138 | 160 |
| FA-06 | Final assembly cell 6 | FA | 5 | 85% | 1.00 | C2X5 | large-format | none | 133 | 160 |
| TB-01 | Burn-in bank 1 | TB | 4 | 90% | 1.00 | C24X7 | standard | TEST-TECH | 309 | 336 |
| TB-02 | Burn-in bank 2 | TB | 4 | 90% | 1.00 | C24X7 | standard | TEST-TECH | 272 | 336 |
| TB-03 | Burn-in bank 3 | TB | 4 | 90% | 1.00 | C24X7 | standard | TEST-TECH | 258 | 336 |
| TB-04 | Burn-in bank 4 | TB | 4 | 90% | 1.00 | C24X7 | environmental | TEST-TECH | 312 | 336 |
| CFG-01 | Imaging cell 1 | CFG | 12 | 90% | 1.00 | C2X5 | standard | IMG-ENG | 28 | 160 |
| CFG-02 | Imaging cell 2 | CFG | 12 | 90% | 1.00 | C2X5 | standard | IMG-ENG | 13 | 160 |
| PK-01 | Pack-out line 1 | PK | 4 | 88% | 1.00 | C2X5 | standard | none | 101 | 160 |
| PK-02 | Pack-out line 2 | PK | 4 | 88% | 1.00 | C2X5 | standard | none | 149 | 160 |
Dispatch lists
The run sequence for each resource over the next ten days, grouped by day. Print from the browser to get a shift sheet for the resource on screen.
SMT-01 SMT line 1
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Thu Jun 4 01:50 | WO-10083 op 10 Running | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key LT-02 | 149 | 18.8 | Thu Jun 11 17:00 | Warehouse stock | |
| Thursday June 4 | |||||||||
| 2 | 03:25 | Thu Jun 4 17:25 | WO-10265 op 10 Frozen | 24-Port PoE Switch, managed VW-1670, setup key NW-04 | 125 | 90 min from LT-02 | 12.0 | Thu Jun 11 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 3 | 06:00 | Mon Jun 8 19:50 | WO-10069 op 10 | Mesh Wi-Fi Kit, 3-pack BP-8055, setup key NW-01 | 365 | 45 min from NW-04 | 34.8 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 4 | 19:50 | Tue Jun 9 08:40 | WO-10339 op 10 | Thin Client, 4GB / 32GB, gray AF-4236, setup key DT-01 | 120 | 90 min from NW-01 | 11.1 | Wed Jun 17 15:00 | ACCOUNT 3915 |
| Tuesday June 9 | |||||||||
| 5 | 08:40 | Tue Jun 9 19:20 | WO-10303 op 10 | Mechanical Keyboard, TKL VW-8762, setup key PR-05 | 260 | 90 min from DT-01 | 8.2 | Wed Jun 17 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 6 | 00:15 | Thu Jun 11 18:15 | WO-10260 op 10 | 22" Touch Monitor, gray VW-1017, setup key MN-05 | 540 | 90 min from PR-05 | 38.5 | Wed Jun 17 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 7 | 06:00 | Fri Jun 12 21:45 | WO-10002 op 10 | Ergonomic Mouse, wireless, gray AF-4219, setup key PR-01 | 370 | 90 min from MN-05 | 13.2 | Mon Jun 22 17:00 | Warehouse stock |
39 more jobs after Sat Jun 13.
SMT-02 SMT line 2
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Fri Jun 5 10:00 | WO-10203 op 10 Running | 14" Rugged Laptop, 16GB / 256GB NB-7498, setup key LT-04 | 371 | 49.8 | Wed Jun 10 17:00 | Warehouse stock | |
| Sunday June 7 | |||||||||
| 2 | 23:00 | Wed Jun 10 00:15 | WO-10255 op 10 Late order | 13" Ultralight Laptop, 16GB / 512GB QN-7885, setup key LT-05 | 350 | 45 min from LT-04 | 46.0 | Fri Jun 12 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 3 | 02:20 | Wed Jun 10 09:00 | WO-10059 op 10 | 128GB USB Flash Drive, 10-pack BP-7439, setup key ST-03 | 110 | 90 min from LT-05 | 4.9 | Thu Jun 18 17:00 | Warehouse stock |
| 4 | 09:00 | Wed Jun 10 21:10 | WO-10284 op 10 | USB-C Travel Hub, 7-in-1 VW-4303, setup key DK-03 | 100 | 90 min from ST-03 | 9.7 | Thu Jun 18 17:00 | Warehouse stock |
| 5 | 21:10 | Thu Jun 11 16:35 | WO-10132 op 10 | 8" Rugged Tablet, 64GB, gray LM-5109, setup key TB-02 | 140 | 90 min from DK-03 | 17.2 | Fri Jun 19 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 6 | 16:35 | Fri Jun 12 07:20 | WO-10050 op 10 | 27" 4K Monitor, USB-C, refresh BP-5748, setup key MN-02 | 215 | 90 min from TB-02 | 12.8 | Mon Jun 22 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 7 | 07:20 | Fri Jun 12 22:55 | WO-10118 op 10 | 14" Laptop, 8-core, 16GB / 512GB, gray KL-9462, setup key LT-03 | 90 | 90 min from MN-02 | 13.1 | Tue Jun 23 17:00 | Warehouse stock |
27 more jobs after Sat Jun 13.
SMT-03 SMT line 3
Planned downtime
- Tue Jun 9 06:00 to Tue Jun 9 14:30: Preventive maintenance: reflow oven
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 19:25 | WO-10127 op 10 Running | 24-Port PoE Switch, managed, refresh LM-3668, setup key NW-04 | 123 | 12.4 | Thu Jun 11 17:00 | Warehouse stock | |
| 2 | 23:10 | Thu Jun 4 09:55 | WO-10226 op 10 Frozen | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key DT-03 | 95 | 90 min from NW-04 | 9.0 | Thu Jun 11 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 3 | 15:15 | Fri Jun 5 13:45 | WO-10289 op 10 | 27" 4K Monitor, USB-C VW-6003, setup key MN-02 | 355 | 90 min from DT-03 | 20.0 | Fri Jun 12 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 4 | 13:45 | Mon Jun 8 08:55 | WO-10294 op 10 | 34" Ultrawide Monitor, curved VW-6938, setup key MN-04 | 265 | 45 min from MN-02 | 17.7 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 5 | 08:55 | Mon Jun 8 23:15 | WO-10093 op 10 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 90 | 90 min from MN-04 | 11.8 | Tue Jun 16 17:00 | Warehouse stock |
| 6 | 23:15 | Wed Jun 10 08:15 | WO-10035 op 10 | 15" Laptop, 12-core, 32GB / 1TB BP-4957, setup key LT-01 | 195 | 45 min from LT-03 | 22.8 | Wed Jun 17 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 7 | 08:15 | Thu Jun 11 03:30 | WO-10045 op 10 | 24" FHD Monitor, IPS BP-5281, setup key MN-01 | 280 | 90 min from LT-01 | 16.5 | Fri Jun 19 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 8 | 05:30 | Thu Jun 11 20:45 | WO-10231 op 10 | 15" Laptop, 12-core, 32GB / 1TB, gray QN-4418, setup key LT-01 | 110 | 90 min from MN-01 | 12.8 | Fri Jun 19 17:00 | Warehouse stock |
| 9 | 20:45 | Fri Jun 12 11:25 | WO-10194 op 10 | 10" Tablet, 64GB NB-7024, setup key TB-03 | 125 | 90 min from LT-01 | 12.7 | Mon Jun 22 17:00 | Warehouse stock |
31 more jobs after Sat Jun 13.
SMT-04 SMT line 4
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Thu Jun 4 07:00 | WO-10040 op 10 Running | KVM Switch, 2-port 4K BP-5055, setup key DK-01 | 276 | 23.8 | Thu Jun 11 17:00 | Warehouse stock | |
| Thursday June 4 | |||||||||
| 2 | 07:00 | Fri Jun 5 17:30 | WO-10344 op 10 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 240 | 90 min from DK-01 | 31.5 | Fri Jun 12 15:00 | ACCOUNT 4340 |
| Monday June 8 | |||||||||
| 3 | 03:25 | Mon Jun 8 20:10 | WO-10006 op 10 | Thin Client, 4GB / 32GB, gray AF-4236, setup key DT-01 | 155 | 90 min from LT-03 | 14.2 | Tue Jun 16 17:00 | Warehouse stock |
| 4 | 20:10 | Wed Jun 10 02:20 | WO-10198 op 10 | Chromebook 11", 4GB / 64GB NB-7136, setup key LT-02 | 240 | 90 min from DT-01 | 27.4 | Tue Jun 16 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 5 | 02:25 | Wed Jun 10 16:20 | WO-10103 op 10 | 1080p Webcam with mic KL-5125, setup key PR-02 | 350 | 90 min from LT-02 | 11.7 | Thu Jun 18 17:00 | Warehouse stock |
| 6 | 16:20 | Thu Jun 11 15:50 | WO-10088 op 10 | 12" Pro Tablet, 256GB KL-2075, setup key TB-01 | 190 | 90 min from PR-02 | 20.8 | Fri Jun 19 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 7 | 15:50 | Tue Jun 16 08:50 | WO-10137 op 10 | 14" Laptop, 8-core, 16GB / 512GB LM-5139, setup key LT-03 | 505 | 90 min from TB-01 | 60.5 | Mon Jun 22 17:00 | Warehouse stock |
25 more jobs after Sat Jun 13.
SMT-05 SMT line 5
Planned downtime
- Wed Jun 3 06:00 to Thu Jun 4 12:00: Placement head failure, awaiting spare
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Thursday June 4 | |||||||||
| 1 | 12:00 | Fri Jun 5 12:25 | WO-10156 op 10 Frozen | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 390 | 90 min | 21.9 | Thu Jun 11 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 2 | 12:25 | Mon Jun 8 09:00 | WO-10209 op 10 | 4-Bay NAS Enclosure, refresh QN-2129, setup key ST-01 | 435 | 90 min from MN-03 | 18.3 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 3 | 09:00 | Tue Jun 9 00:55 | WO-10240 op 10 | 1TB NVMe SSD, gray QN-4854, setup key ST-02 | 300 | 45 min from ST-01 | 14.2 | Tue Jun 16 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 4 | 00:55 | Tue Jun 9 04:40 | WO-10078 op 10 | Thin Client, 4GB / 32GB, gray KL-1432, setup key DT-01 | 20 | 90 min from ST-02 | 2.0 | Wed Jun 17 17:00 | Warehouse stock |
| 5 | 06:00 | Tue Jun 9 14:20 | WO-10179 op 10 | Wi-Fi 6 Access Point, ceiling, refresh NB-4322, setup key NW-03 | 75 | 90 min from DT-01 | 6.3 | Wed Jun 17 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 6 | 05:20 | Thu Jun 11 05:30 | WO-10157 op 10 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 380 | 90 min from NW-03 | 21.4 | Thu Jun 18 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 7 | 06:00 | Thu Jun 11 20:35 | WO-10319 op 10 | All-in-One 24", 16GB / 512GB, gray KL-2287, setup key DT-02 | 120 | 90 min from MN-03 | 12.1 | Mon Jun 22 15:00 | ACCOUNT 9148 |
| Friday June 12 | |||||||||
| 8 | 06:00 | Mon Jun 15 01:55 | WO-10031 op 10 | Mesh Wi-Fi Kit, 3-pack, refresh AF-9913, setup key NW-01 | 200 | 90 min from DT-02 | 17.4 | Tue Jun 23 17:00 | Warehouse stock |
30 more jobs after Sat Jun 13.
SMT-06 SMT line 6
Planned downtime
- Tue Jun 30 06:00 to Tue Jun 30 23:00: Placement head overhaul
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Thu Jun 4 01:55 | WO-10245 op 10 Running | Thunderbolt Dock, 4 ports QN-5393, setup key DK-04 | 191 | 18.9 | Wed Jun 10 17:00 | Warehouse stock | |
| Thursday June 4 | |||||||||
| 2 | 01:55 | Thu Jun 4 15:35 | WO-10064 op 10 | 1TB NVMe SSD, refresh BP-7490, setup key ST-02 | 230 | 90 min from DK-04 | 11.4 | Fri Jun 12 17:00 | Warehouse stock |
| 3 | 15:35 | Fri Jun 5 09:15 | WO-10026 op 10 | 1TB NVMe SSD AF-7757, setup key ST-02 | 450 | 10 min | 17.0 | Mon Jun 15 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 4 | 09:15 | Mon Jun 8 03:25 | WO-10113 op 10 | Mini PC, 8-core, 16GB / 512GB, gray KL-9030, setup key DT-03 | 140 | 90 min from ST-02 | 15.4 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 5 | 06:00 | Mon Jun 8 21:30 | WO-10142 op 10 | 4K Conference Camera LM-5365, setup key PR-03 | 400 | 90 min from DT-03 | 13.0 | Tue Jun 16 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 6 | 04:40 | Wed Jun 10 05:20 | WO-10122 op 10 | 27" QHD Monitor, 165Hz LM-2177, setup key MN-03 | 340 | 90 min from PR-03 | 21.9 | Wed Jun 17 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 7 | 06:00 | Wed Jun 10 12:30 | WO-10250 op 10 | 4K Conference Camera, gray QN-6249, setup key PR-03 | 125 | 90 min from MN-03 | 4.5 | Thu Jun 18 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 8 | 03:30 | Fri Jun 12 16:45 | WO-10189 op 10 | KVM Switch, 2-port 4K, gray NB-7003, setup key DK-01 | 340 | 90 min from PR-03 | 34.2 | Fri Jun 19 17:00 | Warehouse stock |
26 more jobs after Sat Jun 13.
SMT-07 SMT line 7
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 20:45 | WO-10021 op 10 | Mini PC, 8-core, 16GB / 512GB AF-7495, setup key DT-03 | 85 | 90 min | 12.2 | Fri Jun 12 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 2 | 06:00 | Thu Jun 4 15:15 | WO-10165 op 10 | 34" Ultrawide Monitor, curved, gray LM-9032, setup key MN-04 | 80 | 90 min from DT-03 | 7.2 | Fri Jun 12 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 3 | 06:00 | Fri Jun 5 18:25 | WO-10170 op 10 | Tower Workstation, 32GB / 1TB, refresh LM-9819, setup key DT-04 | 90 | 90 min from MN-04 | 10.4 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 4 | 06:00 | Mon Jun 8 13:55 | WO-10274 op 10 | Wi-Fi 6E Router, gray VW-2128, setup key NW-02 | 50 | 90 min from DT-04 | 5.9 | Tue Jun 16 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 5 | 06:00 | Wed Jun 10 02:25 | WO-10221 op 10 | 8-Port Gigabit Switch QN-4070, setup key NW-05 | 160 | 45 min from NW-02 | 18.7 | Wed Jun 17 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 6 | 06:00 | Wed Jun 10 12:30 | WO-10342 op 10 | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key LT-02 | 30 | 90 min from NW-05 | 4.5 | Fri Jun 19 12:00 | ENGINEERING |
| Friday June 12 | |||||||||
| 7 | 06:00 | Mon Jun 15 00:10 | WO-10143 op 10 | 4K Conference Camera LM-5365, setup key PR-03 | 410 | 90 min from LT-02 | 15.7 | Tue Jun 23 17:00 | Warehouse stock |
33 more jobs after Sat Jun 13.
SUB-A Sub-assembly cell A
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 07:00 | WO-10279 op 20 Running | Ergonomic Mouse, wireless VW-4001, setup key PR-01 | 146 | 1.0 | Wed Jun 10 17:00 | Warehouse stock | |
| Thursday June 4 | |||||||||
| 2 | 08:15 | Fri Jun 5 13:05 | WO-10203 op 20 | 14" Rugged Laptop, 16GB / 256GB NB-7498, setup key LT-04 | 475 | 50 min from PR-01 | 19.5 | Wed Jun 10 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 3 | 13:05 | Fri Jun 5 15:40 | WO-10064 op 20 | 1TB NVMe SSD, refresh BP-7490, setup key ST-02 | 230 | 50 min from LT-04 | 1.8 | Fri Jun 12 17:00 | Warehouse stock |
| 4 | 15:40 | Mon Jun 8 08:10 | WO-10289 op 20 | 27" 4K Monitor, USB-C VW-6003, setup key MN-02 | 355 | 50 min from ST-02 | 8.2 | Fri Jun 12 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 5 | 08:10 | Mon Jun 8 12:20 | WO-10209 op 20 | 4-Bay NAS Enclosure, refresh QN-2129, setup key ST-01 | 435 | 50 min from MN-02 | 2.8 | Mon Jun 15 17:00 | Warehouse stock |
| 6 | 12:20 | Mon Jun 8 20:55 | WO-10294 op 20 | 34" Ultrawide Monitor, curved VW-6938, setup key MN-04 | 265 | 50 min from ST-01 | 7.2 | Mon Jun 15 17:00 | Warehouse stock |
| 7 | 20:55 | Tue Jun 9 08:25 | WO-10093 op 20 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 90 | 50 min from MN-04 | 3.7 | Tue Jun 16 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 8 | 08:25 | Tue Jun 9 10:55 | WO-10274 op 20 | Wi-Fi 6E Router, gray VW-2128, setup key NW-02 | 50 | 50 min from LT-03 | 1.2 | Tue Jun 16 17:00 | Warehouse stock |
| 9 | 17:40 | Tue Jun 9 20:40 | WO-10303 op 20 | Mechanical Keyboard, TKL VW-8762, setup key PR-05 | 260 | 50 min from NW-02 | 1.7 | Wed Jun 17 17:00 | Warehouse stock |
| 10 | 22:00 | Wed Jun 10 14:45 | WO-10198 op 20 | Chromebook 11", 4GB / 64GB NB-7136, setup key LT-02 | 240 | 50 min from PR-05 | 8.4 | Tue Jun 16 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 11 | 14:45 | Wed Jun 10 19:45 | WO-10221 op 20 | 8-Port Gigabit Switch QN-4070, setup key NW-05 | 160 | 50 min from LT-02 | 3.7 | Wed Jun 17 17:00 | Warehouse stock |
| 12 | 19:45 | Wed Jun 10 23:00 | WO-10103 op 20 | 1080p Webcam with mic KL-5125, setup key PR-02 | 350 | 50 min from NW-05 | 2.4 | Thu Jun 18 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 13 | 06:00 | Thu Jun 11 08:20 | WO-10284 op 20 | USB-C Travel Hub, 7-in-1 VW-4303, setup key DK-03 | 100 | 50 min from PR-02 | 1.5 | Thu Jun 18 17:00 | Warehouse stock |
| 14 | 08:20 | Thu Jun 11 10:50 | WO-10342 op 20 | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key LT-02 | 30 | 50 min from DK-03 | 1.2 | Fri Jun 19 12:00 | ENGINEERING |
| 15 | 10:50 | Thu Jun 11 18:25 | WO-10045 op 20 | 24" FHD Monitor, IPS BP-5281, setup key MN-01 | 280 | 50 min from LT-02 | 6.8 | Fri Jun 19 17:00 | Warehouse stock |
| 16 | 18:25 | Fri Jun 12 06:40 | WO-10231 op 20 | 15" Laptop, 12-core, 32GB / 1TB, gray QN-4418, setup key LT-01 | 110 | 50 min from MN-01 | 3.9 | Fri Jun 19 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 17 | 12:00 | Fri Jun 12 18:05 | WO-10189 op 20 | KVM Switch, 2-port 4K, gray NB-7003, setup key DK-01 | 340 | 50 min from LT-01 | 5.2 | Fri Jun 19 17:00 | Warehouse stock |
| 18 | 19:05 | Fri Jun 12 22:40 | WO-10002 op 20 | Ergonomic Mouse, wireless, gray AF-4219, setup key PR-01 | 370 | 50 min from DK-01 | 2.8 | Mon Jun 22 17:00 | Warehouse stock |
80 more jobs after Sat Jun 13.
SUB-B Sub-assembly cell B
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 07:20 | WO-10184 op 20 Frozen | 8" Rugged Tablet, 64GB, gray NB-5680, setup key TB-02 | 25 | 25 min | 0.9 | Thu Jun 11 17:00 | Warehouse stock |
| 2 | 16:10 | Thu Jun 4 06:50 | WO-10245 op 20 Frozen | Thunderbolt Dock, 4 ports QN-5393, setup key DK-04 | 415 | 50 min from TB-02 | 6.3 | Wed Jun 10 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 3 | 06:50 | Thu Jun 4 14:10 | WO-10083 op 20 | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key LT-02 | 155 | 50 min from DK-04 | 6.0 | Thu Jun 11 17:00 | Warehouse stock |
| 4 | 14:10 | Thu Jun 4 19:40 | WO-10226 op 20 | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key DT-03 | 95 | 50 min from LT-02 | 4.2 | Thu Jun 11 17:00 | Warehouse stock |
| 5 | 19:40 | Fri Jun 5 07:50 | WO-10021 op 20 | Mini PC, 8-core, 16GB / 512GB AF-7495, setup key DT-03 | 85 | 25 min | 4.8 | Fri Jun 12 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 6 | 09:35 | Fri Jun 5 21:05 | WO-10344 op 20 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 240 | 50 min from DT-03 | 9.7 | Fri Jun 12 15:00 | ACCOUNT 4340 |
| 7 | 21:05 | Mon Jun 8 12:30 | WO-10113 op 20 | Mini PC, 8-core, 16GB / 512GB, gray KL-9030, setup key DT-03 | 140 | 50 min from LT-03 | 7.1 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 8 | 15:05 | Mon Jun 8 22:50 | WO-10006 op 20 | Thin Client, 4GB / 32GB, gray AF-4236, setup key DT-01 | 155 | 40 min from DT-03 | 6.6 | Tue Jun 16 17:00 | Warehouse stock |
| 9 | 22:50 | Tue Jun 9 09:20 | WO-10142 op 20 | 4K Conference Camera LM-5365, setup key PR-03 | 400 | 50 min from DT-01 | 2.7 | Tue Jun 16 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 10 | 09:20 | Tue Jun 9 11:35 | WO-10078 op 20 | Thin Client, 4GB / 32GB, gray KL-1432, setup key DT-01 | 20 | 50 min from PR-03 | 0.9 | Wed Jun 17 17:00 | Warehouse stock |
| 11 | 13:30 | Tue Jun 9 15:50 | WO-10179 op 20 | Wi-Fi 6 Access Point, ceiling, refresh NB-4322, setup key NW-03 | 75 | 50 min from DT-01 | 1.5 | Wed Jun 17 17:00 | Warehouse stock |
| 12 | 16:10 | Wed Jun 10 15:05 | WO-10255 op 20 Late order | 13" Ultralight Laptop, 16GB / 512GB QN-7885, setup key LT-05 | 350 | 50 min from NW-03 | 14.1 | Fri Jun 12 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 13 | 15:05 | Wed Jun 10 16:45 | WO-10059 op 20 | 128GB USB Flash Drive, 10-pack BP-7439, setup key ST-03 | 110 | 50 min from LT-05 | 0.8 | Thu Jun 18 17:00 | Warehouse stock |
| 14 | 16:45 | Wed Jun 10 18:30 | WO-10250 op 20 | 4K Conference Camera, gray QN-6249, setup key PR-03 | 125 | 50 min from ST-03 | 0.9 | Thu Jun 18 17:00 | Warehouse stock |
| 15 | 19:55 | Thu Jun 11 20:30 | WO-10260 op 20 | 22" Touch Monitor, gray VW-1017, setup key MN-05 | 540 | 50 min from PR-03 | 15.8 | Wed Jun 17 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 16 | 20:30 | Fri Jun 12 09:35 | WO-10132 op 20 | 8" Rugged Tablet, 64GB, gray LM-5109, setup key TB-02 | 140 | 50 min from MN-05 | 5.2 | Fri Jun 19 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 17 | 09:35 | Fri Jun 12 14:40 | WO-10194 op 20 | 10" Tablet, 64GB NB-7024, setup key TB-03 | 125 | 40 min from TB-02 | 3.9 | Mon Jun 22 17:00 | Warehouse stock |
65 more jobs after Sat Jun 13.
SUB-C Sub-assembly cell C
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 06:10 | WO-10108 op 20 Running | Wi-Fi 6 Access Point, ceiling KL-5384, setup key NW-03 | 9 | 0.2 | Fri Jun 12 17:00 | Warehouse stock | |
| 2 | 16:50 | Wed Jun 3 21:35 | WO-10127 op 20 | 24-Port PoE Switch, managed, refresh LM-3668, setup key NW-04 | 155 | 40 min from NW-03 | 3.6 | Thu Jun 11 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 3 | 06:00 | Thu Jun 4 14:30 | WO-10040 op 20 | KVM Switch, 2-port 4K BP-5055, setup key DK-01 | 540 | 50 min from NW-04 | 7.2 | Thu Jun 11 17:00 | Warehouse stock |
| 4 | 15:55 | Thu Jun 4 20:05 | WO-10265 op 20 | 24-Port PoE Switch, managed VW-1670, setup key NW-04 | 125 | 50 min from DK-01 | 2.8 | Thu Jun 11 17:00 | Warehouse stock |
| 5 | 20:45 | Fri Jun 5 14:05 | WO-10156 op 20 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 390 | 50 min from NW-04 | 9.0 | Thu Jun 11 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 6 | 14:05 | Fri Jun 5 17:15 | WO-10165 op 20 | 34" Ultrawide Monitor, curved, gray LM-9032, setup key MN-04 | 80 | 40 min from MN-03 | 2.5 | Fri Jun 12 17:00 | Warehouse stock |
| 7 | 17:15 | Fri Jun 5 21:15 | WO-10026 op 20 | 1TB NVMe SSD AF-7757, setup key ST-02 | 450 | 50 min from MN-04 | 2.7 | Mon Jun 15 17:00 | Warehouse stock |
| 8 | 21:15 | Mon Jun 8 09:10 | WO-10170 op 20 | Tower Workstation, 32GB / 1TB, refresh LM-9819, setup key DT-04 | 90 | 50 min from ST-02 | 4.1 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 9 | 12:10 | Mon Jun 8 21:30 | WO-10069 op 20 | Mesh Wi-Fi Kit, 3-pack BP-8055, setup key NW-01 | 365 | 50 min from DT-04 | 8.0 | Mon Jun 15 17:00 | Warehouse stock |
| 10 | 21:30 | Tue Jun 9 07:30 | WO-10240 op 20 | 1TB NVMe SSD, gray QN-4854, setup key ST-02 | 300 | 50 min from NW-01 | 2.2 | Tue Jun 16 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 11 | 07:30 | Tue Jun 9 13:55 | WO-10339 op 20 | Thin Client, 4GB / 32GB, gray AF-4236, setup key DT-01 | 120 | 50 min from ST-02 | 5.1 | Wed Jun 17 15:00 | ACCOUNT 3915 |
| 12 | 19:45 | Wed Jun 10 11:05 | WO-10035 op 20 | 15" Laptop, 12-core, 32GB / 1TB BP-4957, setup key LT-01 | 195 | 50 min from DT-01 | 7.0 | Wed Jun 17 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 13 | 11:05 | Wed Jun 10 21:20 | WO-10122 op 20 | 27" QHD Monitor, 165Hz LM-2177, setup key MN-03 | 340 | 50 min from LT-01 | 8.9 | Wed Jun 17 17:00 | Warehouse stock |
| 14 | 21:20 | Thu Jun 11 14:00 | WO-10157 op 20 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 380 | 25 min | 8.8 | Thu Jun 18 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 15 | 14:00 | Thu Jun 11 21:45 | WO-10088 op 20 | 12" Pro Tablet, 256GB KL-2075, setup key TB-01 | 190 | 50 min from MN-03 | 6.4 | Fri Jun 19 17:00 | Warehouse stock |
| 16 | 21:45 | Fri Jun 12 11:40 | WO-10319 op 20 | All-in-One 24", 16GB / 512GB, gray KL-2287, setup key DT-02 | 120 | 50 min from TB-01 | 5.6 | Mon Jun 22 15:00 | ACCOUNT 9148 |
| Friday June 12 | |||||||||
| 17 | 11:40 | Fri Jun 12 17:45 | WO-10050 op 20 | 27" 4K Monitor, USB-C, refresh BP-5748, setup key MN-02 | 215 | 50 min from DT-02 | 5.2 | Mon Jun 22 17:00 | Warehouse stock |
| 18 | 19:10 | Mon Jun 15 07:00 | WO-10031 op 20 | Mesh Wi-Fi Kit, 3-pack, refresh AF-9913, setup key NW-01 | 200 | 50 min from MN-02 | 4.0 | Tue Jun 23 17:00 | Warehouse stock |
69 more jobs after Sat Jun 13.
FA-01 Final assembly cell 1
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:40 | Wed Jun 3 16:00 | WO-10279 op 30 Frozen | Ergonomic Mouse, wireless VW-4001, setup key PR-01 | 500 | 45 min | 8.1 | Wed Jun 10 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 2 | 07:45 | Thu Jun 4 22:20 | WO-10040 op 30 | KVM Switch, 2-port 4K BP-5055, setup key DK-01 | 540 | 45 min from PR-01 | 12.8 | Thu Jun 11 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 3 | 09:35 | Mon Jun 8 17:35 | WO-10209 op 30 | 4-Bay NAS Enclosure, refresh QN-2129, setup key ST-01 | 435 | 45 min from DK-01 | 6.8 | Mon Jun 15 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 4 | 07:15 | Tue Jun 9 14:55 | WO-10142 op 30 | 4K Conference Camera LM-5365, setup key PR-03 | 400 | 45 min from ST-01 | 6.4 | Tue Jun 16 17:00 | Warehouse stock |
| 5 | 14:55 | Tue Jun 9 18:00 | WO-10274 op 30 | Wi-Fi 6E Router, gray VW-2128, setup key NW-02 | 50 | 45 min from PR-03 | 2.3 | Tue Jun 16 17:00 | Warehouse stock |
| 6 | 19:50 | Thu Jun 11 19:35 | WO-10255 op 30 Late order | 13" Ultralight Laptop, 16GB / 512GB QN-7885, setup key LT-05 | 350 | 45 min from NW-02 | 31.0 | Fri Jun 12 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 7 | 06:30 | Fri Jun 12 19:35 | WO-10132 op 30 | 8" Rugged Tablet, 64GB, gray LM-5109, setup key TB-02 | 140 | 45 min from LT-05 | 11.3 | Fri Jun 19 17:00 | Warehouse stock |
| 8 | 20:35 | Mon Jun 15 11:20 | WO-10002 op 30 | Ergonomic Mouse, wireless, gray AF-4219, setup key PR-01 | 370 | 45 min from TB-02 | 6.5 | Mon Jun 22 17:00 | Warehouse stock |
42 more jobs after Sat Jun 13.
FA-02 Final assembly cell 2
Planned downtime
- Tue Jun 16 06:00 to Tue Jun 16 10:00: Fixture rebuild
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 09:00 | WO-10216 op 30 Running | USB-C Travel Hub, 7-in-1, gray QN-2461, setup key DK-03 | 111 | 3.0 | Tue Jun 9 17:00 | Warehouse stock | |
| 2 | 18:05 | Thu Jun 4 13:50 | WO-10245 op 30 Frozen | Thunderbolt Dock, 4 ports QN-5393, setup key DK-04 | 415 | 25 min from DK-03 | 11.3 | Wed Jun 10 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 3 | 18:10 | Fri Jun 5 08:00 | WO-10265 op 30 | 24-Port PoE Switch, managed VW-1670, setup key NW-04 | 125 | 45 min from DK-04 | 5.6 | Thu Jun 11 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 4 | 14:35 | Fri Jun 5 20:05 | WO-10064 op 30 | 1TB NVMe SSD, refresh BP-7490, setup key ST-02 | 230 | 45 min from NW-04 | 4.2 | Fri Jun 12 17:00 | Warehouse stock |
| 5 | 20:05 | Mon Jun 8 09:25 | WO-10026 op 30 | 1TB NVMe SSD AF-7757, setup key ST-02 | 450 | 5 min | 6.2 | Mon Jun 15 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 6 | 14:25 | Tue Jun 9 15:10 | WO-10069 op 30 | Mesh Wi-Fi Kit, 3-pack BP-8055, setup key NW-01 | 365 | 45 min from ST-02 | 16.0 | Mon Jun 15 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 7 | 15:10 | Tue Jun 9 21:40 | WO-10240 op 30 | 1TB NVMe SSD, gray QN-4854, setup key ST-02 | 300 | 45 min from NW-01 | 5.2 | Tue Jun 16 17:00 | Warehouse stock |
| 8 | 22:40 | Wed Jun 10 22:45 | WO-10035 op 30 | 15" Laptop, 12-core, 32GB / 1TB BP-4957, setup key LT-01 | 195 | 45 min from ST-02 | 15.3 | Wed Jun 17 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 9 | 22:45 | Thu Jun 11 11:00 | WO-10303 op 30 | Mechanical Keyboard, TKL VW-8762, setup key PR-05 | 260 | 45 min from LT-01 | 4.0 | Wed Jun 17 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 10 | 11:00 | Thu Jun 11 13:35 | WO-10059 op 30 | 128GB USB Flash Drive, 10-pack BP-7439, setup key ST-03 | 110 | 45 min from PR-05 | 1.8 | Thu Jun 18 17:00 | Warehouse stock |
| 11 | 13:35 | Thu Jun 11 16:55 | WO-10342 op 30 | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key LT-02 | 30 | 45 min from ST-03 | 2.6 | Fri Jun 19 12:00 | ENGINEERING |
| 12 | 16:55 | Fri Jun 12 15:25 | WO-10088 op 30 | 12" Pro Tablet, 256GB KL-2075, setup key TB-01 | 190 | 45 min from LT-02 | 13.8 | Fri Jun 19 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 13 | 15:25 | Mon Jun 15 08:15 | WO-10231 op 30 | 15" Laptop, 12-core, 32GB / 1TB, gray QN-4418, setup key LT-01 | 110 | 45 min from TB-01 | 8.6 | Fri Jun 19 17:00 | Warehouse stock |
38 more jobs after Sat Jun 13.
FA-03 Final assembly cell 3
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 22:25 | WO-10136 op 30 Running | 14" Laptop, 8-core, 16GB / 512GB LM-5139, setup key LT-03 | 191 | 15.4 | Mon Jun 8 17:00 | Warehouse stock | |
| Thursday June 4 | |||||||||
| 2 | 11:55 | Tue Jun 9 06:40 | WO-10203 op 30 | 14" Rugged Laptop, 16GB / 256GB NB-7498, setup key LT-04 | 475 | 25 min from LT-03 | 42.8 | Wed Jun 10 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 3 | 07:05 | Tue Jun 9 16:00 | WO-10093 op 30 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 90 | 25 min from LT-04 | 8.0 | Tue Jun 16 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 4 | 07:55 | Thu Jun 11 11:20 | WO-10198 op 30 | Chromebook 11", 4GB / 64GB NB-7136, setup key LT-02 | 240 | 25 min from LT-03 | 18.5 | Tue Jun 16 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 5 | 11:20 | Thu Jun 11 14:20 | WO-10250 op 30 | 4K Conference Camera, gray QN-6249, setup key PR-03 | 125 | 45 min from LT-02 | 2.2 | Thu Jun 18 17:00 | Warehouse stock |
| 6 | 14:20 | Thu Jun 11 17:45 | WO-10284 op 30 | USB-C Travel Hub, 7-in-1 VW-4303, setup key DK-03 | 100 | 45 min from PR-03 | 2.7 | Thu Jun 18 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 7 | 13:55 | Mon Jun 15 07:20 | WO-10189 op 30 | KVM Switch, 2-port 4K, gray NB-7003, setup key DK-01 | 340 | 25 min from DK-03 | 9.5 | Fri Jun 19 17:00 | Warehouse stock |
43 more jobs after Sat Jun 13.
FA-04 Final assembly cell 4
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 09:00 | WO-10150 op 30 Running | 2TB Portable SSD LM-7276, setup key ST-04 | 200 | 3.0 | Wed Jun 10 17:00 | Warehouse stock | |
| 2 | 10:35 | Wed Jun 3 13:20 | WO-10184 op 30 Frozen | 8" Rugged Tablet, 64GB, gray NB-5680, setup key TB-02 | 25 | 45 min from ST-04 | 2.0 | Thu Jun 11 17:00 | Warehouse stock |
| 3 | 19:25 | Thu Jun 4 10:50 | WO-10127 op 30 | 24-Port PoE Switch, managed, refresh LM-3668, setup key NW-04 | 155 | 45 min from TB-02 | 7.2 | Thu Jun 11 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 4 | 17:30 | Fri Jun 5 11:30 | WO-10226 op 30 | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key DT-03 | 95 | 45 min from NW-04 | 9.2 | Thu Jun 11 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 5 | 11:30 | Fri Jun 5 22:45 | WO-10021 op 30 | Mini PC, 8-core, 16GB / 512GB AF-7495, setup key DT-03 | 85 | 5 min | 10.7 | Fri Jun 12 17:00 | Warehouse stock |
| 6 | 22:45 | Mon Jun 8 13:45 | WO-10165 op 30 | 34" Ultrawide Monitor, curved, gray LM-9032, setup key MN-04 | 80 | 45 min from DT-03 | 6.8 | Fri Jun 12 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 7 | 13:45 | Tue Jun 9 20:40 | WO-10289 op 30 | 27" 4K Monitor, USB-C VW-6003, setup key MN-02 | 355 | 25 min from MN-04 | 22.0 | Fri Jun 12 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 8 | 20:40 | Wed Jun 10 16:15 | WO-10339 op 30 | Thin Client, 4GB / 32GB, gray AF-4236, setup key DT-01 | 120 | 45 min from MN-02 | 11.3 | Wed Jun 17 15:00 | ACCOUNT 3915 |
| Wednesday June 10 | |||||||||
| 9 | 16:15 | Wed Jun 10 20:25 | WO-10179 op 30 | Wi-Fi 6 Access Point, ceiling, refresh NB-4322, setup key NW-03 | 75 | 45 min from DT-01 | 2.9 | Wed Jun 17 17:00 | Warehouse stock |
| 10 | 22:30 | Mon Jun 15 17:05 | WO-10260 op 30 | 22" Touch Monitor, gray VW-1017, setup key MN-05 | 540 | 45 min from NW-03 | 42.3 | Wed Jun 17 17:00 | Warehouse stock |
29 more jobs after Sat Jun 13.
FA-05 Final assembly cell 5
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 08:30 | WO-10174 op 30 Running | 8" Rugged Tablet, 64GB NB-1986, setup key TB-02 | 33 | 2.5 | Tue Jun 9 17:00 | Warehouse stock | |
| Thursday June 4 | |||||||||
| 2 | 09:55 | Fri Jun 5 07:55 | WO-10083 op 30 | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key LT-02 | 155 | 45 min from TB-02 | 13.2 | Thu Jun 11 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 3 | 13:15 | Mon Jun 8 19:20 | WO-10344 op 30 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 240 | 25 min from LT-02 | 21.2 | Fri Jun 12 15:00 | ACCOUNT 4340 |
| Monday June 8 | |||||||||
| 4 | 19:20 | Tue Jun 9 12:40 | WO-10170 op 30 | Tower Workstation, 32GB / 1TB, refresh LM-9819, setup key DT-04 | 90 | 45 min from LT-03 | 9.1 | Mon Jun 15 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 5 | 12:40 | Wed Jun 10 16:50 | WO-10294 op 30 | 34" Ultrawide Monitor, curved VW-6938, setup key MN-04 | 265 | 45 min from DT-04 | 19.4 | Mon Jun 15 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 6 | 17:00 | Thu Jun 11 08:35 | WO-10221 op 30 | 8-Port Gigabit Switch QN-4070, setup key NW-05 | 160 | 45 min from MN-04 | 7.3 | Wed Jun 17 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 7 | 08:35 | Thu Jun 11 15:35 | WO-10103 op 30 | 1080p Webcam with mic KL-5125, setup key PR-02 | 350 | 45 min from NW-05 | 5.8 | Thu Jun 18 17:00 | Warehouse stock |
| 8 | 15:35 | Mon Jun 15 07:25 | WO-10157 op 30 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 380 | 45 min from PR-02 | 23.6 | Thu Jun 18 17:00 | Warehouse stock |
32 more jobs after Sat Jun 13.
FA-06 Final assembly cell 6
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 06:45 | WO-10011 op 30 Running | All-in-One 24", 16GB / 512GB AF-4434, setup key DT-02 | 6 | 0.8 | Wed Jun 10 17:00 | Warehouse stock | |
| 2 | 08:10 | Wed Jun 3 12:50 | WO-10108 op 30 Frozen | Wi-Fi 6 Access Point, ceiling KL-5384, setup key NW-03 | 100 | 45 min from DT-02 | 3.4 | Fri Jun 12 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 3 | 06:00 | Mon Jun 8 15:25 | WO-10156 op 30 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 390 | 45 min from NW-03 | 24.2 | Thu Jun 11 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 4 | 15:25 | Tue Jun 9 16:00 | WO-10113 op 30 | Mini PC, 8-core, 16GB / 512GB, gray KL-9030, setup key DT-03 | 140 | 45 min from MN-03 | 15.8 | Mon Jun 15 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 5 | 16:00 | Wed Jun 10 15:05 | WO-10006 op 30 | Thin Client, 4GB / 32GB, gray AF-4236, setup key DT-01 | 155 | 25 min from DT-03 | 14.7 | Tue Jun 16 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 6 | 15:05 | Wed Jun 10 17:10 | WO-10078 op 30 | Thin Client, 4GB / 32GB, gray KL-1432, setup key DT-01 | 20 | 5 min | 2.0 | Wed Jun 17 17:00 | Warehouse stock |
| 7 | 17:10 | Fri Jun 12 09:30 | WO-10122 op 30 | 27" QHD Monitor, 165Hz LM-2177, setup key MN-03 | 340 | 45 min from DT-01 | 24.1 | Wed Jun 17 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 8 | 09:30 | Mon Jun 15 12:35 | WO-10045 op 30 | 24" FHD Monitor, IPS BP-5281, setup key MN-01 | 280 | 25 min from MN-03 | 18.2 | Fri Jun 19 17:00 | Warehouse stock |
34 more jobs after Sat Jun 13.
TB-01 Burn-in bank 1
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 15:55 | WO-10188 op 40 Frozen | KVM Switch, 2-port 4K, gray NB-7003, setup key Docks & Hubs | 340 | 35 min | 9.3 | Fri Jun 5 17:00 | Warehouse stock |
| 2 | 15:55 | Thu Jun 4 10:10 | WO-10208 op 40 Frozen | 4-Bay NAS Enclosure, refresh QN-2129, setup key Storage | 485 | 35 min from Docks & Hubs | 17.7 | Mon Jun 8 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 3 | 10:10 | Thu Jun 4 23:40 | WO-10073 op 40 | 4-Bay NAS Enclosure BP-8568, setup key Storage | 415 | 15 min | 13.2 | Tue Jun 9 17:00 | Warehouse stock |
| 4 | 23:40 | Fri Jun 5 18:35 | WO-10117 op 40 | 14" Laptop, 8-core, 16GB / 512GB, gray KL-9462, setup key Laptops | 100 | 35 min from Storage | 18.3 | Tue Jun 9 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 5 | 18:35 | Fri Jun 5 20:45 | WO-10098 op 40 | Wi-Fi 6E Router KL-3459, setup key Networking | 20 | 35 min from Laptops | 1.6 | Wed Jun 10 17:00 | Warehouse stock |
| 6 | 20:45 | Sat Jun 6 08:30 | WO-10245 op 40 | Thunderbolt Dock, 4 ports QN-5393, setup key Docks & Hubs | 415 | 35 min from Networking | 11.2 | Wed Jun 10 17:00 | Warehouse stock |
| Saturday June 6 | |||||||||
| 7 | 08:30 | Sun Jun 7 09:50 | WO-10083 op 40 | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key Laptops | 155 | 35 min from Docks & Hubs | 24.8 | Thu Jun 11 17:00 | Warehouse stock |
| Sunday June 7 | |||||||||
| 8 | 09:50 | Mon Jun 8 03:55 | WO-10226 op 40 | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key Desktops | 95 | 35 min from Laptops | 17.5 | Thu Jun 11 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 9 | 06:00 | Tue Jun 9 22:20 | WO-10344 op 40 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key Laptops | 240 | 35 min from Desktops | 39.8 | Fri Jun 12 15:00 | ACCOUNT 4340 |
| Wednesday June 10 | |||||||||
| 10 | 06:00 | Thu Jun 11 12:35 | WO-10113 op 40 | Mini PC, 8-core, 16GB / 512GB, gray KL-9030, setup key Desktops | 140 | 35 min from Laptops | 30.0 | Mon Jun 15 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 11 | 12:35 | Fri Jun 12 04:30 | WO-10294 op 40 | 34" Ultrawide Monitor, curved VW-6938, setup key Monitors | 265 | 35 min from Desktops | 15.3 | Mon Jun 15 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 12 | 04:30 | Fri Jun 12 20:00 | WO-10093 op 40 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key Laptops | 90 | 35 min from Monitors | 14.9 | Tue Jun 16 17:00 | Warehouse stock |
| 13 | 20:00 | Sat Jun 13 08:50 | WO-10240 op 40 | 1TB NVMe SSD, gray QN-4854, setup key Storage | 300 | 35 min from Laptops | 12.2 | Tue Jun 16 17:00 | Warehouse stock |
76 more jobs after Sat Jun 13.
TB-02 Burn-in bank 2
Planned downtime
- Sat Jun 20 00:00 to Sat Jun 20 12:00: Chamber calibration
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 18:00 | WO-10193 op 40 Running | 10" Tablet, 64GB NB-7024, setup key Tablets | 109 | 12.0 | Mon Jun 8 17:00 | Warehouse stock | |
| 2 | 18:20 | Wed Jun 3 23:00 | WO-10141 op 40 Frozen | 4K Conference Camera LM-5365, setup key Peripherals | 430 | 35 min from Tablets | 4.1 | Tue Jun 9 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 3 | 06:00 | Thu Jun 4 13:55 | WO-10330 op 40 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key Monitors | 150 | 35 min from Peripherals | 7.3 | Tue Jun 9 15:00 | ACCOUNT 8733 |
| 4 | 13:55 | Thu Jun 4 20:40 | WO-10216 op 40 | USB-C Travel Hub, 7-in-1, gray QN-2461, setup key Docks & Hubs | 230 | 35 min from Monitors | 6.2 | Tue Jun 9 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 5 | 06:00 | Fri Jun 5 09:25 | WO-10298 op 40 | USB-C Dock, 100W, dual display VW-7925, setup key Docks & Hubs | 140 | 15 min | 3.2 | Tue Jun 9 17:00 | Warehouse stock |
| 6 | 09:25 | Fri Jun 5 20:30 | WO-10011 op 40 | All-in-One 24", 16GB / 512GB AF-4434, setup key Desktops | 45 | 35 min from Docks & Hubs | 10.5 | Wed Jun 10 17:00 | Warehouse stock |
| Saturday June 6 | |||||||||
| 7 | 02:55 | Sat Jun 6 08:15 | WO-10279 op 40 | Ergonomic Mouse, wireless VW-4001, setup key Peripherals | 500 | 35 min from Desktops | 4.8 | Wed Jun 10 17:00 | Warehouse stock |
| 8 | 08:15 | Sat Jun 6 21:25 | WO-10040 op 40 | KVM Switch, 2-port 4K BP-5055, setup key Docks & Hubs | 540 | 35 min from Peripherals | 12.6 | Thu Jun 11 17:00 | Warehouse stock |
| 9 | 21:25 | Sun Jun 7 10:40 | WO-10127 op 40 | 24-Port PoE Switch, managed, refresh LM-3668, setup key Networking | 155 | 35 min from Docks & Hubs | 12.7 | Thu Jun 11 17:00 | Warehouse stock |
| Sunday June 7 | |||||||||
| 10 | 10:40 | Sun Jun 7 20:40 | WO-10265 op 40 | 24-Port PoE Switch, managed VW-1670, setup key Networking | 125 | 15 min | 9.8 | Thu Jun 11 17:00 | Warehouse stock |
| 11 | 22:35 | Mon Jun 8 18:10 | WO-10156 op 40 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key Monitors | 390 | 35 min from Networking | 19.0 | Thu Jun 11 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 12 | 06:00 | Tue Jun 9 12:35 | WO-10108 op 40 | Wi-Fi 6 Access Point, ceiling KL-5384, setup key Networking | 100 | 35 min from Monitors | 6.0 | Fri Jun 12 17:00 | Warehouse stock |
| 13 | 12:35 | Tue Jun 9 18:30 | WO-10165 op 40 | 34" Ultrawide Monitor, curved, gray LM-9032, setup key Monitors | 80 | 35 min from Networking | 5.3 | Fri Jun 12 17:00 | Warehouse stock |
| 14 | 18:30 | Wed Jun 10 12:05 | WO-10289 op 40 | 27" 4K Monitor, USB-C VW-6003, setup key Monitors | 355 | 15 min | 17.3 | Fri Jun 12 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 15 | 12:05 | Wed Jun 10 16:30 | WO-10142 op 40 | 4K Conference Camera LM-5365, setup key Peripherals | 400 | 35 min from Monitors | 3.8 | Tue Jun 16 17:00 | Warehouse stock |
| 16 | 16:30 | Wed Jun 10 21:10 | WO-10274 op 40 | Wi-Fi 6E Router, gray VW-2128, setup key Networking | 50 | 35 min from Peripherals | 4.1 | Tue Jun 16 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 17 | 06:00 | Thu Jun 11 23:45 | WO-10170 op 40 | Tower Workstation, 32GB / 1TB, refresh LM-9819, setup key Desktops | 90 | 35 min from Networking | 17.2 | Mon Jun 15 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 18 | 06:00 | Sat Jun 13 17:15 | WO-10198 op 40 | Chromebook 11", 4GB / 64GB NB-7136, setup key Laptops | 240 | 35 min from Desktops | 34.7 | Tue Jun 16 17:00 | Warehouse stock |
56 more jobs after Sat Jun 13.
TB-03 Burn-in bank 3
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Sat Jun 6 02:55 | WO-10136 op 40 Running | 14" Laptop, 8-core, 16GB / 512GB LM-5139, setup key Laptops | 455 | 68.9 | Mon Jun 8 17:00 | Warehouse stock | |
| Monday June 8 | |||||||||
| 2 | 03:55 | Mon Jun 8 08:35 | WO-10341 op 40 | 15" Laptop, 12-core, 32GB / 1TB BP-4957, setup key Laptops | 30 | 15 min | 4.4 | Fri Jun 12 12:00 | ENGINEERING |
| 3 | 08:35 | Tue Jun 9 05:25 | WO-10021 op 40 | Mini PC, 8-core, 16GB / 512GB AF-7495, setup key Desktops | 85 | 35 min from Laptops | 20.2 | Fri Jun 12 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 4 | 05:25 | Tue Jun 9 15:50 | WO-10064 op 40 | 1TB NVMe SSD, refresh BP-7490, setup key Storage | 230 | 35 min from Desktops | 9.8 | Fri Jun 12 17:00 | Warehouse stock |
| 5 | 15:50 | Wed Jun 10 06:45 | WO-10026 op 40 | 1TB NVMe SSD AF-7757, setup key Storage | 450 | 15 min | 14.7 | Mon Jun 15 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 6 | 08:20 | Fri Jun 12 19:05 | WO-10255 op 40 Late order | 13" Ultralight Laptop, 16GB / 512GB QN-7885, setup key Laptops | 350 | 35 min from Storage | 58.2 | Fri Jun 12 17:00 | Warehouse stock |
62 more jobs after Sat Jun 13.
TB-04 Burn-in bank 4
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 13:45 | WO-10049 op 40 Running | 27" 4K Monitor, USB-C, refresh BP-5748, setup key Monitors | 151 | 7.8 | Mon Jun 8 17:00 | Warehouse stock | |
| 2 | 14:10 | Thu Jun 4 05:30 | WO-10310 op 40 Frozen | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key Desktops | 80 | 35 min from Monitors | 14.8 | Tue Jun 9 15:00 | ACCOUNT 8733 |
| Thursday June 4 | |||||||||
| 3 | 05:30 | Thu Jun 4 12:10 | WO-10326 op 40 Frozen | 14" Laptop, 8-core, 16GB / 512GB LM-5139, setup key Laptops | 40 | 35 min from Desktops | 6.1 | Tue Jun 9 15:00 | ACCOUNT 8321 |
| 4 | 12:10 | Fri Jun 5 06:05 | WO-10030 op 40 | Mesh Wi-Fi Kit, 3-pack, refresh AF-9913, setup key Networking | 245 | 35 min from Laptops | 17.3 | Tue Jun 9 17:00 | Warehouse stock |
| Friday June 5 | |||||||||
| 5 | 06:05 | Fri Jun 5 17:15 | WO-10174 op 40 | 8" Rugged Tablet, 64GB NB-1986, setup key Tablets | 85 | 35 min from Networking | 10.6 | Tue Jun 9 17:00 | Warehouse stock |
| 6 | 17:15 | Fri Jun 5 22:50 | WO-10054 op 40 | 128GB USB Flash Drive, 10-pack, refresh BP-7381, setup key Storage | 130 | 35 min from Tablets | 5.0 | Wed Jun 10 17:00 | Warehouse stock |
| 7 | 22:50 | Sat Jun 6 12:15 | WO-10150 op 40 | 2TB Portable SSD LM-7276, setup key Storage | 380 | 15 min | 13.2 | Wed Jun 10 17:00 | Warehouse stock |
| Saturday June 6 | |||||||||
| 8 | 12:15 | Tue Jun 9 21:20 | WO-10203 op 40 | 14" Rugged Laptop, 16GB / 256GB NB-7498, setup key Laptops | 475 | 35 min from Storage | 80.5 | Wed Jun 10 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 9 | 21:20 | Wed Jun 10 01:10 | WO-10184 op 40 | 8" Rugged Tablet, 64GB, gray NB-5680, setup key Tablets | 25 | 35 min from Laptops | 3.2 | Thu Jun 11 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 10 | 01:10 | Thu Jun 11 06:05 | WO-10069 op 40 | Mesh Wi-Fi Kit, 3-pack BP-8055, setup key Networking | 365 | 35 min from Tablets | 28.3 | Mon Jun 15 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 11 | 06:05 | Thu Jun 11 22:30 | WO-10209 op 40 | 4-Bay NAS Enclosure, refresh QN-2129, setup key Storage | 435 | 35 min from Networking | 15.8 | Mon Jun 15 17:00 | Warehouse stock |
| 12 | 23:45 | Sat Jun 13 04:10 | WO-10006 op 40 | Thin Client, 4GB / 32GB, gray AF-4236, setup key Desktops | 155 | 35 min from Storage | 27.8 | Tue Jun 16 17:00 | Warehouse stock |
| Saturday June 13 | |||||||||
| 13 | 04:10 | Sun Jun 14 01:55 | WO-10339 op 40 | Thin Client, 4GB / 32GB, gray AF-4236, setup key Desktops | 120 | 15 min | 21.5 | Wed Jun 17 15:00 | ACCOUNT 3915 |
43 more jobs after Sat Jun 13.
CFG-01 Imaging cell 1
Planned downtime
- Wed Jun 24 14:30 to Wed Jun 24 23:00: Image server patching
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Thursday June 4 | |||||||||
| 1 | 06:00 | Thu Jun 4 11:55 | WO-10310 op 45 | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key ACCOUNT 8733 | 80 | 25 min | 5.0 | Tue Jun 9 15:00 | ACCOUNT 8733 |
| Tuesday June 9 | |||||||||
| 2 | 22:50 | Wed Jun 10 22:05 | WO-10344 op 45 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key ACCOUNT 4340 | 240 | 25 min from ACCOUNT 8733 | 14.8 | Fri Jun 12 15:00 | ACCOUNT 4340 |
18 more jobs after Sat Jun 13.
CFG-02 Imaging cell 2
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Thursday June 4 | |||||||||
| 1 | 12:40 | Thu Jun 4 15:35 | WO-10326 op 45 | 14" Laptop, 8-core, 16GB / 512GB LM-5139, setup key ACCOUNT 8321 | 40 | 25 min | 2.5 | Tue Jun 9 15:00 | ACCOUNT 8321 |
| 2 | 15:35 | Fri Jun 5 08:50 | WO-10330 op 45 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key ACCOUNT 8733 | 150 | 25 min from ACCOUNT 8321 | 9.3 | Tue Jun 9 15:00 | ACCOUNT 8733 |
8 more jobs after Sat Jun 13.
PK-01 Pack-out line 1
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 10:45 | WO-10155 op 50 Running | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 203 | 4.2 | Thu Jun 4 17:00 | Warehouse stock | |
| 2 | 10:45 | Wed Jun 3 12:25 | WO-10283 op 50 | USB-C Travel Hub, 7-in-1 VW-4303, setup key DK-03 | 130 | 15 min from MN-03 | 1.4 | Thu Jun 4 17:00 | Warehouse stock |
| 3 | 12:55 | Wed Jun 3 16:05 | WO-10087 op 50 Frozen | 12" Pro Tablet, 256GB KL-2075, setup key TB-01 | 200 | 15 min from DK-03 | 2.9 | Fri Jun 5 17:00 | Warehouse stock |
| 4 | 16:05 | Wed Jun 3 19:25 | WO-10131 op 50 Frozen | 8" Rugged Tablet, 64GB, gray LM-5109, setup key TB-02 | 160 | 10 min from TB-01 | 2.7 | Fri Jun 5 17:00 | Warehouse stock |
| 5 | 19:25 | Thu Jun 4 06:30 | WO-10188 op 50 Frozen | KVM Switch, 2-port 4K, gray NB-7003, setup key DK-01 | 340 | 15 min from TB-02 | 3.8 | Fri Jun 5 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 6 | 06:30 | Thu Jun 4 08:40 | WO-10230 op 50 | 15" Laptop, 12-core, 32GB / 1TB, gray QN-4418, setup key LT-01 | 110 | 15 min from DK-01 | 1.9 | Fri Jun 5 17:00 | Warehouse stock |
| 7 | 15:50 | Thu Jun 4 16:45 | WO-10326 op 50 | 14" Laptop, 8-core, 16GB / 512GB LM-5139, setup key LT-03 | 40 | 10 min from LT-01 | 0.8 | Tue Jun 9 15:00 | ACCOUNT 8321 |
| Friday June 5 | |||||||||
| 8 | 19:05 | Fri Jun 5 21:20 | WO-10117 op 50 | 14" Laptop, 8-core, 16GB / 512GB, gray KL-9462, setup key LT-03 | 100 | 5 min | 2.2 | Tue Jun 9 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 9 | 06:05 | Mon Jun 8 15:00 | WO-10136 op 50 | 14" Laptop, 8-core, 16GB / 512GB LM-5139, setup key LT-03 | 470 | 5 min | 8.3 | Mon Jun 8 17:00 | Warehouse stock |
| 10 | 15:00 | Mon Jun 8 17:50 | WO-10150 op 50 | 2TB Portable SSD LM-7276, setup key ST-04 | 380 | 15 min from LT-03 | 2.6 | Wed Jun 10 17:00 | Warehouse stock |
| 11 | 17:50 | Mon Jun 8 22:15 | WO-10279 op 50 | Ergonomic Mouse, wireless VW-4001, setup key PR-01 | 500 | 15 min from ST-04 | 3.7 | Wed Jun 10 17:00 | Warehouse stock |
| 12 | 22:15 | Tue Jun 9 08:25 | WO-10083 op 50 | Chromebook 11", 4GB / 64GB, refresh KL-1625, setup key LT-02 | 155 | 15 min from PR-01 | 2.9 | Thu Jun 11 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 13 | 08:25 | Tue Jun 9 17:20 | WO-10156 op 50 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 390 | 15 min from LT-02 | 8.2 | Thu Jun 11 17:00 | Warehouse stock |
| 14 | 17:20 | Tue Jun 9 18:10 | WO-10341 op 50 | 15" Laptop, 12-core, 32GB / 1TB BP-4957, setup key LT-01 | 30 | 15 min from MN-03 | 0.6 | Fri Jun 12 12:00 | ENGINEERING |
| 15 | 18:10 | Tue Jun 9 20:50 | WO-10064 op 50 | 1TB NVMe SSD, refresh BP-7490, setup key ST-02 | 230 | 15 min from LT-01 | 1.9 | Fri Jun 12 17:00 | Warehouse stock |
| 16 | 21:50 | Wed Jun 10 15:00 | WO-10203 op 50 | 14" Rugged Laptop, 16GB / 256GB NB-7498, setup key LT-04 | 475 | 15 min from ST-02 | 9.4 | Wed Jun 10 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 17 | 22:20 | Thu Jun 11 10:40 | WO-10344 op 50 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 240 | 10 min from LT-04 | 4.7 | Fri Jun 12 15:00 | ACCOUNT 4340 |
| Friday June 12 | |||||||||
| 18 | 19:35 | Mon Jun 15 09:35 | WO-10255 op 50 Late order | 13" Ultralight Laptop, 16GB / 512GB QN-7885, setup key LT-05 | 350 | 10 min from LT-03 | 6.8 | Fri Jun 12 17:00 | Warehouse stock |
122 more jobs after Sat Jun 13.
PK-02 Pack-out line 2
| # | Start | End | Order | Product | Qty | Changeover | Run h | Order due | For |
|---|---|---|---|---|---|---|---|---|---|
| Wednesday June 3 | |||||||||
| 1 | 06:00 | Wed Jun 3 11:20 | WO-10259 op 50 Running | 22" Touch Monitor, gray VW-1017, setup key MN-05 | 183 | 4.8 | Wed Jun 3 17:00 | Warehouse stock | |
| 2 | 11:50 | Wed Jun 3 13:40 | WO-10315 op 50 Frozen | 22" Touch Monitor VW-1888, setup key MN-05 | 80 | 5 min | 1.8 | Fri Jun 5 15:00 | ACCOUNT 1466 |
| 3 | 13:50 | Wed Jun 3 22:35 | WO-10044 op 50 Frozen | 24" FHD Monitor, IPS BP-5281, setup key MN-01 | 370 | 10 min from MN-05 | 8.1 | Fri Jun 5 17:00 | Warehouse stock |
| 4 | 22:35 | Thu Jun 4 09:00 | WO-10001 op 50 Frozen | Ergonomic Mouse, wireless, gray AF-4219, setup key PR-01 | 390 | 15 min from MN-01 | 3.2 | Mon Jun 8 17:00 | Warehouse stock |
| Thursday June 4 | |||||||||
| 5 | 09:00 | Thu Jun 4 13:55 | WO-10049 op 50 | 27" 4K Monitor, USB-C, refresh BP-5748, setup key MN-02 | 190 | 15 min from PR-01 | 4.2 | Mon Jun 8 17:00 | Warehouse stock |
| 6 | 13:55 | Thu Jun 4 15:50 | WO-10193 op 50 | 10" Tablet, 64GB NB-7024, setup key TB-03 | 120 | 15 min from MN-02 | 1.7 | Mon Jun 8 17:00 | Warehouse stock |
| 7 | 15:50 | Thu Jun 4 20:00 | WO-10208 op 50 | 4-Bay NAS Enclosure, refresh QN-2129, setup key ST-01 | 485 | 15 min from TB-03 | 3.4 | Mon Jun 8 17:00 | Warehouse stock |
| 8 | 20:00 | Thu Jun 4 21:05 | WO-10235 op 50 | Tower Workstation, 32GB / 1TB QN-4437, setup key DT-04 | 30 | 15 min from ST-01 | 0.8 | Mon Jun 8 17:00 | Warehouse stock |
| 9 | 21:05 | Thu Jun 4 22:10 | WO-10269 op 50 | Thin Client, 4GB / 32GB VW-2014, setup key DT-01 | 30 | 10 min from DT-04 | 0.9 | Mon Jun 8 17:00 | Warehouse stock |
| 10 | 22:10 | Fri Jun 5 07:25 | WO-10310 op 50 | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key DT-03 | 80 | 10 min from DT-01 | 2.1 | Tue Jun 9 15:00 | ACCOUNT 8733 |
| Friday June 5 | |||||||||
| 11 | 09:05 | Fri Jun 5 13:00 | WO-10330 op 50 | 27" QHD Monitor, 165Hz, refresh LM-8095, setup key MN-03 | 150 | 15 min from DT-03 | 3.2 | Tue Jun 9 15:00 | ACCOUNT 8733 |
| 12 | 13:00 | Fri Jun 5 16:50 | WO-10030 op 50 | Mesh Wi-Fi Kit, 3-pack, refresh AF-9913, setup key NW-01 | 245 | 15 min from MN-03 | 3.6 | Tue Jun 9 17:00 | Warehouse stock |
| 13 | 16:50 | Fri Jun 5 20:10 | WO-10073 op 50 | 4-Bay NAS Enclosure BP-8568, setup key ST-01 | 415 | 15 min from NW-01 | 2.6 | Tue Jun 9 17:00 | Warehouse stock |
| 14 | 20:10 | Mon Jun 8 06:35 | WO-10141 op 50 | 4K Conference Camera LM-5365, setup key PR-03 | 430 | 15 min from ST-01 | 3.2 | Tue Jun 9 17:00 | Warehouse stock |
| Monday June 8 | |||||||||
| 15 | 06:35 | Mon Jun 8 08:10 | WO-10174 op 50 | 8" Rugged Tablet, 64GB NB-1986, setup key TB-02 | 85 | 15 min from PR-03 | 1.3 | Tue Jun 9 17:00 | Warehouse stock |
| 16 | 08:10 | Mon Jun 8 11:25 | WO-10216 op 50 | USB-C Travel Hub, 7-in-1, gray QN-2461, setup key DK-03 | 230 | 15 min from TB-02 | 2.5 | Tue Jun 9 17:00 | Warehouse stock |
| 17 | 11:25 | Mon Jun 8 12:55 | WO-10298 op 50 | USB-C Dock, 100W, dual display VW-7925, setup key DK-02 | 140 | 10 min from DK-03 | 1.3 | Tue Jun 9 17:00 | Warehouse stock |
| 18 | 12:55 | Mon Jun 8 14:40 | WO-10011 op 50 | All-in-One 24", 16GB / 512GB AF-4434, setup key DT-02 | 45 | 15 min from DK-02 | 1.5 | Wed Jun 10 17:00 | Warehouse stock |
| 19 | 14:40 | Mon Jun 8 15:55 | WO-10054 op 50 | 128GB USB Flash Drive, 10-pack, refresh BP-7381, setup key ST-03 | 130 | 15 min from DT-02 | 1.0 | Wed Jun 10 17:00 | Warehouse stock |
| 20 | 15:55 | Mon Jun 8 16:30 | WO-10098 op 50 | Wi-Fi 6E Router KL-3459, setup key NW-02 | 20 | 15 min from ST-03 | 0.3 | Wed Jun 10 17:00 | Warehouse stock |
| 21 | 16:30 | Mon Jun 8 21:50 | WO-10245 op 50 | Thunderbolt Dock, 4 ports QN-5393, setup key DK-04 | 415 | 15 min from NW-02 | 4.6 | Wed Jun 10 17:00 | Warehouse stock |
| 22 | 21:50 | Tue Jun 9 10:40 | WO-10040 op 50 | KVM Switch, 2-port 4K BP-5055, setup key DK-01 | 540 | 10 min from DK-04 | 5.2 | Thu Jun 11 17:00 | Warehouse stock |
| Tuesday June 9 | |||||||||
| 23 | 10:40 | Tue Jun 9 13:30 | WO-10127 op 50 | 24-Port PoE Switch, managed, refresh LM-3668, setup key NW-04 | 155 | 15 min from DK-01 | 2.6 | Thu Jun 11 17:00 | Warehouse stock |
| 24 | 13:30 | Tue Jun 9 16:10 | WO-10226 op 50 | Mini PC, 8-core, 16GB / 512GB, refresh QN-4241, setup key DT-03 | 95 | 15 min from NW-04 | 2.4 | Thu Jun 11 17:00 | Warehouse stock |
| 25 | 16:10 | Tue Jun 9 18:25 | WO-10265 op 50 | 24-Port PoE Switch, managed VW-1670, setup key NW-04 | 125 | 15 min from DT-03 | 2.0 | Thu Jun 11 17:00 | Warehouse stock |
| 26 | 18:25 | Tue Jun 9 22:00 | WO-10021 op 50 | Mini PC, 8-core, 16GB / 512GB AF-7495, setup key DT-03 | 85 | 15 min from NW-04 | 2.8 | Fri Jun 12 17:00 | Warehouse stock |
| Wednesday June 10 | |||||||||
| 27 | 06:00 | Wed Jun 10 06:40 | WO-10184 op 50 | 8" Rugged Tablet, 64GB, gray NB-5680, setup key TB-02 | 25 | 15 min from DT-03 | 0.4 | Thu Jun 11 17:00 | Warehouse stock |
| 28 | 06:40 | Wed Jun 10 08:10 | WO-10108 op 50 | Wi-Fi 6 Access Point, ceiling KL-5384, setup key NW-03 | 100 | 15 min from TB-02 | 1.2 | Fri Jun 12 17:00 | Warehouse stock |
| 29 | 08:10 | Wed Jun 10 11:15 | WO-10165 op 50 | 34" Ultrawide Monitor, curved, gray LM-9032, setup key MN-04 | 80 | 15 min from NW-03 | 2.3 | Fri Jun 12 17:00 | Warehouse stock |
| 30 | 12:35 | Wed Jun 10 20:40 | WO-10289 op 50 | 27" 4K Monitor, USB-C VW-6003, setup key MN-02 | 355 | 10 min from MN-04 | 7.4 | Fri Jun 12 17:00 | Warehouse stock |
| 31 | 20:40 | Thu Jun 11 06:45 | WO-10026 op 50 | 1TB NVMe SSD AF-7757, setup key ST-02 | 450 | 15 min from MN-02 | 2.8 | Mon Jun 15 17:00 | Warehouse stock |
| Thursday June 11 | |||||||||
| 32 | 06:45 | Thu Jun 11 13:20 | WO-10069 op 50 | Mesh Wi-Fi Kit, 3-pack BP-8055, setup key NW-01 | 365 | 15 min from ST-02 | 5.8 | Mon Jun 15 17:00 | Warehouse stock |
| 33 | 13:20 | Thu Jun 11 17:45 | WO-10113 op 50 | Mini PC, 8-core, 16GB / 512GB, gray KL-9030, setup key DT-03 | 140 | 15 min from NW-01 | 4.2 | Mon Jun 15 17:00 | Warehouse stock |
| Friday June 12 | |||||||||
| 34 | 06:00 | Fri Jun 12 08:35 | WO-10170 op 50 | Tower Workstation, 32GB / 1TB, refresh LM-9819, setup key DT-04 | 90 | 10 min from DT-03 | 2.4 | Mon Jun 15 17:00 | Warehouse stock |
| 35 | 08:35 | Fri Jun 12 12:25 | WO-10209 op 50 | 4-Bay NAS Enclosure, refresh QN-2129, setup key ST-01 | 435 | 15 min from DT-04 | 3.1 | Mon Jun 15 17:00 | Warehouse stock |
| 36 | 12:25 | Fri Jun 12 19:45 | WO-10294 op 50 | 34" Ultrawide Monitor, curved VW-6938, setup key MN-04 | 265 | 15 min from ST-01 | 6.6 | Mon Jun 15 17:00 | Warehouse stock |
| 37 | 20:30 | Fri Jun 12 22:30 | WO-10093 op 50 | 14" Laptop, 8-core, 16GB / 512GB, refresh KL-2645, setup key LT-03 | 90 | 15 min from MN-04 | 1.8 | Tue Jun 16 17:00 | Warehouse stock |
121 more jobs after Sat Jun 13.
Exceptions
Everything the schedule could not make work, with the likely cause and a next step. Red is high, amber medium, grey low.
Adds 144 open hours over the next two weeks and cuts late orders from 41 to 25 and weighted lateness by 43%. To adopt it, set allow_overtime to Y and list SMT, PK in overtime_work_centers.
Late orders 41
Waiting for material 30
Crew limits 3
Downtime 2
Frozen window 1
Changes since the last run
Compared with the schedule published as of Tue Jun 2 06:00. Orders whose on-time status flipped are listed first.
113 of 198 operations due to start in the next 7 days held within 4 h. Across the full horizon, 30%.
24 crossed their due date
Not in the last schedule
Completed since the last run
Headline measures
1412 open operations compared. In the next 7 days, 85 moved more than 4 h (77 of them later) and 46 changed resource. Further out, work reshuffles more freely because nothing there has been released to the floor.
| Measure | Now | Last run | Change |
|---|---|---|---|
| On-time orders | 86.2% | 91.8% | −5.5% |
| Weighted on-time | 85.4% | 89.3% | −3.8% |
| Late orders | 41 | 25 | +16 |
| Order-days late | 31.2 | 11.9 | +19.2 |
| Open orders | 298 | 304 | −6 |
| Utilization | 77.4% | 78.0% | −0.6% |
New and finished orders
New
| Order | Product | Qty | Customer | Due | Status |
|---|---|---|---|---|---|
| WO-10344 | 14" Laptop, 8-core, 16GB / 512GB, refresh | 240 | ACCOUNT 4340 | Fri Jun 12 15:00 | On time |
Finished
| Order | Product | Qty | Finished | Due |
|---|---|---|---|---|
| WO-10329 | 14" Laptop, 8-core, 16GB / 512GB, refresh | 400 | Tue Jun 2 06:55 | Mon Jun 1 15:00 |
| WO-10317 | All-in-One 24", 16GB / 512GB, gray | 150 | Tue Jun 2 14:20 | Tue Jun 2 15:00 |
| WO-10121 | 27" QHD Monitor, 165Hz | 355 | Tue Jun 2 08:35 | Wed Jun 3 17:00 |
| WO-10220 | 8-Port Gigabit Switch | 160 | Tue Jun 2 13:00 | Wed Jun 3 17:00 |
| WO-10302 | Mechanical Keyboard, TKL | 330 | Tue Jun 2 16:55 | Wed Jun 3 17:00 |
| WO-10015 | 4-Bay NAS Enclosure, gray | 150 | Tue Jun 2 09:10 | Thu Jun 4 17:00 |
| WO-10102 | 1080p Webcam with mic | 310 | Tue Jun 2 19:55 | Thu Jun 4 17:00 |
Orders whose finish moved
Moves of more than 8 hours. A plus sign means later.
| Order | Product | Was | Now | Moved | Due | |
|---|---|---|---|---|---|---|
| WO-10258 | 13" Ultralight Laptop, 16GB / 512GB | Tue Jul 21 15:55 | Mon Jul 27 12:40 | +5.9 d | Fri Jul 24 17:00 | Now late |
| WO-10257 | 13" Ultralight Laptop, 16GB / 512GB | Thu Jul 9 16:05 | Mon Jul 13 13:25 | +3.9 d | Fri Jul 10 17:00 | Now late |
| WO-10255 | 13" Ultralight Laptop, 16GB / 512GB | Thu Jun 11 21:10 | Mon Jun 15 09:35 | +3.5 d | Fri Jun 12 17:00 | Now late |
| WO-10191 | KVM Switch, 2-port 4K, gray | Tue Jul 14 07:50 | Fri Jul 17 19:30 | +3.5 d | Fri Jul 17 17:00 | Now late |
| WO-10205 | 14" Rugged Laptop, 16GB / 256GB | Tue Jul 7 10:45 | Fri Jul 10 11:00 | +3.0 d | Wed Jul 8 17:00 | Now late |
| WO-10023 | Mini PC, 8-core, 16GB / 512GB | Wed Jul 8 07:30 | Fri Jul 10 20:00 | +2.5 d | Fri Jul 10 17:00 | Now late |
| WO-10267 | 24-Port PoE Switch, managed | Tue Jul 7 19:50 | Thu Jul 9 18:25 | +47 h | Thu Jul 9 17:00 | Now late |
| WO-10228 | Mini PC, 8-core, 16GB / 512GB, refresh | Wed Jul 8 21:55 | Fri Jul 10 16:30 | +43 h | Thu Jul 9 17:00 | Now late |
| WO-10129 | 24-Port PoE Switch, managed, refresh | Thu Jul 9 08:25 | Fri Jul 10 13:55 | +30 h | Thu Jul 9 17:00 | Now late |
| WO-10187 | 8" Rugged Tablet, 64GB, gray | Wed Jul 22 14:45 | Thu Jul 23 19:15 | +28 h | Thu Jul 23 17:00 | Now late |
| WO-10119 | 14" Laptop, 8-core, 16GB / 512GB, gray | Tue Jul 7 17:10 | Mon Jul 6 15:55 | −25 h | Tue Jul 7 17:00 | Back on time |
| WO-10186 | 8" Rugged Tablet, 64GB, gray | Wed Jul 8 22:30 | Thu Jul 9 22:40 | +24 h | Thu Jul 9 17:00 | Now late |
| WO-10042 | KVM Switch, 2-port 4K | Fri Jul 10 13:45 | Thu Jul 9 16:05 | −22 h | Thu Jul 9 17:00 | Back on time |
| WO-10281 | Ergonomic Mouse, wireless | Wed Jul 8 13:30 | Thu Jul 9 10:35 | +21 h | Wed Jul 8 17:00 | Now late |
| WO-10296 | 34" Ultrawide Monitor, curved | Mon Jul 13 12:45 | Tue Jul 14 09:05 | +20 h | Mon Jul 13 17:00 | Now late |
| WO-10134 | 8" Rugged Tablet, 64GB, gray | Fri Jul 17 08:25 | Fri Jul 17 21:25 | +13 h | Fri Jul 17 17:00 | Now late |
| WO-10116 | Mini PC, 8-core, 16GB / 512GB, gray | Mon Jul 27 10:55 | Mon Jul 27 23:00 | +12 h | Mon Jul 27 17:00 | Now late |
| WO-10308 | All-in-One 24", 16GB / 512GB, gray | Tue Jun 30 06:50 | Tue Jun 30 18:00 | +11 h | Tue Jun 30 15:00 | Now late |
| WO-10233 | 15" Laptop, 12-core, 32GB / 1TB, gray | Fri Jul 17 10:45 | Fri Jul 17 21:20 | +11 h | Fri Jul 17 17:00 | Now late |
| WO-10176 | 8" Rugged Tablet, 64GB | Tue Jul 7 20:20 | Tue Jul 7 09:50 | −10 h | Tue Jul 7 17:00 | Back on time |
| WO-10213 | 4-Bay NAS Enclosure, refresh | Mon Jul 13 09:30 | Mon Jul 13 19:45 | +10 h | Mon Jul 13 17:00 | Now late |
| WO-10218 | USB-C Travel Hub, 7-in-1, gray | Tue Jul 7 22:55 | Tue Jul 7 12:55 | −10 h | Tue Jul 7 17:00 | Back on time |
| WO-10201 | Chromebook 11", 4GB / 64GB | Tue Jul 28 11:05 | Tue Jul 28 20:55 | +9.8 h | Tue Jul 28 17:00 | Now late |
| WO-10318 | 34" Ultrawide Monitor, curved, gray | Thu Jul 2 08:20 | Thu Jul 2 17:50 | +9.5 h | Thu Jul 2 15:00 | Now late |
| WO-10172 | Tower Workstation, 32GB / 1TB, refresh | Wed Jul 8 16:25 | Mon Jul 13 15:45 | +5.0 d | Mon Jul 13 17:00 | |
| WO-10237 | Tower Workstation, 32GB / 1TB | Thu Jul 2 18:25 | Mon Jul 6 12:25 | +3.8 d | Mon Jul 6 17:00 | |
| WO-10175 | 8" Rugged Tablet, 64GB | Thu Jun 18 15:05 | Mon Jun 22 07:55 | +3.7 d | Tue Jun 23 17:00 | |
| WO-10301 | USB-C Dock, 100W, dual display | Fri Jul 17 17:25 | Tue Jul 21 10:00 | +3.7 d | Tue Jul 21 17:00 | |
| WO-10271 | Thin Client, 4GB / 32GB | Thu Jul 2 22:25 | Mon Jul 6 13:40 | +3.6 d | Mon Jul 6 17:00 | |
| WO-10051 | 27" 4K Monitor, USB-C, refresh | Thu Jul 2 17:20 | Mon Jul 6 07:35 | +3.6 d | Mon Jul 6 17:00 | |
| WO-10195 | 10" Tablet, 64GB | Thu Jul 2 20:00 | Mon Jul 6 07:20 | +3.5 d | Mon Jul 6 17:00 | |
| WO-10214 | 4-Bay NAS Enclosure, refresh | Fri Jul 17 16:00 | Mon Jul 20 12:55 | +2.9 d | Mon Jul 20 17:00 | |
| WO-10238 | Tower Workstation, 32GB / 1TB | Fri Jul 17 17:05 | Mon Jul 20 14:00 | +2.9 d | Mon Jul 20 17:00 | |
| WO-10272 | Thin Client, 4GB / 32GB | Fri Jul 17 18:30 | Mon Jul 20 15:25 | +2.9 d | Mon Jul 20 17:00 | |
| WO-10215 | 4-Bay NAS Enclosure, refresh | Mon Jul 27 16:50 | Fri Jul 24 19:55 | −2.9 d | Mon Jul 27 17:00 | |
| WO-10144 | 4K Conference Camera | Fri Jun 26 16:25 | Mon Jun 29 12:25 | +2.8 d | Tue Jun 30 17:00 | |
| WO-10006 | Thin Client, 4GB / 32GB, gray | Fri Jun 12 15:00 | Mon Jun 15 10:35 | +2.8 d | Tue Jun 16 17:00 | |
| WO-10142 | 4K Conference Camera | Fri Jun 12 18:10 | Mon Jun 15 13:45 | +2.8 d | Tue Jun 16 17:00 | |
| WO-10004 | Ergonomic Mouse, wireless, gray | Fri Jul 17 13:00 | Mon Jul 20 08:30 | +2.8 d | Mon Jul 20 17:00 | |
| WO-10240 | 1TB NVMe SSD, gray | Fri Jun 12 21:20 | Mon Jun 15 16:25 | +2.8 d | Tue Jun 16 17:00 | |
| WO-10295 | 34" Ultrawide Monitor, curved | Fri Jun 26 12:35 | Mon Jun 29 07:05 | +2.8 d | Mon Jun 29 17:00 | |
| WO-10137 | 14" Laptop, 8-core, 16GB / 512GB | Fri Jun 19 21:30 | Mon Jun 22 15:45 | +2.8 d | Mon Jun 22 17:00 | |
| WO-10052 | 27" 4K Monitor, USB-C, refresh | Fri Jul 17 15:45 | Mon Jul 20 09:25 | +2.7 d | Mon Jul 20 17:00 | |
| WO-10274 | Wi-Fi 6E Router, gray | Fri Jun 12 22:25 | Mon Jun 15 15:25 | +2.7 d | Tue Jun 16 17:00 | |
| WO-10029 | 1TB NVMe SSD | Fri Jul 24 22:35 | Mon Jul 27 13:00 | +2.6 d | Mon Jul 27 17:00 | |
| WO-10297 | 34" Ultrawide Monitor, curved | Fri Jul 24 21:20 | Mon Jul 27 09:30 | +2.5 d | Mon Jul 27 17:00 | |
| WO-10291 | 27" 4K Monitor, USB-C | Fri Jul 10 15:40 | Wed Jul 8 11:35 | −2.2 d | Fri Jul 10 17:00 | |
| WO-10316 | 34" Ultrawide Monitor, curved | Fri Jul 24 12:35 | Wed Jul 22 09:30 | −2.1 d | Fri Jul 24 15:00 | |
| WO-10027 | 1TB NVMe SSD | Wed Jun 24 22:35 | Fri Jun 26 09:35 | +35 h | Mon Jun 29 17:00 | |
| WO-10206 | 14" Rugged Laptop, 16GB / 256GB | Wed Jul 22 21:35 | Fri Jul 24 08:35 | +35 h | Wed Jul 22 17:00 | |
| WO-10342 | Chromebook 11", 4GB / 64GB, refresh | Mon Jun 15 23:00 | Wed Jun 17 09:50 | +35 h | Fri Jun 19 12:00 | |
| WO-10250 | 4K Conference Camera, gray | Mon Jun 15 22:10 | Wed Jun 17 09:00 | +35 h | Thu Jun 18 17:00 | |
| WO-10211 | 4-Bay NAS Enclosure, refresh | Thu Jun 25 15:05 | Fri Jun 26 20:25 | +29 h | Mon Jun 29 17:00 | |
| WO-10070 | Mesh Wi-Fi Kit, 3-pack | Thu Jun 25 11:50 | Fri Jun 26 15:25 | +28 h | Mon Jun 29 17:00 | |
| WO-10111 | Wi-Fi 6 Access Point, ceiling | Thu Jul 23 17:50 | Wed Jul 22 14:30 | −27 h | Fri Jul 24 17:00 | |
| WO-10167 | 34" Ultrawide Monitor, curved, gray | Thu Jul 9 21:25 | Wed Jul 8 18:25 | −27 h | Fri Jul 10 17:00 | |
| WO-10343 | 14" Laptop, 8-core, 16GB / 512GB, refresh | Mon Jun 22 10:00 | Tue Jun 23 11:45 | +26 h | Fri Jun 26 12:00 | |
| WO-10124 | 27" QHD Monitor, 165Hz | Tue Jul 14 15:30 | Wed Jul 15 16:25 | +25 h | Wed Jul 15 17:00 | |
| WO-10158 | 27" QHD Monitor, 165Hz, refresh | Wed Jun 24 16:40 | Tue Jun 23 15:50 | −25 h | Thu Jun 25 17:00 | |
| WO-10019 | 4-Bay NAS Enclosure, gray | Tue Jul 28 17:05 | Wed Jul 29 17:55 | +25 h | Thu Jul 30 17:00 | |
| WO-10204 | 14" Rugged Laptop, 16GB / 256GB | Tue Jun 23 16:05 | Wed Jun 24 16:45 | +25 h | Wed Jun 24 17:00 | |
| WO-10185 | 8" Rugged Tablet, 64GB, gray | Tue Jun 23 08:35 | Wed Jun 24 09:00 | +24 h | Thu Jun 25 17:00 | |
| WO-10331 | 22" Touch Monitor | Wed Jul 8 16:15 | Thu Jul 9 16:15 | +24 h | Wed Jul 8 15:00 | |
| WO-10262 | 22" Touch Monitor, gray | Wed Jul 15 21:05 | Thu Jul 16 21:00 | +24 h | Wed Jul 15 17:00 | |
| WO-10100 | Wi-Fi 6E Router | Wed Jul 8 14:05 | Tue Jul 7 14:30 | −24 h | Wed Jul 8 17:00 | |
| WO-10305 | Mechanical Keyboard, TKL | Wed Jul 15 14:50 | Tue Jul 14 15:20 | −24 h | Wed Jul 15 17:00 | |
| WO-10163 | 27" QHD Monitor, 165Hz, refresh | Wed Jul 29 17:25 | Thu Jul 30 16:05 | +23 h | Thu Jul 30 17:00 | |
| WO-10224 | 8-Port Gigabit Switch | Tue Jul 28 15:50 | Wed Jul 29 14:25 | +23 h | Wed Jul 29 17:00 | |
| WO-10253 | 4K Conference Camera, gray | Wed Jul 29 19:05 | Tue Jul 28 21:00 | −22 h | Thu Jul 30 17:00 | |
| WO-10135 | 8" Rugged Tablet, 64GB, gray | Thu Jul 30 09:00 | Fri Jul 31 06:55 | +22 h | Fri Jul 31 17:00 | |
| WO-10062 | 128GB USB Flash Drive, 10-pack | Tue Jul 28 21:30 | Wed Jul 29 19:25 | +22 h | Thu Jul 30 17:00 | |
| WO-10336 | 15" Laptop, 12-core, 32GB / 1TB | Tue Jul 21 09:00 | Wed Jul 22 06:50 | +22 h | Thu Jul 23 15:00 | |
| WO-10047 | 24" FHD Monitor, IPS | Thu Jul 16 13:40 | Fri Jul 17 10:45 | +21 h | Fri Jul 17 17:00 | |
| WO-10090 | 12" Pro Tablet, 256GB | Thu Jul 16 16:45 | Fri Jul 17 13:50 | +21 h | Fri Jul 17 17:00 | |
| WO-10322 | 12" Pro Tablet, 256GB | Thu Jul 16 18:00 | Fri Jul 17 15:05 | +21 h | Mon Jul 20 15:00 | |
| WO-10303 | Mechanical Keyboard, TKL | Mon Jun 15 14:10 | Tue Jun 16 11:10 | +21 h | Wed Jun 17 17:00 | |
| WO-10196 | 10" Tablet, 64GB | Thu Jul 16 20:55 | Fri Jul 17 17:55 | +21 h | Mon Jul 20 17:00 | |
| WO-10306 | Mechanical Keyboard, TKL | Tue Jul 28 20:25 | Wed Jul 29 16:40 | +20 h | Wed Jul 29 17:00 | |
| WO-10081 | Thin Client, 4GB / 32GB, gray | Tue Jul 28 12:20 | Mon Jul 27 16:15 | −20 h | Wed Jul 29 17:00 | |
| WO-10096 | 14" Laptop, 8-core, 16GB / 512GB, refresh | Mon Jul 27 14:10 | Tue Jul 28 09:55 | +20 h | Tue Jul 28 17:00 |
Showing 80 of 142. The full list is in schedule_changes.csv.
Inputs and method
What this schedule was built from, how it was built, and how to refresh it.
Refreshing the schedule
The page is static. New data reaches it when the scheduler runs again and rewrites this file in place.
- Drop updated exports into the
inputfolder. Open work orders, material arrivals and shop-floor actuals change most often. Column layouts are listed at the bottom of this page. - Run
python schedule.py, or leavepython schedule.py --watchrunning and it reschedules within seconds of any file changing. - Browsers showing this page pick up the new schedule on their next reload, every 5 minutes. No scripts are involved; the page uses an HTML refresh tag.
- The schedule it replaces is archived in
output/history. Operations inside the frozen window keep the slot the floor was given.
python schedule.py # schedule once python schedule.py --watch # reschedule when inputs change python schedule.py --passes 0 # skip the improvement passes python tools/roll_forward.py --to "2026-06-04 06:00" # sample data: advance a day
Integrity checks
Every run re-checks the finished schedule against the raw calendars and rules, separately from the engine.
Built in 24.1 s. 20 of 24 operations in the frozen window held in place.
Sequencing
Orders are ranked by earliest due date, then scheduled one at a time on whichever eligible resource finishes each step first. 30 improvement passes tried moving late orders earlier in the sequence and kept 8 of 54 changes, cutting weighted lateness by 24%.
| Rule, before improvement passes | On time | Late | Late, weight 2+ | Weighted days late |
|---|---|---|---|---|
| Earliest due date | 83.6% | 49 | 7 | 61 |
| Least slack | 45.0% | 164 | 15 | 336 |
| Priority, then due date | 32.9% | 200 | 12 | 1,200 |
| Customer tier, then due date | 29.5% | 210 | 9 | 1,637 |
| Least slack, weighted by tier | 25.5% | 222 | 0 | 1,743 |
| Critical ratio | 34.2% | 196 | 13 | 2,767 |
| Shortest work first | 46.0% | 161 | 15 | 5,035 |
Every rule was run on the same data. The highlighted row is the rule in use; change it with sequencing_rule in parameters.csv.
How the engine works
Time is a grid of 5-minute slots. Each resource gets a working mask from its shift calendar, breaks, plant holidays, optional overtime and planned downtime. An operation uses working slots only, so it pauses overnight and picks up on the next shift.
Run time is quantity times minutes per unit, divided by the resource's stations, efficiency and speed. Changeovers depend on what ran before, from the setup rules and changeover matrix. A job can slot into an earlier gap when it fits and the job after it still has room for its own changeover.
Steps overlap in transfer batches: the next step may start once the first batch is done, but may not finish before the last batch reaches it. Move times, order release and material arrival all hold work back. Shared crews limit how many lines or banks run at once on each shift.
Shop-floor actuals remove finished steps and lock running ones in place. Operations due to start inside the frozen window keep the slot they had in the last published schedule.
For each late order the engine also schedules it alone on an empty plant. If it is still late, the cause is lead time or material; if not, the cause is the queue where it waited longest.
Input files
Read from the input folder for this run. The fingerprint changes whenever a file's contents change.
| File | Rows | Last changed | Fingerprint | |
|---|---|---|---|---|
parameters.csv | Required | 20 | 2026-09-29 12:59 | 9f08416002 |
resources.csv | Required | 24 | 2026-09-29 12:58 | 46b0179e1e |
calendars.csv | Required | 61 | 2026-09-29 12:58 | b36599059a |
products.csv | Required | 68 | 2026-09-29 12:58 | 09ec4dd3b8 |
routings.csv | Required | 408 | 2026-09-29 12:58 | 7e4366388a |
work_orders.csv | Required | 344 | 2026-09-29 12:59 | f7740bfca4 |
holidays.csv | Optional | 3 | 2026-09-29 12:58 | 5bda2b142d |
downtime.csv | Optional | 6 | 2026-09-29 12:59 | 5519661f69 |
labor_pools.csv | Optional | 49 | 2026-09-29 12:58 | d5ff899bf8 |
setup_rules.csv | Optional | 6 | 2026-09-29 12:58 | 0b4fb8e13a |
changeover_matrix.csv | Optional | 3 | 2026-09-29 12:58 | 32f948baa9 |
materials.csv | Optional | 1,341 | 2026-09-29 12:59 | aa0eefd11f |
actuals.csv | Optional | 203 | 2026-09-29 12:59 | 05db1a1286 |
customer_tiers.csv | Optional | 6 | 2026-09-29 12:58 | c86b44ba09 |
Parameters
From parameters.csv, with defaults for anything left out.
site_name | Reno Integration Center |
schedule_start | 2026-06-03 06:00 |
calendar_origin | 2026-05-11 |
calendar_weeks | 22 |
sequencing_rule | due_date |
optimize_passes | 30 |
allow_overtime | N |
overtime_work_centers | FA,PK |
frozen_hours | 24 |
transfer_batch_qty | 50 |
release_policy | asap |
jit_buffer_days | 3 |
at_risk_hours | 8 |
stability_threshold_hours | 4 |
utilization_window_days | 14 |
display_days_before | 2 |
display_days_after | 40 |
html_refresh_seconds | 300 |
resource_stickiness_hours | 2 |
stability_horizon_days | 7 |
Data validation
All input files loaded without errors or warnings.
Input layouts
CSV with a header row. Dates as YYYY-MM-DD HH:MM. Column order does not matter.
| File | Columns | Notes |
|---|---|---|
work_orders.csv | wo_id, sku, qty, release, due, priority, customer, tier, order_type, reference, special_requirements, status | Open orders from ERP. special_requirements such as 10:npi forces a capability on one step. Status Closed drops the order. |
actuals.csv | wo_id, op_seq, resource_id, status, qty_done, actual_start, actual_end | Shop-floor feedback. complete removes the step; started locks it on its resource with the quantity left. |
materials.csv | wo_id, component, supplier, qty_required, eta, status | Anything not On hand holds the first step until its ETA. |
routings.csv | sku, op_seq, work_center, description, run_min_per_unit, setup_min, required_capability, allow_overlap, move_min_after, order_types | Minutes per unit at one station. order_types limits a step to some order types. |
resources.csv | resource_id, name, work_center, stations, efficiency, speed_factor, calendar_id, capabilities, labor_pool, crew_per_run, initial_setup_key, cost_per_hour, preference | Capabilities are separated by semicolons. |
calendars.csv | calendar_id, day, start, end, kind, shift_name | kind is shift, break or overtime. An end before the start crosses midnight. |
labor_pools.csv | pool_id, name, day, start, end, headcount | Crew available by shift. Fractions are allowed. |
setup_rules.csv | work_center, key_attribute, group_attribute, same_key_min, same_group_min, different_group_min | Keys can be family, category, customer, sku or brand. |
changeover_matrix.csv | work_center, from_key, to_key, minutes | Overrides the rules for specific pairs. |
downtime.csv | resource_id, start, end, reason | Planned maintenance and breakdowns. |
holidays.csv | date, name, applies_to | applies_to lists calendar IDs, or all. |
products.csv | sku, description, category, family, brand, price, case_pack | |
customer_tiers.csv | tier, weight, otd_target_pct, description | Weight sets how much lateness costs in the improvement passes. |
parameters.csv | parameter, value, description | Listed in full above. |